gifa projects for giic 2017 progress on projects from giic...

21
GIFA projects for GIIC 2017 Progress on Projects from GIIC-2015 Project Title Rooftop Solar Panels Estimated Project Cost: ZAR 5.8 Billion Expected Delivery Model: Regulated PPP Status: Financial Close process Sector: Energy Project Background and Scope The GPG’s Solar PV Programme aimed at developing Rooftop Solar PV panels on GPG owned properties and buildings to generate electricity throughout the province. The design, construction, financing, maintenance and operations of a programme of rooftop solar panel installation on Gauteng Provincial Government’s buildings (more than 500 sites, with a total roof surface area of app. 8 million m 2 ). Progress for the first phase of the project is as follows: The project was registered as a PPP. The feasibility study was completed and taken through the TR16 process, which involved issuing the project to the market through RFQ. Bidders were evaluated for phase 1 which included the 16 sites split into 4 clusters to generate 35 MW of power circa R900 million. A preferred bidder has been recommended, and GIFA is currently awaiting the approval from National Treasury for a TAIIB.

Upload: others

Post on 26-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

GIFA projects for GIIC 2017

Progress on Projects from GIIC-2015

Project Title

Rooftop Solar Panels

Estimated Project Cost ZAR 58 Billion Expected Delivery Model Regulated PPP Status Financial Close process Sector Energy

Project Background and Scope

The GPGrsquos Solar PV Programme aimed at developing Rooftop Solar PV panels on GPG owned properties and buildings to generate electricity throughout the province The design construction financing maintenance and operations of a programme of rooftop solar panel installation on Gauteng Provincial Governmentrsquos buildings (more than 500 sites with a total roof surface area of app 8 million m2) Progress for the first phase of the project is as follows The project was registered as a PPP The feasibility study was completed and taken through

the TR16 process which involved issuing the project to the market through RFQ Bidders were evaluated for phase 1 which included the 16 sites split into 4 clusters to generate

35 MW of power circa R900 million A preferred bidder has been recommended and GIFA is currently awaiting the approval from

National Treasury for a TAIIB

Project Title

CoTri-generation Programme in Hospitals (Phase 2)

Estimated Project Cost ZAR 23Billion Expected Delivery Model Regulated PPP Status Financial Close process Sector Energy

Project Background and Scope

The Design construction financing maintenance and operations of tri-generation (electricity heating and cooling) plants (app 2MW each) at the following 6 hospitals viz

Chris Hani Baragwanath (Financial close) Charlotte Maxeke Dr George Mukhari Steve Biko New Natalspruit Bheki Mlangeni Hospital

Progress for the pilot phase is as follows

The preferred bidder was selected for the implementation of a Co-generation Plant at Chris-Hani Bara Hospital for a 25 MW base load of power circa R100 million

The contractual negotiations with the preferred bidder on-going and expected to conclude in August 2017

The remainder of the 5 hospitals will be issued to the prequalified bidders post-financial close of CHB Hospital

Project Title

Kopanong Precinct Project

Estimated Project Cost ZAR 74 Billion Expected Delivery Model Regulated PPP Status Feasibility completed Sector Commercial Property

Short Project Description

The project involves the refurbishment of GPG owned buildings within the City of Johannesburg for government accommodation The feasibility study has been completed The project would be delivered as a regulated PPP with the private sector expected to provide hard infrastructure develop structured packing offer maintenance and facilities management

Progress is as follows The project was registered as a PPP with National Treasury and the pre-feasibility study was

conducted which allowed GIFA with permission from National Treasury to test the market through a RFQ

Currently awaiting the TAI and TAII from National Treasury so we can issue the RFP to prequalified bidders

Project Title

Tshwane Innovation Hub ndash Enterprise Building 2 amp 3

Estimated Project Cost ZAR 149m (EB2) ZAR 161m (EB3) Expected Delivery Model Regulated PPP Status Financial close process Sector Commercial Property

Short Project Description

The purpose of the project is to increase the value benefits of the site through a long-term lease arrangement involving the design construction and financing of the site (land parcel 4) called EB2 amp EB3 in The Innovative Hub (TIH) requiring both infrastructure and top structure to accommodate tenants fitting the TIH tenant profile The development will comprise a 2 storey building with some 5 693 msup2 gross building area

Progress is as follows A preferred bidder was selected for both EB 2 and EB 3 and the TAII (B) was obtained from

National Treasury Currently in contractual negotiations with the preferred bidder and is expected to conclude in

August 2017

Project Title

Jewellery Manufacturing Precinct Project

Estimated Project Cost ZAR 800million Expected Delivery Model Long-term Lease Model Status Feasibility completed Market-release stage Sector Manufacturing amp Commercial Property

Short Project Description

The main aim of the project is to contribute to the diversification of the Gauteng economy and strengthen the global competitiveness of the jewellery industry to use natural resources in an efficient manner develop human capital and develop the necessary technology The Design construction financing maintenance and operations of a jewellery manufacturing precinct of app 42 000 m2 within the Special Economic Zone of the OR Tambo International Airport A lease agreement has been concluded with the Airports Company of South Africa (ACSA) An IDZ operator permit was issued to the IDZ Devco in December 2010 The campus approach enables the conglomeration of jewellery manufacturing regulators and support operations within close proximity of each other The development comprises of amongst others production facilities - gold and diamond cutting jewellery factories office buildings and other supporting services and infrastructure Progress to date 85 of the tenant pipeline has been achieved Lease contract has been concluded for 50 of the precinct relating to in2Food

Projects for Market Release ndash 201718

Project Title

COJ Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Study completed Awaiting Council approval Sector Energy

