geppert hydropower - advantageaustria.orggeppert has developed the geppert power cube solution for...

17
1 Leading engineering. Made in Austria. Geppert Hydropower

Upload: others

Post on 27-Oct-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

1

Leading engineering. Made in Austria.

Geppert Hydropower

Page 2: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

Company tradition

1896• Establishment at location Breitweg

in Hall in Tirol

1896• Company founded at Breitweg

in Hall in Tirol

2016 • 120-years jubilee celebration

• Relocation from the founded locationto the new location in Hall in Tirol

• Family owned company in 4th Generation

2

since 1896

Page 3: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

- Consultancy

- Financial arrangements- Design and development- New development- Modernization and refurbishment- Maintenance and service- Repair and overhaul- Trainings

3www.geppert.at

We realize your desire for…

…of your Hydroelectric Power plant

Page 4: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

4www.geppert.at

Solutions for small hydroelectric power plants from one source

Production square: 6.000 m²Inside storage: 3.000 m²Office square: 1.200 m²

Modern tool machines, welding hall, sand blasting room, corrosion protection, testing facilities etc.

Page 5: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

- Design in 3D and 2D- FE calculation- Flow simulation- top modern CNC machines- milling freeform surface by CAM- trained specialists

5www.geppert.at

Modern design and manufacturing

Page 6: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

- Quality of workmanship and implementation

- Head start in experience and innovation

- Guaranteed efficiency (model test) and

optimised fluid mechanics (simulation)

- On your request – full range supplier –turn key

6www.geppert.at

We guarantee you…

Page 7: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

- Pelton Turbines

-Francis Turbines

- Diagonal Turbines

- Kaplan Turbines

-Main Inlet Valve

- Guaranteed

- efficiencies*

- runaway speed

- Cavitation

based on model tests

7www.geppert.at

Production Range of Turbines…

Page 8: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

-up to 25MW

- up to 1000 m Head

-vertical or horizontal shaft

- 1 to 6 nozzles

- inside or outside regulated nozzles

-conducted with Jet deflector

-hydraulically or electrically operated

- special condition for drinking water solutions

8www.geppert.at

Pelton Turbines

Page 9: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

- up to 25MW

- up to 250m Head

- vertical or horizontal shaft

- open flume or Spiral Units

- Outside regulated guide vanes

hydraulically or electrically operated

9www.geppert.at

Francis Turbines

Page 10: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

-up to 7MW

- up to 80m Head

- double regulated reaction Turbine

- vertical or horizontal shaft

- adjustable guide vanes and runner blades

- High partial-load efficiencies and increasedannual production

10www.geppert.at

Diagonal Turbines

Page 11: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

-up to 10MW

- up to 30m Head

- as chamber, bulb or spiral Turbine

- vertical or horizontal shaft

- adjustable guide vanes and runner blades

- Special Type „Kaplanaggregat“ complete placed in the water

11www.geppert.at

Kaplan Turbines

Page 12: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

-up to 1200 mm nominal diameter

- up to 160 bar nominal pressure

- as ball valve or spherical valve

- elastic or metallic operation seal

- emergency shut-down with drop weight

- Optional with revision sealing12

www.geppert.at

Ball/Spherical Valves

Page 13: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

Geppert has developed the Geppert Power Cube solution for microhydropower, which reduces the costfor powerhouse construction.

• Project: Ruzieh (Iran)• Total capacity: 2576 KW• 5x Pelton (V) type turbine incl.

complete electromechanicalequipment and automation

• Commissioned in 2018

13www.geppert.at

Power Cube: Solution for micro hydro

Page 14: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

- Handcraft- Experience- precision

14www.geppert.at

Refurbishment and upgrading

Page 15: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

- Pressure Test- non destructive material testing- factory acceptance Test

15www.geppert.at

Testing

Page 16: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

Our trained team of technicians have manyexperience in installation of our Turbine Equipment on site.Equipped with special tools, they give their bestto make sure that your plant reaches a longlifetime.

16www.geppert.at

Installation on site

Page 17: Geppert Hydropower - advantageaustria.orgGeppert has developed the Geppert Power Cube solution for micro hydropower, which reduces the cost for powerhouse construction. •Project:

Geppert GmbH

Geppertstrasse 6

A-6060 Hall in Tirol

Austria

Telephone: +43(5223) 57788

Fax: +43(5223) 57788 2

Email: [email protected]

Internet: www.geppert.at

17www.geppert.at

We are at your service