10/22/2010 1 Company LOGO By Ir. Liew Shaw Shong GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, JKR Headquarters, 26-27 October 2010 Course Outline Planning, Specification & Contractual Arrangement Site Monitoring Data Processing / Analysis, Interpretation & Actions Common Problems, Applications & Lesson Leant from Case Study 1 2 3 4

Upload: vuthien

Post on 08-Apr-2018

236 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

1

Company

LOGO

By Ir. Liew Shaw Shong

GEOTECHNICAL INSTRUMENTATION WORKSHOP

Menara PJD, JKR Headquarters, 26-27 October 2010

Course Outline

Planning, Specification & Contractual Arrangement

Site Monitoring

Data Processing / Analysis, Interpretation & Actions

Common Problems, Applications& Lesson Leant from Case Study

1

2

3

4

Page 2: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

2

Geotechnical Engineer

岩土工程师

大地工程師

� Geotechnical engineer in Malaysia is ambiguously regarded as “Geologist” in the public perception.

� Geotechnical engineer is a qualified civil engineer registered with Board of Engineers Malaysia as either graduate engineer or professional engineer having relevant and competent experience in geotechnical works

� ability to plan ground investigation & characterise ground conditions for engineering processes

� identify & assess the potential geo-hazards and the possible ground borne interaction to proposed structures

� offer feasible engineering design solutions to ensure safety & satisfactory performance of the end product of the engineering works including its surrounding 3

Civil Engineer

Geotechnical Engineer

� Why Geotechnical Engineer?� Geotechnical engineer as an

underwriter for risk assessment.

� GI as tools for Geotechnical Engineer

� It is regard as necessary, but not a rewarding expense. (Uncertainty, sufficiently accurate design options for Cost & Benefit study)

� What Risk in Ground & its Consequence ?

� Ground Variability & Geo-hazards.� Financial Viability & Cost Overrun

(Construction & Operation).

4

Why appoint Geotechnical Engineer?

Page 3: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

3

5

Risk Evaluation with Cost-

Benefit Analysis

Risk Mitigation (Pro-active)

Risk Reduction (Defensive)

Risk Avoidance

Risk Assessment

6

Page 4: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

4

Geotechnical Engineering

Fluid Control Systemse.g. dams

Underground Geo-structures

e.g. tunnel

Structural Support Systems

e.g. foundations

Ground Improvemente.g. densification,

remediation

Surface Geo-structurese.g. embankments, landfills

Rock Mechanicsdeformation

failureseepage

Soil Mechanicsdeformation

failureseepage

Geologycomposition

genesisprocesseshydrology

HydrologySurface fluid flow

Structural Mechanicsdeformation

failuremember design

Continuum Mechanicselasticityplasticity

idealisation

Numerical Analysisboundary element

finite differencediscrete element

finite element

Materialstypes

propertiesgeosynthetics

Geochemistrywaste

leachatesdurability

Site Explorationreconnaissance

drillingin-situ testing

laboratory testinggeophysics

Ground Movementsearthquakeliquefaction

sinkhole

Constructionpractice

experience

Mechanical Engineeringdrilling

instrumentexcavation

Risk Managementobservation method

risk assessmentinstrumentation

Contract Lawspecification

Public Policycodes

standardlaws & compliance

Modified from Morgenstern (2000)

Fracture Mechanics

blastingquarry

7

Genesis/Geology

Ground Profile

Appropriate Model

Ground Behaviour

Precedent,Empiricism,Experience,

Risk-management

Idealisation followed by evaluation. Conceptual or physical modelling

Analytical modelling

Lab/field testingObservation/measurement

Site investigationGround descriptionBurland’s

Geotechnical Triangle

Morgenstern (2000)

8

Page 5: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

5

Engineering Judgement

� Definition : The operation of the mind, involving “comparison” and “discrimination” by which knowledge of values and relations is mentally formulated. (Webster’s New Collegiate Dictionary)

� Recognition : Engineering judgement as an acceptable engineering practice

Engineering Judgement

ExperienceDirectly or

indirectly from others

KnowledgeFamiliarity gained from Experience

JudgementKnowledge of all

kinds & from many different sources

Process of Developing Judgement

Judgement

Knowledge

Experience

Theoretical Concepts

Experimental Methods

Measurements

Observations

Past Experience

Page 6: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

6

Soil-Structure Interactions

Time Dependent Behaviours

Groundwater Related

Problems

Foundations

Earthworks

Scope

11

Work Scope of Geotechnical Engineer

Natural geologic materials of inherentlyvariable nature do not necessarily follow well-defined natural laws, hence renderingprediction in high uncertainty.