Project Background and Scope

The City of Johannesburg (ldquoCOJrdquo) is experiencing challenges of waste management particularly on disposal where the City is fast running out of landfill space The completed feasibility study has proposed a solution that aims to reduce of waste to landfill and if possible alternative energy generation from all waste material generated from the municipal areas In order to solve the above the COJ intends to embark on a project that aims to reduce approximately 500 000 tpa waste-to-landfill and if possible alternative energy generation (approximately 25 MW) from municipal solid waste material

Project Title

Ekurhuleni Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Study completed Awaiting Council approval Sector Energy

Project Background and Scope

The Ekurhuleni Municipality is experiencing few challenges of waste management particularly on disposal In order to solve the above the Ekurhuleni Municipality intends to embark on a project that would reduce waste-to-landfill and if possible alternative energy generation (approx 33 MW) from all waste material generated from the municipal areas

Project Title

Tshwane Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Stage Sector Energy

Project Background and Scope

The Tshwane Municipality is experiencing challenges of waste management particularly on disposal In order to solve the above the Tshwane Municipality intends to embark on a project that aims to reduce waste-to-landfill and if possible alternative energy generation (approx 88 MW) from all waste material generated from the municipal areas

Project Title

SedibengWest Rand Waste Water Treatment Works Energy

Promoter Sedibeng amp West Rand District Municipalities Estimated Project Cost ZAR 300 million Expected Delivery Model Lease Operate amp Transfer Status Feasibility Study completed Sector Energy

Project Background and Scope

The Sedibeng and West Rand Districts Municipalities waste water treatment facilities are experiencing challenges in sludge disposal and plant inefficiencies The existing infrastructure requires upgrade to incorporate new technologies In order to solve the above the Sedibeng and West Rand District Municipalities intend to embark on a project that aims to generate alternative energy from 4 (four) waste water treatment works 2 (two) in each District municipality respectively

Project Title

Lindley Waste Water Treatment Works

Promoter Mogale City Estimated Project Cost ZAR 15 Billion Expected Delivery Model Finance Lease (BOT) Status Feasibility Study completed Sector Water

Project Background and Scope

The project entails development of a new waste water treatment plant to adequately service the North Eastern part of Mogale City including the N14 corridor The new 100 mega litre wastewater treatment works which will be situated in Lindley will be able to service all of the areas in the municipality not serviced including future developments

Project Title

Gauteng Schools Programme

Promoter Gauteng Dept of Education Estimated Project Cost ZAR 7 Billion Expected Delivery Model Regulated PPP Finance Lease Status Feasibility Completed Sector Education

Project Background and Scope

The design construction and financing of 110 new schools to provide additional spaces and replace some dilapidated structures The extent of the programme will potentially result in a substantial reduction in the backlogs in school infrastructure The school designs will be in line with the Gauteng Department of Educationrsquos initiatives to provide smart classrooms as a way of modernising public education and responding to new educational imperatives for quality learning

Projects Under Feasibility ndash 201718

Project Title

Sedibeng Agro-Processing Hub

Estimated Project Cost ZAR 11 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the upgrade of a Fresh Produce Market and the development of an Agro Processing hub in the EmfuleniSedibeng district

Project Title

Tshwane Agro-Processing Hub

Estimated Project Cost ZAR 600million Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the development of an Agro Processing hub in Tshwane The agro-processing industry is among the sectors identified by the National Development Plan (NDP) Industrial Policy Action Plan (IPAP) the New Growth Path Gauteng Employment Growth and Development Strategy (2009) and Gauteng Agricultural Development Strategy (2010) for its potential to spur growth and create jobs because of its strong backward linkage with the primary agricultural sector The proposed agro-processing facility will only focus on food and beverages category as per International Standards Industrial Classification (ISIC 2013) The facility will include some value added services such as food laboratory training centre and offices and make provision for nine food processing line opportunities Nine (9) food processing opportunities were identified ie Powdering Mixing and Packaging Drying Canning Pastes Juicing Bottling Dairy Jam and Chutney Market testing will be conducted in the second half of 2017 to solicit appetite for potential developerinvestors through a turnkey approach

Project Title

West Rand Agro-Processing Hub

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project entails the development of an integrated intervention to enhancesupport agricultural production establishment andor strengthening of fresh produce markets as well as agro-processing in the West Rand

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 2: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

CoTri-generation Programme in Hospitals (Phase 2)

Estimated Project Cost ZAR 23Billion Expected Delivery Model Regulated PPP Status Financial Close process Sector Energy

Project Background and Scope

The Design construction financing maintenance and operations of tri-generation (electricity heating and cooling) plants (app 2MW each) at the following 6 hospitals viz

Chris Hani Baragwanath (Financial close) Charlotte Maxeke Dr George Mukhari Steve Biko New Natalspruit Bheki Mlangeni Hospital

Progress for the pilot phase is as follows

The preferred bidder was selected for the implementation of a Co-generation Plant at Chris-Hani Bara Hospital for a 25 MW base load of power circa R100 million

The contractual negotiations with the preferred bidder on-going and expected to conclude in August 2017

The remainder of the 5 hospitals will be issued to the prequalified bidders post-financial close of CHB Hospital

Project Title

Kopanong Precinct Project

Estimated Project Cost ZAR 74 Billion Expected Delivery Model Regulated PPP Status Feasibility completed Sector Commercial Property

Short Project Description

The project involves the refurbishment of GPG owned buildings within the City of Johannesburg for government accommodation The feasibility study has been completed The project would be delivered as a regulated PPP with the private sector expected to provide hard infrastructure develop structured packing offer maintenance and facilities management

Progress is as follows The project was registered as a PPP with National Treasury and the pre-feasibility study was

conducted which allowed GIFA with permission from National Treasury to test the market through a RFQ

Currently awaiting the TAI and TAII from National Treasury so we can issue the RFP to prequalified bidders

