ge monogram ® installation instructions - partselect...* based on36" countertop height....
TRANSCRIPT
-
GE Monogram ®
Installation
Instructions
36" Island
Vent Hood
Model
ZV850
Monogram°
-
Before you begin - Read these instructions completely and careflllly.
IMPORTANT - Save these instructions for local inspector's use.IMPORTANT - OBSERVE AI,L GOVERNING (;ODES AND ORDINANCES.
Note to Installer - Be sure to leave these instructions with the Consumer.
Note to Consumer - Keep these instructions with your Owner's Manual for flmne reference.
WARNING: This appliance must be properly grounded. See "Electrical Supply," page 5.
If you have a question concerning theinstallation of this product, call the GE AnswerCenter ® Consumer Information Service at
800.626.2000, 24 hours a day, 7 days a week.
If you received a damaged vent hood, youshould immediately contact your dealer orbuilder.
For Monogram local service in your area,1.800.444.1845.
For Monogram service in Canada, call1.888.880.3030.
For Monogram Parts and Accessories, call1.800.626.2002.
(;cAUTION!
Due to the weight and size of this vent hoodand to reduce the risk of personal i_jury ordamage to the product, TWO PEOPI,E AREREO,.UIRED FOR PROPER INSTAI,I,ATION.
Proper installation is the responsibility ofthe installer. Product failure due to improperinstallation is not covered under the GE
Appliance _¥arranty. See the Owner'sManual for warranty information.
_i_SkRNING:To reduce the risk of fire or elecuical
shock, do not use this hood with any externalsolid-state speed conuol device. Any suchalteration flom original factory wiring couldresult in damage to the unit and/or createan elecuical safety hazard.
To reduce the risk of fire and to properlyexhaust air, be sure to duct air outdoors. Do
not vent exhaust air into spaces within walls orceilings or into attics, crawl spaces or garages.
_i_SkRNING: TO REDUCE THE RISK OF FIRE,USE ONIX METAl, DUCTWORK
TO REDUCE THE RISK OF FIRE,
EI,ECTRICAI, SHOCK OR INJURY TOPERSONS, OBSERVE THE FOI,I,OWING:
A. Use this unit only in the manner intendedby the manufactureL If you have anyquestions, contact the manufacturer.
B. Before servicing or cleaning unit, switchpower off at the service panel and lock servicepanel to prevent power flom being switchedon accidentally. If the service panel cannot belocked, fasten a tag or prominent warninglabel to the panel.
For general ventilating use only. Do not useto exhaust hazardous or explosive materialsor vapors.
Structural flaming, installation work andelecuical wiring must be done by qualifiedperson (s), in accordance with all applicablecodes and standards including fire-ratedconstruction.
Sufficient air is needed for proper combustionand exhausting of gases through the flue(chimney) of tirol burning equipment toprevent back drafting. Follow the heatingequipment manufacturer's guidelines andsafety standards such as those published bythe National Fire Protection Association
(NFPA), and the American Society forHeating, Refligerafion and Air ConditioningEngineers (ASHRAE), and the local codeauthorities.
I,ocal codes vary. Installation elecuicalconnections and grounding must complywith applicable codes. In the absence oflocal codes, the vent should be installed inaccordance with National Electrical (;ode
ANSI/NFPA 70-1990 or latest edition.
Contents Model Available ............................................ 3Required Accessory ...................................... 3
Recirculating Operation .............................. 3Product Dimensions ..................................... 3
Using Duct Cover Accessories ..................... 4Installation Preparation
Tools and Materials Required ..................... 5Power Supply ................................................ 5
Duct Fittings ................................................. 6Step 1, Advance Planning ........................ 7, 8Installation
Step 2, Remove the Packaging .................... 9
Step 3, Check Installation Hardware .......... 9
Step 4, Mount Template ............................ 10Step 5, Install Support Frame .................... 10
Step 6, Secure Wiring ................................ 11Step 7, Size and Install Ductwork .............. 11
Step 8, Install Decorative Duct Covers ..... 12Step 9, Install Hood ................................... 13
Step 10, Connect Electrical ....................... 13Step 11, Slide Duct Cover Down,
Install Side Utility Bars ................ 14
Step 12, Install Filters ................................. 15Step 1,3, Finalize Installation ..................... 15
-
Design Intormation
36" Island Vent Hood
ModelAvailable
Model This vent hood is designed toZV850 be used in vented ceiling mounted
installations.
