geothermal energy potential and biofuel energy potential...
TRANSCRIPT
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited. COPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
Briefing and Policy Dialogue OnGeothermal Energy Potential and Biofuel Energy Potential To Help Meet HCEI Renewable Energy Goals
Hawaii State Capitol Building, Room 225March 30, 20119 a.m. to noon
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
DisclaimerStatements in this presentation as well as oral statements made by the officers or directors of Ormat
Technologies, Inc., its advisors, affiliates or subsidiaries often will contain “forward-looking statements.”
Whenever you read or hear a statement that is not simply a statement of historical fact (such as when we
describe what we “believe”, “expect” or “anticipate” will occur, and other similar statements), you must
remember that our expectations may not be correct, even though we believe they are reasonable. You
should read and listen to these statements completely and with the understanding that actual future results
may be materially different from what we expect, as a result of certain risks and uncertainties. For a
complete discussion of the risks and uncertainties relating to the forward-looking statements in this
presentation, please see “Risk Factors” as described in the Annual Report on Form 10-K report filed with
the Securities and Exchange Commission on 28 February 2011.
We will not update these forward-looking statements, even though our situation will change in the future.
2
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
Ormat Technologies, Inc. Only vertically integrated company in the geothermal and recovered
energy power business Designs, develops, owns and operates geothermal and recovered
energy-based power plants around the world Designs, manufactures and sells geothermal and recovered energy
power plants Resource, development and drilling (6 rigs) Over four decades of experience Engineered and built power plants totaling over 1,370 MW of which
50% are owned and operated by Ormat Current portfolio includes Puna Geothermal Venture, Brady Complex,
North Brawley, Heber Complex, Mammoth Complex, Ormesa Complex, Jersey Valley, Steamboat Complex, OREG 1, OREG 2, OREG 3 and OREG 4 as well as Zunil Amatitlan (Guatemala), Olkaria III Complex (Kenya) and Momotombo (Nicaragua)
3
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
Hawai„i History
1881: King Kalakaua asks friend, Thomas Edison, to find way to harness volcano‟s energy
1961–1962: First geothermal wells drilled in Kapoho by Richard Lyman
1981–1989: HGP-A 3 MW geothermal facility proves viability; but with drawback of H2S release and noise
1993: First commercial geothermal power plant startup located in Puna for reinjection of brine and H2S• Noise abatement
4
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
5
How it Works…
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
Geothermal Benefits
6
Clean Sustainable Local Indigenous Reduces
usage of fossil fuels
Renewable
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
Air-cooled: No water consumption
100% fluids re-injected into Earth‟s interior
Uses no fossil fuels, emits no greenhouse gases
Near-zero emissions Recent upgrades
further reduce noise
Clean and Renewable
7
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
Puna Geothermal Venture Site
Online in 1993
Today: 6 production wells4 injection wells
8
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
Economic Contributions 30 full-time employees Numerous routine & seasonal contractors Royalty payments to the State, County & OHA >$2M annually
9
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
Expenditures from the Geothermal Relocation and Community Benefits Fund 2007-2010
Two 33-passenger buses were purchased to increase the number of buses serving the Puna makai area • Stops in subdivisions not before serviced, like Leilani
Estates, were added
Two bus driving positions Four street lights on Hawaiian Beaches One street light at Post Office Road closer to
Highway 130 Four street lights from Nanawale Subdivision
to Pāhoa School Three lifeguard pool positions and one swim
instructor
Funded the completion of the Pāhoa skate board park for the kids in the area
Fenced the Pāhoa skate board park Playground set for Hawaiian Beach Park Playground set next to Pāhoa Skate park Security Guards stationed at the Pāhoa
Neighborhood Facility providing additional after-hours security in Pāhoa
Security Guards stationed at Pohoiki Beach Park
Lifeguard and lifeguard stand at Pohoiki to improve the family experience
District 5 council office 2008-2009
In the pipeline: Steam vents purchase
Heating system for the Pāhoa poolLighting at the Pāhoa pool for night swimming
Expanding services to the Pāhoa Transfer Station
10
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