Project Title

Tshwane Innovation Hub ndash Enterprise Building 2 amp 3

Estimated Project Cost ZAR 149m (EB2) ZAR 161m (EB3) Expected Delivery Model Regulated PPP Status Financial close process Sector Commercial Property

Short Project Description

The purpose of the project is to increase the value benefits of the site through a long-term lease arrangement involving the design construction and financing of the site (land parcel 4) called EB2 amp EB3 in The Innovative Hub (TIH) requiring both infrastructure and top structure to accommodate tenants fitting the TIH tenant profile The development will comprise a 2 storey building with some 5 693 msup2 gross building area

Progress is as follows A preferred bidder was selected for both EB 2 and EB 3 and the TAII (B) was obtained from

National Treasury Currently in contractual negotiations with the preferred bidder and is expected to conclude in

August 2017

Project Title

Jewellery Manufacturing Precinct Project

Estimated Project Cost ZAR 800million Expected Delivery Model Long-term Lease Model Status Feasibility completed Market-release stage Sector Manufacturing amp Commercial Property

Short Project Description

The main aim of the project is to contribute to the diversification of the Gauteng economy and strengthen the global competitiveness of the jewellery industry to use natural resources in an efficient manner develop human capital and develop the necessary technology The Design construction financing maintenance and operations of a jewellery manufacturing precinct of app 42 000 m2 within the Special Economic Zone of the OR Tambo International Airport A lease agreement has been concluded with the Airports Company of South Africa (ACSA) An IDZ operator permit was issued to the IDZ Devco in December 2010 The campus approach enables the conglomeration of jewellery manufacturing regulators and support operations within close proximity of each other The development comprises of amongst others production facilities - gold and diamond cutting jewellery factories office buildings and other supporting services and infrastructure Progress to date 85 of the tenant pipeline has been achieved Lease contract has been concluded for 50 of the precinct relating to in2Food

Projects for Market Release ndash 201718

Project Title

COJ Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Study completed Awaiting Council approval Sector Energy

Project Background and Scope

The City of Johannesburg (ldquoCOJrdquo) is experiencing challenges of waste management particularly on disposal where the City is fast running out of landfill space The completed feasibility study has proposed a solution that aims to reduce of waste to landfill and if possible alternative energy generation from all waste material generated from the municipal areas In order to solve the above the COJ intends to embark on a project that aims to reduce approximately 500 000 tpa waste-to-landfill and if possible alternative energy generation (approximately 25 MW) from municipal solid waste material

Project Title

Ekurhuleni Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Study completed Awaiting Council approval Sector Energy

Project Background and Scope

The Ekurhuleni Municipality is experiencing few challenges of waste management particularly on disposal In order to solve the above the Ekurhuleni Municipality intends to embark on a project that would reduce waste-to-landfill and if possible alternative energy generation (approx 33 MW) from all waste material generated from the municipal areas

Project Title

Tshwane Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Stage Sector Energy

Project Background and Scope

The Tshwane Municipality is experiencing challenges of waste management particularly on disposal In order to solve the above the Tshwane Municipality intends to embark on a project that aims to reduce waste-to-landfill and if possible alternative energy generation (approx 88 MW) from all waste material generated from the municipal areas

Project Title

SedibengWest Rand Waste Water Treatment Works Energy

Promoter Sedibeng amp West Rand District Municipalities Estimated Project Cost ZAR 300 million Expected Delivery Model Lease Operate amp Transfer Status Feasibility Study completed Sector Energy

Project Background and Scope

The Sedibeng and West Rand Districts Municipalities waste water treatment facilities are experiencing challenges in sludge disposal and plant inefficiencies The existing infrastructure requires upgrade to incorporate new technologies In order to solve the above the Sedibeng and West Rand District Municipalities intend to embark on a project that aims to generate alternative energy from 4 (four) waste water treatment works 2 (two) in each District municipality respectively

Project Title

Lindley Waste Water Treatment Works

Promoter Mogale City Estimated Project Cost ZAR 15 Billion Expected Delivery Model Finance Lease (BOT) Status Feasibility Study completed Sector Water

Project Background and Scope

The project entails development of a new waste water treatment plant to adequately service the North Eastern part of Mogale City including the N14 corridor The new 100 mega litre wastewater treatment works which will be situated in Lindley will be able to service all of the areas in the municipality not serviced including future developments

Project Title

Gauteng Schools Programme

Promoter Gauteng Dept of Education Estimated Project Cost ZAR 7 Billion Expected Delivery Model Regulated PPP Finance Lease Status Feasibility Completed Sector Education

Project Background and Scope

The design construction and financing of 110 new schools to provide additional spaces and replace some dilapidated structures The extent of the programme will potentially result in a substantial reduction in the backlogs in school infrastructure The school designs will be in line with the Gauteng Department of Educationrsquos initiatives to provide smart classrooms as a way of modernising public education and responding to new educational imperatives for quality learning

Projects Under Feasibility ndash 201718

Project Title

Sedibeng Agro-Processing Hub

Estimated Project Cost ZAR 11 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the upgrade of a Fresh Produce Market and the development of an Agro Processing hub in the EmfuleniSedibeng district

Project Title

Tshwane Agro-Processing Hub

Estimated Project Cost ZAR 600million Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the development of an Agro Processing hub in Tshwane The agro-processing industry is among the sectors identified by the National Development Plan (NDP) Industrial Policy Action Plan (IPAP) the New Growth Path Gauteng Employment Growth and Development Strategy (2009) and Gauteng Agricultural Development Strategy (2010) for its potential to spur growth and create jobs because of its strong backward linkage with the primary agricultural sector The proposed agro-processing facility will only focus on food and beverages category as per International Standards Industrial Classification (ISIC 2013) The facility will include some value added services such as food laboratory training centre and offices and make provision for nine food processing line opportunities Nine (9) food processing opportunities were identified ie Powdering Mixing and Packaging Drying Canning Pastes Juicing Bottling Dairy Jam and Chutney Market testing will be conducted in the second half of 2017 to solicit appetite for potential developerinvestors through a turnkey approach

