ggu phase7 9-plans_130204

12
GOLDEN GATE UNIVERSITY Prepared for: Project Team Golden Gate University Prepared by: MKThink The information contained in this drawing is the sole property of MKThink. Any reproduction in part or as a whole without the written permission of MKThink is prohibited. W www.mkthink.com T 415.402.0888 MKThink A RoundhouseOne 1500 Sansome Street, Suite 200 San Francisco, CA 94111 02.04.13 SF REMODEL PROJECT - PHASES 7-9

Upload: mkthink-strategy

Post on 16-May-2015

236 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ggu phase7 9-plans_130204

GOLDEN GATE UNIVERSITY

Prepared for: Project TeamGolden Gate University

Prepared by: MKThink

The information contained in this drawing is the sole property of MKThink. Any reproduction in part or as a whole without the written permission of MKThink is prohibited.

W www.mkthink.com

T 415.402.0888 MKThink A RoundhouseOne 1500 Sansome Street, Suite 200 San Francisco, CA 94111

02.04.13SF REMODEL PROJECT - PhASES 7-9

Page 2: Ggu phase7 9-plans_130204

Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com

All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.

Golden Gate UniversitySF Remodel Project

Client:Golden Gate University

536 Mission StreetSan Francisco, CA 94105

02/04/13

Prepared By:

Nate GooreEvelyn LeeTiffany ChenMatt Okazaki

Prepared For:

GGU Project Team

Available

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

2

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

OUTDOOR480

205 S.F.

OUTDOOR481

205 S.F.

CORRIDOR482

1080 S.F.

CORRIDOR484

1754 S.F.

OUTDOOR485

140 S.F.

MEETING ROOM

PLUSLEARNING ANNEX

COPYROOM

WORK STATION4332A98 S.F.

CORRIDOR485

OFFICECOPYROOM

484A84 S.F.

484A484B

CIRCULATION4312A

650 S.F.

4312B117 S.F.

STORAGE4312C

185 S.F.

463

CIRCULATION4210A44 S.F.

4308B40 S.F.

4308D66 S.F.

CIRCULATION4308C

299 S.F.

430889 S.F.

4312279 S.F.

4337B140 S.F.

4337158 S.F.

4337A53 S.F.

CIRCULATION4337C

636 S.F.

CLASSROOM

Undergraduate Programs

Ageno School of Business PLUS SchoolofLaw

ClassroomTech.Services

ELSLanguageTech.Center

Drop-inComputerLab

Existing Proposed

STAIRS-3

322 S.F.

AVAILABLE496 S.F.

Phase 7A:

4-West Classrooms

Phase 7A

Scope:SD-DD-CD:Permitting:Begin Construction:End Construction:

4-West ClassroomsFeb-Apr 2013Apr-May 2013May 1, 2013August 1, 2013

Description: Floor 4 - Renovate the West Wing Classrooms.

•Rightsize the classrooms to student enrollment data and class sizes•Add four additional classrooms•Remove old computer labs and switch to ‘mobile’ labs (laptop carts or a laptop checkout sys-tem)•Create an informal gathering space for studying and after-class discussions.•496 SF of available space for new or existing programs. Possible location of new Drop-In Lab.

Phase 7A - Floor 4

Floor 4

OUTDOOR480

205 S.F.

OUTDOOR481

205 S.F.

CORRIDOR482

1080 S.F.

CORRIDOR484

1754 S.F.

OUTDOOR485

140 S.F.

MEETING ROOM

PLUSLEARNING ANNEX

COPYROOM

WORK STATION4332A98 S.F.

CORRIDOR485

OFFICECOPYROOM

484A84 S.F.

484A484B

CIRCULATION4312A

650 S.F.

4312B117 S.F.

STORAGE4312C

185 S.F.

463

CIRCULATION4210A44 S.F.

4308B40 S.F.

4308D66 S.F.

CIRCULATION4308C

299 S.F.

430889 S.F.

4312279 S.F.

4337B140 S.F.

4337158 S.F.

4337A53 S.F.

CIRCULATION4337C

636 S.F.

CLASSROOM

Undergraduate Programs

Ageno School of Business PLUS SchoolofLaw

ClassroomTech.Services

ELSLanguageTech.Center

Drop-inComputerLab

Page 3: Ggu phase7 9-plans_130204

Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com

All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.

