MANUFACTURING QUALITY PLAN OF ITEM CONTROL & RELAY PANELS UPTO 220kV SYSTEM Sampling Plan Testing Agency Remarks i Raw Material Inspection I Sheet Steel CRCA IS 513 z IS 513 b 100% IS 513 c Physical properties IS 513 IS 513 Manufacturer d Chemical Composition IS 513 IS 513 Manufacturer II Sheet metal fabricated parts a Dimensional check b Visual check III a Dimensional check b Visual check c Venson Electirc Private Limited Works : 331,9th Cross , 4th Phase, Peenya Industrial Area, Banaglore - 560 085 S.No Component / Operation & description of test Ref Doc & acceptance norm Venson / Manufacturer Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis) Dimensional confirmity incl. thickness Venson Plant Std Venson / Manufacturer Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis) Surface Finish and visual check incl. Venson / Manufacturer Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis) Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis) Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis) Venson Plant Std Venson Plant std Venson Review of test record at the time of final inspection (surveillance test) Venson Plant Std Venson Plant std Venson Review of test record at the time of final inspection (surveillance test) Fasteners ( Nuts, Bolts & Washers ) Venson Plant Std IS 1363 / 1364/ 1367/ 2016 / 2389 Venson / Manufacturer Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis) Venson Plant Std IS 1363 / 1364/ 1367/ 2016 / 2389 Venson / Manufacturer Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis) Mechanical test (TORQUE TEST AT 70N-M) Venson Plant Std Venson Plant Std Venson / Manufacturer Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

Upload: guru-mishra

Post on 06-Sep-2015

225 views

Category:

Documents


0 download

TRANSCRIPT

  • MANUFACTURING QUALITY PLANOF

    ITEM CONTROL & RELAY PANELS UPTO 220kV SYSTEM

    Sampling Plan Testing Agency Remarks

    i Raw Material Inspection

    I Sheet Steel CRCA IS 513

    z IS 513

    b 100% IS 513

    c Physical properties IS 513 IS 513 Manufacturer

    d Chemical Composition IS 513 IS 513 Manufacturer

    II Sheet metal fabricated parts

    a Dimensional check

    b Visual check

    III

    a Dimensional check

    b Visual check

    c

    Venson Electirc Private Limited Works : 331,9th Cross , 4th Phase, Peenya Industrial Area, Banaglore - 560 085

    S.NoComponent / Operation &

    description of testRef Doc &

    acceptance norm

    Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Dimensional confirmity incl. thickness

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Surface Finish and visual check incl.

    Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std Venson Plant std Venson Review of test record at the time of final inspection (surveillance test)

    Venson Plant Std Venson Plant std Venson Review of test record at the time of final inspection (surveillance test)

    Fasteners ( Nuts, Bolts & Washers )

    Venson Plant StdIS 1363 / 1364/ 1367/ 2016 / 2389

    Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant StdIS 1363 / 1364/ 1367/ 2016 / 2389

    Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Mechanical test (TORQUE TEST AT 70N-M)

    Venson Plant Std Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

  • MANUFACTURING QUALITY PLANOF

    ITEM CONTROL & RELAY PANELS UPTO 220kV SYSTEM

    Sampling Plan Testing Agency Remarks

    Venson Electirc Private Limited Works : 331,9th Cross , 4th Phase, Peenya Industrial Area, Banaglore - 560 085

    S.NoComponent / Operation &

    description of testRef Doc &

    acceptance norm

    IV Insulating Material

    a Dimensional check IS 2036

    b Visual check IS 2036

    c Tensile Strength IS 2036 IS 2036 Manufacturer

    d Dielectric Strength IS 2036 IS 2036 Manufacturer

    V Name Plate

    Dimensional check 100%

    Visual check 100%

    VI PVC insulated Cable

    a Conductor

    i Resistance Check IS 694

    ii Annealing Check IS 694 IS 694 Manufacturer

    iii Diameter Check IS 694 IS 694

    b IS 694 IS 694 Manufacturer

    c Visual check IS 694 IS 694

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    High Voltage test at 2.5 kv for 1 min