Project Title

West Rand Agro-Processing Hub

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project entails the development of an integrated intervention to enhancesupport agricultural production establishment andor strengthening of fresh produce markets as well as agro-processing in the West Rand

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 3: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

Kopanong Precinct Project

Estimated Project Cost ZAR 74 Billion Expected Delivery Model Regulated PPP Status Feasibility completed Sector Commercial Property

Short Project Description

The project involves the refurbishment of GPG owned buildings within the City of Johannesburg for government accommodation The feasibility study has been completed The project would be delivered as a regulated PPP with the private sector expected to provide hard infrastructure develop structured packing offer maintenance and facilities management

Progress is as follows The project was registered as a PPP with National Treasury and the pre-feasibility study was

conducted which allowed GIFA with permission from National Treasury to test the market through a RFQ

Currently awaiting the TAI and TAII from National Treasury so we can issue the RFP to prequalified bidders

Project Title

Tshwane Innovation Hub ndash Enterprise Building 2 amp 3

Estimated Project Cost ZAR 149m (EB2) ZAR 161m (EB3) Expected Delivery Model Regulated PPP Status Financial close process Sector Commercial Property

Short Project Description

The purpose of the project is to increase the value benefits of the site through a long-term lease arrangement involving the design construction and financing of the site (land parcel 4) called EB2 amp EB3 in The Innovative Hub (TIH) requiring both infrastructure and top structure to accommodate tenants fitting the TIH tenant profile The development will comprise a 2 storey building with some 5 693 msup2 gross building area

Progress is as follows A preferred bidder was selected for both EB 2 and EB 3 and the TAII (B) was obtained from

National Treasury Currently in contractual negotiations with the preferred bidder and is expected to conclude in

August 2017

Project Title

Jewellery Manufacturing Precinct Project

Estimated Project Cost ZAR 800million Expected Delivery Model Long-term Lease Model Status Feasibility completed Market-release stage Sector Manufacturing amp Commercial Property

Short Project Description

The main aim of the project is to contribute to the diversification of the Gauteng economy and strengthen the global competitiveness of the jewellery industry to use natural resources in an efficient manner develop human capital and develop the necessary technology The Design construction financing maintenance and operations of a jewellery manufacturing precinct of app 42 000 m2 within the Special Economic Zone of the OR Tambo International Airport A lease agreement has been concluded with the Airports Company of South Africa (ACSA) An IDZ operator permit was issued to the IDZ Devco in December 2010 The campus approach enables the conglomeration of jewellery manufacturing regulators and support operations within close proximity of each other The development comprises of amongst others production facilities - gold and diamond cutting jewellery factories office buildings and other supporting services and infrastructure Progress to date 85 of the tenant pipeline has been achieved Lease contract has been concluded for 50 of the precinct relating to in2Food

Projects for Market Release ndash 201718

Project Title

COJ Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Study completed Awaiting Council approval Sector Energy

Project Background and Scope

The City of Johannesburg (ldquoCOJrdquo) is experiencing challenges of waste management particularly on disposal where the City is fast running out of landfill space The completed feasibility study has proposed a solution that aims to reduce of waste to landfill and if possible alternative energy generation from all waste material generated from the municipal areas In order to solve the above the COJ intends to embark on a project that aims to reduce approximately 500 000 tpa waste-to-landfill and if possible alternative energy generation (approximately 25 MW) from municipal solid waste material

Project Title

Ekurhuleni Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Study completed Awaiting Council approval Sector Energy

Project Background and Scope

The Ekurhuleni Municipality is experiencing few challenges of waste management particularly on disposal In order to solve the above the Ekurhuleni Municipality intends to embark on a project that would reduce waste-to-landfill and if possible alternative energy generation (approx 33 MW) from all waste material generated from the municipal areas

Project Title

Tshwane Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Stage Sector Energy

Project Background and Scope

The Tshwane Municipality is experiencing challenges of waste management particularly on disposal In order to solve the above the Tshwane Municipality intends to embark on a project that aims to reduce waste-to-landfill and if possible alternative energy generation (approx 88 MW) from all waste material generated from the municipal areas

Project Title

SedibengWest Rand Waste Water Treatment Works Energy

Promoter Sedibeng amp West Rand District Municipalities Estimated Project Cost ZAR 300 million Expected Delivery Model Lease Operate amp Transfer Status Feasibility Study completed Sector Energy

Project Background and Scope

The Sedibeng and West Rand Districts Municipalities waste water treatment facilities are experiencing challenges in sludge disposal and plant inefficiencies The existing infrastructure requires upgrade to incorporate new technologies In order to solve the above the Sedibeng and West Rand District Municipalities intend to embark on a project that aims to generate alternative energy from 4 (four) waste water treatment works 2 (two) in each District municipality respectively

Project Title

Lindley Waste Water Treatment Works

Promoter Mogale City Estimated Project Cost ZAR 15 Billion Expected Delivery Model Finance Lease (BOT) Status Feasibility Study completed Sector Water

Project Background and Scope

The project entails development of a new waste water treatment plant to adequately service the North Eastern part of Mogale City including the N14 corridor The new 100 mega litre wastewater treatment works which will be situated in Lindley will be able to service all of the areas in the municipality not serviced including future developments

Project Title

Gauteng Schools Programme

Promoter Gauteng Dept of Education Estimated Project Cost ZAR 7 Billion Expected Delivery Model Regulated PPP Finance Lease Status Feasibility Completed Sector Education