NOTE: Accessories to meet properceiling height are required to completethe installation.
RequiredAeeesso U
ZX858 - Fox 8 ft. ceiling height.This kit includes decorative duct covers and
support flames to reach an 8 ft ceiling height.
ZX859 - Fox 9 ft. ceiling height.This kit includes decorative duct covers and
support flames to reach an 9 ft ceiling height.
ZX8510 - Fox 10 ft. ceiling height.This kit includes decorative duct covers and
support flames to reach a 10 ft. ceiling height.
Order the required accessox y at the same timeas the vent hood and have on site before
installation.
ReeireulatingOperation
This hood may be installed for recirculadngoperation. One of the following kits isrequired and must be ordered with the hood.ZXR858 - For 8 ft. ceiling height.ZXR859 - For 9 ft. ceiling height.ZXR8510 - For 10 ft. ceiling height.
Both the hood and accessory must beon site at the time of installation. Follow
the installation insuuctions packed with
the accessory to complete the installation.
Product
Dimensions
The vent hood must be installed 24" rain. and
30" max. above the cooking surface. 25-1/2" isrecommended for best venting performanceand to insure that the duct cover meets the
ceiling. The cooking surface should be at least36" above the floor. Installation will be easier if
the vent hood is installed before the cooktopand countertop is installed.
"25-1/2" Recommended
*He ght
] to Ceiling
*26-1/4"for8 ft. Ceiling
UsingZX858Accessory
38-1/8"for9 ft. Ceiling
UsingZX859Accessory
50-1/8"for 10ft. Ceiling
UsingZX8510Accessory
36"Reference
Thedistance between the cooking surface and the bottom
of the hood must be at least 24" and upto 30". The 25-1/2"
recommended installation height, above the standard36"
countertop, will insure duct cover fit to the ceiling.
-
Design Intormation
36" Island Vent Hood
Usinff DuctCover Accessories
A duct cover accessory is required for all
ceiling heights. Use this chart to determine the
correct Duct Cover Accessory for 8 ft. to 10 ft.
ceilings that must be ordered with the hood.
ZV850SBInstallation HeightsActual
Ceiling * PossibleHoodHeight Installation Height
7' 11" 24-1/2"
8'0" 25-1/2"
8' 1" 25-1/2"t0 26-1/2"
8' 2" 25-1/2"t0 27-1/2"
8' 3" 25-1/2" t0 28-1/2"
8' 4" 25-1/2" t0 29-1/2"
8' 5" 30" max.
8' 6" 30" max.
8' 7" 30" max.
8' 8" 30" max.
8' 9" 30" max.
8' 10" 30" max.
8' 11" 30" max.
9' O" 30" max.
9' 1" 30" max.
9' 2" 30" max.
9' 3" 30" max.
9' 4" 30" max.
9' 5" 30" max.
9' 6" 30" max.
9' 7" 30" max.
9' 8" 30" max.
9' 9" 30" max.
9' 10" 30" max.
9' 11" 30" max.
10' O" 30" max.
Duct Cover
Accessory
>-
o o3co
coIJJ ¢ooX_.3 N
mC.0O3
C0xN>-et-o
uJ
-n-oo3o3uJcoco
-
Installation Preparation
36" Island Vent Hood
7bols andMaterials
Required(not supplied)
• Tapemeasure• Knife
• Spirit level• Wire cutter
• Wire stripper• Wire nuts
• Electric drill and 5/32" bit• Phillips screwdriver• Flat blade screwdriver• Hammer• Pliers
• 10 mm Hexwrench/socket• Safety glasses• Tapeto mount template• Glovesto protect against sharp edges
• 120V60Hz.15 or 20 Amp, 2 wire with ground.Properlygrounded branchcircuit.