Potential Scope of Geotechnical Engineering (modifi ed from Atkinson, 2006) 12

Natural Terrain

Instability

Cut Slope Instability

Slope Strengthening

Fill Slope Instability

Retaining Structure

Reservoir Dam

Basement Excavation

Underground Space &

Foundation

Embankment

Tunnel

Environmental Landfill

PVD Ground Treatment

with Preloading

Ground Treatment with Stone Columns

Maritime Structures

ReclamationDredging

Stability & Erosion

Protection

Offshore Structures

Work Scope of Geotechnical Engineer

Page 7: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

7

WHY DO WE NEED INSTRUMENTATION??

It is a useful tool to supplement what we can not identify trend of behaviours & quantify the changes of the crucial parameters affecting the bahaviours in the observation.

Why Instrumentation?

Theory .vs. Observation

Sir Isaac Newton – Law of Gravity by observation

Observation with

Measurements

Theoretical Development

Albert Einstein - General relativity'spredictions have been confirmed in allobservations and experiments to date.

Page 8: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

8

Benefits of Instrumentation

Design Verification & Optimisation

Construction & Operational Safety

Cost & Time Saving

If you can not get high quality and reliable data, then better don’t initiate any instrumentation scheme because it will create more problems than being advantageous.

Pitfalls of Instrumentation

Design Rectification

Overly Caution of SafetyPotential Legal Evidence

Realistic Construction Cost & Time

In some cases, instrumentation results may reveal the shortcomings or negligence in the design of the project designer and also those by the work contractor.

Page 9: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

9

Purpose & Objectives

Maintenance Monitoring- Long Term Performance- Necessary Maintenance Action- Early Warning System

Construction Monitoring- Safety- Observation Method- Construction Control - Legal Protection- Quantity Measurement- Public Relation

Design Verification- Failure mechanism & Capacity- Serviceability- Reveal unknowns- Pile Load Test- Pullout Test-Trial Embankment

Design Construction Operation

Forensic Investigation

Failure mechanism, Serviceability, Contributory & T riggering Factors

Stakeholders

Project Objectives

ProjectOwner

InstrumentSpecialist

DesignConsultant

ConstructionContractor

InsuranceCompany

Page 10: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

10

Responsibility

ResponseActions

InstrumentsSelection

InstrumentInstallation Data

Collection

Calibration&

InterpretData

Cycle related to high quality Instrumentation

Scheme

Responsibility

Instrument Procurement

• Instrument (hardware & software)• Factory calibration

Field Instrumentation

Service

• Acceptance tests• Instrument installation• Establish baseline reading• Maintaining & calibrating instruments regularly• Data collection, processing & presentation

Interpretation & Response

Actions

• Interpret & report data• Review need for response actions & instruction• Timely implementation of response actions

Instrumentation Specialist

Project DesignerInstrumentation Specialist

Project DesignerWork Contractor

Page 11: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

11

Parameters to be Monitored

Types of Measurement

GroundDeformation

Ground/StructuralStresses

WaterPressure Thermal

Vibration/Flow

Planning Cycle

ControllingMechanisms

DefineProject

Conditions

ResponseActions

Measurement.vs.

PredictionPurpose &Parameters

to be measured

Questionsto be answered

Every instrument shall be placed at the site to answer specific question. If no question, then no instrument.

Page 12: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

12

Project Conditions

� Construction Control : modify or improve the initial construction sequence or/and method.

� Remedy : strengthen the stability, reduce the negative impacts, repair the damage or distresses

� Notice : serving notice to project owner, insurance, neighbouring owners, local authorities

Questions to be answered

� Any Questions related to Performance of the Concerned System• Deformation of Ground or Structures• Stress or Strain in Ground or Structure• Water Pressure Distribution, Flow and

Changes• Thermal, Vibration, Tidal Effects• Location and magnitude of changes

Page 13: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

13

What does instrument measure & response?

Effects

Causes

• Measurement can be either performed on the changes of CAUSES (difficult to pick up the changes) or EFFECTS (usually too late for response actions).

