GEOTECHNICAL REPORT OF ARJA-TIAN-DHALKOT HYDROPOWER PROJECT AZAD KASHMIR(BAGH)
![Page 3: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/3.jpg)
INTRODUCTION
M/S Geo-con were awarded the project of sub soil investigation with geological mapping, topographic survey, seismic survey and interpretation of Harighal-Dhalkot hydropower project
![Page 4: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/4.jpg)
INTRODUCTION CAN’T
In ARJA-TIAN-Dhal kot hydropower project the small reservoir is located on Mahel River upstream. The objective of this small dam is to provide the hydropower downstream the river around the loop through an underground tunnel for power generation
![Page 5: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/5.jpg)
LOCATION AND ACCESSIBILITY
The project area is approximately 10 km from Bagh towards Rawalpindi
The approach of this project area is very easy on Rawalpindi-Bagh main metalled road
In our project area the right abutment of the dam is in district Bagh and the left abutment is in district Poonch and power house is in district poonch
![Page 6: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/6.jpg)
![Page 7: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/7.jpg)
INVESTIGATION PLANE
A programme of subsurface investigation was conducted according to instruction by consultant M/s RENCON, ISLAMABAD
The programme consisted of geological mapping, seismic refraction survey of dam site and power house site as well as collecting subsurface data.
The subsurface data has been collected by drilling and coring in bore holes
![Page 8: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/8.jpg)
INVESTIGATION PLANESr. No. BOREHOLE NO. DEPTH
1. RA#01 30m/Right abutment
2. RA#02 30m/Right abutment
3. RA#03 30m/Right abutment
4. NB#01 30m/Bed of river
5. NB#02 30m/bed of the river
6. LA#01 30m/Left abutment
7. PH#01 30m/power house
![Page 9: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/9.jpg)
GEOLOGY OF THE AREALITERATURE REWIEW
TWO TYPE OF FORMATION ARE PRESENT IN THIS AREA
SAWALIK FORMATION
MURREE FORMATION
![Page 10: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/10.jpg)
SIWALIKS GROUP
The left abutment of the project have siwalike formation
In this area lower siwaliks and lower part of middle siwalike are exposed. The siwaliks of this area however appears similar throughout. They are petro graphically indistinguishable. The sand stone are coarse grained massive and even pebbly. They are interbeded with hard and compact shaly/clayly rock
![Page 11: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/11.jpg)
STRATIGRAPHIC COMMITTEE OF PAKISTAN
(1973) HAS FORMALIZED SIWALIKE GROUP AND
DIVIDED IT INTO FOLLOWING FORMATION
![Page 12: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/12.jpg)
Soan formation Pleistocene
Dhok phatan formation Pliocene
Nagri formation upper Miocene
Chinji formation middle Miocene
![Page 13: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/13.jpg)
MIDDLE SIWALIKE NAGRI STAGE
Orange and brown incoherent sandstone with harder cores within, weathering in uneven pitted surface. Soft red shale's with buff or grey plant bearing shale's. Hard semi nodular pale red clay, Rhinocerotid and ungulate bones
![Page 14: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/14.jpg)
CHINGI AND NURPUR STAGES
Fine grain, blue grey nonmicaceous sand stone pseudo-conglumerate at interval, massive and thick bedded. Grey coarse, soft micaceous sand stone with pebbles at places almost conglomerates. Strata rudely bedded with laminated shale's hard, indicated, reddish purple, semi concretionary, thickly veined with calcite few calcareous red clays, weathering in hummocky surfaces proportion of sand stone to shale is about equal
![Page 15: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/15.jpg)
KAMLIAL AND LOWER CHINJI
Fewer shale of grey blue, purple and red colors, with carbonized leaf impressions limonitised woody tissues. Hard semi-nodular sand stone blue grey with purple stains, containing kankar like nodules and limonitoised woody tissues (coniferous) proportion of sandstone to shale
![Page 16: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/16.jpg)
RECENT ALLUVIUM
The gentle slopes and flat plains of the area contains stream. River and wind blow the deposits of recent age. The surrounding area of this dam is situated over the alluvial deposits of Mahl river these deposits are composed of clay fine silt and sands with boulders and pebbles of varying size and composition the boulders are usually sub angular to sub rounded the alluvial deposits provide fertile land for agriculture purpose
![Page 17: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/17.jpg)
MURREE FORMATION:
Lithology, the widely exposed rocks of Murree formation is composed of alternating beds of clays, shale, siltstone and sandstone. This formation is well exposed in Rawalakot, Bagh and Hajera areas.
