GEOSYNTHETIC REINFORCED SOIL –INTEGRATED BRIDGE SYSTEM

(GRS‐IBS)

GRS‐IBS Overview, Case Studies, & MDOT Perspective   

Chris D. Johnecheck, P.E.Geotechnical Engineer

Michigan Department of Transportation

2015 COUNTY ENGINEERS CONFERENCEFebruary 3‐5, 2015

Page 2: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

What is GRS-IBS?

FHWA Every Day Counts-2 (EDC-2) Initiative• Technology developed as part of the Accelerated Bridge

Construction

MDOT’s Goal: Develop awareness of GRS-IBS in bridgeowners and designers within the state of Michigan. Develop State specific plans and specifications for a demonstration project. Let at least one bridge with this technology.

Page 3: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

GRS DEFINED…………..

Conventional Bridge - Design is comprised of• Foundation• Substructure• Superstructure.

GRS-IBS is also comprised of three components• Reinforced Soil Foundation (RSF) – Aggregate wrapped in

layers of geotextile. • GRS Abutment - Alternating layers of soil and

geosynthetic reinforcements. Faced with concrete blocks.• IBS – Beams, guardrail, and deck (HMA or concrete).

Page 4: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

Abutment Cross Section of GRS-IBS

Page 5: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

RSF – Keefer Highway Project

Page 6: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

GRS AbutmentKeefer Highway Project

Page 7: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

IBS – Pre-Cast Concrete Box BeamsKeefer Highway

Page 8: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

GRS IBS - Design Considerations

Types of Facing Used for GRS IBS

8

Sheet Pile

CMU

Pre‐cast panelLarge Wet Cast Block

SRW

Image source: Town of North Haven, ME

Image source: PA DOT

Image source: Utah DOT Image source:  Scott County, IA

Image source: Colorado DOT

Page 9: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

GRS IBS – Implementation Progress 190 Bridges nationally in 43 states including PR and DC ‐ September 2014

9

No GRS projects

Federal & local project

Only Federal agency projects

State DOT utilizing GRS IBS

CA

AZ

CO

NM

TX

OK AR

LA

MO KY

AL GA

FL

VA

OH

MI

VTAK

MT

NV

MEWA

OR

UTKS

IDWY

ND

SD

MN

NE

WI

IAIL IN

MS

TNSC

NC

WV

PA

NY

CT

DE

MD

DC

MANH

PR

HI

RI

6

2

9

1

5

4

1

1

8

3

3

33

1

1

2

15

1

2

165

1

1

8

11

2

5

3

1

6

2

3 4

1

33

2

2

3

4

1

1

NJ4

1

Image source:  FHWA

1

Page 10: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

Cross Section of GRS-IBS

Page 11: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

Challenge:Improve Local Agency Bridges

Local Agencies• Structurally Deficient Bridges > 1000

556 Poor Bridges 459 Serious and Critical

Page 12: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

Local AgencyBridge Replacement Needs

675 Single-Span Poor Bridges

Page 13: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

Guidelines on Design and Use

At Structure Study, Consider for:• One-span structures only, less than 140 ft span,• Low traffic volume county roads and state trunklines,• Grade crossings or roads crossing streams, creeks, and drains

that have suitable hydraulic conditions (i.e., low velocity and scour),

• Abutment heights less than 30 feet.• “Good” Foundation Soils

Page 14: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

Design Development

Design Manual – Geosynthetic Reinforced Soil Integrated Bridge System Interim Implementation Guide, June 2012, FHWA-HRT-11-026

Initial Design Steps• Establish Project Requirements• Perform Site Evaluation• Evaluate Project Feasibility…………

Page 15: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

Geosynthetic Reinforced SoilIntegrated Bridge System Interim Implementation Guide

Publication No. FHWA‐HRT‐11‐026 June 2012

Page 16: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

Michigan Department of TransportationSpecial Provision for

Geosynthetic Reinforced Soil Abutment12DS206(G355)

Page 17: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

Design Development

Design Manual – Geosynthetic Reinforced Soil Integrated Bridge System Interim Implementation Guide, June 2012, FHWA-HRT-11-026

Initial Design Steps• Establish Project Requirements• Perform Site Evaluation• Evaluate Project Feasibility…………

Page 18: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

GRS-IBS Considerations Requires early geotechnical and hydraulic analysis to

determine GRS abutment feasibility. Requires good communication between structural and

geotechnical engineers.Cross Section of GRS-IBS Abutment

Page 19: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

GRS-IBS Considerations (continued)

Perform thorough QC testing of materials during construction.

Provide enough lead time between let date and construction start date for block testing.• 90 day freeze thaw testing requires 3 to 4 months depending on

lab capabilities. Exception: Manufacturer has tested lot already.

Page 20: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

Summary

Encourage CRCs to look at GRS-IBS during Structure Study.

Plans and special provision for a County/MDOT/FHWA funded project have been developed.

One project let: Keefer Highway over Sebewa Creek.

MDOT is actively searching for an appropriate trunkline to use GRS-IBS.

If technology becomes widely used, develop specific design guidance for MDOT funded projects.

Page 21: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

Questions?

Thank you!

Page 22: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

GRS-IBS in Luverne, MNBridge Length = 77.5 ft, Wall Height ~ 22.5 ft

Page 23: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM
Page 24: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM
Page 25: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM
Page 26: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

NY – CR 38, St. Lawrence County

Page 27: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

PA – Sandy Creek Bridge

Page 28: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

PA – Sandy Creek Bridge

Page 29: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

IL – Great Western Trail overGrace Street

Page 30: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

FL – Nassau County

Page 31: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

SD – 8th Street, Custer

Page 32: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEMctt.mtu.edu/sites/ctt/files/resources/cew2015/day1/2-johnecheck... · GEOSYNTHETIC REINFORCED SOIL – INTEGRATED BRIDGE SYSTEM

UT – I-84 Echo Project