• Most instruments provide point measurement with dependence on localisedcharacteristics, hence may not represent the problem in larger scale, unless large number of point measurement instruments are installed.

Controlling Mechanisms

Page 14: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

14

Measurement .vs. Prediction

GreenNo action

AmberCautionary Measures

RedTimely

Contingency Action

Hazard Warning Level

Measurement

Prediction

Analysis

Don’t forget to apply Engineering

Judgement

Response Actions

� Construction Control : modify or improve the initial construction sequence or/and method.

� Remedy : strengthen the stability, reduce the negative impacts, repair the damage or distresses

� Notice : serving notice to project owner, insurance, neighbouring owners, local authorities

Page 15: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

15

Dilemma of Instrumentation

1 : Doc, can you guarantee I have 100% fix of all my

problems?

2 : Well, do you want me to open up

everything, big or small one, to check

for fixing.

3 : Doc, his credit card limit is up to RM50,000 only.

Specification

Clear Concise Complete Correct

Over-specified-High price-Inadequate budget with expectation of omission of requirements-Inexperienced site staffing

-PrescriptiveOwner accept liability, but better control

-PerformanceInnovation, no bias, clear liability, competitive, but difficult to evaluate

Project-specific-Measurement range-Duration of service

Under Owner-Sufficient baseline data-Avoid price slaughter in subcontracting

Page 16: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

16

Contractual Arrangement

Project Owner

Consultant (PMC)

Site Supervision Team

Instrumentation Specialist Firm

Main Contractor

Subcontractor

Construction Works

Project Owner

Consultant (PMC)

Site Supervision Team

Main Contractor

Instrumentation Specialist FirmSubcontractor

Construction Works

Project Owner

Main Contractor (PM)

Consultant Site Supervision Team

Instrumentation Specialist Firm

Subcontractor

Construction Works

Independence : Good Independence : Fair Independence : PoorData Quality : Good Data Quality : Possibly Fair Data Quality : Possibly Poor

Problem : No liability for Contractor

Problem : Low bid tender Problem : Low bid tender

Advice : Nominate SpecialistAdvice : Nominate Specialist

Procurement Approach

� Professional Service� Lowest Bid Tender� Independence

We’re underfunded, but we manage!

Page 17: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

17

Good Practices

� Instrument Life-Cycle Costs : Calibration, installation, taking readings, maintenance, data management & interpretation, and decommissioning.

� Partnership to Instrument Manufacturers/Suppliers

Good Practices

� Good QA/QC of Personnel Training, Equipments, Data Management

� Dedicated Team & Equipment for Project

� Measures of Instrument Protection

� Duplicate Instruments for Data Redundancy

Page 18: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

18

Course Outline

Planning, Specification & Contractual Arrangement

Site Monitoring

Data Processing / Analysis, Interpretation & Actions

Common Problems, Applications& Lesson Leant from Case Study

1

2

3

4

MeasurementUncertainty & Reliability

Accuracy Precision

Sensitivity Resolution

Conformance

Linearity Hysteresis

Error Noise

Page 19: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

19

Conformance

• Good conformance of instrument and installation procedures are necessary for measurement of good accuracy.• Beware of any changes of properties related to parameters to be measured due to presence of instrument

Accuracy & Precision

Accuracy High High Low Low

Precision High Low High Low

Acceptance Good Fair Systematic Error Bad

Page 20: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

20

Measurement Deviation

� Resolution : the degree to which the smallest change it can detect in the quantity that it is measuring.

� Sensitivity : the smallest absolute amount of change that can be detected by a measurement, usually defined as the ratio between output signal and measured property

� Linearity : The amount of error change throughout an instrument's measurement range. Linearity is also the amount of deviation from an instrument's ideal straight-line performance.

