TECHNICAL PRESENTATIONPresentation of properties, construction technologies
and sequence
©photo_KLH
Properties of KLH timber pannels Very high stiffness and strenght (long spans) Can manage large concentrated forces Can use a great diversity in wood regarding density/stifness/strenght Very dimensional stable Light weight compered to competitive material Great possibility in multi‐storey buildings Easy to process Fire resistant, Euroclass D‐s2, d0 Noise reducing
©photo_KLH
Statics
Very high axial load capacity due to large bearing areaHigh shear strength to resist the horizontal loadsDead weight reduces the need for mechanical holding down
Earthquake test
Simulation of the Kobe earthquake Repeated test
No significant damage
Technical approvals of KLH
ETA -European technical approval
CE-Certificate of conformity
ISO 14025 -Environmental product decleration
ISO EN 9001 –Quality management
ISO EN 14001 –Environmental management
DIBT -Technical approval for Germany
CSTB -French approval
AITIM -Spanish approval
Technical ApprovalforRussia
PEFC -Programmefor the Endorsement of Forest Certification
GHS_Technology©photo_KLH
Green House Solutions
-Sequence- Design, prefabrication, transport and montage of buildingparts
©photo_KLH
©photo_KLH
Design
Design According to your needs an wishes
Preparation of building plans
Construction plan processing and editing
Confirmation of solutions created
©photo_KLH
Contract & Financing
Contract negotiation and preparation
Preparation of financing plan
Financing solutions
Help with obtaining a building permit
©photo_KLH
Prefabrication
All building parts are prefabricated:
to suit your wishes, make construction faster, cheaper, more secure and easier
©photo_KLH
Transport
Walls vertical, floor elements horizontal transported, just in time to construction time
Transport in closed trucks
Correct stacking order accordant to mounting order on construction site
Green House Solutions
– Construction DetailsPresented with:
Project Spöttlgasse, ViennaProject Mühlweg, Vienna
©photo_KLH
©photo_KLH
GHS BuildUp
KLH-walls
Prefabricated floor-elements
Elastic base strips in all
joints or airproof foil on the
outside
©photo_KLH
GHS BuildUp
Fermacell dry screed with floor
heating
Suspended ceiling and
Electric Installation
©photo_KLH
Spöttlgasse, Vienna
Residential building with 4 floors in Vienna, 112 Flats
16.000m² KLH-Elements (7400m² useable floor space)
Low-energy-house (demand of heating < 50kWh/(m²*a))
©photo_KLH
Spöttlgasse - Structure
Access balconies concrete
Floor elements run through the walls
Stabilising walls with openings
Single-leaf party wall
Loggias prefixed
©photo_KLH
Spöttlgasse - BuildUp
KLH
KLH
KLH
Grit/bottoming/gravel
Suspended ceiling
Screed
Freestanding facing
©photo_KLH
Mühlweg, Vienna
Building promotor competition for 3 projects in solid wood
construction method, first realisation in Europe in this size
Residential building with 4 floors, 70 flats at Site C
Passiv house standard (demand of heating < 15kWh/(m²*a))
©photo_KLH
Mühlweg - Structure
Building joint
Stairhouse concrete
Double leaf party walls
Balconies prefixed
©photo_KLH
Mühlweg - BuildUp
KLH
KLH
KLH
KLH
Double leaf Party wall
Screed
Grit/bottoming/gravel
Suspended ceiling
©photo_KLH
GHS Summary
Quite easy to calculate KLH elements Serviceability (static and dynamic properties) is most often the design criteria Low rollin shear properties of the elements Dimension stability very good because of the 2 direction oflayers