Golden Gate UniversitySF Remodel Project

Client:Golden Gate University

536 Mission StreetSan Francisco, CA 94105

02/04/13

Prepared By:

Nate GooreEvelyn LeeTiffany ChenMatt Okazaki

Prepared For:

GGU Project Team

Available

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

3

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

VENDINGMACHINES

1490 S.F.

LOBBY383

1247 S.F.

CORRIDOR384

1553 S.F.

OUTDOOR385

138 S.F.

166 S.F.

331490 S.F.

CIRCULATION3314A

148 S.F.

3310248 S.F.

3310A112 S.F.

3327153 S.F.

3327A55 S.F.

CIRCULATION3327B

287 S.F.

LawRegistration

LLMPrograms

School of LawAdmissionsFinancial AidFaculty Offices

School of Law

StudentServices

STAIRS-3

322 S.F.

Floor 3

Existing Proposed

Phase 7B:

3-West Classrooms & Lawyering Skills

Phase 7B

Scope:SD-DD-CD:Permitting:Begin Construction:End Construction:

3-West Classrooms & Lawyering SkillsJun-Aug 2013Sept-Nov 2013Dec 1, 2013Apr 31, 2014

Description: Floor 3 - Convert 4 West Wing classrooms into the Lawyering Skills Program.•Retrofitclassrooms3200,3201,and 3203 to function as prac-tice trial courtrooms. Equip with proper courtroom furniture and furnishings.Allowforflexibleclassroom setups.

•Relocate the Baxter Room (2314) to 3205.•Convert 3211 and 3216 into 4 smaller rooms. Net gain of 1 classroom.

Phase 7B - Floor 3

VENDINGMACHINES

1490 S.F.

LOBBY383

1247 S.F.

CORRIDOR384

1553 S.F.

OUTDOOR385

138 S.F.

166 S.F.

331490 S.F.

CIRCULATION3314A

148 S.F.

3310248 S.F.

3310A112 S.F.

3327153 S.F.

3327A55 S.F.

CIRCULATION3327B

287 S.F.

LawRegistration

LLMPrograms

School of LawAdmissionsFinancial AidFaculty Offices

School of Law

StudentServices

Page 4: Ggu phase7 9-plans_130204

Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com

All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.

Golden Gate UniversitySF Remodel Project

Client:Golden Gate University

536 Mission StreetSan Francisco, CA 94105

02/04/13

Prepared By:

Nate GooreEvelyn LeeTiffany ChenMatt Okazaki

Prepared For:

GGU Project Team

Available

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

4

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

EXTERIORBALCONY

211298 S.F.

185 S.F.

322 S.F.

LOBBY2100

1203 S.F.

OUTDOOR2500

138 S.F.CORRIDOR

26001693 S.F.

STORAGE2002B75 S.F.

STORAGE2002A75 S.F.

JANITOR2600A38 S.F.

COPY

CIRCULATION2322A

344 S.F.

2322154 S.F.

2300C112 S.F.

2300A70 S.F.

CIRCULATION2300B

512 S.F.

CIRCULATION2300D

284 S.F.

54

School of LawDean’s Offices

School of LawFaculty Offices

School of LawFaculty Center

StudentBarAssociation

ABACriminalPracticeFellowOffice

EXTERIORBALCONY

211298 S.F.

185 S.F.

322 S.F.

LOBBY2100

1203 S.F.

STORAGE2002B75 S.F.

STORAGE2002A75 S.F.

LECTURE HALL/MOOT COURT

STAIRS-3

322 S.F.

Floor 2

Existing Proposed

Phase 7C:

2-West Lecture Halls

Phase 7C

Description:

Scope:SD-DD-CD:Permitting:Begin Construction:End Construction:

2-West Lecture HallsSep-Dec 2013Jan-Apr 2014May 1, 2014Aug 1, 2014

Floor 2 - Renovate the West Wing Lecture Halls (2201, 2202, 2203).

•Decrease slope of tiered seating.•Improve acoustic quality of rooms.•Convert 2203 into a signature Moot Courtroom for the Law School. Provide appropriate furni-ture and furnishings.