� Hysteresis : an error caused by when the measured property reverses direction, but there is some finite lag in time for the sensor to respond, creating a different offset error in one direction than in the other

� Noise : Random measurement variations by external factors

Linearity & Hysteresis

Non Linearity Hysteresis

Page 21: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

21

Types of Errors & Corrective Measures

Type of Error Sources Corrective Actions

Gross Error Human mistakes Care, checking & training

Systematic Error Calibration, hysteresis & non-linearity

Periodic recalibration

Conformance Error Instrument design & installation Appropriate instrument, improveinstallation procedures

Environmental Error Weather, temperature, vibration & corrosion

Apply correction with recorded environmental changes & conditioning instrument to ambient environment

Observation Error Variation between observers Training & automised data acquisition

Sampling Error Inherent variability & samplingtechnique

Sufficient instruments

Random Error Noise, friction & environmental effect

Statistical analysis on multiple readings

Course Outline

Planning, Specification & Contractual Arrangement

Site Monitoring

Data Processing / Analysis, Interpretation & Actions

Common Problems, Applications& Lesson Leant from Case Study

1

2

3

4

Page 22: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

22

Parameters to be Measured

� Deformation/Movement� Inclinometer� Extensometer� Ground Movement Marker� Tiltmeter� Crackmeter

� Water/Earth Pressure� Piezometer, Observation Well� Earth Pressure Cell

Parameters & Measurement

� Load/Stress/Strain � Strain Gauges� Load Cell

� Thermal� Thermal Coupler

� Flow� V-Notch Gauge

� Vibration� Accelerometer

Page 23: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

23

Inclinometer

� Inclinometer

L

θθθθ

L××××Sin θθθθ

A+A-

+θ+θ+θ+θ

A-A+

−−−−θθθθ

d1

d1 + d2

θθθθ1111

θθθθ2222

θθθθ3333

d1 + d2 + d3

+δ+δ+δ+δ

−−−−δδδδ

A+ Reading : +(+(+(+(θ+δθ+δθ+δθ+δ))))

A- Reading : −−−−(θ(θ(θ(θ−−−−δ)δ)δ)δ)

Reading :

{+(+(+(+(θ+δθ+δθ+δθ+δ) ) ) ) −−−− [[[[−−−−(θ(θ(θ(θ−−−−δ)]}/2 = θ δ)]}/2 = θ δ)]}/2 = θ δ)]}/2 = θ

Checksum Review :

{+(+(+(+(θ+δθ+δθ+δθ+δ) + [) + [) + [) + [−−−−(θ(θ(θ(θ−−−−δ)]}/2 = δ δ)]}/2 = δ δ)]}/2 = δ δ)]}/2 = δ

Inclinometer

Random Errors

Systematic Errors

Total Error

Sensor Bias Shift,

Sensitivity Drift &

Rotation

SensorPositioning,

Casing inclination & Curvature

Systematic Error

Poor Installation

Sensor Precision

Random Error

Unpredictable & Uncorrectable

Predictable & Correctable

Systematic errors can accumulate upward in the cumulative displacement at ground surface (apparent cumulative displacement ).

Total Error = εRandom ×××× √√√√(No. of Readings) + εSystematic ×××× (No. of Readings)

Page 24: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

24

Inclinometer

Bias Shift Sensitivity Drift

Rotation Error

Depth Positioning

Reading, y

b = Bias Shift

k Sin x

y = k Sin x + b

Sin x

k = Sensitivity Drift (Drift in Pre-amplifier)

Solutions : Factory calibration and repair of probe is needed.

Misalignment of SensorCurvature in Casing, Vertical Probe Placing, Cable Stretching, Ground Settlement

Easy to detect & correct

Easy to detect & correct

Rare, difficult to detect, but easy to correct

Difficult to detect & correct (time consuming & tedious)

αA0B0

Rotation Error Angle

Inclinometer

Err

or

Err

or

Err

or

Identification & Correction of Bias Shift Error

Identification & Correction of Rotation Error

Change Deflection Change Deflection

No Correction Deflection, A-Axis

Casing Profile, B-Axis (Cross Axis Inclination

CorrectedDeflection, A-Axis

No Correction With Zero Shift Correction

Page 25: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

25

Inclinometer

� Spiral Probe� Twisted casings lead to incorrect magnitude of

movement in the A and B directions.� Application :

� To check orientation of the inclinometer grooves for necessary correction for direction of resultant movement.

� Readings show movements in unlikely direction

� Check installation quality� Deep casing installation

ααααA R =d/Cos αααα

αααα

If αααα = 10°°°°,R =A/Cos αααα =1.015A

B

Inclinometer

� Error Detection & Correction : � Double data redundancy with readings

taken in diametrical direction� 3 to 6m bottom of casing into firm strata

for good fixity to provide calibration data

� Deeper readings have highest potential systematic errors : (a) Sensor warming up, (b) Steepest borehole inclination, (c) Further distance from top reference

Page 26: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

26

Inclinometer

� Tolerance : Variation of Checksum < 5 to 10 units of Mean Checksum

� Correction : � If the large variation is localised to one

depth, correction can be performed based on mean of other checksum.