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

  • MANUFACTURING QUALITY PLANOF

    ITEM CONTROL & RELAY PANELS UPTO 220kV SYSTEM

    Sampling Plan Testing Agency Remarks

    Venson Electirc Private Limited Works : 331,9th Cross , 4th Phase, Peenya Industrial Area, Banaglore - 560 085

    S.NoComponent / Operation &

    description of testRef Doc &

    acceptance norm

    d IS 694

    e IS 694 IS 694 Third Party Lab

    f HV Water Immersion Test IS 694 IS 694

    VII

    a 100%

    b IS 1248

    c Calibration check 100% IS 1248

    VIII

    a Visual inspection 100%

    b Check for healthiness 100%

    VIII

    a 100%

    b 100%

    Check for thickness of insulation & Overall dimension

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Flammability test ( When required )

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Measuring and other panel mounted (Instruments Voltmeter, Ammeter, Frequency Meter, Wattmeter, etc )

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Operational checks including current injection test

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Chart Recorders (if applicable)

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Control Switches Selector switches

    Visual inspection incl rating and type

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Check for proper fixing of inscription plates in Panel

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

  • MANUFACTURING QUALITY PLANOF

    ITEM CONTROL & RELAY PANELS UPTO 220kV SYSTEM

    Sampling Plan Testing Agency Remarks

    Venson Electirc Private Limited Works : 331,9th Cross , 4th Phase, Peenya Industrial Area, Banaglore - 560 085

    S.NoComponent / Operation &

    description of testRef Doc &

    acceptance norm

    c 100%

    d 100%

    IX

    a Visual check 100% Manufacturer

    b Functional check 100% Manufacturer

    i. Calibration 100% Manufacturer

    ii. Accuracy and range 100% Manufacturer

    100%

    X HRC Fuse Link

    a Visual check 100%

    b Continuity test 100%

    XI Space heater

    a Visual check 100%

    b IR value 100%

    Continuity check for contact in different position ( Mechanical operation )

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    High Voltage test in control panel

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Energy meter (if applicable) 3 ph, 3 wire

    Venson Plant Std

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    iii. High voltage test in control panel assembly

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std Venson / Manufacturerrecord/manufacturers test certificate at the time of final

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

  • MANUFACTURING QUALITY PLANOF

    ITEM CONTROL & RELAY PANELS UPTO 220kV SYSTEM

    Sampling Plan Testing Agency Remarks

    Venson Electirc Private Limited Works : 331,9th Cross , 4th Phase, Peenya Industrial Area, Banaglore - 560 085

    S.NoComponent / Operation &

    description of testRef Doc &

    acceptance norm

    c H.V. Test 100%

    d Functional test 100%

    XII Rubber Gasket

    a Hardness 100%

    b Chemical Composition 100% Manufacturer

    c Visual and dimensional 100%

    d 1 x sample per batch Manufacturer

    e Verification of shelf life 100% Manufacturer

    f 1 per lot Manufacturer

    XIII Thermostat

    a Visual check 100%

    b H.V. Test in panel assembly 100%

    c 100%

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std Venson

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Fire retardant test for neoprene rubber

    Venson Plant Std

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Accelerated ageing Venson Plant Std

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Functional test in panel assembly

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

  • MANUFACTURING QUALITY PLANOF

    ITEM CONTROL & RELAY PANELS UPTO 220kV SYSTEM

    Sampling Plan Testing Agency Remarks

    Venson Electirc Private Limited Works : 331,9th Cross , 4th Phase, Peenya Industrial Area, Banaglore - 560 085

    S.NoComponent / Operation &

    description of testRef Doc &

    acceptance norm

    XIV Terminal blocks

    a Visual check 100%

    b 100%

    c 100%

    d 100%

    XV Plug socket and switch

    a Visual check 100%

    b 100%

    c Insulation resistance 100%

    XVI

    a Dimensional check 100%

    b 100%

    XVII Push button with element 100%

    a Visual check 100%

    b 100%

    c 100%

    d 100%

    XVIII Indicating lamp assembly

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    IR value check in panel assembly

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Continuity check in panel assembly

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Dielectric test in panel assembly (HV test)

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    High voltage test (in panel assembly)

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Earth busbar

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Visual check for surface defects and waviness

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std Venson / Manufacturer

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    High voltage test in panel assembly

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Continuity test in panel assembly

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Operational test in panel assembly