• Strain relief for junction box cover.• Plumb
• Center punch
IMPORTANT- (Please read careflflly)
FOR PERSONAI, SAFETY, THISAPPI,IANCE MUST BE PROPERIX(;ROUNDED.
Remove house flase or open circuit
breaker before beginninginstallation.
Do not use an extension cord or adapter
plug with this appliance. Follow NationalElecuical Code or prevailing local codesand ordinances.
Grounding Instructions
The grounding conductor must be connected
to a ground metal, permanent wiring system,
or an equipment-grounding terminal or leadon the hood.
Electrical supplyThis vent hood must be supplied with 120V,60Hz, and connected to an individual,
properly grounded branch circuit, andprotected by a 15 or 20 amp circuitbreaker or time delay flase.• Wiring must be 2 wire with ground.• If the elecuical supply does not meet
tim above requirements, call a licensedelecuician before proceeding.
• Rotate house wiring in the ceiling, asclose to the installation location as possible.Allow an additional 3 feet length flomceiling joists to reach the junction boxon the hood.
• Connect the wiring to the house wiring inaccordance with local codes.
Warning: The improperconnection of the equipment-grounding conductor can result ina risk of elecuic shock. Check with
a qualified elecuician or servicerepresentative if you are in doubt whetherthe appliance is properly grounded.
-
Installation Preparation
36" Island Vent Hood
Duct
fittincs
Use this chart to
compute maximum
permissable lengthsfor duct runs to
outdoors.
Note: Do not exceed
maximumpermissableequivalent lengths!
Maximumductlength:100footforrangehoods.
Flexible ducting:If flexible metal
ducfing is used, all
the equivalent feetvalues in the ruble
should be doubled.
The flexible metal
duct should be
straight and smoothand extended as
much as possible.
Do NOT use flexible
plastic ducfing.
Note:Any homeventilationsystem, suchas a ventilationhood, may interrupt the properflow of combustion air and
exhaust required by fireplaces,gas furnaces, gaswater heatersand other naturally ventedsystems. Tominimize the chanceof interruption of such naturallyvented systems,follow theheating equipmentmanufacturer'sguidelines andsafety standards such asthosepublished by NFPAand ASHRAE.
Duct Piece Dimensions
Ro t/Ild,
straight
/_ 3-1/4" x 10"straight
Q_ 90 ° elbow 12 It.
45 ° elbow 7 It.
3-1/4" x 10" 14 ft.3-1/4" x 12" 10 It.
90 ° elbow
@_ 3-1/4" x 10" 8 ft.3-1/4" x 12" 6tt.
45 ° elbow
3-1/4" x 10" 33 It.3-1/4" x 12" 24 It.
90 ° fiat elbow
_@,_ 6" I'ound torectangular 2 It.
Equivalent QuantityI,ength* Usedlit.
(per foot
length)
lit.
(per fbot
length)
_1_ Rectangularto 6" round 2 It.
_ 3-1/4" x l 0" 4 ft.3-1/4" x 12" 4 ft.6" I'Ot/Ild to
rectangular
transition 90 ° elbow
_ 3-1/4" x 10" 4 ft.3-1/4" x 12" 4ft.
Rectangular to 6" roundtransition 90 ° elbow
Roundwall cap
with dainper 24 ft.
3-1/4" x 10" 24 ft.3-1/4" x 12" 18 ft.
Rectangular wall cap
with damper
Round roof cap 33 ft.
_Actual length of straight duct plus duct fittingequivalent. Equivalent length of duct pieces are basedon actual tests conducted by GEEvaluation Engineeringand reflect requirements for good venting performancewith any ventilation hood.