� If the large variation spreads over the entire dataset, it is better to retake the readings.

Inclinometer

� Inclinometer (Vertical)

Page 27: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

27

Inclinometer

� Horizontal Profiler

0 2 4 6 8 10 12 14 16 18 20Distance From Starting End of Inclinometer (m)

-26

-24

-22

-20

-18

-16

-14

-12

-10

-8

-6

-4

-2

0

Set

tlem

ent (

mm

)

Water Load 452T-19/06/20011530T-20/06/20011630T-21/06/20011756T-22/06/20011894T-23/06/20012007T-24/06/20012087T-25/06/20012295T-26/06/20012521T-27/06/20012721T-28/06/20012910T-29/06/20012960T-29/06/20012947T-30/06/20012922T-01/07/20011517T-02/07/2001

0 2 4 6 8 10 12 14 16 18 20Distance From Staring End of Inclinometer (m)

-160

-140

-120

-100

-80

-60

-40

-20

0

Set

tlem

ent

(mm

) Measured Raft Deflection Profileat Water Load of 2521Ton

Predicted Raft Deflection Profile

at Water Load of 2500Ton

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20Distance From Staring End of Inclinometer (m)

250

200

150

100

50

0

-50

-100

-150

-200

-250

Ben

ding

Mom

ent (

kNm

/m w

idth

)

Ho

ggin

gS

agg

ing

G1(24m)

G2(24m)

G3(30m)

G4(30m)

G5(36m)

G6(36m)

G7(36m)

G8(36m)

G9(36m)

G10(30m)

G11(30m)

G12(24m)

G13(24m)

Inclinometer

� Horizontal Profiler

Page 28: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

28

Data Evaluation

� Type of Ground Movement

Deflection Deflection

Developed Shear Zone with Drastic Movement Profile

Creeping Slope with Continuous Movement Profile

Data Presentation

� Good Practice :� Use of exaggerated horizontal scale shall

be avoided because “errors” are magnified & could be misinterpreted.

� Change plot (incremental deformation) is useful to emphasize the location of deformation zone.

Page 29: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

29

Case Studies

� Demo 1 – Open Cut Excavations using Jack-In Pipe Anchorage & Soil Nail Anchorage

� Demo 2 – 8 Cases on Landslides� Demo 3 – Piling Foundation� Demo 4 – Reinforced Soil Wall with Stone

Columns Improvement� Demo 5 – Dewatering� Demo 6 – Dam

Course Outline

Planning, Specification & Contractual Arrangement

Site Monitoring

Data Processing / Analysis, Interpretation & Actions

Common Problems, Applications& Lesson Leant from Case Study

1

2

3

4

Page 30: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

30

Myths in Instrumentation

� Myth No.1 : Instrumentation can prevent bad thing from occurring.

� Myth No. 2 : Maintenance free instruments are possible.

� Myth No. 3 : Geotechnical engineer is not needed to review the instrumentation results if threshold and action plan are available (traffic light system).

� Myth No. 4 : Instrumentation does not require the input from instrumentation specialist.

Myths in Instrumentation

� Myth No. 5 : Instrumentation can replace engineering judgement. Everything is fine if instrumentation is in place.

� Myth No.6 : More instruments and data are better.

� Myth No. 7 : Instrumentation is costly investment, hence is unnecessary if the design is good.

Page 31: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

31

Common Problems

� Instrument : Selection of appropriate instrument fit for the purpose.

� Contract Arrangement : Interest party for high quality instrumentation data.

� Data Quality : Poor quality data will neither reveal the truth of engineering behavioursnor give correct warning.

� Data Management : Keeping raw data is essential for future data reprocessing with new interpretative objectives

Common Problems

� Data Interpretation : Screening & filtering of problematic data or uninvited events/factors for a distilled content are deliberately needed.

� Data Presentation : Data presentation without connection to records of activities at site is a discounted information for decision making.

Page 32: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

32

Common Problems

� Review : Timely review is important to capture indication of distress development & need for instrument maintenance/checking for proper functioning.

� Loss of Feel : Sometimes readings given to person who is not taking care of the instruments has no clue to slight variation of the readings, but possible an important indication of adverse effect. (You will not know your baby if you did not take care of him/her.)