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

  • MANUFACTURING QUALITY PLANOF

    ITEM CONTROL & RELAY PANELS UPTO 220kV SYSTEM

    Sampling Plan Testing Agency Remarks

    Venson Electirc Private Limited Works : 331,9th Cross , 4th Phase, Peenya Industrial Area, Banaglore - 560 085

    S.NoComponent / Operation &

    description of testRef Doc &

    acceptance norm

    a Visual check 100%

    b 100%

    c 100%

    XIX

    a Visual check (range) 100%

    b Accuracy 100%

    c 100% Venson Plant Std Venson / Manufacturer

    d 100%

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    High voltage test in panel assembly

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Operational test in panel assembly

    Venson Plant Std Venson / ManufacturerReview of test record at the time of final inspection (surveillance test)

    Transducer ( if applicable)

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    High voltage test in panel assembly

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

    Operational test in panel assembly

    Venson Plant Std Venson / Manufacturer

    Review of test record/manufacturers test certificate at the time of final inspection. (surveillance basis)

  • MANUFACTURING QUALITY PLANOF

    ITEM CONTROL & RELAY PANELS UPTO 220kV SYSTEM

    Sampling Plan Testing Agency Remarks

    Venson Electirc Private Limited Works : 331,9th Cross , 4th Phase, Peenya Industrial Area, Banaglore - 560 085

    S.NoComponent / Operation &

    description of testRef Doc &

    acceptance norm

    XX

    a Functional check 100%

    b 100%

    c 100%

    d Routine test 100%

    XXI Mimic strip

    a 100%

    b Dimensional check 100%

    XXII

    a 100% Manufacturer

    b 100% Manufacturer

    c 100% Manufacturer

    Annunciators (including window)

    Venson Plant standard

    Venson Plant Std

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    High voltage test in panel assembly

    Venson Plant standard

    Venson Plant Std

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Visual check- Rating, type, inscription and size

    Venson Plant standard

    Venson Plant Std

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Venson Plant standard

    Venson Plant Std

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Visual check for colour and symbol

    Venson Plant standard

    Venson Plant Std

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Venson Plant standard

    Venson Plant Std

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Semaphore indicators/hooter/bell/buzzer/test terminal block/door switch/ lamp/ fluroscent/incandescent lamp /fuse fittings

    Visual check/type and rating check

    Venson Plant standard

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Functional check in panel assembly

    Venson Plant standard

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    High voltage test in panel assembly

    Venson Plant standard

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

  • MANUFACTURING QUALITY PLANOF

    ITEM CONTROL & RELAY PANELS UPTO 220kV SYSTEM

    Sampling Plan Testing Agency Remarks

    Venson Electirc Private Limited Works : 331,9th Cross , 4th Phase, Peenya Industrial Area, Banaglore - 560 085

    S.NoComponent / Operation &

    description of testRef Doc &

    acceptance norm

    XXIII Current operated relay

    a Continuity check 100% IS 3231 / IEC 255 Manufacturer

    b 100% IS 3231 / IEC 255

    c Visual check 100% IS 3231 / IEC 255 Manufacturer

    XXIV Voltage operated relay

    a Check for healthiness 100% IS 3231 / IEC 255 Manufacturer

    b 100% IS 3231 / IEC 255 Manufacturer

    c Visual check 100% IS 3231 / IEC 255 Manufacturer

    XXV Trip circuit supervision relay

    a Functional check 100% Manufacturer

    c Indication check

    d HV test for 2 KV for 1 minute

    e

    XXV

    a Pickup / Dropout test 100% IEC 255/IS 3231 Manufacturer

    b HV test at 2 KV for 1 minute 100% IEC 255/IS 3231 Manufacturer

    c 100% IEC 255/IS 3231 Manufacturer

    d Timing check as applicable 100% IEC 255/IS 3231 Manufacturer

    e Contact configuration check 100% IEC 255/IS 3231 Manufacturer

    Review of test record at the time of final inspection ( Surveillance basis)

    High voltage test in panel assembly

    Venson Plant StdReview of test record at the time of final inspection ( Surveillance basis)

    Review of test record at the time of final inspection ( Surveillance basis)

    Review of test record at the time of final inspection ( Surveillance basis)