PGV Update
Aerial of PGV - near Pahoa
11
30 MW contract with HELCO through 2027
~20% of Big Island electrical use
Displaces ~144,000 barrels of oil annually
Permits to increase generation up to 60 MW
Construction of new unit completed, delinking the 5 MW from fuel oil pricing
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
8 MW Expansion 25 MW contract remains as is 5 MW contract at fixed price of
11.8 cents per kwhr. ~39% lower than current pricing
8 MW contract at fixed price of 9 cents per kwhr. ~54% lower than current pricing
Dispatchable energy, remotely and automatically controlled by HELCO System Operator
Optimizes geothermal resource, brine not previously used will generate the additional power
12
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
Geothermal Resources
The state* has identified seven areas on Maui and Hawai„i Islands
that might work for geothermal power generation
*GeothermEx, Inc. 2005
Kilauea East Rift Zone -PROVEN RESOURCE
Kilauea SW Rift Zone
Hualalai
Mauna Loa SW Rift Zone
Haleakala East Rift Zone
Haleakala SW Rift Zone
Mauna Loa NE Rift Zone
13
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
Ulupalakua Ranch, Maui Outreach is the first step in
any new exploration – the community, public officials and other stakeholders will be informed and consulted every step of the way
Dain Kane is our Outreach Coordinator
Charles Maxwell, Sr is our Cultural Expert
Munekiyo & Hiraga is our permitting advisor
Lease of ~8,000 acres of surface access rights from Ulupalakua Ranch
14
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
US Dept of Energy Award Geothermal Technologies Program award funded by
American Recovery and Reinvestment Act Goal is to demonstrate use of innovative technologies in
reducing risk of geothermal exploration well siting Build 3-D model of subsurface at Ulupalakua Ranch using
innovative technologies based on model of subsurface at Puna
Partner with Lawrence Berkeley National Lab and UC Santa Cruz
DOE provides ~$4.9M and Ormat matches at ~50% Funds model building, 2 exploration wells, and testing
15
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
We will use a combination of traditional geophysical and geochemical tools with exploration suites not typically used in geothermal exploration• These techniques will be assessed
first at Ormat‟s Puna geothermal field – a „known‟ system
• The exploration suites will then be applied at Ulupalakua Ranch (a private lease on Maui); a site of similar, but older volcanism to Kilauea/Puna
Objectives
Puna, Hawai’i
Ulupalakua, Maui
Plan of Exploration
16
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
Next Steps Continue exploration and outreach Apply to Dept of Land and Natural Resources for
geothermal leases and expanded geothermal resource subzone (GRS):• “mining” (geothermal) lease covering subsurface of Ulupalakua
Ranch lands (non-competitive)• “mining” (geothermal) lease covering surface and subsurface of
State parcel (competitive bid)• GRS expansion covers Ranch lands and State parcel• GRS does not extend into Conservation District• Single EIS supports both lease and zoning applications
Maui County adopts geothermal resource permit (GRP) processing rules, allows County to issue permits for geothermal exploration and production wells
17
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
Next Steps Ormat selects 2-6 exploration well sites
• Apply to County for GRP• Additional EA/EIS focused on exploration wells
Test wells for commercial temperature and flow If commercial resource found, possibly:
• Drill one or more additional wells to support commercial production
• Additional EIS focused on power plant/commercial use• Construct power plant
18
GREEN ENERGY you can rely onCOPYRIGHT © 2011 ORMAT. All rights reserved. This document contains information proprietary to ORMAT. Reproduction in any form without prior written permission is strictly prohibited.
Typical Geothermal Project Development Process
Assess potential resource development sitesSecure lease agreements for new sitesApply for and obtain geothermal subzone designation from State
Preparing Development
Inventory
Exploration Activity
Regulatory Requirements Finance
Assess findings and share with lawmakers, officials, general public Plan field investments and developmentConduct community outreach throughoutCarry out preliminary exploration using new non-intrusive measures
Address all state/county/ federal regulatory requirementsConduct Environmental Assessment or Environmental Impact Statement, as requiredNegotiate independent Power Purchase Agreement with utility
Anticipated costs and investorsAnticipated timeline for return on investment
19
Pre-Drilling Exploration
Drilling Permits
Exploration Drilling
Field Development
Equipment Manufacturing
(EPC)
Start up Operation
Permitting
Signing PPA
3 years 2 years