Page 1: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya
Page 2: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

General Information

S. No. Question Response

1. Company Name Dolphin Engineer

2. Name and Contact information of contact person Rajesh Saxena

C-49, B-3, Vidya Apartments, Paras Marg, Bapu Nagar Jaipur - 302015

3. Connect No. +91-9680026609, 0141-4036515

4. Annual Turnover of the company (Last Three

Years)

1.10 Cr.

5. Specify any taxes applicable (along with rate) GST 18.00 %

6. Pan No BLPPSO 212P

7. GST No 08BLPPSO 212P1ZL

8. Bank Name Oriental Bank of Commerce

9. Bank Address 69/334 V.T. Road Madhyam Marg Mansarover Jaipur-

10. Bank Branch CBS BRANCH (022)

11. Account Type Current A/c

12. Account Number 07031011002625

13. RTGS / IFSC Code (11 characters) ORBC 0100703

Page 3: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

14. MICR Code (9 digits) 302022007

15. Specify any taxes applicable (along with rate) GST 18.00 %

16. Experience Details Profile Copy Attached

17. Key Projects in hand Profile Copy Attached

18. Equipment & Resource details Profile Copy Attached

Client Reference 1

Company Name Thought Consultant Jaipur Pvt Ltd

Contact Name Mr. Ashish Gupta

Title / Position Director

Address 1 DA 15, Jawahar Nagar Jaipur.302017

Telephone Number 09829055330

Email Address [email protected]

Length of Relationship 10 Year

Nature of Relationship Survey Work

Page 4: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

Customer Reference 2

Company Name CEG Test House & Research Centre

Contact Name Mr. Amar Singh Rajawat

Title / Position Sr. General Manager

Address CEG tower, B-11 G Malviya Industrial Area -302017

Telephone Number 07300000111

Email Address [email protected]

Length of Relationship 20 Year

Nature of Relationship Survey Work

Page 5: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

Dolphin Engineer’ lies in the following.

• Conducting accurate & precise Topographical Surveys using Tota l Station & DGPS for So lar parks , Wind Energy, Highways a lignments,

Bridge location, Pipeline & Sewerage Systems, Bu ilding & Town Planning Projects, and Water Supply Schemes etc.

• Dolphin Engineer’s have provided serv ices to various pub lic & private agencies, government & semi- government departments,

consultants etc.

The important bodies with which Dolphin Engineer is provided services are listed below: -

RAJASTHAN PUBLIC WORKS DEPARTMENT (PWD)

GUJARAT AMBUJA CEMENT, PALI.

RELIANCE ENGINEERING ASSOCIATE LTD., JAIPUR.

MEGHA ENGINEERING & INFRASTACTURE LTD

PDCOR JAIPUR

MANGLAM CEMENT

SHREE CEMENT. BEAWAR. (AJMER)

SUZLON INFRASTRUCTURE SERVICE LIMITED

ENERCON INDIA

LAHOTY BUILDCAON

CHANDRKALA ARCHITECTURE

SPMAL JAIPUR

GVR AJMER NAGAUR TOLLWAY PRIVATE LTD

THOUGHTS CONSULTANT JAIPUR PVT LTD

Page 6: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

EMCO LIMITED

PEARL KRISHNAM DEVELOPER

GOVT. ENGINEERING COLLAGE BHARTPUR

BENGAL CITY NIRMAN PVT LTD

RAYS POWER INFRA PRIVATE LIMITED

THEME ENGINEERING SERVICES PVT. LTD

OPULENT RESORTS K KOLKOTA

GAMESA WIND TURBINES PVT. LTD

V & A VENTURES LLP

ADANI RENEWABLE ENERGY PARK

SANKARA EYE HOSPITAL

VISHVARAJ ENVIRONMENT PVT LTD

HINDUSTAN ZINC LTD

OPULENT RESORT LTD KOLKATTA

JAI MAHAL PALACE JAIPUR

COUNTRY CONDO’S LIMITED

A.B.ENTERPRIEASE

ADANI RENWABLE ENERGY PARK RAJASTHAN

.

Page 7: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

1. Details of Technical Personal/detail of the firm-

SR. NO.

Name of Technical Personnel along with Qualification

Experience ENGINEERS (WITH Specialization)

