geo-information governance: application of geospatial ... zakaria.pdf · geo-information...
TRANSCRIPT
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
GEO-INFORMATION GOVERNANCE: APPLICATION OF GEOSPATIAL TECHNOLOGY TO MANAGE UTILITY SERVICES IN BSP
Asia Geospatial Forum
17-19 September 2012
Hanoi, Vietnam
Junit Zakaria
Head Geomatics Services
Brunei Shell Petroleum Company Sdn Bhd
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
Introduction & Historical Background
Since the first discovery of oil in 1929, Brunei Shell Petroleum (BSP) has become a leading oil & gas company in Brunei till today.
Vast amount of infrastructures and utilities had been built and installed over the years to support the exploration and production (E&P) activities.
Geomatics department plays a very important role in managing these assets to ensure one knows what is where. This is not an easy task: - Data and information kept in different places and different forms - Work process- Geomatics not always engaged/involved in
installation/modifications of (new) utilities - Different data standards and formats.
History of mapping and geo-information management in BSP has gone a long way, and technology has completely revolutionised the process.
Today, with the GIS technology, everyone can have access to any spatial information with a press of a button on his/her personal computer (almost)!
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
Geomatics in the E&P Lifecycle
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
Development of Mapping & Spatial Data Management in BSP Application of Technology
From To
Pre-1980s
Paper Documents
Master Cartographic data on paper maps
Master Coordinates data on paper tables
Mid-1980s
MicroStation DGN
Master Cartographic data in DGN format, Map documents in DGN format
Master Coordinates data in digital ASCII file or spreadsheet.
1997~2000
Shell GG (Group GIS) based on GenaMap
Master data still in DGN format, GG provide GIS functionalities for business support.
2001 Present
ArcSDE GeoDatabase
Master Cartographic data, coordinates data in ArcSDE GeoDatabase
Map documents in ESRI .mxd format.
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
Development of Mapping & Spatial Data Management in BSP Application of Technology
From To
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
SEISMIC_SEILO_XGP
SEISMIC_SEILO_DXT
SEISMIC_SEILO_XGL
VISUALISATION VIEW CONTROL DISSOLVE
SPATIAL SELECTION DATABASE QUERIES EXPORT MAP
SELECTION MANAGEMENT REPORTING UNION
BOOLEAN AND PROXIMITY BUFFER INTERSECT
INTERFACE CONFIGURATION REPORT/GRAPH PLOTTING
Seismic Lines Map
Environmental Map
Pipelines & Utilities
Map
Concessions Map
Wells Map
ENVI_OILSPILL_HSE
ENVI_MINERAL_HSE
PIPE_GENERAL_OPD
PIPE_EDE
PIPE_SERVICE_OPD
ASSETS_LGL
ASSETS_XGM
WELLS_XGM
WELLS_OPD
WELLS_DRO
Seismic
Environment
Pipeline
Concession
Wells
Shared Digital Data Geographical Information Systems Attribute Data Shared
Oracle Table
File
Export Report
GIS Concept
Plot
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
BSP Infrastructure
214 offshore platforms, 45 onshore facilities (manifold stations, tank terminals, production plants, etc.)
Approximately 1600 km onshore and 2200 km offshore pipelines Approximately 1200 km onshore and 1800 km offshore cables (Electrical,
Telecoms, etc.)
C PDP- 3 3
EAST OI L PI PELI NES
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
Geo-Governance in BSP
Managing geospatial information is a critical task. To ensure good data is maintained, proper standards and procedures must be followed.
2) Permit To Work (PTW) A mandatory control system required prior to
executing any work. Part of Health Safety & Environment (HSE)
Critical Procedures a legal requirement!
1) Mappable Changes Policy High level governance, along with other policies of
the Company Translated into procedures, contractual
specifications, work instructions, etc.
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
Geospatial Data Integrity Failures Examples of what could go wrong if geo-information is not managed properly
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
Mappable Changes Policy
Main issues with Geo-information management:
1) Missing/incomplete data
Survey not done / not completed
Survey data not provided to Geomatics
2) Data quality (accuracy, validity, consistency, out-of-date, etc.)
