Page 1: GBAS Operational Implementations

DFS experiences and capabilities

[email protected]

GBAS Operational Implementations

Page 2: GBAS Operational Implementations

Agenda

DFS GBAS Installations

Bremen and Frankfurt

GBAS Tools

IGM Independent GBAS Monitor

GIMOS GNSS Interference Monitoring System

VDB Test Transitter

GPS Site Survey

Ground Testing

Flight Inspection

DFS Services

2

Page 3: GBAS Operational Implementations

3

GBAS Ground Station Installations in Germany

DFS Headquarters

Tower

Center

DFS Academy

AIS

GBAS ground station

Braunschweig DLR

North Sea

Baltic Sea

GBAS Bremen

GBAS Frankfurt

Netherlands

Denmark

Belgium

France

Switzerland Austria

Poland

Czech

RepublicLuxembourg

Page 4: GBAS Operational Implementations

4

GBAS Installation Bremen

Page 5: GBAS Operational Implementations

5

Honeywell SLS-4000 cabinetGPS L1 reference antenna GPS reference receiver (4x)

VDB data link antenna

GBAS Installation Bremen

Page 6: GBAS Operational Implementations

6

GBAS Installation Bremen

RSMU1

RSMU2

RSMU4

RSMU3

SLS-4000 + VDB

runway 23 runway 09 / 27

200 m

Page 7: GBAS Operational Implementations

7

GBAS Implementation Steps

operational concept

site survey for GBAS ground station (GNSS, VDB)

VDB frequency coordination, official approvals, site preparation

procedure design (final approach segment - FAS data, AIP)

factory acceptance testing (FAT)

GBAS ground station installation, configuration

ATC & maintenance interfaces (implementation, testing, training)

ground testing (IGM, GIMOS)

flight inspection (certified GBAS flight inspection aircraft)

site acceptance testing (SAT)

maintenance concept (spare parts, maintenance contract, …)

operational safety assessment

ATCO training (briefing)

technical & operational approval (facility approval, service approval)

→ EC Declaration of Verification

Page 8: GBAS Operational Implementations

GBAS Frankfurt

8

GBAS Site

Page 9: GBAS Operational Implementations

GBAS Frankfurt

9

Page 10: GBAS Operational Implementations

10

Frankfurt Installation

10

Page 11: GBAS Operational Implementations

Monitoring Systems – IGM

Independent GBAS Monitor

2 different GNSS receivers (SF GPS & DF SBAS)

VDB ground station data link receiver

Online GBAS CAT I receiver simulation

Certified GBAS CAT I MMR

in mobile (laptop) or stationary configuration (server) to support

GNSS data recording (ICAO SARPs Att. D.11)

GNSS performance assessment (ICAO SARPs Att. D.12)

GBAS ground testing (ICAO Doc 8071 Vol. II, 4.2)

2005 IGM development started

2010 update of server & laptop HW & operating system

2011 GAST D update phase 1 (HETEREX)

handling of new GAST D message types

add online GAST D receiver simulation (algorithms TU

BS)

2012 GAST D update phase 2 (SESAR 15.3.6)

additional online tools to support GAST D validation

11

Page 12: GBAS Operational Implementations

Monitoring Systems – GIMOS

GNSS Interference Monitoring System

programmable real time spectrum analyzer

TSO C-129 certified GPS receiver

embedded PC

to support mobile and stationary measurements of

GNSS interference (GPS NPA, SBAS, GBAS)

VDB interference (GBAS)

VDB field strength (GBAS)

1998 GIMOS I development started (GNSS interference)

2000 GIMOS II second generation introduced

2006 GIMOS II GBAS VDB capabilities added

2011 GIMOS III development started

improve performance for GAST D VDB measurements

(more than one VDB Transmitter)

new hardware (PC, spectrum analyzer)

update software capabilities

2014 GIMOS IV interference monitoring implemented12

Page 13: GBAS Operational Implementations

Monitoring System GIMOS (2)

13

ICAO CW Interference Mask

GPS L1 interference mode VDB field strength mode

Page 14: GBAS Operational Implementations

VDB Measurements – VDB Transmitter Setup

VDB transmitter setup to support

Lab measurements

improve setup for unwanted emission & adjacent

channel measurements

(ground testing, type approval)

develop frequency coordination criteria

(SESAR 15.3.6)

Site measurements

Munich 2010 – VDB site survey for GBAS CAT I

(ground & flight measurements)

Frankfurt 2011 – VDB ground coverage for GBAS

CAT II/III (GAST D, SESAR 15.3.6)

Zurich 2011 – support Skyguide in VDB site survey

for GBAS CAT I (ground measurements)

Frankfurt 2014 - VDB site survey for GBAS CAT I

(ground & flight measurements)

14

Page 15: GBAS Operational Implementations

15

Equipment for GPS siting

Page 16: GBAS Operational Implementations

GBAS Ground Testing (Doc 8071)

GBAS ground testing divided into blocks

GNSS interference (GIMOS)

Survey of antenna phase center position

(geodetic equipment)

RF measurements (GIMOS)

VDB runway coverage & interference (IGM, GIMOS)

FAS data check on runway thresholds (IGM)

Performance evaluation & data content (IGM)

Matrix in DFS maintenance directive to allow more

flexible response to certain maintenance activities

16

Page 17: GBAS Operational Implementations

GBAS Flight Testing – Flight Inspection Aircraft

GBAS CAT I flight inspection performed by FCS

(Flight Calibration Services, Braunschweig)

Certified flight inspection aircraft King Air 350

Certified flight inspection system (FIS)

modified GBAS MMR integrated

MMR guidance signal can be switched to

primary avionics incl. autopilot

FIS software is now GBAS capable

Licensed crew (pilots, FI engineer)

02/08/2011 First GBAS flight inspection in Europe

with certified aircraft, equipment and crew performed

in Bremen

GBAS Flight Inspection performed at Bremen,

Frankfurt, Braunschweig, Zürich, Malaga

17

source: FCS

Page 18: GBAS Operational Implementations

DFS Experience & Services

18

DFS has 16 years of experience in GBAS standardisation, testing & implementation

• ICAO Navigation Systems Panel (NSP)

• EUROCAE WG28 (ED-114 GBAS ground station MOPS)

• IGWG - International GBAS Working Group (EUROCONTROL, FAA)

• EUROCONTROL LATO - Landing & Guided Take-Off Task Force

• test implementations in Munich 1995, Frankfurt 1998, 2000, 2013, Bremen 2007, 2008

• world’s first ICAO GBAS CAT I implementation in Bremen 2012

• ICAO GBAS CAT I implementation in Frankfurt 2014

Your partner for

• GBAS project planning

• GBAS ground station siting, installation

• operational concept, GLS procedure planning

• GBAS ground & flight testing/inspection

• GBAS monitoring & GNSS interference monitoring, etc.

contact [email protected], phone +49 6103 707 - 2051

Page 19: GBAS Operational Implementations

19

Thank You !