Qualification GIS Experts Whether employed of Associated on Other condition

1. Rajesh Saxena 22 Yrs Managing Director Diploma in Civil /

Programming

Employed

2. Rakesh Sankhla 21 Yrs Project Manager M.TECH. Employed

3. Shashi Kant 18 Yrs Project

Coordinator

Diploma in Civil /

Programming

Data base Software

developer

Employed

4. Hemant Chandwani 15 yrs Degree in Civil /

Programming

Data base Software

developer

Employed

5. Jitendra Sharma 8 yrs Diploma in Civil /

Programming

Data base Software

developer

Employed

6. Mujmmil Ahmed Ansari 10 Yrs I.T.I. Diploma Employed

7. Raj Kumari Sharma 4 Yr Diploma in Civil Employed

8. Bhagchand

Bairwa

2 Yrs Diploma in ARC `

GIS

Data base Software

developer

Employed

9. Rajendra saini 8 Yrs I.T.I. Diploma Employed

10. Rakesh Saini 7 Yrs I.T.I. Diploma Employed

Page 8: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

11. Bhagchand

Meena

7 Yrs Diploma in civil Employed

12. Jay Prakesh 1.5 Yrs I.T.I. Draftsman Employed

13. Ashok Saini 1.5 Yrs I.T.I. Draftsman Employed

14. Mohammed Naeem 2.5 Yrs I.T.I. Surveyor Employed

15. Rajesh Meena 2.5 Yrs I.T.I. Surveyor Employed

16. Pradeep Senwar 3.5 Yrs I.T.I. Surveyor Employed

17. Raju Lal Meena 3.5 Yrs I.T.I. Surveyor Employed

18. Gunjan 1.7 Yrs Draftsman Employed

19. Shiv Lal Saini 2.2 Yrs Surveyor Employed

20. Lala ram Saini 2.2 Yrs Surveyor Employed

21. Puk Raj Saini 3.5 Yrs Surveyor Employed

22. Ganga Ram 3.5 Yrs Surveyor Employed

23. Mukesh Swami 3.5 Yrs I.T.I. Surveyor Employed

24. Banwari lal Kumavat 3.5 Yrs I.T.I. Surveyor Employed

25. Ratan malo 3.5 Yrs I.T.I. Surveyor Employed

26. Shubaham

Khandelwal

3.5 Yrs I.T.I. Surveyor

Draftsman

Employed

Page 9: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

27. Daulat Kumar 3.5 Yrs I.T.I. Surveyor Employed

28. VIRI SINGH 5 Yrs I.T.I. Surveyor

Employed

29. BIJOY BARMAN 5 Yrs I.T.I. Surveyor

Employed

Details of the work experience:-

SR. NO. Name of Project Name of the client (Govt./Semi. Govt./

Private) Page No.

Estimated Project

Cost

Status of the Project

(completed / under Execution / Under Planning

Process)

Details / Proof of Agreement/ Letter of Intent/ Work order etc. (Copy to be attached) Page No.

1. Detail survey plan of existing land at RAJPURA DARIBA MINES (Hindusthan

Zink)

CONSULTING ENGNEERING GROUP

LTD.

.80 LAC Completed CEGTH/WO/TS/2018-19/0681 Dated 08/01/2019

2.

Detail survey plan of existing land taking all measurement at Onamakulam, Sankaraperi & Kuppanapuram Village Tirunelveli.

RAYS POWER INFRA PVT. LTD.

3.41

LAC

Completed Rays/Tamil nadu/100mw/Survey/WO-04

Dated 12/12/2018

3.

Topographical survey for Upgradation of Two lane with Paved Shoulder from Kati to Telore nagar, MDR - 39 in state of Maharashtra in EPC mode.

Thought Consultants 11.5 Lac Completed Dated 10/12/2018

Page 10: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

4.

Conduction bathymetry survey at TIDI DAM, Rajasthan including taking underwater level up Datum

VEXL ENVIRON PROJECTS PVT.LTD

5.45

LAC

Completed P.O.NO. 8520000805/333

Dated 12/10/2018

5.

Topographical survey for Upgradation of Two lane with Paved Shoulder from AT SH-57 Bhoom to Beed- Solapur Road (NH-211) in state of Maharashtra in EPC mode.

Thought Consultants 10.5 Lac Completed Dated 15/09/2018

6.

Survey Work of BHADANPUR PARASMANIYA GROUP WATER SUPPLY SCHEME , SATNA,MP

Sharma Associates ( L & T )

20 LAC Completed Dated 22/07/2018

7.

Detail survey plan of existing RAILSAY CROSSING C_64 FOR PROPOSED ROB AT NAGOUR

Thought Consultants .95 LAC Completed

Dated 28/06/2018

8. Topographical survey for Karanpura-Mandrayal MDR 3A Existing bridge survey

Thought Consultants 0.60

LAC Completed Dated 06/07/2018

9.

Detail survey plan of existing RAILSAY CROSSING 142/T3 FOR PROPOSED ROB AT Rajgarh (Sadullpur) Churu

Thought Consultants 2.4 LAC Completed Dated 28/05/2018

10. Survey Work of Pipe line Pertaining to Pune 24X7 Water Supply Line Project,

Sharma Associates ( L & T )

12 LAC Completed Dated 25/04/2018

Page 11: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

11.

Topographical survey for Upgradation of Two lane with Paved Shoulder from Jhadol to Ambhabhelly (Section Nh-58E – 47.00 kms) in state of Rajasthan in EPC mode.

Shri Kushalsuri Engineering Services

Pvt. Ltd.

12.26

Lacs

Completed SKES/D-005/2018/008

Dated 18/04/2018

12. Detail survey plan of existing RAILSAY CROSSING LC/116 FOR PROPOSED ROB AT - Keshoraipatan - Bundi

Thought Consultants 2.5

LAC Completed Dated 24/03/2018

13.

Detail survey plan of existing land taking all measurement at Bijapur, Karnataka

RAYS POWER INFRA PVT. LTD.

