Get off to a good start Go for upscaling Institutiona lization and sustainabili ty •Starting up, get ownership / partnerships •Bohol and Cebu •Value Chain Tourism •Scoping/ inventories •Good practices •EIC •Scaling up strategy •New Locations, sector(s) •Compile learnings •Start impact assessments •Award system •Forums, matchmaking •Look for funding •Impact Assessment •Knowledge Management •Inphasing / outphasing •Spread the word •Prepare follow up “phase” 2013 Elections May 2013 2014 2015 Start of elections 2016

Upload: calvin-weaver

Post on 17-Jan-2018

216 views

Category:

Documents


0 download

DESCRIPTION

Go for upscaling 2014 Needed: an upscaling strategy Additional locations? Move into another value chain? Green Awards Compile learnings Start Impact assessments

TRANSCRIPT

Page 1: Get off to a good startGo for upscaling Institutionalization and sustainability Starting up, get ownership / partnerships Bohol and Cebu Value Chain Tourism

Get off to a good start Go for upscaling Institutionalization and sustainability

•Starting up, get ownership / partnerships•Bohol and Cebu•Value Chain Tourism•Scoping/inventories•Good practices•EIC

•Scaling up strategy •New Locations, sector(s)•Compile learnings•Start impact assessments•Award system•Forums, matchmaking•Look for funding

•Impact Assessment •Knowledge Management•Inphasing / outphasing•Spread the word•Prepare follow up “phase”

2013Elections May 2013

2014 2015Start of elections 2016

Page 2: Get off to a good startGo for upscaling Institutionalization and sustainability Starting up, get ownership / partnerships Bohol and Cebu Value Chain Tourism

Get off to a good start

2013We will jointly work on this after lunchaccording to the Lines if Intervention and the Locationson the basis of the draft Annual Plan of Operation (AOP)prepared by the GIZ ProGED Teamalready basically approved by DTI National Level, DTI Region 7, DTI Bohol and DTI Cebu

VERY IMPORTANT: BE REALISTIC

Page 3: Get off to a good startGo for upscaling Institutionalization and sustainability Starting up, get ownership / partnerships Bohol and Cebu Value Chain Tourism

Go for upscaling

2014

•Needed: an upscaling strategy •Additional locations?•Move into another value chain?•Green Awards•Compile learnings•Start Impact assessments

Page 4: Get off to a good startGo for upscaling Institutionalization and sustainability Starting up, get ownership / partnerships Bohol and Cebu Value Chain Tourism

Institutionalization and sustainability

2015

•Impact Assessment•Knowledge Management•Spread the word•Inphasing / Outphasing•Follow Up Project / Phase?

Page 5: Get off to a good startGo for upscaling Institutionalization and sustainability Starting up, get ownership / partnerships Bohol and Cebu Value Chain Tourism

Get off to a good start Go for upscaling Institutionalization and sustainability

•Adaptation???????MSMEs and even Enablers not very aware on the need to adapt to Climate ChangeSeem most important to CCC or DENR

2013 2014 2015

Page 6: Get off to a good startGo for upscaling Institutionalization and sustainability Starting up, get ownership / partnerships Bohol and Cebu Value Chain Tourism

What now

• We will then look at the Fifth Success Factor PROCESSES • The GIZ team of ProGED had three days to come up with a draft

Annual Plan of Operations accorcing t the Lines of Intervention• We would like you to understand, assess, validate and verify the

draft OP• Sensitive balance: what is given, what can be changed• You might proposed additional activities, but only if you bring in

own resources• You might defer activities to 2014 or even 2015• Thre points to be very much considered; Be realistic, be realistic,

be realistic!!!!!