Phase 7C - Floor 2

EXTERIORBALCONY

211298 S.F.

185 S.F.

322 S.F.

LOBBY2100

1203 S.F.

OUTDOOR2500

138 S.F.CORRIDOR

26001693 S.F.

STORAGE2002B75 S.F.

STORAGE2002A75 S.F.

JANITOR2600A38 S.F.

COPY

CIRCULATION2322A

344 S.F.

2322154 S.F.

2300C112 S.F.

2300A70 S.F.

CIRCULATION2300B

512 S.F.

CIRCULATION2300D

284 S.F.

54

School of LawDean’s Offices

School of LawFaculty Offices

School of LawFaculty Center

StudentBarAssociation

ABACriminalPracticeFellowOffice

Page 5: Ggu phase7 9-plans_130204

Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com

All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.

Golden Gate UniversitySF Remodel Project

Client:Golden Gate University

536 Mission StreetSan Francisco, CA 94105

02/04/13

Prepared By:

Nate GooreEvelyn LeeTiffany ChenMatt Okazaki

Prepared For:

GGU Project Team

Available

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

5

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

5324A

5221A

5221E5221D

5221C 5221B

OUTDOOR585

138 S.F.

OUTDOOR581

271 S.F.

OUTDOOR580

286 S.F.

LOBBY583

1247 S.F.

CORRIDOR584

1376 S.F.JANITORIAL

CLOSEST5323

25 S.F.

CORRIDOR582

933 S.F.

OFFICE

OFFICE

STORAGE

CIRCULATION5300C

742 S.F.

OFFICE5300

88 S.F.

CIRCULATION5314A

218 S.F.

OFFICE5314

88 S.F.

OFFICES5324

232 S.F.

OFFICES5324

84 S.F.

CIRCULATION5324C

534 S.F.

CIRCULATION5221G

199 S.F.

522124 S.F.

5221F18 S.F.

STAIRS-3

322 S.F.

School of Taxation

ELSLanguageCenter

School of Accounting

CyberCampus

Floor 5

Existing Proposed

FACULTY/STAFFLOUNGE1212 S.F.

AVAILABLE754 S.F. 893 SF

STAIRS-3

322 S.F.

Phase 7D:

5-West Classrooms & Faculty Center(Includes new 5th Floor Auditorium &Digital Signage)

Phase 7D

Description:

Scope:

SD-DD-CD:Permitting:Begin Construction:End Construction:

5-West Classrooms & Faculty Center(Includes new 5th Floor Auditorium &Digital Signage)June-Aug 2014Sept-Nov 2014Dec 1, 2014Apr 31, 2015

Floor 5 - Relocate 5th Floor Audito-rium to 5-West

•Convert 5200, 5205, 5210 to four classrooms.•New classrooms will have move-able walls to create a larger audi-torium room.•Renovation of East Wing doors to meet building code.

Phase 7D - Floor 5

5324A

5221A

5221E5221D

5221C 5221B

OUTDOOR585

138 S.F.

OUTDOOR581

271 S.F.

OUTDOOR580

286 S.F.

LOBBY583

1247 S.F.

CORRIDOR584

1376 S.F.JANITORIAL

CLOSEST5323

25 S.F.

CORRIDOR582

933 S.F.

OFFICE

OFFICE

STORAGE

CIRCULATION5300C

742 S.F.

OFFICE5300

88 S.F.

CIRCULATION5314A

218 S.F.

OFFICE5314

88 S.F.

OFFICES5324

232 S.F.

OFFICES5324

84 S.F.

CIRCULATION5324C

534 S.F.

CIRCULATION5221G

199 S.F.

522124 S.F.

5221F18 S.F.

STAIRS-3

322 S.F.

School of Taxation

ELSLanguageCenter

School of Accounting

CyberCampus

5324A

5221A

5221E5221D

5221C 5221B

OUTDOOR585

138 S.F.

OUTDOOR581

271 S.F.

OUTDOOR580

286 S.F.

LOBBY583

1247 S.F.

CORRIDOR584

1376 S.F.JANITORIAL

CLOSEST5323

25 S.F.

CORRIDOR582

933 S.F.

OFFICE

OFFICE

STORAGE

CIRCULATION5300C

742 S.F.

OFFICE5300

88 S.F.

CIRCULATION5314A

218 S.F.

OFFICE5314

88 S.F.

OFFICES5324

232 S.F.

OFFICES5324

84 S.F.

CIRCULATION5324C

534 S.F.

CIRCULATION5221G

199 S.F.

522124 S.F.

5221F18 S.F.