0.94

LAC

Completed RPIPL/BIJAPUR/45MW/Survey/SO-44

Dated 12/01/2018

14.

Detail survey plan of existing land taking all measurement at Kushtagi Koppal Dist. Karnataka

RAYS POWER INFRA PVT. LTD.

1.94

LAC

Completed RPIPL/KUSHTAGI/SURVEY/SO-02

Dated 06/01/2018

15.

Rehabilitation of Thikri-Anjad Road Section: Thikri to Anjad [Design km. 0+000 to km. 34+560] Rigid Pavement two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode.

Translink Infrastructure Consultants (P.) Ltd.

7.36

Lacs

Completed Translink/TIC133-SC/01/2018

Dated 19/03/2018

16.

Topographical Survey for Proposed ROB at LC – 116 at Keshauraipatan, Bundi

Thought Consultants 1.10 Lacs Completed As per Mail confirmation

17.

Work order for carrying out Topographical survey at MBA-2 surface facility project at Barmer, Rajastha (OSWAL INFRA)

CONSULTING ENGNEERING GROUP

LTD.

0.32

LAC

Completed CEGTH/WO/TS/2018-19/0657

Dated 22/12/2018

Page 12: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

18.

Topographical Survey for Newly Declared National Highway Umred Bypass (NH-353D.) under package no. NH/IAHE/03

Theme Engineering Services Pvt.Ltd.

1.25 Lacs Completed MOU dated 20/02/2018

19.

Detailed Plan & contour Survey Grid level at Every 10X10 Meter of Proposed Land at 4 locations – Ludhiana, Patiala, Meerut & Hapur for Maruti Suzuki Pvt. Ltd.

Maruti Suzuki Pvt. Ltd. 1.25 Lacs Completed As per Mail confirmation

20.

Topographical Survey for Newly Declared National Highway Barmer-Ramsar-Munabao (NH-25 Extn.)

Theme Engineering Services Pvt.Ltd.

12 Lacs Completed Job no. NH-25 Ext./RJ/2016-17/887

21. Detailed Project Report on Indore Water Supply System GIS Based Hydraulic Model, Design of Distribution Pipe Network for Indore City

Sharma Associates ( L & T )

9 LAC Completed Dated 13/11/2017

22.

Detailed Plan & contour Survey Grid level at Every 5X5 Meter of 15 Proposed & Existing Thanas at Various Locations in Rajasthan

Rajasthan Police Housing & Construction Corporation Ltd. Jaipur

2.00 Lacs Completed RPHCCL/2017-18/15

23.

Topographical survey at Mohanpura extn (Jaipur Panipat Pipeline Project).

CONSULTING ENGNEERING GROUP

LTD.

1.05 Lacs Completed CEG/WO/TS/2016-17/1047(A) DATED 16/01/2017

24.

Topographical survey for the Toll Plaza Location at Cable bridge Kota.

CONSULTING ENGNEERING GROUP

LTD.

1.15 Lacs Completed CEG/D-144/2017/352

Page 13: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

25.

Topographical Survey & Auto Leveling DGPS Control Point Work for upgradation of the stretches of Deeg-Alwar-Bahror(124 kms)

Info Trans Engineers Pvt Ltd.

14.98

Lacs

Completed Rajasthan/Dolphin/03/2017

26.

Augmentations and rehabilation of urban water supply bnaran under amrut mission

STS Completed STS/2017-18/615

Dated 25/06/2017

27.

Detail survey plan of existing land taking all measurement at Alabal Village, Jamkhandi, Town bagalkot, District, Karnataka.

RAYS POWER INFRA PVT. LTD.

2.17

LAC

Completed RPIPL/RFE/KARNATAKAS/SURVEY/SO-02

Dated 29/09/2017

28.

Demarcation and survey work in vighyan nagar and shalimaar yojana

UIT, ALWAR 6.92

LAC

Completed UIT/ACCTS/WORKS/5921/17

Dated 25/07/2017

29.

RTK Survey of 10 kms from Piprai To Ashoknagar in Madhya Pradesh.

Krishna Infra 2.65 Lacs Completed As per Mail Confirmation 01/07/2017

30.

RTK and STATIC survey project for Bhorkebardi to Amrawati & Amarawati to Karanji (157 to 475)

Technocons Construction

8.4 Lacs Completed NA/2016-17/AMRAVATI/312/

Dated 01/06/2016

31.

Topographical Survey for Proposed Byepass at various Location

Asegaon Purna Bypass, Amarawati bypass, Dharni Bypass, Paratwada Bypass,

Manglam Associates 9.36 Lacs Completed As per Mail confirmation

Page 14: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

Walgaon Bypass, Ner Bypass, Yavatmal Bypass (Amarawati to Karanji)

32.

Topographical Survey & Auto Leveling DGPS Control Point Work for Four Laning/Two Laning with Paved Shoulder from Km 0.000 to Km 83.453 of Dausa-Lalsot-Kauthun section of NH-11A Extn. in the State of Rajasthan under NHDP Phase-IV on Hybrid Annuity Mode

CONSULTING ENGNEERING GROUP

LTD.