![Page 18: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/18.jpg)
MURREE CLAYS AND SHALE
The Murree clays and shale are red, brown, purple and grey in color, soft, sticky and slightly silty and places
The clay stone is well stratified, brownish grey to dull red, soft to medium hard and interbeded with silt stone and sandstone beds.
![Page 19: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/19.jpg)
MURREE SILTSTONE
The siltstone is greenish grey to pale and yellowish brown on weathered surface
Greenish grey to brownish grey on fresh surface
Thin to medium bedded, at places lens form, soft to medium hard, sheared and fractured.
![Page 20: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/20.jpg)
MURREE SANDSTONE It is greenish to brownish grey and purplish on
weathered surface
Dull down to red and light green to grey on fresh surface
It is massive too thin bedded, fine to medium grained, well sorted and at places cross bedded. It is medium hard to hard, well jointed and fractured
The block size ranges from 2-3m. Joints are mostly closed and packed with secondary clay material. Calcite veins are occasionally present.
![Page 21: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/21.jpg)
QUATERNARY DEPOSITS
The Quaternary deposits include the stream channel deposits, alluvium and some exposures of Mirpur Conglomerate. The stream channel deposits comprise sand, silt, gravel and boulders of unsorted and heterogeneous nature occupying the nala beds and flood plain area. The alluvium consists of mainly clay and silt intermixed with talus and detrital material which is dusky grey to light brown in color. Valleys are filled with alluvial material which is dominantly clay. The slopes have been developed into alluvial terraces
![Page 22: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/22.jpg)
QUATERNARY DEPOSITS
The Mirpur conglomerate is exposed in Bagh area along the Mahl River. It is poorly sorted and consists of pebbles and boulders of sedimentary, igneous and metamorphic rocks indurated in sandy and clayey matrix. These deposits rest with an angular unconformity on Murree formation.
![Page 23: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/23.jpg)
TECTONICS OF THE AREA
Himalayan seismic zone
Suliamn-KirtharSeismic Zone
Kuchch SeismicZone
Makran Seismic Zone
Chaman-HindukushSeismic Zone
![Page 24: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/24.jpg)
![Page 25: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/25.jpg)
![Page 26: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/26.jpg)
![Page 27: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/27.jpg)
![Page 28: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/28.jpg)
PROJECT AREA
![Page 29: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/29.jpg)
PHASING AND OBJECTIVE
The investigation for Arja-Tian-Dhalkothydropower project and its associated structures may initially be directed at choosing the more favorable site. This involve geology and geotechnical study and other aspects
![Page 30: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/30.jpg)
OBJECTIVE
FOLLOWING OBJECTIVE WERE UNDER CONSIDERATION
Engineering parameters, suitability of weir foundations, and its probable settlement which can occur
Seepage problems under the weir and abutments, and to determine the parameters require accessing the volume of seepage, the accompanying pressure distributions, reduce seepage etc.
![Page 31: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/31.jpg)
To examine the water tightness of the reservoir
area and stability of the surrounding slopes under
submergence and draw down.
![Page 32: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/32.jpg)
INVESTINGATIONG AT SELECTED SITE AND DATA EVALUATION OF BOREHOLE LOGS
WEIR SITE:
BORE HOLE RA-01
In borehole RA-01 rocks are slightly fragmented
Slightly too closely jointed
Slightly to moderately weathered
RQD values range from 0 %-78%.
Core recovery range from 60%-97%
![Page 33: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/33.jpg)
RQD IN BORE HOLE RA-01
The RQD value of the upper mudstone is 0-53%
In the lower mudstone bed it is 53%
In upper sandstone bed it is 53-60%
In lower sand stone bed it is 69-72%
![Page 34: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/34.jpg)
CORE RECOVERY IN BORE HOLE RA-01
Core recovery in upper sandstone bed is 60%
Core recovery in lower sandstone bed is 80-97%
Core recovery is 60% in the upper mud stone bed and 63% in the lower mudstone.