STAIRS-3

322 S.F.

School of Taxation

ELSLanguageCenter

School of Accounting

CyberCampus

Floor 5 - Convert classroom 5207 into Faculty/Staff Lounge.

Floor 5 - Renovate the West Wing Classrooms

•Rightsize classrooms to student enrollment data and class sizes.

Page 6: Ggu phase7 9-plans_130204

Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com

All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.

Golden Gate UniversitySF Remodel Project

Client:Golden Gate University

536 Mission StreetSan Francisco, CA 94105

02/04/13

Prepared By:

Nate GooreEvelyn LeeTiffany ChenMatt Okazaki

Prepared For:

GGU Project Team

Available

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

6

5324A

5221A

5221E5221D

5221C 5221B

OUTDOOR585

138 S.F.

OUTDOOR581

271 S.F.

OUTDOOR580

286 S.F.

LOBBY583

1247 S.F.

CORRIDOR584

1376 S.F.JANITORIAL

CLOSEST5323

25 S.F.

CORRIDOR582

933 S.F.

OFFICE

OFFICE

STORAGE

CIRCULATION5300C

742 S.F.

OFFICE5300

88 S.F.

CIRCULATION5314A

218 S.F.

OFFICE5314

88 S.F.

OFFICES5324

232 S.F.

OFFICES5324

84 S.F.

CIRCULATION5324C

534 S.F.

CIRCULATION5221G

199 S.F.

522124 S.F.

5221F18 S.F.

STAIRS-3

322 S.F.

School of Taxation

ELSLanguageCenter

School of Accounting

CyberCampus

OUTDOOR480

205 S.F.

OUTDOOR481

205 S.F.

CORRIDOR482

1080 S.F.

CORRIDOR484

1754 S.F.

OUTDOOR485

140 S.F.

MEETING ROOM

PLUSLEARNING ANNEX

COPYROOM

WORK STATION4332A98 S.F.

CORRIDOR485

OFFICECOPYROOM

484A84 S.F.

484A484B

CIRCULATION4312A

650 S.F.

4312B117 S.F.

STORAGE4312C

185 S.F.

463

CIRCULATION4210A44 S.F.

4308B40 S.F.

4308D66 S.F.

CIRCULATION4308C

299 S.F.

430889 S.F.

4312279 S.F.

4337B140 S.F.

4337158 S.F.

4337A53 S.F.

CIRCULATION4337C

636 S.F.

CLASSROOM

Undergraduate Programs

Ageno School of Business PLUS SchoolofLaw

ClassroomTech.Services

ELSLanguageTech.Center

Drop-inComputerLab

VENDINGMACHINES

1490 S.F.

LOBBY383

1247 S.F.

CORRIDOR384

1553 S.F.

OUTDOOR385

138 S.F.

166 S.F.

331490 S.F.

CIRCULATION3314A

148 S.F.

3310248 S.F.

3310A112 S.F.

3327153 S.F.

3327A55 S.F.

CIRCULATION3327B

287 S.F.

LawRegistration

LLMPrograms

School of LawAdmissionsFinancial AidFaculty Offices

School of Law

StudentServices

EXTERIORBALCONY

211298 S.F.

185 S.F.

322 S.F.

LOBBY2100

1203 S.F.

OUTDOOR2500

138 S.F.CORRIDOR

26001693 S.F.

STORAGE2002B75 S.F.

STORAGE2002A75 S.F.

JANITOR2600A38 S.F.

COPY

CIRCULATION2322A

344 S.F.

2322154 S.F.

2300C112 S.F.

2300A70 S.F.