17.71

Lacs

Completed CEG/D-136/2016/302

33.

Topographical Survey & Auto Leveling DGPS Control Point Work for upgradation of the stretches from Khakashi titha to Aronda (Km 122 of MSH-4) to 2 lanes with paved shoulder (Maharashtra to Goa coastal region)

Thought Consultants 28.24

Lacs

Completed As per Mail confirmation

34.

Detailed Plan & contour Survey Grid level at Every 5X5 Meter of Proposed Extension of Kolana Airport, Jhalwara, Rajasthan

Sangeeta Aviation Services Pvt Ltd.

1.50 Lacs Completed SASPL/102/2017

35.

Detailed Plan & contour Survey Grid level at Every 10X10 Meter of Proposed Land at Koppal and Bijapur, Karnataka (300 Hect Area)

Rays Power infra Pvt. Ltd.

6.00 Lacs Completed RPIPL/BIJAPUR/45 MW/SURVEY/SO-17

Page 15: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

36.

Detailed Plan & contour Survey Grid level at Every 10X10 Meter of Proposed Land at Jamkhandi, Karnataka (170 Hect Area)

Rays Power infra Pvt. Ltd.

3.50 Lacs Completed RPIPL/RFE/KARNATAKA/SURVEY/SO-02

37.

Bathematery Survey of Proposed Chikili Bridge at Mahi river, Dungarpur, Rajasthan

Thought Consultants 2.50 Lacs Completed

38.

Detailed Plan & contour Survey Grid level at Every 10X10 Meter of Proposed Land at 14 locations throughout India for Maruti Suzuki Pvt. Ltd.

Maruti Suzuki Pvt. Ltd. 3.25 Lacs Completed As per Mail confirmation

39.

Survey Work of Pipeline pertaining to Indore UWSS project (750 Km )

Larsen & Toubro, Chennai

9.70 Lacs Completed LTCCD/IUWSS/WET/WSD/VTV/LOI/1117/002

40.

Topographical Survey & Auto Leveling Work for Road widening & Strengthening Hanumangarh To Abhohar(Length-42 km approx)

Thoughts Consultant Jaipur Pvt Ltd

Completed As per Mail confirmation

41.

Detail Topographical survey of existing Land OF SSB campus, Vill. Faliyawas, Near Bassi, Kanota, Jaipur (24.28 hect.)

Millenium Consultants

Jaipur

Completed As per Mail confirmation

42.

Detail Topographical survey of existing Land OF CRPF campus, Vill. Faliyawas, Near Bassi, Kanota, Jaipur (19.97 hect.)

Millenium Consultants

Jaipur

Completed As per Mail confirmation

Page 16: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

43.

Topographical Survey work at existing land AT Killa village Tehsil Degana with 5m x 5mgrid level & 0.25 m contour interval with total station.

Opulent Resorts Pvt.

Ltd.

1.17 Lac Completed ORPL/NAGAUR/SURVEY/DOLPHIN/

WO-1/120717

44.

Survey work and Soil testing at institute 's land IPS-1,11,12 & 13 SITAPURA INDUSTRIAL AREA, Sitapura Phase III, Sanganer, Jaipur

The Institute of Cost

Accountants of India

1.15 Lac Completed WO dated 24-02-2017

45.

Detailed Plan & contour Survey Grid level at Every 5X5 Meter of Proposed HDD location on crossings alignment of IOCL pipe line & Pump House Locations for PARADEEP TO HYDERABAD PIPE LINE PROJECT (1100KM)

Consulting Engineers

Group Ltd , B-11(G),

Malviya Industrial Area,

Jaipur-1 Rajasthan

10.0 Lac completed CEG/IOCL/PHPP/2016-17/199

Dated 23 May 2016

46.

Topographical Survey Plan of Existing Land for solar Park at 500MW Bhadla solar park at Village Bhadla, District Jodhpur, Rajasthan India (1339 hect)

Adani Renewable

Energy Park Rajasthan

15 Lac completed AREPRL/DE/C/SO/04/16 on dated

2nd Feb 2016.

47.

Topographical Survey & Auto Leveling Work for Road widening & Strengthening DARA to JHALAWAR (Length-82 km)

Thoughts Consultant

Jaipur Pvt Ltd

2.45 Lac Completed

Mail conformation on 20/01/2016

48.

Topographical Survey & New Route

Alignment for proposed new bypass for

Pratap garh District (Length-22 km)

Thoughts Consultant

Jaipur Pvt Ltd

1.85 Lac Completed

Mail conformation on 25/02/2016

49.

Topographical Survey & Auto Leveling Work for Road widening & Strengthening RAJGARH TO LOHARU (Length-57 km)

Thoughts Consultant

Jaipur Pvt Ltd

2.35 Lac Completed

Mail conformation on 15/03/2016

Page 17: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

50. Topographical Survey for Proposed ROB

at Abu Road Railway Crossing LC 132

Thoughts Consultant Jaipur Pvt Ltd

Completed

51.