Project Background and Scope

The design construction and financing of 110 new schools to provide additional spaces and replace some dilapidated structures The extent of the programme will potentially result in a substantial reduction in the backlogs in school infrastructure The school designs will be in line with the Gauteng Department of Educationrsquos initiatives to provide smart classrooms as a way of modernising public education and responding to new educational imperatives for quality learning

Projects Under Feasibility ndash 201718

Project Title

Sedibeng Agro-Processing Hub

Estimated Project Cost ZAR 11 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the upgrade of a Fresh Produce Market and the development of an Agro Processing hub in the EmfuleniSedibeng district

Project Title

Tshwane Agro-Processing Hub

Estimated Project Cost ZAR 600million Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the development of an Agro Processing hub in Tshwane The agro-processing industry is among the sectors identified by the National Development Plan (NDP) Industrial Policy Action Plan (IPAP) the New Growth Path Gauteng Employment Growth and Development Strategy (2009) and Gauteng Agricultural Development Strategy (2010) for its potential to spur growth and create jobs because of its strong backward linkage with the primary agricultural sector The proposed agro-processing facility will only focus on food and beverages category as per International Standards Industrial Classification (ISIC 2013) The facility will include some value added services such as food laboratory training centre and offices and make provision for nine food processing line opportunities Nine (9) food processing opportunities were identified ie Powdering Mixing and Packaging Drying Canning Pastes Juicing Bottling Dairy Jam and Chutney Market testing will be conducted in the second half of 2017 to solicit appetite for potential developerinvestors through a turnkey approach

Project Title

West Rand Agro-Processing Hub

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project entails the development of an integrated intervention to enhancesupport agricultural production establishment andor strengthening of fresh produce markets as well as agro-processing in the West Rand

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 4: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

Tshwane Innovation Hub ndash Enterprise Building 2 amp 3

Estimated Project Cost ZAR 149m (EB2) ZAR 161m (EB3) Expected Delivery Model Regulated PPP Status Financial close process Sector Commercial Property

Short Project Description

The purpose of the project is to increase the value benefits of the site through a long-term lease arrangement involving the design construction and financing of the site (land parcel 4) called EB2 amp EB3 in The Innovative Hub (TIH) requiring both infrastructure and top structure to accommodate tenants fitting the TIH tenant profile The development will comprise a 2 storey building with some 5 693 msup2 gross building area

Progress is as follows A preferred bidder was selected for both EB 2 and EB 3 and the TAII (B) was obtained from

National Treasury Currently in contractual negotiations with the preferred bidder and is expected to conclude in

August 2017

Project Title

Jewellery Manufacturing Precinct Project

Estimated Project Cost ZAR 800million Expected Delivery Model Long-term Lease Model Status Feasibility completed Market-release stage Sector Manufacturing amp Commercial Property

Short Project Description

The main aim of the project is to contribute to the diversification of the Gauteng economy and strengthen the global competitiveness of the jewellery industry to use natural resources in an efficient manner develop human capital and develop the necessary technology The Design construction financing maintenance and operations of a jewellery manufacturing precinct of app 42 000 m2 within the Special Economic Zone of the OR Tambo International Airport A lease agreement has been concluded with the Airports Company of South Africa (ACSA) An IDZ operator permit was issued to the IDZ Devco in December 2010 The campus approach enables the conglomeration of jewellery manufacturing regulators and support operations within close proximity of each other The development comprises of amongst others production facilities - gold and diamond cutting jewellery factories office buildings and other supporting services and infrastructure Progress to date 85 of the tenant pipeline has been achieved Lease contract has been concluded for 50 of the precinct relating to in2Food

Projects for Market Release ndash 201718

Project Title

COJ Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Study completed Awaiting Council approval Sector Energy

Project Background and Scope

The City of Johannesburg (ldquoCOJrdquo) is experiencing challenges of waste management particularly on disposal where the City is fast running out of landfill space The completed feasibility study has proposed a solution that aims to reduce of waste to landfill and if possible alternative energy generation from all waste material generated from the municipal areas In order to solve the above the COJ intends to embark on a project that aims to reduce approximately 500 000 tpa waste-to-landfill and if possible alternative energy generation (approximately 25 MW) from municipal solid waste material

Project Title

Ekurhuleni Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Study completed Awaiting Council approval Sector Energy

Project Background and Scope

The Ekurhuleni Municipality is experiencing few challenges of waste management particularly on disposal In order to solve the above the Ekurhuleni Municipality intends to embark on a project that would reduce waste-to-landfill and if possible alternative energy generation (approx 33 MW) from all waste material generated from the municipal areas

Project Title

Tshwane Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Stage Sector Energy

Project Background and Scope

The Tshwane Municipality is experiencing challenges of waste management particularly on disposal In order to solve the above the Tshwane Municipality intends to embark on a project that aims to reduce waste-to-landfill and if possible alternative energy generation (approx 88 MW) from all waste material generated from the municipal areas

Project Title

SedibengWest Rand Waste Water Treatment Works Energy

Promoter Sedibeng amp West Rand District Municipalities Estimated Project Cost ZAR 300 million Expected Delivery Model Lease Operate amp Transfer Status Feasibility Study completed Sector Energy

Project Background and Scope

The Sedibeng and West Rand Districts Municipalities waste water treatment facilities are experiencing challenges in sludge disposal and plant inefficiencies The existing infrastructure requires upgrade to incorporate new technologies In order to solve the above the Sedibeng and West Rand District Municipalities intend to embark on a project that aims to generate alternative energy from 4 (four) waste water treatment works 2 (two) in each District municipality respectively

Project Title

Lindley Waste Water Treatment Works

Promoter Mogale City Estimated Project Cost ZAR 15 Billion Expected Delivery Model Finance Lease (BOT) Status Feasibility Study completed Sector Water

