Gemini Solar Project Public Meeng Gemini Solar Project Draft Resource Management Plan Amendment and Environmental Impact Statement Public Meeting What is the Gemini Solar Project? In 2017, Solar Partners XI, LLC amended an exisng applicaon with the BLM and requested authorizaon to construct, operate, maintain, and decommission an approximately 690-megawa photovoltaic (PV) solar electric generang facility and associated generaon e-line and access road facilies, on approximately 7,100 acres of public land administered by the BLM. The project is located approximately 33 miles northeast of Las Vegas, along Interstate-15, in close proximity to Apex Industrial Park and south of the Moapa River Indian Reservaon, in Clark County, Nevada The project would include: The PV Solar Array—including solar panels, internal energy collecon systems, and integrated baery storage Infrastructure—including internal roadways, fire breaks, an Operaons and Maintenance facility, and drainage systems Transmission Systems—up to three internal substaons, gen-e lines to Crystal Substaon, and upgrades to Crystal Substaon Environmental Documentaon The BLM has produced a Draſt Resource Management Plan Amendment and Environmental Impact Statement that evaluates the potenal environmental, social, and economic impacts of the proposed project. The Resource Management Plan Amendment would be required to change the visual resource management class to allow for the proposed solar development. The analysis in the Draſt Resource Management Plan Amendment and Environmental Impact Statement will allow the BLM to make a decision on whether or not to authorize the project and issue a right-of-way grant required to construct the solar facility on these public lands. Input must be submitted by September 5, 2019 Project Website: hps://go.usa.gov/xntTQ

Upload: others

Post on 01-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

Ge

min

i Solar P

roje

ct Pu

blic M

ee

tin

g

Gemini Solar Project Draft Resource

Management Plan Amendment and

Environmental Impact Statement

Public Meeting

What is the Gemini Solar Project?

In 2017, Solar Partners XI, LLC amended an existing application with the

BLM and requested authorization to construct, operate, maintain, and

decommission an approximately 690-megawatt photovoltaic (PV) solar

electric generating facility and associated generation tie-line and access

road facilities, on approximately 7,100 acres of public land administered

by the BLM. The project is located approximately 33 miles northeast of

Las Vegas, along Interstate-15, in close proximity to Apex Industrial Park

and south of the Moapa River Indian Reservation, in Clark County, Nevada

The project would include:

The PV Solar Array—including solar panels, internal energy collection

systems, and integrated battery storage

Infrastructure—including internal roadways, fire breaks, an

Operations and Maintenance facility, and drainage systems

Transmission Systems—up to three internal substations, gen-tie lines

to Crystal Substation, and upgrades to Crystal Substation

Environmental Documentation

The BLM has produced a Draft Resource Management Plan Amendment

and Environmental Impact Statement that evaluates the potential

environmental, social, and economic impacts of the proposed project. The

Resource Management Plan Amendment would be required to change

the visual resource management class to allow for the proposed solar

development.

The analysis in the Draft Resource Management Plan Amendment and

Environmental Impact Statement will allow the BLM to make a decision

on whether or not to authorize the project and issue a right-of-way grant

required to construct the solar facility on these public lands.

Input must be submitted by September 5, 2019 Project Website: https://go.usa.gov/xntTQ

Page 2: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

Ge

min

i Solar P

roje

ct Pu

blic M

ee

tin

g

Input Deadline September 5, 2019 Project Website: https://go.usa.gov/xntTQ

How to Submit Input

The purpose of today’s public meeting is to provide information and offer an opportunity

for the public and regulatory agencies to comment on the Draft Resource Management

Plan Amendment and Environmental Impact Statement.