Topographical Survey for Proposed ROB

at Bhilwara-Swaroopganj Railway

Crossing LC 72C/E2

Thoughts Consultant Jaipur Pvt Ltd

Completed

52.

Topographical Survey for Proposed

Bridge and existing bridge at Mandrayil

River

Thoughts Consultant Jaipur Pvt Ltd

Completed

53. Detailed Topographical Survey for

Proposed New Road to Jalor Fort

Thoughts Consultant Jaipur Pvt Ltd

Completed

54.

Detailed Topographical Survey for

Proposed New Road Alignment For

Bhadresh Mines at Barmer

Thoughts Consultant Jaipur Pvt Ltd

Completed

55. Topographical Survey for Proposed ROB

at Narena Railway Crossing

Thoughts Consultant Jaipur Pvt Ltd

Completed

56. Topographical Survey for Proposed ROB

at Kachroda Railway Crossing LC 249

Thoughts Consultant Jaipur Pvt Ltd

Completed

57.

Total Station Survey (Pilot area ward 39) under project ‘Capacity Building Support for Building Innovative Sanitation Solution for Rajasthan’

IPE Global Limited House, B- 84, Defense

Colony, New Delhi 110 024, India.

0.50 Lac Completed MD/IPE-DE/2015/703,

dated 27/07/2016

58.

Topographical Survey for Proposed ROB

at Neem Ka Thana Railway Crossing LC

72

Thoughts Consultant Jaipur Pvt Ltd

Completed

59. Topographical Survey for Proposed New Thoughts Consultant Completed

Page 18: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

Bridge on Anas River at Bhil Kunwa

Banswara

Jaipur Pvt Ltd

60.

Detailed Topographical Survey & Auto

Leveling work for road widening and

strengthening from Banswara to Aaspur

(Length-67.25 km approx)

Thoughts Consultant Jaipur Pvt Ltd

Completed

61.

Topographical Survey & Auto Leveling

Work for Road widening &

Strengthening of route from Kapsen

Circle to Flyover at Chittorgarh (Length-

3.75 km approx)

Thoughts Consultant Jaipur Pvt Ltd

Completed

62.

Carrying out Topographical survey Plan

Work for Rajgarh water supply scheme

package NO. PHED/RGH/WS

A.B. Enterprises &

DEEM Construction

Pvt Ltd

5.22 Lac Completed AB & DEEM /Rajgarh/2016-17/24

63.

Detailed Topographical Survey &

Contour Survey for 80 MW Project

Village Balswaj Tehsil Roorkee Near

Chudiyala Railway Station Uttrakhand

Rays Power Infra

Private Limited

0.89 Lac Completed RAYS/UK/80MW/contour/wo-003

64.

Detailed Topographical Survey &

Contour Survey for 5 MW Project Village

Bewoor District Koppal, KARNATAKA

Rays Power Infra

Private Limited

0.89 Lac Completed RAYS/KARNATAKA/5MW/CONTOU

R/W0-01

65.

Consultancy provide for detailed survey

plan & Auto Leveling for proposed Pump

house & distribution pipe line for water

Intergen Energy

Limited

1.95 Lac Completed Unknown

Mail conformation on 12/12/2015

Page 19: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

pipe line at Hanumana M.P.

66.

Consultancy provide for detailed

Topographical survey plan & Contour

Plan for waste water treatment Plant at

Narnod Hissar & Thallapallen Andra -

Pradesh

Intergen Energy

Limited

1.95 Lac Completed Unknown

Mail conformation on 12/01/2016

67.

Consultancy provide for detailed survey

plan & Auto Leveling for proposed

Sewerage Line from Pratap nagar to

Chitroli Bagru via Mahindra SEZ Jaipur

(length 110 Km )Rajasthan

VIshvaraj Environment

Pvt. Ltd.

2.57 Lac Completed VEPL/RAJ/WO/SURVEY/2015/001,

on dated 28th Dec 2015

68.

Providing an experienced Surveyor Team

who can Measure your Crane track

alignment and leveling work with

Computerized Instrument Total Station

HINDUSTAN ZINC

LIMITED

0.72 Lac completed No. RGARG-552/ 510001876 &

Vendor Code 9006420

69.

Detailed survey plan & Contour survey

of Proposed for Multi Level Car Parking

using with DGPS & total at Amritsar &

Jaipur Airport

Landmark Material

Testing And Research

Laboratory Pvt. Ltd.

0.50 Lac Completed

Mail conformation on 12/03/2016

70.

Detailed topographical survey of Project

road (part of National Highway 07 (NH-

11C)) for Proposed Elevated Road

starting from Ambedkar Junction to

Ajmer Road Junction for a length of

3kms in Jaipur City falling under Jaipur

Landmark Material

Testing And Research

Laboratory Pvt. Ltd

5.00 Lac Completed

Mail conformation on 06/04/2016

Page 20: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

Corridor - Package-I & II.

71.

Topographical Survey Plan of Existing

Land for solar Park at Badla Viilage

Phalodi (2650 Hect.) Phase – III rd

IL&FS Energy Ltd

Sub contract by CEGTH

Jaipur

19.50 Lac completed CEGTH&RC/WO/2014-15-325

On Dated 25/03/2015

72.