![Page 35: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/35.jpg)
LITHALOGY OF BORE HOLE RA-01
The lithology varies as upper shale brownish fine gained
Sandstone is brownish to grayish brown, fine to medium grained and moderately weathered
The middle mudstone is dark brown, fine grained, loose and disintegrated at water contact
![Page 36: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/36.jpg)
BORE HOLE RA-02
Rocks were highly fragmented
Weathered
Highly jointed
The joints were closely spaced
Core recovery value range from 57%-97%
RQD values range from 30%-81%
![Page 37: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/37.jpg)
RQD IN BORE HOLE RA-02
The RQD value of the upper sandstone is 0-68%
In the lower sandstone bed it is 71-77%
In upper mudstone bed it is 41-76%
In lower mudstone bed it is 53-81%
![Page 38: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/38.jpg)
CORE RECOVERY IN BORE HOLE RA-02
Core recovery in upper sandstone bed is 77-85%
Core recovery in lower sandstone bed is 66-82%
Core recovery is 73-93% in the upper mud stone bed and 75-98% in the lower mudstone.
![Page 39: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/39.jpg)
LITHALOGY OF BOREHOLE RA-02
Top 1.5m is overburden brownish, grayish brown, coarse grained, gravels, cobbles, pebbles, and some shaly clay
The middle part Reddish brown to brown fine grain highly fractured, freshly weathered s.st.1.5-5m
From 5-15.5m Fractured, medium Compacted, Low strength Mud stone Fractured, jointed and contact of gray Fragmented Mud stone Highly jointed
![Page 40: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/40.jpg)
BORE HOLE RA-03
The rock was slightly to highly fragmented
the joints spacing was moderately to closely the joints direction was along the direction of strike.
Core recovery value range from 32%-97%
RQD values range from 0%-78%
![Page 41: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/41.jpg)
RQD IN BORE HOLE RA-03
The RQD value of the sandstone is 13-76%
The RQD value of mud stone is from30-33%
![Page 42: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/42.jpg)
CORE RECOVERY IN BORE HOLE RA-03
Core recovery of sand stone is from 34-97%
Core recovery of mudstone is from 53-63%
![Page 43: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/43.jpg)
LITHALOGY OF BORE HOLE RA-03
1-2m is overburden which is reddish brown clay and some cobble
2-27.5m there is highly fractured, weathered reddish brown to brownish fine to medium grain sand stone which is low to medium hard
27.5-30 there is mixture of mudstone and clay that mudstone is medium to highly fractured
![Page 44: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/44.jpg)
BORE HOLE NB-01
The rock was fragmented moderately to highly
Joint spacing was moderately to closely
weathering was slightly to highly
![Page 45: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/45.jpg)
RQD IN BORE HOLE NB-01
The RQD value of the sandstone is 40-75%
The RQD value of mud stone is from 64-84%
![Page 46: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/46.jpg)
CORE RECOVERY IN BORE HOLE NB-01
Core recovery of sand stone is from 82-97%
Core recovery of mudstone is from 86-91%
![Page 47: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/47.jpg)
LITHALOGY IN BORE HOLE NB-01
From 1-16.75m there is gravel poorly sorted and poorly to well rounded
From 16.75-28.2m there is sandstone which is which is jointed, weathered and medium hard
From 28.2-30m there is mud stone which is medium hard
![Page 48: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/48.jpg)
BORE HOLE NB-02
The rock was fragmented moderately to highly
Joint spacing was moderately to closely
weathering was slightly to highly
![Page 49: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/49.jpg)
RQD IN BORE HOLE NB-02
The RQD value of the sandstone is 40-82%
The RQD value of mud stone is from 39-45%
![Page 50: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/50.jpg)
CORE RECOVERY IN BORE HOLE NB-02
Core recovery of sand stone is from 79-96%
Core recovery of mudstone is from 70-77%
![Page 51: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/51.jpg)
LITHOLOGY OF BORE HOLE NB-02
1-20m there is gravel which is poorly to well sorted and medium to well rounded
From 20-27.90m there is sand stone which is medium to fine grained and highly fractured and weathered, color is grey to brownish
From 27.90-30m there is fine grain and highly mud stone whose strength is medium to high
![Page 52: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/52.jpg)
BORE HOLE LA-01
The rock was highly fractured and freshly weathered
Core recovery value range from 32%-93%
RQD values range from 13%-81%
![Page 53: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/53.jpg)