    High voltage test in panel assembly

    Review of test record at the time of final inspection ( Surveillance basis)

    Review of test record at the time of final inspection ( Surveillance basis)

    Venson Plant standard

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Routine tests as per IS3231 / IS8686 / IEC255

    Fully assembled Aux. Relays / Latch realys

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Routine tests as per IS3231 / IS8686 / IEC255

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

  • MANUFACTURING QUALITY PLANOF

    ITEM CONTROL & RELAY PANELS UPTO 220kV SYSTEM

    Sampling Plan Testing Agency Remarks

    Venson Electirc Private Limited Works : 331,9th Cross , 4th Phase, Peenya Industrial Area, Banaglore - 560 085

    S.NoComponent / Operation &

    description of testRef Doc &

    acceptance norm

    f 100% IEC 255/IS 3231 Manufacturer

    g 100% IEC 255/IS 3231 Manufacturer

    h 100% IEC 255/IS 3231 Manufacturer

    I fixing of name plate/ sticker 100% IEC 255/IS 3231 Manufacturer

    XXVIII Paints

    a) Paint shade IS 101/IS 5 Manufacturer

    b) Viscosity IS 101 Manufacturer

    Flag / indication check as applicable

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Reset operation check as applicable

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Adjust the required settings / resetting characteristices

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    1x Drum per batch%

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    1x Drum per batch%

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

  • MANUFACTURING QUALITY PLANOF

    ITEM CONTROL & RELAY PANELS UPTO 220kV SYSTEM

    Sampling Plan Testing Agency Remarks

    Venson Electirc Private Limited Works : 331,9th Cross , 4th Phase, Peenya Industrial Area, Banaglore - 560 085

    S.NoComponent / Operation &

    description of testRef Doc &

    acceptance norm

    B IN PROCESS INSPECTION

    1 Fabrication of enclosure

    I Visual check Manufacturer

    ii Dimensional check Manufacturer

    2 100%

    a 100% Manufacturer

    Daily Manufacturer

    -Bath temperature Every four hour 75-85 deg C Manufacturer

    b 100% Manufacturer

    c 100% Manufacturer

    Daily 20 - 26 Manufacturer

    d 100% Manufacturer

    e 100% Manufacturer

    Daily 2-4 pH

    Bath temperature Every four hour

    f) 100%

    g) 100%

    Daily 2-4 pH

    h) Hot air drying 100%

    Shearing, punching, bending marking, deburring & nibbling

    1 x sample from each batch

    Venson Plant standard

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    1 x sample from each batch

    Venson Plant standard

    Review of test record / manufacturers test certificate at the time of inspection ( Surveillance basis)

    Pre-treatment by 7 tank process

    Venson Plant standard

    Degreasing for 20-25 minutesReview of lab test record at the time of inspection ( on random basis)

    -Bath pointage80-100 for P20 , 50-70 for S 398

    Review of lab test record at the time of inspection ( on random basis)

    Review of lab test record at the time of inspection ( on random basis)

    Water rinsing( 30-60 seconds) at ambient temperature

    Degreasing Solution should be removed

    Review of lab test record at the time of inspection ( on random basis)

    De Rusting for 5 - 10 minutes at ambient temperature

    Venson Plant standard

    Review of lab test record at the time of inspection ( on random basis)

    - Bath pointageReview of lab test record at the time of inspection ( on random basis)

    Water rinsing( 30-60 seconds) at ambient temperature

    Degreasing Solution should be removed

    Review of lab test record at the time of inspection ( on random basis)

    Phosphating for 8-12 minutesVenson Plant standard

    Review of lab test record at the time of inspection ( on random basis)

    Bath pointage Venson / ManufacturerReview of lab test record at the time of inspection ( on random basis)

    65-700 C Venson / Manufacturer

    Review of lab test record at the time of inspection ( on random basis)

    Water Rinsing (30 to 60 seconds) at ambient temperature

    Venson Plant Std Venson / Manufacturer

    Review of lab test record at the time of inspection ( on random basis)

    Passivation for 1 minute Venson Plant Std Venson / Manufacturer

    Bath pointage Venson / ManufacturerReview of lab test record at the time of inspection ( on random basis)