Topographical Survey & Auto Leveling

DGPS Control Point Work for Six Line

Project MSH-9 Nagpur to Armori

Maharastra Length 137 km

Theme Engineering

Services Pvt. Ltd

27.75 Lac Completed

Unknown

12/06/2015

73.

RTK and Statis Survey and establishing

control point at every 10 km from

Hamirpur to Mandi

Theme Engineering Services Pvt. Ltd

Completed Verbal Confirmation 06-04-2013

74.

Detailed Survey Plan of existing railway crossing taking all existing features like Building , railway track, Tin shades, B.T. roads, Nalla, Boundary /Compound walls, , WBM roads, wells, wire fencings, H.T. lines, EP lines, other utility services. Taking spot level rail top & each side 300 m. * LC‐200 Bassi * LC‐211 Dantli * LC‐70 Sitapura

Theme Engineering Services Pvt. Ltd

Completed MoU Dated 26-05-2015

75.

Detailed Survey Plan of existing site at Biradawal Phatek 105, Suratgarh, taking all existing features like Building , Tin shades, B.T. roads, Nalla, Boundary /Compound walls, , WBM roads, wells, tube wells, wire fencings, H.T. lines, EP lines, other utility services. Taking Contour Survey Plan & Taking Spot Level every 10 X 10 Grid. Contour Interval 0.25

Theme Engineering Services Pvt. Ltd

Completed Verbal Confirmation 02-08-2015

Page 21: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

Meter.

76.

Detailed survey plan & Contour survey

of existing site using with DGPS & total

& Khasra Superimposing work for resort

at Degana Rajasthan

Opulent Resorts

Pvt Ltd

Kolkota

0.50 Lac Completed

ORPL/Project/15-16/PO/01

On dated 11/06/2015

77. Taking all required measurement &

prepared existing Building drawing.

Jai Mahal Palace

Taj Group

0.50 Lac Completed WO/taj/2015/64 Dated

29th May 2015

78.

Service for Field Up-diction of ABD with

Auto Cad. Field Verification & prepared

ABD drawing as per required Format at

Jhalander city

V & A Ventures LLP.

(Reliance Power)

New Dehli

5.50 Lac Completed WO/JLD/00073

on dated 15th April 2015,

79.

Land Survey work study for new Projects

at Gunga-II Balasar Project and Dharvi

Kalan Project in Rajasthan.

Gamesa Wind Turbines

Pvt. Ltd

7.83

Lac

Completed 40873597 on

dated 17/03/2015

80. Land Survey work study for new Projects

at Gunga Balasar Project in Rajasthan.

Gamesa Wind Turbines

Pvt. Ltd

4.89

Lac

Completed 40873616 on

dated 17/03/2015

81.

Taking all Government features and

related to our Project like Canals, Border

windmill location, Road & rasta etc in

Ramgarh Village in Rajasthan.

Gamesa Wind Turbines

Pvt. Ltd

2.13

Lac

Completed 40830145 on

dated 24/11/2014

82.

Service for Field Up-diction of ABD with

Auto Cad. Field Verification & prepared

ABD drawing as per required Format at

Jhalander city

V & A Ventures LLP.

(Reliance Power)

New Dehli

5.50 Lac Completed WO/JLD/00052 on dated 17th Dec 2014,

83. Topographical Survey Plan of Existing Rays Power Infra 0.26 Lac Completed Rays/Ridhu/jul-14cs/WO-01

Page 22: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

Land for mini solar Park at kolayat

Viilage Bikane (15 Acre )

Private Limited Dated 25/07/14

84.

Topographical Survey Plan of Existing

Land for mini solar Park at kolayat

Viilage Bikane (86 Acre )

TecSo Projects Limited

Gujrat

1.50 Lac Completed TPL/PO/2014-15/1016 On dated 31 July

2014

85.

Digitization work of village map hard

copy, conversion in UTM with village

reference point, with Google image

superimposing work at various locations

in Rajasthan.

Gamesa Wind Turbines

Pvt. Ltd

4.88 Lac Completed 40779212 on

dated 26/06/2014

86. Layout Marking at given coordinates

at shri balaji campus.

Shri Balaji Industrial

products Ltd

0.18 Lac Completed No. 02/2014-15

Dated 24/06/014

87.

Digitization work of village map hard

copy, conversion in UTM with village

reference point, with Google image

superimposing work at various locations

in Rajasthan.

Gamesa Wind Turbines

Pvt. Ltd

3.25 Lac Completed 40785710 on

dated 15/07/2014

88.

Detailed Survey & DPR Project for

Proposed Agriculture Collage at Balara

Village Tehsil Kumhre Distt Bhartpur

Office of the Estate

Officer Jobner

0.18 Lac Completed SKANU/JOB/2013-2014

60-63

89.

Topographical Survey Plan of Existing

Land for solar Park at Badla Viilage

Phalodi (5000 Hect.) Phase 2nd

CEG test House Jaipur

7.50 Lac completed CEGTH&RC/WO/2013-14-625

On dated 21 Dec 2013

90. Carrying out Topographical survey Plan

Work for Regional WSS for 246 Village of

Saraswati Technical

Services (P)ltd

15.50 Lac Completed STS/2013-14/607

Dated 25th Nov2013

Page 23: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

Kaman& Pahari thasil Bhartpur

91.