� Threshold Limits : It is not easy to set a accurate set of threshold limits for multiple parameters controlling the behaviours.

� Action : Timely implementation of actions asidentified from interpreting instrumentation results.

Advices

� Paradox :• Appearance of apparently unmotivated

change are often the first sign of distress• Observations of overall phenomenon

become more relevant than “spot” occurrence.

Page 33: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

33

Applications

� Observation Method (e.g. NATM in Tunnel)

Natural Terrain

Instability

Cut Slope Instability

Slope Strengthening

Fill Slope Instability

Retaining Structure

Reservoir Dam

Basement Excavation

Underground Space &

Foundation

Embankment

Tunnel

Environmental Landfill

PVD Ground Treatment

with Preloading

Ground Treatment with Stone Columns

Maritime Structures

ReclamationDredging

Stability & Erosion

Protection

Offshore Structures

Earthfill/Clay Core RockfillDam

Page 34: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

34

Concrete Dam

Tunnel & Underground Excavation

Page 35: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

35

Strutting & Excavation

Design Verification Testing

Page 36: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

36

Case Studies

� Demo 1 – Open Cut Excavations using Jack-In Pipe Anchorage & Soil Nail Anchorage

� Demo 2 – 8 Cases on Landslides� Demo 3 – Piling Foundation� Demo 4 – Reinforced Soil Wall with Stone

Columns Improvement� Demo 5 – Dewatering� Demo 6 – Dam

References

� Sources :� Dunnicliff, J. (1988), ”Geotechnical Instrumentation for Monitoring Field Performance”. Wiley-Interscience Publication.� Geotechical Intrumentation News (http://www.bitech.ca/news.htm)� Liew, S.S. (2010), "Lessons Learned from Case Histories", JKR Sabah One-Day Short Course on Slope Engineering, Promenade Hotel,

Kota Kinabalu, Sabah, 30 June 2010� Liew,S.S. (2010), “Dam Safety Monitoring and Surveillance in Malaysia”, Conference on ASIAWATER 2010, jointly organized by The

Malaysian Water Association (MWA), 6th – 8th April 2010� Liew, S.S.; Lim, Wei & Lau, L.S. (2010), “Investigation of Soil Nailed Slope Distress at Fill Ground & Remedial Solutions”, The

17th Southeast Asian Geotechnical Conference, Taipei, Taiwan, 10 to 13 May 2010 Liew, S.S.; Lee, S.T. & Koo, K.S. (2010), “Failure Investigation of Piled Reinforcement Soil Wall & Excessive Movements of Piled Embankment at Soft Ground, Malaysia”, The 17th Southeast Asian Geotechnical Conference, Taipei, Taiwan, 10 to 13 May 2010

� Liew, S.S.; Ting, D.I. & Low, Y.H. (2010), “Piling Foundation Design & Construction Problems of Tank Farm in Reclaimed Land over Untreated Soft Marine Clay in Malaysia”, The 17th Southeast Asian Geotechnical Conference, Taipei, Taiwan, 10 to 13 May 2010

� Liew, S.S. (2009), “Role of Geotechnical Engineer in Civil Engineering Works in Malaysia”, CIE-IEM Joint Seminar on Geotechnical Engineering, Yilan, Taiwan, 26 to 27 August 2009

� Liew, S.S. & Khoo C.M. (2008), "Lessons Learned from Two Investigation Cases of Ground Distresses Due to Deep Excavation in Filled Ground", 6th Int'l Conf. on Case Histories in Geotechnical Engineering, 11-16 Aug 2008 , Arlington, Virginia, United States.

� Liew, SS (2008), "Case Studies of Support of Open Excavations and Distressed Retaining Walls in Malaysia" Seminar on "Deep Excavation and Retaining Walls", Jointly organised by IEM-HKIE at Tropicana Golf & Country Resort, Petaling Jaya, Malaysia, 24 March 2008.

� Liew S.S. & Khoo C.M. (2007),"Performance of Soil Nail Stabilisation Works for a 14.5m Deep Excavation at Uncontrolled Fill Ground", Proc. 16th Southeast Asian Geotechnical Conferences, Malaysia.

� Liew S. S. & Tan S. K. (2007), "Performance of Reinforced Soil Wall Supported on Stone Columns", Proc. 16th Southeast Asian Geotechnical Conferences, Malaysia.

