gef full sized project (vlasic)

25
GEF Full Sized Project ‘Strengthening the institutional and financial sustainability of the national protected area system’

Upload: undphr

Post on 18-Dec-2014

86 views

Category:

Education


1 download

DESCRIPTION

Strengthening the institutional and financial sustainability of the national protected area system

TRANSCRIPT

Page 1: GEF Full Sized Project (Vlasic)

GEF Full Sized Project

‘Strengthening the institutional and financial sustainability of the national protected area

system’

Page 2: GEF Full Sized Project (Vlasic)
Page 3: GEF Full Sized Project (Vlasic)

The project context

• June 2012: the project concept is summarised in a Project Information Form (PIF), approved into the pipeline of the fifth funding cycle of GEF (‘GEF 5’)

• December 2013: the project is cleared by the GEF and endorsed for an amount of US$4,953,000 grant to Croatia

Page 4: GEF Full Sized Project (Vlasic)

The project context

• GEF has provided funding, through a Project Preparation Grant, to develop the project documentation.

• A team of consultants (3 national and one international) have been contracted to support UNDP and the Ministry in the drafting of the project documentation

• The full project will be implemented over a period of four years 2014-2017

Page 5: GEF Full Sized Project (Vlasic)

Submission file: prodoc of 100 pages, 15 additional files...

Page 6: GEF Full Sized Project (Vlasic)
Page 7: GEF Full Sized Project (Vlasic)

The project is activity-focused around two key areas of support to national protected areas:

Key area 1: increase efficiency of management- Reform the institutional framework and strengthen systemic and institutional management capacities

Key area 2: increase financial efficiency- Improve the financial sustainablity of the network of national protected areas

Strategic approach to project design

Page 8: GEF Full Sized Project (Vlasic)

The project is spatially focused on the network of ‘national protected areas’ (National Parks and Nature Parks)

Strategic approach to project design

Page 9: GEF Full Sized Project (Vlasic)
Page 10: GEF Full Sized Project (Vlasic)

Component 1:

• improve the current institutional framework• address it’s key weaknesses• build on the strong sides of the system

[19 public institutions, weak coordination; limited performance accountability; duplication of functions]

Project structure - two components

Page 11: GEF Full Sized Project (Vlasic)

Component 1 - outputsOutput 1.1: National planning framework for PA system

Output 1.2: Financial management capacity of PA institutions

Output 1.3: Shared Service Centre (SSC) for national PAs

Output 1.4: Feasibility assessment – CBA and ranking of different options for establishing a ‘park agency’

Page 12: GEF Full Sized Project (Vlasic)
Page 13: GEF Full Sized Project (Vlasic)
Page 14: GEF Full Sized Project (Vlasic)
Page 15: GEF Full Sized Project (Vlasic)

Component 2:

• improve the financial sustainability of the national protected areas• ensure that they have adequate financial resources to cover the full costs of their management

[cost-inefficiencies; inequitable distribution of funds; funding gap for optimal management]

Project structure - two components

Page 16: GEF Full Sized Project (Vlasic)

Component 2 - outputs

Output 2.1: Reduce transaction costs of user-pay systems in national protected areas

Output 2.2: Develop integrated tourism services in national protected areas

Output 2.3: Improve the productive efficiency of national protected areas

Page 17: GEF Full Sized Project (Vlasic)
Page 18: GEF Full Sized Project (Vlasic)
Page 19: GEF Full Sized Project (Vlasic)
Page 20: GEF Full Sized Project (Vlasic)

Full project budgetGEF funding GEF (USD)

Component 1 (including M&E) 1,762,000

Component 2 2,842,000

Project management 349,000

TOTAL (GEF) 4,953,000

Co-financing GEF (USD)

UNDP (project management) 500,000

National PIs (Vransko jazero; Papuk; Ucka; Telascica; Risnjak)

811,116

MENP 16,700,000

TOTAL (Co-financing) 18,011,116

Page 21: GEF Full Sized Project (Vlasic)

Implementation arrangementsUNDPResponsible to GEF for monitoring of project implementation

- Provide administrative and financial support services to project (procurement, accounting services, contracting services, etc.)

Ministry of Environment and Nature ProtectionResponsible to UNDP for national implementation of project- Appoint a National Project Director (NPD) to

provide strategic oversight and guidance to project implementation

Page 22: GEF Full Sized Project (Vlasic)

Implementation arrangementsProject Board (PB)Responsible for project co-ordination and decision-making.

Representation may include:- MENP (Chair)- UNDP- SINP- MRD&EU Funds- MF- National PIs

Page 23: GEF Full Sized Project (Vlasic)

Implementation arrangementsProject management staffDay-to-day administration of project- Project Manager- Project Associate (administrative and

technical support)

Protected area institutions (SINP + PIs)Responsible for implementing pre-designated project outputs and activities

Page 24: GEF Full Sized Project (Vlasic)
Page 25: GEF Full Sized Project (Vlasic)

Parks: for people and nature toghether!

[email protected]