Wrong coordinates (system)
Communication failure to inform Geomatics
Data ownership
Lack of coordination - different parties conducting different activities
Non-compliance
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
Mappable Changes Policy
How does Mappable Changes Policy help:
1) Enforcement Responsibility of all asset owners to ensure their assets are correctly and
completely mapped in the Corporate map database Responsibility of all asset owners to inform Geomatics of any mappable
change to their assets.
2) Consequence management
In the event of an incident due to failure to comply with the Mappable Changes policy will lead to a consequence management, which may result in disciplinary action, including
- dismissal of individuals - termination of contracts, etc.
IF YOU CANT MAP IT, YOU CANT MANAGE IT!
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
BSPs Permit To Work (PTW) System
The main objectives of the PTW system in BSP are:
to prevent incidents that may lead to harm to People, Environment, Asset or Reputation (PEAR)
to ensure that all necessary measures are taken to provide a safe working environment to identify the potential hazards and risks ahead of starting work
to ensure that everyone involved in the work is fully aware of the scope of the work, any potential hazards and risks
to ensure everyone involved in the work fully understand the controls to be implemented to mitigate the hazards and risks.
Type of Permits:
Hot Work (naked flame), Hot Work (spark potential), Cold Work, and Cold Work (equipment disjointing).
A requirement under Legislation of Brunei Darussalam Workplace Safety and Health Order 2009
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
PTW Mapping
Permit To Work Procedure Excavation Certificate:
As part of the Permit an Excavation Certificate is required if any excavation is undertaken at a depth greater than 0.3 m
The Excavation Certificate consists of:
An application form with specific details of the excavation required
A valid PTW map displaying topographic information and all utilities. PTW maps have a 3 month validity period.
Use of a Cable Avoidance Tool
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
PTW Mapping
Typical example: Trenching for a new pipeline installation
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
PTW Mapping
The reality in the ground
How it looks in the excavation trench!
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
PTW applicant makes a map request to Geomatics team Geomatics team prepares the PTW map, highlighting
the area of interest list of affected utilities reference to Mappable Changes policy for as-built surveys
Upon work completion, Work Executer informs Geomatics of any new changes to the map.
PTW Mapping Process
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
PTW Mapping: Geomatics Follow up
Geomatics team ensures everyone from PTW applicant to field Work Executer understands the Mappable Changes Policy requirements. What to do when work is completed and when to call out Geomatics surveyors. What to do if they come across any infrastructure which is not on the maps or if
map data does not match the infrastructure in the field.
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
PTW Mapping: Geomatics Follow up
Geomatics surveyor conduct as-built survey of the new/additional infrastructures using the field-to-finish technique.
Field-to-Finish using Leica Mobile Matrix :
A field solution for the interactive acquisition,
processing, visualization and maintenance of survey data
features.
Workflow:
Project Start
Check-Out Check-In
Field Work
ArcSDE
Map before the survey
Map after (with displayed cable on screen):
A surveyor conducting the survey, equipped with a tablet PC containing a digital copy of the map, and integrated with RTK GPS positioning system.
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED
Conclusion and Recommendation
Geomatics department plays a vital role in managing BSPs assets infrastructures, facilities, utilities. Accurate and reliable maps are essential for safe operations. GIS technology provides the means to do this efficiently.
The PTW Mapping workflow and Mappable Changes policy go hand in hand and together form a key governance to ensure up-to-date and accurate spatial database is maintained.
The issue, however, does not end here... The ground is also used by others:
- public sectors (electrical, water, telecoms, etc)
- other oil & gas operators (similar to BSP).
Therefore, need to address this geo-governance issue at the national level a regulatory body... next step?
IF YOU CANT MAP IT, YOU CANT MANAGE IT!
-
Brunei Shell Petroleum Company Sdn Bhd September 2012 RESTRICTED Brunei Shell Petroleum Company Sdn Bhd
Thank You