Project Background and Scope

The project entails development of a new waste water treatment plant to adequately service the North Eastern part of Mogale City including the N14 corridor The new 100 mega litre wastewater treatment works which will be situated in Lindley will be able to service all of the areas in the municipality not serviced including future developments

Project Title

Gauteng Schools Programme

Promoter Gauteng Dept of Education Estimated Project Cost ZAR 7 Billion Expected Delivery Model Regulated PPP Finance Lease Status Feasibility Completed Sector Education

Project Background and Scope

The design construction and financing of 110 new schools to provide additional spaces and replace some dilapidated structures The extent of the programme will potentially result in a substantial reduction in the backlogs in school infrastructure The school designs will be in line with the Gauteng Department of Educationrsquos initiatives to provide smart classrooms as a way of modernising public education and responding to new educational imperatives for quality learning

Projects Under Feasibility ndash 201718

Project Title

Sedibeng Agro-Processing Hub

Estimated Project Cost ZAR 11 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the upgrade of a Fresh Produce Market and the development of an Agro Processing hub in the EmfuleniSedibeng district

Project Title

Tshwane Agro-Processing Hub

Estimated Project Cost ZAR 600million Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the development of an Agro Processing hub in Tshwane The agro-processing industry is among the sectors identified by the National Development Plan (NDP) Industrial Policy Action Plan (IPAP) the New Growth Path Gauteng Employment Growth and Development Strategy (2009) and Gauteng Agricultural Development Strategy (2010) for its potential to spur growth and create jobs because of its strong backward linkage with the primary agricultural sector The proposed agro-processing facility will only focus on food and beverages category as per International Standards Industrial Classification (ISIC 2013) The facility will include some value added services such as food laboratory training centre and offices and make provision for nine food processing line opportunities Nine (9) food processing opportunities were identified ie Powdering Mixing and Packaging Drying Canning Pastes Juicing Bottling Dairy Jam and Chutney Market testing will be conducted in the second half of 2017 to solicit appetite for potential developerinvestors through a turnkey approach

Project Title

West Rand Agro-Processing Hub

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project entails the development of an integrated intervention to enhancesupport agricultural production establishment andor strengthening of fresh produce markets as well as agro-processing in the West Rand

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 5: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

Jewellery Manufacturing Precinct Project

Estimated Project Cost ZAR 800million Expected Delivery Model Long-term Lease Model Status Feasibility completed Market-release stage Sector Manufacturing amp Commercial Property

Short Project Description

The main aim of the project is to contribute to the diversification of the Gauteng economy and strengthen the global competitiveness of the jewellery industry to use natural resources in an efficient manner develop human capital and develop the necessary technology The Design construction financing maintenance and operations of a jewellery manufacturing precinct of app 42 000 m2 within the Special Economic Zone of the OR Tambo International Airport A lease agreement has been concluded with the Airports Company of South Africa (ACSA) An IDZ operator permit was issued to the IDZ Devco in December 2010 The campus approach enables the conglomeration of jewellery manufacturing regulators and support operations within close proximity of each other The development comprises of amongst others production facilities - gold and diamond cutting jewellery factories office buildings and other supporting services and infrastructure Progress to date 85 of the tenant pipeline has been achieved Lease contract has been concluded for 50 of the precinct relating to in2Food

Projects for Market Release ndash 201718

Project Title

COJ Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Study completed Awaiting Council approval Sector Energy

Project Background and Scope

The City of Johannesburg (ldquoCOJrdquo) is experiencing challenges of waste management particularly on disposal where the City is fast running out of landfill space The completed feasibility study has proposed a solution that aims to reduce of waste to landfill and if possible alternative energy generation from all waste material generated from the municipal areas In order to solve the above the COJ intends to embark on a project that aims to reduce approximately 500 000 tpa waste-to-landfill and if possible alternative energy generation (approximately 25 MW) from municipal solid waste material

Project Title

Ekurhuleni Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Study completed Awaiting Council approval Sector Energy

Project Background and Scope

The Ekurhuleni Municipality is experiencing few challenges of waste management particularly on disposal In order to solve the above the Ekurhuleni Municipality intends to embark on a project that would reduce waste-to-landfill and if possible alternative energy generation (approx 33 MW) from all waste material generated from the municipal areas

Project Title

Tshwane Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Stage Sector Energy

Project Background and Scope

The Tshwane Municipality is experiencing challenges of waste management particularly on disposal In order to solve the above the Tshwane Municipality intends to embark on a project that aims to reduce waste-to-landfill and if possible alternative energy generation (approx 88 MW) from all waste material generated from the municipal areas

Project Title

SedibengWest Rand Waste Water Treatment Works Energy

Promoter Sedibeng amp West Rand District Municipalities Estimated Project Cost ZAR 300 million Expected Delivery Model Lease Operate amp Transfer Status Feasibility Study completed Sector Energy

Project Background and Scope

The Sedibeng and West Rand Districts Municipalities waste water treatment facilities are experiencing challenges in sludge disposal and plant inefficiencies The existing infrastructure requires upgrade to incorporate new technologies In order to solve the above the Sedibeng and West Rand District Municipalities intend to embark on a project that aims to generate alternative energy from 4 (four) waste water treatment works 2 (two) in each District municipality respectively

Project Title

Lindley Waste Water Treatment Works

Promoter Mogale City Estimated Project Cost ZAR 15 Billion Expected Delivery Model Finance Lease (BOT) Status Feasibility Study completed Sector Water

Project Background and Scope

The project entails development of a new waste water treatment plant to adequately service the North Eastern part of Mogale City including the N14 corridor The new 100 mega litre wastewater treatment works which will be situated in Lindley will be able to service all of the areas in the municipality not serviced including future developments