Carrying out Topographical survey Plan

Work for Regional WSS for 199 Village of

Beawer tehsil Ajmer

Saraswati Technical

Services (P)ltd

12.36 Lac Completed STS/2013-14/608

Dated 25th Nov2013

92.

Detailed Survey & DPR Project for

Proposed route alignment at SH-62

Adjacent To Binnaigram Pindwada

Binani Cement 1.80 Lac Completed BCL/WO/2013-3014/34

Dated 05/09/2013

93.

Consultancy Service for Preparation of L-

Section for water supply schemes in

Gangapur Lift Canal

SPMAL Jaipur 17.37 Lac Completed SPML-/13-14/Gangapur/proj-

/c/01/41

94.

Preparation of water supply schemes for

laying Pipe lines in Bhilwara

Megha Engineering

Hyderabad

4.25 Lac completed MAIL/ Bhilwara –PHED(Raj)13-

14/W.O.1464

Date 10.09.13

95.

Survey Work for Off take work H

Narmada Canal DPR for 140 Village of

tehsil Gudamalani Badmer

PDCOR Limited 1.23 Lac completed PDCOR/BRWSP/226B

June 27 2013

96.

Survey Work for Off take work L

Narmada Canal DPR for 205Village of

Sheo & Ramsar, 322 Villgae of Choutan

Barmer

PDCOR Limited 1.11 Lac completed PDCOR/BRWSP/226A

June 27 2013

97.

Conducting survey in 668 village in jalor

dist. Capturing Latitude & Longitude &

secondary data collection of existing

water supply

PDCOR Limited 3.75 Lac completed PDCOR/Jalor/69A

April 26 2013

98. Preparation of L-Section for water Lahoty Builcaon 25.56 Lac completed LBL/2012-13/Ratangarh /648

Page 24: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

supply schemes in Fatehpur Ratan, Ghar 12/04/2013

99.

Consultancy Service for “Survey Along

the existing Road from Chikalwas Dam

to Railmagra via Rajamasnd

PDCOR Limited 1.24 Lac completed PDCOR/ Transport Hub /69A

April 26 2013

100.

Consultancy Service for Topographical

Survey of Mangli River for Chambal

Bisalpur Link Project

PDCOR Limited 0.70 Lac completed PDCOR/CBWS/982 A

Feb 22, 2013

101.

Consultancy Service for Survey &

demarcation Work of Existing Land at

Village Ramchandra pura Sitapura Jaipur

Pearl Krishnam

Developer

1.96 Lac completed SBPL 2012-13/05

15/02/2013

102.

Preparation of L-Section for water

supply schemes in AKELGARH , Krishi

upaj Mandi Kota

Lahoty Builcaon 0.74 lac completed LBL/2013-13/Akelgarh/444

24/12/2012

103.

Consultancy Service for Govt P.G.

Collage Campus & District Stadium

Campus Dausa

Public Work

Department

0.29 Lac completed Agreement no. 276/10590

01/11/2012

104.

Consultancy Service for Zila Parishad &

DJ Court Campus Dausa

Public Work

Department

0.29 Lac completed Agreement no. 275/10593

01/11/2012

105. Consultancy Service for Survey Work on

MDR 48 Km-0/00 to 4/300 Dausa

Public Work

Department

0.29 Lac completed Agreement no. 278/10757

08/11/2012

106.

Consultancy Service for Topographical

Survey for New Jail Building Campus

Dausa

Public Work

Department

0.29 Lac completed Agreement no. 70/1020

12/06/2012

Page 25: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

107. Consultancy Service for Contour Survey

for New Jail Building Campus Dausa

Public Work

Department

0.29 Lac completed Agreement no. 72/1819

15/06/2012

108. Detailed Survey Plan of Existing Colonies

at Dungarpur & Ganagapur

ChandraKala

Architecture

1.35 Lac completed CK-2011-8

24/4/2012

109.

Consultancy Service for Preparation of L-

Section for water supply schemes in

Nagaour Lift Canal

SPMAL Jaipur 12.29 Lac Completed SPML-124/12-13/Nagaur/proj-

/c/01/02

110.

Consultancy Service for Preparation of L-

Section for water supply schemes in

Nagaour Lift Canal

Lahoty Builcaon 1.03 Lac Completed LBL/2012-13/Nagour/317

26/06/2013

111.

Consultancy Service for Preparation of

Route Plan L-Section & Complete DPR

Report at Ratan garh

L & T Jaipur 2.70 Lac completed Unknown

112.

Consulting Service for Traffic Volume,

Origin/Destination Survey & Axle Load

survey

GVR Ajmer Nagaur

Tollway Private Ltd

2.45 Completed+

GVRAJNTPL/GEN/04/12-13

Sep 20 , 2012

113.

