get easier to manager high load test oriented it projects

20
©2010 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Session ID:BTOT-TU-1700/8 Twitter hashtag #HPSWU

Upload: hp-software-solutions

Post on 05-Dec-2014

961 views

Category:

Documents


1 download

DESCRIPTION

A case study on creating a reporting based design approach for Bank Asya using HP Quality Center

TRANSCRIPT

Page 1: Get Easier to Manager High Load Test Oriented IT projects

©2010 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice

Session ID:BTOT-TU-1700/8 Twitter hashtag #HPSWU

Page 2: Get Easier to Manager High Load Test Oriented IT projects

©2010 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice

Speaker Name: IBRAHIM ULUSOYDate: 30 November 2010Session ID:BTOT-TU-1700/8

Get Easier to Manage High Load Test Oriented IT projects: Reporting Based Design Approach Using HP Quality Center

Page 3: Get Easier to Manager High Load Test Oriented IT projects

3

Agenda– Bank Asya

– Bank Asya’s Vision

– Bank Asya IT, IT Factory, Major Outcomes

– Software Development Life Cycle

– Fundamental Steps of Software Testing

– Bank Asya’s Quality Process

– Bank Asya’s Testing Methodology

– Testing Strategy and Reporting Based Design Approach

– Management Reports

Page 4: Get Easier to Manager High Load Test Oriented IT projects

4

Bank Asya– Founded in 1996

– #13 bank in Turkey (based on asset size over 7B Euros -2010 Q3 )

– Ranked #473 in the world (based on asset size, according to the Banker Magazine)

– Over 1.7 million credit cards

– Number of branches : 173

– Total # of employees : 4240

– IT Staff : 253

Page 5: Get Easier to Manager High Load Test Oriented IT projects

Bank Asya’s Vision

– Being a key player in both retail and corporate banking in Turkey

– Growing in Africa, Middle East and parts of AsiaAcquired 4 banks in West Africa Plans for Northern Iraq and India

– Being a well known global player in certain innovative areas like card technology

The first contactless prepaid card with debit feature in the worldThe first comprehensive card program in the world featuring highway

toll system, and city transportation (bus, ferries, taxis, parking)Wide set of contactless card products (Campus Card, Allowance Card for

teenagers,Gift Card ) One of the leaders in Near Field Communication (NFC) technology

5

Page 6: Get Easier to Manager High Load Test Oriented IT projects

6

AwardsCards and Payments

Best New Credit Card Product Lounch/2009

Page 7: Get Easier to Manager High Load Test Oriented IT projects

Bank Asya IT

– Staff of 25378 employees in Operation and Risk Management175 for Development, Analysis, Quality and Project Management

– We organized our IT based on a manufacturing business model, called

IT Factory

7

Page 8: Get Easier to Manager High Load Test Oriented IT projects

IT Factory

8

Processes

Organization

Tools

Lean IT Production Line

Get rid of waste

IT work power

ToolsIT processes

Strategy

Card Technologies

Line

Banking Applications

Line

IT Factory

InhouseApps

HP PPM HP SM HP QC HP QTP HP LR

Project Management

Customer Management

SLA

Dem

and

Man

agem

ent

Ope

ratio

ns

Analist Developer QA Team

Card Technologies Production Line

Business Applications Production Line Analist Developer QA Team

OLAMng

t

SLA Mng

t

Page 9: Get Easier to Manager High Load Test Oriented IT projects

9

IT Factory

Business and IT Integration

• Better demand management

• Transparency over production line

• Virtual invoice

IT Governance

• Regulation Support

• Better resource management

• Management Reporting

• Quality management

IT Factory

Page 10: Get Easier to Manager High Load Test Oriented IT projects

IT Factory Major Outcomes

– The ratio of operational work vs new project work is now measured as %57-%43 in 2010 Q3 (Our target was to achieve the ratio of %60-%40 at the end of 2010)

– Target ratio for the end of 2011 is %50-%50

– # of untouched demands reduced by %65 since the start of IT factory

– Time spent for rework reduced dramatically while increasing product quality (better defect management)

– Transparency over IT processes contributed to IT’s image within the bank and motivation of IT team is directly effected by this.

10

Page 11: Get Easier to Manager High Load Test Oriented IT projects

11

Project Build Test

Test

Go-LiveDesign

Software Development Life Cycle

Page 12: Get Easier to Manager High Load Test Oriented IT projects

12

Fundamental Steps of Software Testing

Page 13: Get Easier to Manager High Load Test Oriented IT projects

13

IT Factory Quality Process

Page 14: Get Easier to Manager High Load Test Oriented IT projects

14

Defects

Releases

Performance

New Features

Security

Regression

UAT

Requirements

Test Plan

Test Lab

RQ1RQ2RQ3

TP1TP2TP3

Issue / Change Demand

CR_09.05.19

New Features FolderRegression FolderPerformance Folder

Security FolderUAT Folder

DF2DFN

DF1

Ass

ign T

o R

ele

ase

Assig

n To

Cycle

Cycl

es

Test / R

eq

uirm

en

t C

ovara

ge

IT Factory Testing Methodology

Page 15: Get Easier to Manager High Load Test Oriented IT projects

Managing High Load Test Projects Means

15

– managing lots of tasks

– managing lots of scenarios

– managing project actors in different departments

– managing business criticality and failure

probability risks

– managing time to deliver

Page 16: Get Easier to Manager High Load Test Oriented IT projects

Testing Strategy and Reporting Based Design Approach

16

– Prepare an excel file that include the tasks. Define the risk values according to the business criticality and failure probability then assign these tasks to the testers .

– If required, estimate the testing time with respect to the risk values

– Create the reporting hierarchy

– Prepare the requirements and scenarios then define the workflow of task scenarios with respect to the risk values of the scenarios

– Start test execution and follow defect management

– Generate Hierarchy Reports

“Count what is countable,measure what is measurable, and what is not measurable, make measurable.”

-Galileo

Page 17: Get Easier to Manager High Load Test Oriented IT projects

Management Reports

– Create an Excel Report in QC that generates the Management Reports with respect to the hierarchy design (advanced SQL knowledge required)

– These report(s) must include the values forProject DepartmentsServicesApplicationsTesters

17

Page 18: Get Easier to Manager High Load Test Oriented IT projects

– Transparency of Quality Processes increased

– Estimating testing time correctly

– Better Quality Management

– Better Resource Management

– Ability to analyze the performance of the actors

– Better Risk Management

– On-time delivery

– Reliable Management Reports

18

What We Have Achieved at the End

Page 19: Get Easier to Manager High Load Test Oriented IT projects

©2010 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice

We contributed to Bank Asya’s moving from 755th place to 473rd place between 2008 and 2010 by timely and high quality products

We think,

Page 20: Get Easier to Manager High Load Test Oriented IT projects

Continue the conversation with your peers at the HP Software Community hp.com/go/swcommunity