RQD IN BORE HOLE LA-01
The RQD value of the sandstone is 0-81%
The RQD value of mud stone is from34-55%
![Page 54: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/54.jpg)
CORE RECOVERY IN BORE HOLE LA-01
Core recovery of sand stone is from 34-93%
Core recovery of mudstone is from 77-83%
![Page 55: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/55.jpg)
LITHALOGY OF BORE HOLE LA-01
1-2m is overburden which is reddish brown clay and some silt
2-28m there is highly fractured, weathered reddish brown to brownish grey fine to medium grain sand stone which is low to medium hard
28-30 there is mixture of mudstone and clay that mudstone is medium to highly fractured
![Page 56: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/56.jpg)
POWER HOUSE SITE
In power house site only one hole was drilled named as PH-01
BORE HOLE PH-01
Silty sandstone ,freshly weathered and highly fractured,
Core recovery value range from 24-93%
RQD value range from 0-81%
Highly fractured mud stone is present which is mixed with clay
![Page 57: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/57.jpg)
LABORATORY TESTING OF DAM SITE
LABORATORY TESTING ON THE ROCK SAMPLES
TESTING LABORATORY
The laboratory testing on the rock sample was got done from rock mechanics laboratory of mining engineering department university of engineering and technology Lahore
![Page 58: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/58.jpg)
TEST TYPE
Two type of test were performed on rock sample
Test For Physical Properties
Test For Mechanical Properties
![Page 59: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/59.jpg)
PHYSICAL PROPEERTIES TEST
Following properties was determine
Moisture content
Porosity
Density
![Page 60: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/60.jpg)
DISCUSSION OF PHYSICAL PROPERTIES OF ROCK SAMPLE IN DIFFERENT BOREHOLES
BORE HOLE RA-01
In bore holes RA-01 the average moisture content was .509% average porosity measured by helium porosimeter was 10.3%. Average density was 2.601 gm/cc
![Page 61: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/61.jpg)
BORE HOLE NB-01
In bore hole NB- 01 the average moisture content was .280% average porosity measured by helium porosimeter was 4.47%. Average density was 2.646 gm/cc
![Page 62: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/62.jpg)
BORE HOLE LA-01
In bore hole LA- 01 the average moisture content was 0.530% average porosity measured by helium porosimeter was 9.49%. Average density was 2.610 gm/cc
![Page 63: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/63.jpg)
MECHANICAL PROPERTIES
Following test was done for the mechanical properties of the rock sample
UNIAXIAL COMPRESSIVE STRENGTH
![Page 64: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/64.jpg)
DISCUSSION OF MECHANICAL OF ROCK SAMPLE PROPERTIES IN DIFFERENT BOREHOLES
BORE HOLE RA-01
The average height of the sample was 110.00mm and the average diameter was 43.75mm. height to diameter ratio was 2.51 which is according to ISPR standard
Moisture conditions of the specimen at the time of test were laboratory air dry. The equipment used for this test was universal testing machine. The unconfined compressive strength of the sample was 107.985MPa
![Page 65: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/65.jpg)
BORE HOLE NB-01
The average height of the sample was 110.00mm and the average diameter was 44,00mm. Height to diameter ratio was 2.52 which is according to ISPR standard
Moisture conditions of the specimen at the time of test were laboratory air dry. The equipment used for this test was universal testing machine. The unconfined compressive strength of the sample was 81.281MPa
![Page 66: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/66.jpg)
BORE HOLE LA-01
The average height of the sample was 110.00mm and the average diameter was 43.40mm. Height to diameter ratio was 2.53 which is according to ISPR standard
Moisture conditions of the specimen at the time of test were laboratory air dry. The equipment used for this test was universal testing machine. The unconfined compressive strength of the sample was 79.897MPa
![Page 67: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/67.jpg)
PETROGRAPHIC TEST ON ROCK SAMPLE
TESTING LABORTARY
MINERALOGY LAB PUNJAB UNIVERSITY LAHORE
![Page 68: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/68.jpg)
Petrographic only done at the sample from NB-01 at the depth of 20-21m. The core samples have diameter 4cm and length 25cm, weight 800gm. At the cut surface, the color of the sample is medium grey, the sample show mild effervescence at the surface on reaction with cold dilute HCl. Megascopic assessment of the sample revealed that the core sample is fine grained sand stone.