Project Title

Gauteng Schools Programme

Promoter Gauteng Dept of Education Estimated Project Cost ZAR 7 Billion Expected Delivery Model Regulated PPP Finance Lease Status Feasibility Completed Sector Education

Project Background and Scope

The design construction and financing of 110 new schools to provide additional spaces and replace some dilapidated structures The extent of the programme will potentially result in a substantial reduction in the backlogs in school infrastructure The school designs will be in line with the Gauteng Department of Educationrsquos initiatives to provide smart classrooms as a way of modernising public education and responding to new educational imperatives for quality learning

Projects Under Feasibility ndash 201718

Project Title

Sedibeng Agro-Processing Hub

Estimated Project Cost ZAR 11 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the upgrade of a Fresh Produce Market and the development of an Agro Processing hub in the EmfuleniSedibeng district

Project Title

Tshwane Agro-Processing Hub

Estimated Project Cost ZAR 600million Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the development of an Agro Processing hub in Tshwane The agro-processing industry is among the sectors identified by the National Development Plan (NDP) Industrial Policy Action Plan (IPAP) the New Growth Path Gauteng Employment Growth and Development Strategy (2009) and Gauteng Agricultural Development Strategy (2010) for its potential to spur growth and create jobs because of its strong backward linkage with the primary agricultural sector The proposed agro-processing facility will only focus on food and beverages category as per International Standards Industrial Classification (ISIC 2013) The facility will include some value added services such as food laboratory training centre and offices and make provision for nine food processing line opportunities Nine (9) food processing opportunities were identified ie Powdering Mixing and Packaging Drying Canning Pastes Juicing Bottling Dairy Jam and Chutney Market testing will be conducted in the second half of 2017 to solicit appetite for potential developerinvestors through a turnkey approach

Project Title

West Rand Agro-Processing Hub

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project entails the development of an integrated intervention to enhancesupport agricultural production establishment andor strengthening of fresh produce markets as well as agro-processing in the West Rand

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 6: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Projects for Market Release ndash 201718

Project Title

COJ Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Study completed Awaiting Council approval Sector Energy

Project Background and Scope

The City of Johannesburg (ldquoCOJrdquo) is experiencing challenges of waste management particularly on disposal where the City is fast running out of landfill space The completed feasibility study has proposed a solution that aims to reduce of waste to landfill and if possible alternative energy generation from all waste material generated from the municipal areas In order to solve the above the COJ intends to embark on a project that aims to reduce approximately 500 000 tpa waste-to-landfill and if possible alternative energy generation (approximately 25 MW) from municipal solid waste material

Project Title

Ekurhuleni Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Study completed Awaiting Council approval Sector Energy

Project Background and Scope

The Ekurhuleni Municipality is experiencing few challenges of waste management particularly on disposal In order to solve the above the Ekurhuleni Municipality intends to embark on a project that would reduce waste-to-landfill and if possible alternative energy generation (approx 33 MW) from all waste material generated from the municipal areas

Project Title

Tshwane Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Stage Sector Energy

Project Background and Scope

The Tshwane Municipality is experiencing challenges of waste management particularly on disposal In order to solve the above the Tshwane Municipality intends to embark on a project that aims to reduce waste-to-landfill and if possible alternative energy generation (approx 88 MW) from all waste material generated from the municipal areas

Project Title

SedibengWest Rand Waste Water Treatment Works Energy

Promoter Sedibeng amp West Rand District Municipalities Estimated Project Cost ZAR 300 million Expected Delivery Model Lease Operate amp Transfer Status Feasibility Study completed Sector Energy

Project Background and Scope

The Sedibeng and West Rand Districts Municipalities waste water treatment facilities are experiencing challenges in sludge disposal and plant inefficiencies The existing infrastructure requires upgrade to incorporate new technologies In order to solve the above the Sedibeng and West Rand District Municipalities intend to embark on a project that aims to generate alternative energy from 4 (four) waste water treatment works 2 (two) in each District municipality respectively

Project Title

Lindley Waste Water Treatment Works

Promoter Mogale City Estimated Project Cost ZAR 15 Billion Expected Delivery Model Finance Lease (BOT) Status Feasibility Study completed Sector Water

Project Background and Scope

The project entails development of a new waste water treatment plant to adequately service the North Eastern part of Mogale City including the N14 corridor The new 100 mega litre wastewater treatment works which will be situated in Lindley will be able to service all of the areas in the municipality not serviced including future developments

Project Title

Gauteng Schools Programme

Promoter Gauteng Dept of Education Estimated Project Cost ZAR 7 Billion Expected Delivery Model Regulated PPP Finance Lease Status Feasibility Completed Sector Education

Project Background and Scope

The design construction and financing of 110 new schools to provide additional spaces and replace some dilapidated structures The extent of the programme will potentially result in a substantial reduction in the backlogs in school infrastructure The school designs will be in line with the Gauteng Department of Educationrsquos initiatives to provide smart classrooms as a way of modernising public education and responding to new educational imperatives for quality learning

Projects Under Feasibility ndash 201718

Project Title

Sedibeng Agro-Processing Hub

Estimated Project Cost ZAR 11 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the upgrade of a Fresh Produce Market and the development of an Agro Processing hub in the EmfuleniSedibeng district

Project Title

Tshwane Agro-Processing Hub

Estimated Project Cost ZAR 600million Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the development of an Agro Processing hub in Tshwane The agro-processing industry is among the sectors identified by the National Development Plan (NDP) Industrial Policy Action Plan (IPAP) the New Growth Path Gauteng Employment Growth and Development Strategy (2009) and Gauteng Agricultural Development Strategy (2010) for its potential to spur growth and create jobs because of its strong backward linkage with the primary agricultural sector The proposed agro-processing facility will only focus on food and beverages category as per International Standards Industrial Classification (ISIC 2013) The facility will include some value added services such as food laboratory training centre and offices and make provision for nine food processing line opportunities Nine (9) food processing opportunities were identified ie Powdering Mixing and Packaging Drying Canning Pastes Juicing Bottling Dairy Jam and Chutney Market testing will be conducted in the second half of 2017 to solicit appetite for potential developerinvestors through a turnkey approach