Total Duct Run __
Total
Equivalent
I,ength
-
Installation Preparation
36" Island Vent Hood
Advance
Planning
Plan the locationDetermine the exact location of the vent hood.
• Use a plumb to check location to be surecountertop/cooktop location below the hoodwill align exacdy.
• The hood should project forward 1-1/2"beyond the flont edge of the cookingappliance. See illusuadon.
• Observe the recommended 25-1/2" spacebetween the cooking surface and bottomof hood.
Front
Ceiling
i Hood
I :....]z D_ttinllne
Jl..............................27_1/2_.........................
i i
Approx.1-1/2''_"
BeyondCookingSurface
I
Cooktop/'//
I
___- Countertop
SideView
"7-5/8"
8-3/4" ,Cross 1
i
Framing 1iii
, 1B"
i ii ii ii i
TopView of SupportFraming
i ii ii i
i+li ii i
i
i
i
/!
i
i
i
TypicalSupportFrameMounting
*The framing should be spaced 8-3/4" on the sidesand 7-5/8" at thefront from centerline to centerline to accept mounting screws inthe
vent support frame.
ii
Frontof
Hood
Cross
_ Framing
,-'_8-3/4"_;i i
Side Iv_ew I
\\\
Upper
Lower f
Ceiling/
/
SupportFrames
Ceiling support structure• At the hood location, install 2 x 4 cross
flaming between ceiling joists as shown.• The 2 x 4 cross flaming can be installed
standing or fiat, depending on duct run.See illusuadon of ductwork, page 8.
Note."The cross framingmust be spaced 8-3/4" onthe side from centerlineto centerline in order to
accept the hood mountingscrews.
-
Installation Preparation
36" Island Vent Hood
s1Advance
Planning
(continued)
• Arrange cross flatning in tile ceiling to suittile existing structure. See examples.
- Secure each 2 x 4 block with at least four (4),#10 wood screws, 3" long (minimum sizescrews, not supplied). Use 8 wood screwstotal for tile two supports.
• The cross framing must be accuratelyaligned to assure correct positioning ofthe hood.
• The cross framing must be level in alldirections. Check with a spirit level andadjust if necessary.
IMPORTAN#The ceiling structure must be capable of supportingthe weight of the hood(approximately 100 pounds)and anyinadvertent usercontact loads. It is recommendedthat the hood
support frame be supportedby a minimum of 2 x 4 cross framing.
CrossFramingb,
Ceil
Joist __Hood
Support-- _ Frame
Opening
1 :t
UpperHalfOfSupport
Frame
Height ....Adjustment
Slot
Ductwork
• Use tile shortest and suaightest duct routepossible. For satisfactory performance, ductrun should not exceed 100 feet equivalentlength for any duct configuration.
• Refer to "Duct Fittings" chart to compute tilemaxilnum permissible length for duct rtmsto tile outdoors.
• This vent hood must use 6" round duct. Tile
6" round duct can transition to 3-1/4" x 10"or 3-1/4" x 12".
• Install tile house ductwork to run
horizontally between ceiling joistsor suaight tap through tile roof.
Finish the CeilingFinish tile ceiling surface. Be sure to marklocadon of the ceiling joists and cross flaming.Check to be sure that ceiling is level, use shimsif necessary.
• ....... Ii ii ii ii
G"
CeilingJoint
........)_ 2x4
Vent Straight Up
ThroughTheCeiling
DuctElbow
2Standing
VentBetweenCeilingJoists
-
Installation
36" Islan, d Vent Hood
Remove the
Paekacin¢
The vent hood is packed separately flom therequired accessory ZX858, ZX859 or ZX8510.• Remove the flame, cove_; parts box, side bars
and packaging.• Remove junction box cover.• Install suain relief onto junction box coveL
CheekInstallationHardware
I,ocate the hardware accesso_ T box packedwith the hood and check contents.