� Liew S.S. & Khoo C. M. (2006),"Design and Construction of Soil Nail Strengthening Work over Uncontrolled Fill for a 14.5m Deep Excavation", 10th International Conference on Piling and Deep Foundations, 31 May - 2 Jun 2006, Amsterdam, The Netherlands

� Liew S.S. & Liong C.H. (2006),"Two Case Studies on Soil Nailed Slope Failures", Internationals Conference on slope, 7 - 8 August 2006, Kuala Lumpur

Page 37: GEOTECHNICAL INSTRUMENTATION By Ir. Liew Shaw … · GEOTECHNICAL INSTRUMENTATION WORKSHOP Menara PJD, ... Engineer 岩土工程师 ... Maintenance Action - Early Warning System

10/22/2010

37

References

� Sources :� Liew, S. S., Liong, C. H. & Low, C. L., (2004), “Four Landslide Investigations in Malaysia”, 15th SEAGC, Bangkok, 22 - 26

November 2004. � Liew, S. S. & Choo, E. L., (2004), “Bending Moment Interpretation of Structural Element with Measured Deflection Profile”,

Malaysian Geotechnical Conference, 16-18 March, 2004, Sheraton Subang, Petaling Jaya, Malaysia. � Liew, S. S., Kowng, Y. W. & Gan, S. J., (2004), “Interpretations of Instrumented Bored Piles in Kenny Hill Formation”,

Malaysian Geotechnical Conference, 16-18 March, 2004, Sheraton Subang, Petaling Jaya, Malaysia.� Liew, S. S., Gue, S. S. & Liong, C. H., (2003), “Geotechnical Investigation and Monitoring Results of a Landslide Failure at

Southern Peninsula Malaysia (Part 1: Investigating Causes of Failure)”, International Conference on Slope Engineering, Hong Kong, 8-10 Dec 2003.

� Liew, S. S., Gue, S. S. & Liong, C. H., (2003), “Geotechnical Investigation and Monitoring Results of a Landslide Failure at Southern Peninsula Malaysia (Part 2: Back Analyses of Shear Strength and Remedial Works)”, International Conference on Slope Engineering, Hong Kong, 8-10 Dec 2003.

� Liew, S. S. , Tan, Y. C., Ng, H. B. & Lee, P.T., (2003), “New Approach of using Jacked Anchors as Reinforcements in Soil Stabilisation Works for a Cut-And-Cover Tunnel with 17m Deep Excavation”, International Conference on Foundation, Dundee, Scotland, 2-5 Sep 2003.

� Liew, S. S., Gue, S. S. & Tan, Y. C. (2002), "Design and Instrumentation Results of A Reinforcement Concrete Piled Raft Supporting 2500 Ton Oil Storage Tank on Very Soft Alluvium Deposits", Ninth International Conference on Piling and Deep Foundations, Nice, 3 - 5 June, 2002

� Liew, S. S. (2002), "Pile Design with Negative Skin Friction" Course Lecture for Geotechnical Engineering at Puteri Pan Pacific Hotel, Johor Bahru

� Liew, S. S. & Gue, S. S. (2001), “Massive Creep Movements of Post-Glacial Deposits in Kundasang Areas”, GSM-IEM Forum : Engineering Geology & Geotechnics of Slopes, Kuala Lumpur

� Liew, S.S.; Gue, S. S., & Tan, Y. C. (1999), “Instrumentation Results on Negative Downdrag Force of Abutment Piles Underneath the Reinforced Earth Wall Embankment”, 5th Int.. Symp. on Field Measurements in Geomechanics., Singapore.

� Machan, G. & Bennet, V. G. (2008), “Use of Inclinometers for Geotechnical Instrumentation on Tranportation Projects – State of the Practice”, Transportation Research Board

� Mikkelsen, P. K. (2003), “Advances in Inclinometer Data Analysis”, Symposium on Field Measurements in Geotechnics(FMGM) 2003, Oslo, Norway

Thank you

Lord Kelvin (1827 - 1907) :When you can measure what you are speaking about, and express it in numbers, you know something about it; but when you cannot measure it, when you cannot express it in numbers, your knowledge is of a meagre and unsatisfactory kind; it may be the beginning of knowledge, but you have scarcely in your thoughts advanced to the state of Science, whatever the matter may be.