CIRCULATION2300B

512 S.F.

CIRCULATION2300D

284 S.F.

54

School of LawDean’s Offices

School of LawFaculty Offices

School of LawFaculty Center

StudentBarAssociation

ABACriminalPracticeFellowOffice

Existing - Floor 2

Existing - Floor 4 Existing - Floor 5

Existing - Floor 3

Description:

Scope:

SD-DD-CD:Permitting:Begin Construction:End Construction:

Phase 8:

2-East, 3-East, 4-East, and 5-East Academic Suites & Offices

Phase 8

2-East, 3-East, 4-East, and 5-East AcademicSuites&OfficesTBDTBDTBDTBDFloor 2, 3, 4, 5 - Renovate the East WingAcademicSuites&Offices

•Createastandardizedofficeplanlayout.•Rightsizeofficesaccordingtoadministration space standards, faculty and staff directory, and growth projections. Create a widervarietyofoffice/workstationspaces.•Create a single reception/entry intotheofficesuitesoneachfloor.•Introduce more meeting/confer-enceroomsperfloor.

•Move all classrooms off of the East Wing.

Phase 8 - Floors 2-5

Floors 2-5

Page 7: Ggu phase7 9-plans_130204

Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com

All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.

Golden Gate UniversitySF Remodel Project

Client:Golden Gate University

536 Mission StreetSan Francisco, CA 94105

02/04/13

Prepared By:

Nate GooreEvelyn LeeTiffany ChenMatt Okazaki

Prepared For:

GGU Project Team

Available

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

7

STAIRS-3

322 S.F.

Office Plan A

PrivateOffice-175SF:PrivateOffice-144SF:PrivateOffice-110SF:Open Workstations - 64 SF:

Touchdown Workstations:Meeting Rooms:Mini Break Rooms:

12

242653

8 31

STAIRS-3

322 S.F.

Office Plan B

PrivateOffice-175SF:PrivateOffice-144SF:PrivateOffice-110SF:Open Workstations - 64 SF:

Touchdown Workstations:Meeting Rooms:Mini Break Rooms:

12

361352

1 31Proposed - Office Plan B

Proposed - Office Plan A

Description:

Scope:

SD-DD-CD:Permitting:Begin Construction:End Construction:

Phase 8:

2-East, 3-East, 4-East, and 5-East Academic Suites & Offices

Phase 8

2-East, 3-East, 4-East, and 5-East AcademicSuites&OfficesTBDTBDTBDTBDFloor 2, 3, 4, 5 - Renovate the East WingAcademicSuites&Offices

•Createastandardizedofficeplanlayout.•Rightsizeofficesaccordingtoadministration space standards, faculty and staff directory, and growth projections. Create a widervarietyofoffice/workstationspaces.•Create a single reception/entry intotheofficesuitesoneachfloor.•Introduce more meeting/confer-enceroomsperfloor.

•Move all classrooms off of the East Wing.

Phase 8 - Floors 2-5

Page 8: Ggu phase7 9-plans_130204

Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com

All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.

Golden Gate UniversitySF Remodel Project

Client:Golden Gate University

536 Mission StreetSan Francisco, CA 94105

02/04/13

Prepared By:

Nate GooreEvelyn LeeTiffany ChenMatt Okazaki

Prepared For:

GGU Project Team

Available

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

8

QUAD & EVENT SPACE

2053 S.F.

Law

CONCIERGE

56 S.F.

UNISEXTOILET

45 S.F.

161 S.F.

1414 S.F.

74 S.F.

MOVEABLEWALL

PLANTER

UNISEXTOILET

45 S.F.

UNISEXTOILET

45 S.F.

UNISEXTOILET

45 S.F.

LIBRARYENTRANCE

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

Floor 1

Existing Proposed

1003

1200D

1200C

1200A

CIRCULATION1100

1157 S.F.

ENTRY PROMENADE150

MEETING/WORKROOM

TELECOM1500A94 S.F.

OUTDOOR1600A

186 S.F.

236 S.F

CIRCULATION

OFFICE OFFICE OFFICE OFFICE

OFFICE OFFICE

ATM

1218A

LearningSupportServices

Law Library

University Library

Phase 9A:

Learning Commons

The Hub

Phase 9A

Scope:

SD-DD-CD:Permitting:Begin Construction:End Construction:

Learning CommonsThe HubTBDTBDTBDTBD

Floor 1, Mezzanine - Convert the University Library into the Learning Commons.

Description:

•Create 12 group study rooms.•Open up new entrance to Ecker Place.•Add 2 unisex restrooms.•Co-locatestaffofficesandservicepoints.

Floor 1 - Expand the Main Lobby to create the Hub.•Remove north wall of Main Lobby and add moveable wall.•Add 2 unisex restrooms, kitchen/prep area, and storage room.