E
4 Flat Washers
4 Hexhead
wood lag screws(6mm x 2-1/2")
or
(1/4 x 2-1/2")
3 Filters
g2 Phillips Head
Decorative Screws
8 FrameAttachmentScrews with Washers
(attachedtoaccessorysupport
frames)
/o o \
N° Frontof Hood o/
" Q) "\ /
Template
4 (lOmm) Nuts and LockWashers
2 Side Bars With 4 Machine Screws
_ heck service manual envelope taped
to the front of the hood to be sure it
contains one stop screw. Leavethisscrew in the envelope.
Check contents of the required
accesso_T, ZX858, ZX859 or ZX8510.
Support Frameswith 8 Screwsand 8 Washers
MountingScrewHoles
Decorative Duct Covers
-
Installation
36" Island Vent Hood
Template
Install
SupportFrame
• Align the template with the marks on theceiling and tape in place.- Be sure the template is oriented correctly,
with the fiont of the hood.
• Use a plumb to be sure the mounting holeswill provide parallel alignment with thecountertop below.
• Center punch all hole locations.• Drill pilot holes in the 4 screw locations.
Use a 5/32" bit and drill approximately1-1/2" deep.
• Cut the 6-1/4" dia. duct opening and approx.1" dia. wire access hole.
/o o \
o FrontofHood
\\ 0 /
". ..... /-" WireAccessHole
Upper 'Support FrorFrame Of
Hoc
!!
'-L_.__..
. SupportFrame
Opening
CheckLevelinBothDirection
LowerSupport .........-i:....Frame
Hood.. ..... LowerSupportwlountlng_Flange ", ,, ........................
._d_"A:7._"-_.. 13-5/8
]
25-1/2"Recommended
Countertop
"39-1/8"
*'75-1/8"to Floor
1o
Install upper support frame
• Secure the upper support flame to the
ceiling joists and/or cross flaming with the
4 screws provided. For maximum rigidity
and strength, the screws must be driven
into the center of the joists and/or cross
flaming.
• Check to be sure the support frame is
level, vertically and horizontally.
*!ilote:39-1/8" to top of hood flange can be increasedup to 42" max.
*'75-1/8" rain. to floor, 77-7/8" max.
Install lower support frame• Insert lower support flame (flom required
accessory ZX858, ZX859 or ZX8510) into theupper support flame and loosely secure with8 screws and washers (4 on flont and 4 onback sides).
• Adjust the lower support flame up or downto the desired height above the countertop.Tighten screws.
Important: Again, check to be sure the supportis level in both directions. There is no wW tolevel the hood after the hood is secured tothe flame.
-
Installation
36" Island Vent Hood
Wiring• Route house Mring through the ceiling hole
and pull a length to reach the hood junctionbox, approximately 6" below the support.
• Tape the wire to the flont of the flamesupport to prevent damage duringinstallation and service.
FrontSide
SupportFrames
# Ce!ling
r77 _
'\\\
? ?
o o )Tape? ? /
/
/.J
:- House\^I;4%
s,e7Size AndInstall
Duetworh
To Find Required Duct Length:• Measure flom house duct flange to bottom
of support flame. (Dimension A)- Add at least 1" to Dim. A for duct overlap
at the top.- Submmt 1-3/4" for hood insertion into the
bottom of the flame to determine requiredduct length.
• (;tat the 6" duct to required length.Note: The bottom of the duct must be external
(female) connection to the top of the hood.The bottom end should be flared slightly, tofacilitate installation of the hood.
• Install duct tap through support flames andattach to house ducting with sheet metalscIews.
• Seal the connection with duct tape.
HouseDuct....
DuctConnectionToHood........
SideView
SupportFrame
BottomSupportFrameFlange
11
-
Installation
36" Island Vent Hood
Se8InstallDecorative
Duct Covers
Pretap2 Screw /Holes
.1
/
i-lf_
Top DuctCover
InstallScrewonEachSide
TopDuctCover
TopDuctDover
BottomDuctCover
Bottom Duct Cover
// --\\\
,,,(Stop Screw oX.....
