GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING

Tyrel Hulet, P.E. – Trihydro Corporation Mark Donner, P.E. – Trihydro Corporation

Page 2: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Special Thanks Wyoming AML

Division Arch of Wyoming Herrera

Environmental Consultants – Len Ballek

Landowner – Don Calvert

Mk Weeden Construction – Mark Rosenbaum and Monte Weeden

Page 3: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Presentation Overview

Project Location Rosebud Pit Site

Conditions Project Goals Coordination Design Approach Project Discussion Conclusions

Rosebud Pit, WY – Your new winter destination

Page 4: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Project Location

Hanna Basin

Within active mining permit boundary

South-central Wyoming

2 miles west of Hanna, Wyoming

Elevation – Approx. 6,800ft.

Google Maps

Project Location

Page 5: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Rosebud Pit Background

Page 6: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Rosebud Site Conditions - Upper

Highwall Overburden Pile

Pond

Coal Slack

Page 7: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Rosebud Site Conditions - Lower

Arch of Wyoming Reclamation

Overburden Pile

Highwall

Page 8: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Project Goals Mitigate physical

hazards Backfill pond Decrease highwall

and spoil pile slopes Encapsulate coal slack

and unsuitable material

Improve wildlife habitat

Improve area for stock grazing

Page 9: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Coordination

Wyoming Land Quality Division

Memorandum of Understanding

Wyoming Game and Fish Department

Private landowner

Wyoming AML funded and managed reclamation Site falls within active mining permit boundary administered by

Arch of Wyoming

Page 10: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Design Approach Natural Regrade Design using

Carlson Civil GeoFluv Software Open basin design Nearby reference areas Reduce erosion Considerable success on Wyoming

AML projects

Pond De-watering and Backfill Discharge De-watering alternatives

Re-vegetation Soil Amendments Vegetation/soil survey

Continued Use Landowner Arch of Wyoming

Page 11: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Design Approach – NR Input

Grading boundary Channel locations A-channels Drainage density Straightline

Slopes Main channel

slope at mouth Precipitation data

Page 12: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Project Discussion

De-water the pond Removal of coal slack Earthmoving Re-vegetation

Bidding 6 qualified bidders $2.5 Mil Avg.

Contractor Mk Weeden Construction Contract Water Service

Construction November 2012 – May 2013

Page 13: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Project Discussion – De-watering

Land application Impoundments Backfill pond

Page 14: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Project Discussion – Earthmoving Earthmoving work

began concurrently with de-watering

Surveying Dozer ripping of

highwall Slot dozing with D10

and D11 bulldozers Most of material

moved by 637 Scrapers Blasting (change order)

Over-cutting makes the superintendent angry!

Page 15: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Project Discussion – Earthmoving

Page 16: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Project Discussion – Earthmoving

Page 17: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Project Discussion – Earthmoving

Page 18: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Project Discussion – Blasting

Page 19: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Project Discussion – Finish Grading

Page 20: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Project Discussion – Re-vegetation Pre-ripping/disking Manure application Fertilizing Pit seeding

Page 21: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Conclusion – Final Product

Before After

Page 22: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Conclusion – Final Product

Page 23: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Conclusion – Final Product

Regraded surface blends with surroundings

Revegetation success – Finally!

After

Before

Page 24: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Conclusion – Lessons Learned

Under-estimated competency of native sandstone More test pitting Fill shrink factor Additional Information for Contractor Weather difficulties MOU boundaries

Page 25: GEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMINGnaamlp.net/2014technical/presentations/Hulet.pdfGEOMORPHIC RECLAMATION OF THE ROSEBUD PIT, WYOMING Tyrel Hulet, P.E. – Trihydro

Questions? Comments?