    Venson Plant Std Venson / ManufacturerReview of lab test record at the time of inspection ( on random basis)

  • MANUFACTURING QUALITY PLANOF

    ITEM CONTROL & RELAY PANELS UPTO 220kV SYSTEM

    Sampling Plan Testing Agency Remarks

    Venson Electirc Private Limited Works : 331,9th Cross , 4th Phase, Peenya Industrial Area, Banaglore - 560 085

    S.NoComponent / Operation &

    description of testRef Doc &

    acceptance norm

    i) Scratch test

    Scratch by blunt knife Once/lot IS 3618 should show wh

    j) Visual Once/lot

    3 Painting

    a) Paint shade 1x Sample from batc

    b) Surface finish 1x Sample from batc

    c) Coating thickness 1x Sample from batc

    4

    i. Visual check 100%

    ii. Dimensional check 100%

    c)

    Relay and Control panel

    I ROUTINE TESTS

    a) 100% IS 8623 Inspection report

    b) 100% IS 8623 Inspection report

    c) Verification of bill of material 100% Approved drawing Inspection report

    d) 100% IS 8623 Inspection report

    e) IS 8623 Inspection report

    f) -

    Venson / ManufacturerReview of lab test record at the time of inspection ( on random basis)

    Venson / Manufacturer

    Review of lab test record at the time of inspection ( on random basis)

    Uniform grain size and should be free from crystal growth

    Venson / ManufacturerReview of lab test record at the time of inspection ( on random basis)

    Venson Plant Std Venson / ManufacturerLog book and NCR in case of deviations

    Venson Plant Std Venson / ManufacturerLog book and NCR in case of deviations

    Venson Plant Std Venson / ManufacturerLog book and NCR in case of deviations

    Structural sub-assembly and assembly including bolting

    Venson Plant Std Venson / ManufacturerReview of test record at the time of inspection ( Surveillance basis)

    Venson Plant Std Venson / ManufacturerReview of test record at the time of inspection ( Surveillance basis)

    FINAL INSPECTION & TESTING

    Venson / Manufacturer

    Visual check for basic assembly and mimic diagram/dimensional confirmity/finish and workmanship/door alignment/dust proofing/door earthing

    Venson / Manufacturer

    Visual check for mounting of all equipments and terminal block marking

    Venson / Manufacturer

    Venson / Manufacturer

    Verification of wiring/continuity check

    Venson / Manufacturer

    Operation and scheme test for all relays,metres,annunciations etc.

    Venson / Manufacturer

    Operation test (electrical control interlock & sequential operation)

    Venson / Manufacturer

  • MANUFACTURING QUALITY PLANOF

    ITEM CONTROL & RELAY PANELS UPTO 220kV SYSTEM

    Sampling Plan Testing Agency Remarks

    Venson Electirc Private Limited Works : 331,9th Cross , 4th Phase, Peenya Industrial Area, Banaglore - 560 085

    S.NoComponent / Operation &

    description of testRef Doc &

    acceptance norm

    100% IS 8623 Inspection report

    100% IS 8623 Inspection report

    100% IS 8623 Inspection report

    100% IS 8623 Inspection report

    g) 100% IS 8623 Inspection report

    h) IR value test (after HV test) 100% IS 8623 Inspection report

    i) Approved drawing Inspection report

    i. Dry film thickness check 100% Inspection report

    100% Inspection report

    iii. Check for shade 100% Inspection report

    iv Adhesion check 100% Inspection report

    for VENSON ELECTRIC PRIVATE LIMITED

    i. Current injection test on all instruments/meters

    Venson / Manufacturer

    ii. Annunciation sequence check

    Venson / Manufacturer

    iii. Annunciation inscription detail test

    Venson / Manufacturer

    iv. Check for earthing continuity between earth apparatus and earth bar by buzzer.

    Venson / Manufacturer

    H.V. test between all terminal and earth

    Venson / Manufacturer

    Venson / Manufacturer

    Painting (As per POWERGRID approved proceedure)

    Venson / Manufacturer

    Venson Plant Std Venson / Manufacturer

    ii. Surface finish (visual check0

    Venson Plant Std Venson / Manufacturer

    Venson Plant Std Venson / Manufacturer

    Venson Plant Std Venson / Manufacturer