Phase 9A - Floor 1

Page 9: Ggu phase7 9-plans_130204

Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com

All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.

Golden Gate UniversitySF Remodel Project

Client:Golden Gate University

536 Mission StreetSan Francisco, CA 94105

02/04/13

Prepared By:

Nate GooreEvelyn LeeTiffany ChenMatt Okazaki

Prepared For:

GGU Project Team

Available

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

9

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

Mezzanine

Existing Proposed

STORAGE

OFFICE

M-52

OUTDOORM-50

127 S.F.

CONTRACTOROFFICE

M-93188 S.F.

37 S.F.

317 S.F.

387 S.F.

M2008335 S.F.

49 S.F. 343 S.F.

TOOL ROOM

University LibraryTechnical Services Dana &

Teresa WaldmanReading Room

Phase 9A:

Learning Commons

The Hub

Phase 9A

Scope:

SD-DD-CD:Permitting:Begin Construction:End Construction:

Learning CommonsThe HubTBDTBDTBDTBD

Floor 1, Mezzanine - Convert the University Library into the Learning Commons.

Description:

•Create 12 group study rooms.•Open up new entrance to Ecker Place.•Add 2 unisex restrooms.•Co-locatestaffofficesandservicepoints.

Floor 1 - Expand the Main Lobby to create the Hub.•Remove north wall of Main Lobby and add moveable wall.•Add 2 unisex restrooms, kitchen/prep area, and storage room.

Phase 9A - Mezzanine

Page 10: Ggu phase7 9-plans_130204

Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com

All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.

Golden Gate UniversitySF Remodel Project

Client:Golden Gate University

536 Mission StreetSan Francisco, CA 94105

02/04/13

Prepared By:

Nate GooreEvelyn LeeTiffany ChenMatt Okazaki

Prepared For:

GGU Project Team

Available

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

10

CORRIDOR

STUDY

OFFICE

STORAGE

OUTDOOR PLAZAP-150

293 S.F.

28 S.F.

ELJ

75 S.F.

P-2T

P-63A

StudentGovernmentAssociation

Enterprise Technology Services

Business Services& Facilities

Law Library

CORRIDOR

OFFICE

OFFICE

STORAGE

293 S.F.

28 S.F.

ELJ

75 S.F.

P-2T

P-63A

STUDENT ORG.OFFICE

UNISEXTOILET

PG&EVAULT

T-COMM

pool tableping-pong

table

STUDENT ORG.OFFICE

vending machines

vending machines

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

Plaza

Existing Proposed

Phase 9B:

Plaza Courtyard Student Union

6th Floor Moot Court & Storage Relocation

Phase 9B

Scope:

SD-DD-CD:Permitting:Begin Construction:End Construction:

Plaza Courtyard Student Union6th Moot Court & Storage RelocationTBDTBDTBDTBD

Plaza, Floor 1 - Enclose Plaza Courtyard to create the Student Union.

Description:

•Add transparent roof covering to allow for daylighting.•Expand kitchen in existing SGA Lounge.•Convert storage room P-9B into unisex restroom.•Re-locate lockers to Plaza Courtyard.•Enclose stairwell leading to Plaza Courtyard.

Floor 6 - Convert Moot Courtroom into storage and available space.•Remove vending machines. Relo-cate to Plaza Courtyard Student Union.•Relocate storage room 6200A to part of room 6224 (639 SF).•Convert Moot Courtroom (6224) to relocated storage room 6200A and available space (522 SF).

Phase 9B - Plaza

Page 11: Ggu phase7 9-plans_130204

Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com

All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.

Golden Gate UniversitySF Remodel Project

Client:Golden Gate University

536 Mission StreetSan Francisco, CA 94105

02/04/13

Prepared By:

Nate GooreEvelyn LeeTiffany ChenMatt Okazaki

Prepared For:

GGU Project Team

Available

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

11

QUAD & EVENT SPACE

2053 S.F.

Law

CONCIERGE

56 S.F.

UNISEXTOILET

45 S.F.

161 S.F.

1414 S.F.

74 S.F.

MOVEABLEWALL

PLANTER

UNISEXTOILET

45 S.F.

UNISEXTOILET

45 S.F.

UNISEXTOILET

45 S.F.

LIBRARYENTRANCE

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

Floor 1

Existing Proposed

1003

1200D

1200C

1200A

CIRCULATION1100

1157 S.F.

ENTRY PROMENADE150

MEETING/WORKROOM

TELECOM1500A94 S.F.