Install StopScrew in Oneof 3 Holes
• Premp or drive decorative screw into thescrew holes on the support flame. This willmake screw installation easier.
• Separate the two decorative duct covers.• Select the inside (top) covet, which has two
screw holes in the top.• Slide the decorative duct covet over the
support flame and push to the ceiling.• Attach to the hood support at the top with
2 supplied decorative screws.
• I,ocate the stop screw in the envelope tapedto the flont of the hood. Set aside.
• Slide the bottom decorative duct over the
installed top duct and push tap past the stopscrew hole location.
• Install the supplied temporat T stop screw
in one of 3 holes in the support flame or
the top duct covet to prevent the bottom
decorative duct covet flom sliding down.
The stop screw must beinstalled. Failure to do so could result in
personal injury or damage to the ductcover.
12
-
Installation
36" Island Vent Hood
InstallHood
Align DuctConnectorto ..HouseDuct
/ AlignMountingStuds
Bottom I
gU?tr j
StopScrew __ o / Install --l /4,ockH II[ot _ --1 J washer
• _ 4 Nuts
Note: TWO PEOPLE ARE REQUIRED TOCOMPLETE THIS INSTALLATION!
• I,ifl the hood up to the support frame.
Carefldly align tim hood mounting studs
into the support flame holes, and at tim
same time, guide tim hood duct connectorinto tim house duct.
• Install 4 nuts and lock washers to the
mounting studs. Tighten with a 10mmwrencll.
• Check hood level in both directions.
• Check to be sure that the duct is positionedover tim hood connectoL
• Seal tim duct connection with duct rope.
Note: Do not drive screws through lower duct
connection. Doing so will prevent proper
damper operation.
10Connect
Electrical
Verify that power is turned off at the source.
If house wiring is not 2-wire with
a ground wire, a ground must be
provided by the insmlleL
When house wiring is aluminum,
be sure to use U.I,. approved
anti-oxidant compound and
aluminum-to-copper connectors.
• Install strain relief into tim knockout of tim
junction box coveL
• Insert house wiring through strain relief and
tighten.• Connect white leads to branch circuit white
lead.
• Connect black leads to branch circuit black
lead.
• Connect green/yellow leads to branch
circuit green or bare ground lead.• Secure all connections with wire ntlts Oil
each elecuical connectoL
• Push wires into junction box and replace
coveL Be sure wires are not pinched.
13
-
Installation
36" Island Vent Hood
Slide Duct
Cover Down,Install Side
Utility Bars1
JJ
• Hold the deco_afive duct cove_ and
_emove the tempora_y stop sc_ew. Retmnthe sctew to the seevice manual envelopefoi fllttl_e use.
• Slide the lower duct cover down ontothe hood.
• Install the side utility ba_s with screwsas shown.
14
-
Installation
36" Island Vent Hood
InstallFilters LowerFilter
Slots
\\\\\
• Remove protective film on filters.
• Tip the filter into the lower slots at the rear
of the opening. I,ift the filter and pull theknob forward until the filter rests on the
slots.
• To remove the filters, grasp the knob,
push the filter towards the rear and flitdownwards.
e 13FinalizeInstallation
• Remove the protective film covering theconuol panel on the flont face of the hood,and any other packaging materials.
• Check all 4 lamps to assure dghmess insockets.
• Refer to the Owner's Manual for
operating insuuctions.
15
-
Monogram:GEConsumer& IndustrialGEAppliancesGeneralElectricCompanyLouisville,KY40225
monogram, com
5")2007 GE Company
NOTE: While performing installations described in this
book, safer} glasses or goggles should be worn.
I+br Mo_og'ram local service i_ )'our area, call1.800.444.1845.
NOTE: Prod/let impro\vment is a continuing endea or at General Electric.
There[k_re, materials, appearance and specifications are s/ll_ject to change
witho/lt notice.
Pub. No. 49-8970-2
04/07.]RPrinted in halv
!)43!)6398