![Page 69: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/69.jpg)
DISCUSSION OF MINERALOGY OF ROCK SAMPLE
Following is the mineralogical composition of the sample
QUARTZ 61%
FELDSPAR 20%
LITHIC FRAGMENTS 7%
CALCITE 7%
MUSCOVITE 3%
MAGNETITE 2%
![Page 70: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/70.jpg)
CHEMICAL ANALYSIC OF WATER SAMPLE
Water sample was taken from NB-01 and NB-02 of dam site. There chemical analysis shows that water does not contain sulphates or any other dangerous property in harmful quantity. As such ordinary Portland cement may be used in the foundation.
![Page 71: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/71.jpg)
LABORATORY TESTING ON THE SOIL SAMPLES
Testing Laboratory
The laboratory testing on the soil samples was got done from the geo-technical engineering Laboratory of civil department University of Engineering & Technology Lahore.
![Page 72: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/72.jpg)
COLLECTION OF SAMPLES
Two samples of insitu soil were collected from the site. One sample from RA-01 and other sample from PH-01. The sample from RA-01 was collected from 2-3m depth below existing ground level during July 2013. The sample PH-01 was collected from 6-7m depth below existing ground level during September 2013.
![Page 73: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/73.jpg)
LABORATORY TESTING
Both the samples were sent to university of engineering & technology Lahore for soil classification. Following tests were carried out on these samples.
Grain size analysis – ASTM D422
Atterbergh limits – ASTM D4318
![Page 74: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/74.jpg)
DISCUSSION ABOUT TEST RESULTS
Both the samples were found to be non plastic in nature. The sample of RA-01 is classified as silty sand (SM) & sample of PH-01 is classified as poorly graded sand with silt (SP-SM) as per unified soil classification system ASTM D-2487.
![Page 75: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/75.jpg)
RECOMMENDATIONS
Sandy soil is a good bearing material provided that it is properly compacted & confined. In open areas without confinement, this type of material is subjected to erosion. Without proper confinement erosion cannot be avoided. It is therefore suggested that proper confinement of this material be done to avoid the direct hit of water.
![Page 76: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/76.jpg)
FIELD TEST IN DRILL HOLE
Permeability in rock strata has been determined during drilling operation using in-situ water pressure test in drill hole for weir and operational structure
![Page 77: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/77.jpg)
CONCLUSIONS AND RECOMMENDATIONS
Geological investigations of ARJA-TIAN-DHALKOT HPP suggest that site is feasible taking into consideration the discontinuities present
To thoroughly investigate the geological and structural conditions of the tunnel and dam site area extra geotechnical study are require in the tunnel site and dam site During construction stages
![Page 78: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/78.jpg)
The grouting of Joints and fractures will increase the stability of rocks.
Seismicity of the area must be considered during the design of foundations for dam.
Construction material is available nearby dam site so this will be economical for the construction of dam, but for power house and tunnel the accessibility of material will be difficult
![Page 79: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/79.jpg)
Flooding in rainy season is very high in river, the effects must be considered during the design and after constructions of dam.
Because of medium to high relief of mountains, erosion effects are expected, so sedimentation factor should be considered while designing the dam
![Page 80: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/80.jpg)
Thick sandstone with subordinate siltstone and shale is commonly exposed at the surface, or at the shallow depth throughout the area. The foundation therefore may be laid down on the fresh rock. Overburden and weathered portion should be removed
Core recoveries and RQD value is good enough and it reveals from laboratory results. That the rock is hard enough to sustian the expected load of the structure.
![Page 81: GEOTECH PRESENTATION FOR GEOCON](https://reader034.vdocuments.net/reader034/viewer/2022051301/5a6ecfb27f8b9ae8728b4fdd/html5/thumbnails/81.jpg)
Rocks of catchment area are belonging to siwalike group, which is characterized by alternate beds of sandstone and shale. The later unit is soft, therefore siltation activity is expected