OUTDOOR1600A

186 S.F.

236 S.F

CIRCULATION

OFFICE OFFICE OFFICE OFFICE

OFFICE OFFICE

ATM

1218A

LearningSupportServices

Law Library

University Library

Phase 9B:

Plaza Courtyard Student Union

6th Floor Moot Court & Storage Relocation

Phase 9B

Scope:

SD-DD-CD:Permitting:Begin Construction:End Construction:

Plaza Courtyard Student Union6th Moot Court & Storage RelocationTBDTBDTBDTBD

Plaza, Floor 1 - Enclose Plaza Courtyard to create the Student Union.

Description:

•Add transparent roof covering to allow for daylighting.•Expand kitchen in existing SGA Lounge.•Convert storage room P-9B into unisex restroom.•Re-locate lockers to Plaza Courtyard.•Enclose stairwell leading to Plaza Courtyard.

Floor 6 - Convert Moot Courtroom into storage and available space.•Remove vending machines. Relo-cate to Plaza Courtyard Student Union.•Relocate storage room 6200A to part of room 6224 (639 SF).•Convert Moot Courtroom (6224) to relocated storage room 6200A and available space (522 SF).

Phase 9B - Floor 1

Page 12: Ggu phase7 9-plans_130204

Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com

All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.

Golden Gate UniversitySF Remodel Project

Client:Golden Gate University

536 Mission StreetSan Francisco, CA 94105

02/04/13

Prepared By:

Nate GooreEvelyn LeeTiffany ChenMatt Okazaki

Prepared For:

GGU Project Team

Available

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

12

Instruction

Office - Staff

Interaction

Outdoor

Library - Study

Library - Book Storage

Library - Staff

User Support

Building Support

Circulation

Informal Interaction

Office - Faculty

Office - Student

Floor 6

Existing Proposed

LOBBY683

1247 S.F.

CORRIDOR682

934 S.F.OUTDOOR

681278 S.F.

OUTDOOR679

254 S.F.

OUTDOOR680

693 S.F.

ROOF6300

11,287 S.F.

684

245 S.F.

CIRCULATION6202F

336 S.F.

6202E70 S.F.6202

170 S.F.

CIRCULATION6217A

177 S.F.

6217104 S.F.

2068 S.F.

STORAGE

639 S.F.

AVAILABLE

522 S.F.

LSS

UNIVERSITY

Office of the President

Office of theVice PresidentofAcademicAffairs

LOBBY683

1247 S.F.

CORRIDOR682

934 S.F.OUTDOOR

681278 S.F.

OUTDOOR679

254 S.F.

OUTDOOR680

693 S.F.

ROOF6300

11,287 S.F.

684

245 S.F.

CIRCULATION6202F

336 S.F.

6202E70 S.F.6202

170 S.F.

CIRCULATION6217A

177 S.F.

6217104 S.F.

WILLIAM RANDOLPH HEARST

UNIVERSITY

Office of the President

Office of theVice PresidentofAcademicAffairs

Phase 9B:

Plaza Courtyard Student Union

6th Floor Moot Court & Storage Relocation

Phase 9B

Scope:

SD-DD-CD:Permitting:Begin Construction:End Construction:

Plaza Courtyard Student Union6th Moot Court & Storage RelocationTBDTBDTBDTBD

Plaza, Floor 1 - Enclose Plaza Courtyard to create the Student Union.

Description:

•Add transparent roof covering to allow for daylighting.•Expand kitchen in existing SGA Lounge.•Convert storage room P-9B into unisex restroom.•Re-locate lockers to Plaza Courtyard.•Enclose stairwell leading to Plaza Courtyard.

Floor 6 - Convert Moot Courtroom into storage and available space.•Remove vending machines. Relo-cate to Plaza Courtyard Student Union.•Relocate storage room 6200A to part of room 6224 (639 SF).•Convert Moot Courtroom (6224) to relocated storage room 6200A and available space (522 SF).

Phase 9B - Floor 6