Topographical Survey & Auto Leveling

Work for Jaisalmer Barmer NH-15 Km

123/40 to 144/500 km Length 21 km

Thoughts Consultant

Jaipur Pvt Ltd

1.05 Lac Completed+

Unknown

20/12/2012

114.

Topographical Survey & Auto Leveling

Work for Shri Ganganagar Padampura

Road (Length-36 km)

Thoughts Consultant

Jaipur Pvt Ltd

1.08 Lac Completed+

Unknown

23/11/2011

115.

Preparation of water supply schemes for

laying Pipe lines in ChottorGarh

Megha Engineering

Hyderabad

1.23 Lac completed Chittorgarh/WSP/Rajasthan-

2010/11 WO.No.1012

Date 25.05.11

Page 26: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

116.

Preparation of Route Plan L-Section &

Complete DPR Report for Ambuja

Cement. At Marwar Mundwa for

Drinking water Line

Ambuja Cement

MERTA

3.56 Lac Completed+

2800246531

14.07.11

117.

Road alignment & Platform Survey for

our proposed wind farm project sites at

Udaipur

Suzlon Infrastructure

Service Limited

3.20 Lac completed 4500234517

20.07.11

118.

Detailed Survey Plan & 10x 10 m Grid

Contouring of Existing Land for Manglam

Cement (70.0 Hect.)

Mangalam Cement

Ltd

1.07 Lac completed

MC/PS/WO/15438

119.

Topographical Survey & Auto Leveling

Work for Chidawa Singana Road SH-13

Including Chidawa Bye pass ( Length 43

km)

Thoughts Consultant

Jaipur Pvt Ltd

1.16 Lac Completed+

Unknown

25/09/2010

120.

Topographical Survey & Auto Leveling

Work for Bhilwara Mandal garh Ladpura

Including Mandal Garh Byepass (Le

ngth 53 Km )

Thoughts Consultant

Jaipur Pvt Ltd

1.08 Lac Completed+

Unknown

02/09/2010

121.

Topographical Survey & Auto Leveling

Work for Beawer Ras Lambiya Merta

Road, Lambiya Jaitaran & Mangliyawas

Ras Road (Length 178 km)

Thoughts Consultant

Jaipur Pvt Ltd

5.34 Lac Completed+

Unknown

20/03/2010

122.

Road alignment & Platform Survey for

our proposed wind farm project sites at

Jodhpur & Jaiselmer,

Enercon India 4.55 Lac completed 9500023537

25.08.11

Page 27: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

Details of Empanelment with Central Govt/State Govt/ Development Authorities / Local Body etc. (Proof to be attached):

123.

Detailed Survey Plan by DGPS & Grid

Contouring of Existing Land 400KV

Power Grid Station Udaipur

EMCO Limited 0.35 Lac completed LOI/PPP-5/soil/2012/1

124. Route Alignment Survey for Proposed

Railway Yard.

Shree Cement 0 Lac completed SCL/Bwr/logistics/16810

125. Detailed Survey Plan & Contouring of

Govt. Engineering College at Bhartpur

Govt. Engineering

Collage

0.35 Lac completed GECB/2424

126. Contour Survey Plan of Existing Land at

Kota

Bengal City Nirman Pvt

Ltd

0.23 Lac completed TIG/KOTA/0001

127.

Page 28: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

128. Details of financial turn-over of Consultancy fee for last financial year and current year.

S. NO. Annual Turnover Year & turnover in Rs. Remarks/Page No.

1. 9,75,890.00 Finical Year 2009-2010 --------------------

2. 18,07,980.00 Finical Year 2010-2011 --------------------

3. 37,91,307.00 Finical Year 2011-2012 Audited

4. 32,50,765.00 Finical Year 2012-2013 Provisional

5. 65,25,746.00 Finical Year 2013-2014 Audited

6. 80,01,425.00 Finical Year 2014-2015 Audited

IN HOUSE FACILITIES

Page 29: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

In House Equipment (Survey)

Equipment Details Quantity (No’s / Set)

NAVCOM DGPS (SF-3040) Set

GeoMax DGPS (Zenith 10) Set

Total Station (HoriZon Destop 555 R, Sokia Set 500,Pentex-325)

Auto Levels (Sokkia 20 X C 41)

Auto Levels (Sokkia 22 X C33)

Auto Levels (Sokkia 24 X C 32)

04

02

12

03

05

04

Theodolites 03

Dumpy Level 03

Plane Table 08

Prismatic Compass 10

Measuring Tapes 20

Rodometer 06

Computer Facilities

The computer support of Dolphin Engineers consists of the following:

Page 30: General Information · General Information S. No. Question Response 1. Company Name Dolphin Engineer 2. Name and Contact information of contact person Rajesh Saxena C-49, B-3, Vidya

S. No. Equipment Details Quantity (No’s / Set)

A Hardware

a. Computers

Laptop (Hp Pavilion) 03

Curie 3 05

Core two 04

C2D 05

Total 17

b. Plotter A0 Size HP Design Jet 500 C (Up to 42”) 01

c. Printers 02

HP LaserJet 01

HP DeskJet 640 C 01

Canon S100SP 01

Total 03

d. Scanners (HP) 01