Email Fax Mail Online Comments

blm_nv_sndo_gemini

[email protected]

702-515-5023

Attn: Herman

Pinales

BLM Southern Nevada

District Office

Gemini Solar Project EIS

4701 N. Torrey Pines Drive

Comments can be submitted online

at: https:go.usa.gov/

xntTQ

How to Provide Effective Input

The most effective comments are developed using the following guidelines:

Be as specific as possible with your comments and refer to page number and paragraphs

in the Draft EIS

Back up your statements with explanations, facts, and references, as appropriate;

support statements with details

Submit comments if you find:

An error in the analysis that may affect the outcome

New information that would change the analysis and conclusions

Something that should be clarified

A substantially different alternative that meets the purpose and need

statement and has not been considered

Keep your comments focused on the specifics of the proposed project under

consideration

Schedule

Page 3: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

Public Meeting Schedule - Suncoast

5 – 5:15 p.m. Open House Format*5:15 – 5:30 p.m. Presentation5:30 – 6:15 p.m. Open House Format*6:15 – 6:30 p.m. Repeat Presentation6:30 – 7 p.m. Open House Format*7– 8 p.m. Verbal Comments *Ask questions to BLM staff, visit various posters, provide individual input to court recorder

Page 4: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

Gemini Solar ProjectDraft Environmental Impact Statement (DEIS) and Draft Resource Management Plan Amendment (RMPA)

Page 5: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

Timeline Overview

Protest Period

Public Comment

Period

Publish Notice

of Intent

Scoping Period

Draft RMP Amendment

and EIS Prepared

Final RMP Amendment

and EIS Prepared

Issue Record of Decision/

RMP Amendment

July 13 to August 27, 2018

45-day scoping period from

issuance of NOI

June 7 to September 5,

201990-day public

comment period

November to December 201930-day protest

period & 60-day Governor’s

Consistency Review

March 2020

We are here

Page 6: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

• 33 miles northeast of Las Vegas along I-15, south of the Moapa River Indian Reservation, northeast of Apex Industrial Park and Dry Lake Solar Energy Zone

• Nearest community is Moapa – approximately 17 miles north along I-15

Project Location

GeminiSolar

The Strip

NVE Crystal Substation

Page 7: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

• Approximately 44,000-acre application area

• Develop a photovoltaic solar facility on approximately 7,100 acres of land within a 44,000 acre application area

• 690 MW

• Integrated battery storage included

• One 230 kV and one 500 kV gen-tie to Crystal Substation

• 5.5 miles of new 230 kV line on existing towers to connect Crystal Substation to Harry Allen Substation

Project Overview

Page 8: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

Alternative Development

• NEPA requires the development of alternatives that can meet the purpose and need of the Project, but considers the alternative uses of resources

• Additional development areas (B1, B2, F, and G*) were studied to develop alternatives

• Three action alternatives were carried forward in the EIS

Alternative Similarities

• Resource Management Plan Amendment

• Development of ~ 7,100 acres of BLM managed land

• Solar facility components* Please see alternative posters on display

Alternatives

Page 9: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

Traditional Methods

• “Disk and roll” where vegetation is crushed and mixed into soil then compacted

• Required stormwater retention, application of tackifiers and herbicides

Mowing

• Mowing of vegetation instead of “disk and roll”

• Minimizes direct vegetation removal, maintains topsoil seed bank for future regrowth

• Mowed areas would be designed and constructed differently

Alternative Construction Methods

Page 10: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

Alternative Differences Proposed Action All Mowing Hybrid – BLM Preferred Alternative

Methods All traditional methods All mowing Mowing 65%Traditional Methods 35%

Development Areas* A, B, C, D, and E A, B, B1, B2, C, D, E, and G A, B, B1, C, D, and E

Height of Panels 12 foot 15 foot 12-15 foot

Internal Roads 1 mile apart with perimeter road

¼ mile apart, no perimeter road

¼ to 1 mile apart, limited perimeter road to traditional areas

Tortoise Fencing Around entire project Only during construction then removed

Desert tortoise exclusion fencing would be removed around mowed development areas after construction

Drainage Berms and detention basin No berms, no detention No berms, no detention

* Please see alternative posters on display

Page 11: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

Key Resource Constraints

• Designated Section 368 Energy Corridor

• Clark County proposed California Wash ACEC as part of the proposed public lands bill

• Recreation including OHV

• Visual resource management class amendment from III to IV

• High density of Mojave desert tortoise

• Threecorner milkvetch

• Old Spanish National Historic Trail Corridor

Page 12: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

Proposed Action All Mowing Hybrid (BLM-Preferred)• Loss of 7,071 acres of habitat• Loss of ~220 desert tortoise• Connectivity impacts

• Loss of 176 acres of habitat• Remaining habitat altered • Tortoise reoccupy site with 34

translocated south of site• Reduces connectivity impacts

• Loss of 2,578 acres of habitat• Remaining habitat altered • Tortoise reoccupy 65% of site with

36 translocated south of site• Some connectivity impacts from

fencing

Proposed Mitigation Measure Summary• Biological Opinion with tortoise-specific protection terms• Qualified Biologist and Worker Environmental Awareness Program • Site Restoration Plan and Integrated Weed Management Plan• Dust Control and Air Quality Plan • Measures to avoid vehicle/wildlife collisions and to facilitate wildlife movement • Refinement of Project site to minimum size needed

Desert Tortoise

Page 13: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

Proposed Action All Mowing Hybrid (BLM-Preferred)• Direct impacts on plants• Permanent loss of 718 acres

of habitat• Indirect impacts through

spread of invasive species

• Direct impacts on plants• Spread of invasive species; reduced

compared to Proposed Action • Mowing reduces impacts to soils

and seed bank

• Direct impacts on plants• Permanent loss of 718 acres of

habitat • Spread of invasive species; reduced

compared to Proposed Action

Proposed Mitigation Measure Summary • No disk and roll, only drive and crush in development areas

C, D, and E under the Hybrid Alternative to preserve soils and habitat

• Refinement of Project site to minimum size needed • Permits from Nevada Division of Forestry • Seed collection for restoration

• On-site biologist to monitor sensitive plant habitats• Removal of all Sahara mustard• Targeted herbicide treatment • Annual monitoring for threecorner milkvetch • Worker Environmental Awareness Program

Threecorner Milkvetch

Page 14: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

Old Spanish National Historic TrailSetting • Congressionally Designated National Historic Trail Corridor through valley• Natural desert setting is important to the nature and purpose of the trail

Proposed Action All Mowing and Hybrid (BLM-Preferred)

• Long-term (100+ years) substantial interference with the nature, purpose, and primary uses of the Trail

• Substantial interference for life of Project; • Reduces effects by maintaining vegetation, hydrology, contours,

and wildlife that contribute to setting– Restoration of historic setting possible in 30 years for all areas (mowing) or a large portion (hybrid) of the area

Proposed Mitigation Measure Summary• Consult with Nevada State Historic Preservation Officer (SHPO) to determine eligibility• Prepare an Memorandum of Agreement with Nevada SHPO if segments are determined eligible• Develop a Historic Properties Treatment Plan to mitigate adverse effects under the National Historic Preservation Act• Trail Co-administrators and BLM are working to identify mitigation to the nature, purpose, and primary uses of the Trail• Incorporate design elements, color, and surface treatments to minimize visual contrast

Page 15: Gemini Solar Project Draft Resource Management Plan ...clearinghouse.nv.gov/public/Notice/2020/E2020-009.pdf · Gemini Solar Project Draft Resource Management Plan Amendment and Environmental

Ways to Provide Input• Submit input by mail, email, fax, or in person with the provided input forms

• Input is due by September 5, 2019

• More information can be found at: https:go.usa.gov/xntTQ

• Submit via:• Online: https:go.usa.gov/xntTQ

• Email: [email protected]

• Fax: 702-515-5023, Attn: Herman Pinales

• Mail: BLM Southern Nevada District OfficeAttn Herman Pinales4701 N. Torrey Pines DriveLas Vegas, NV 89130

How to make a comment: At the meeting using the comment forms or

provide verbal comments. Email comments or mail in comments to the

addresses, or submit online