Project Title

West Rand Agro-Processing Hub

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project entails the development of an integrated intervention to enhancesupport agricultural production establishment andor strengthening of fresh produce markets as well as agro-processing in the West Rand

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 7: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

Ekurhuleni Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Study completed Awaiting Council approval Sector Energy

Project Background and Scope

The Ekurhuleni Municipality is experiencing few challenges of waste management particularly on disposal In order to solve the above the Ekurhuleni Municipality intends to embark on a project that would reduce waste-to-landfill and if possible alternative energy generation (approx 33 MW) from all waste material generated from the municipal areas

Project Title

Tshwane Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Stage Sector Energy

Project Background and Scope

The Tshwane Municipality is experiencing challenges of waste management particularly on disposal In order to solve the above the Tshwane Municipality intends to embark on a project that aims to reduce waste-to-landfill and if possible alternative energy generation (approx 88 MW) from all waste material generated from the municipal areas

Project Title

SedibengWest Rand Waste Water Treatment Works Energy

Promoter Sedibeng amp West Rand District Municipalities Estimated Project Cost ZAR 300 million Expected Delivery Model Lease Operate amp Transfer Status Feasibility Study completed Sector Energy

Project Background and Scope

The Sedibeng and West Rand Districts Municipalities waste water treatment facilities are experiencing challenges in sludge disposal and plant inefficiencies The existing infrastructure requires upgrade to incorporate new technologies In order to solve the above the Sedibeng and West Rand District Municipalities intend to embark on a project that aims to generate alternative energy from 4 (four) waste water treatment works 2 (two) in each District municipality respectively

Project Title

Lindley Waste Water Treatment Works

Promoter Mogale City Estimated Project Cost ZAR 15 Billion Expected Delivery Model Finance Lease (BOT) Status Feasibility Study completed Sector Water

Project Background and Scope

The project entails development of a new waste water treatment plant to adequately service the North Eastern part of Mogale City including the N14 corridor The new 100 mega litre wastewater treatment works which will be situated in Lindley will be able to service all of the areas in the municipality not serviced including future developments

Project Title

Gauteng Schools Programme

Promoter Gauteng Dept of Education Estimated Project Cost ZAR 7 Billion Expected Delivery Model Regulated PPP Finance Lease Status Feasibility Completed Sector Education

Project Background and Scope

The design construction and financing of 110 new schools to provide additional spaces and replace some dilapidated structures The extent of the programme will potentially result in a substantial reduction in the backlogs in school infrastructure The school designs will be in line with the Gauteng Department of Educationrsquos initiatives to provide smart classrooms as a way of modernising public education and responding to new educational imperatives for quality learning

Projects Under Feasibility ndash 201718

Project Title

Sedibeng Agro-Processing Hub

Estimated Project Cost ZAR 11 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the upgrade of a Fresh Produce Market and the development of an Agro Processing hub in the EmfuleniSedibeng district

Project Title

Tshwane Agro-Processing Hub

Estimated Project Cost ZAR 600million Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the development of an Agro Processing hub in Tshwane The agro-processing industry is among the sectors identified by the National Development Plan (NDP) Industrial Policy Action Plan (IPAP) the New Growth Path Gauteng Employment Growth and Development Strategy (2009) and Gauteng Agricultural Development Strategy (2010) for its potential to spur growth and create jobs because of its strong backward linkage with the primary agricultural sector The proposed agro-processing facility will only focus on food and beverages category as per International Standards Industrial Classification (ISIC 2013) The facility will include some value added services such as food laboratory training centre and offices and make provision for nine food processing line opportunities Nine (9) food processing opportunities were identified ie Powdering Mixing and Packaging Drying Canning Pastes Juicing Bottling Dairy Jam and Chutney Market testing will be conducted in the second half of 2017 to solicit appetite for potential developerinvestors through a turnkey approach

Project Title

West Rand Agro-Processing Hub

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project entails the development of an integrated intervention to enhancesupport agricultural production establishment andor strengthening of fresh produce markets as well as agro-processing in the West Rand

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 8: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

Tshwane Alternative Waste Treatment Technology Project

Estimated Project Cost ZAR 35 Billion Expected Delivery Model Regulated PPP Status Feasibility Stage Sector Energy

Project Background and Scope

The Tshwane Municipality is experiencing challenges of waste management particularly on disposal In order to solve the above the Tshwane Municipality intends to embark on a project that aims to reduce waste-to-landfill and if possible alternative energy generation (approx 88 MW) from all waste material generated from the municipal areas

Project Title

SedibengWest Rand Waste Water Treatment Works Energy

Promoter Sedibeng amp West Rand District Municipalities Estimated Project Cost ZAR 300 million Expected Delivery Model Lease Operate amp Transfer Status Feasibility Study completed Sector Energy

Project Background and Scope

The Sedibeng and West Rand Districts Municipalities waste water treatment facilities are experiencing challenges in sludge disposal and plant inefficiencies The existing infrastructure requires upgrade to incorporate new technologies In order to solve the above the Sedibeng and West Rand District Municipalities intend to embark on a project that aims to generate alternative energy from 4 (four) waste water treatment works 2 (two) in each District municipality respectively

Project Title

Lindley Waste Water Treatment Works

Promoter Mogale City Estimated Project Cost ZAR 15 Billion Expected Delivery Model Finance Lease (BOT) Status Feasibility Study completed Sector Water

Project Background and Scope

The project entails development of a new waste water treatment plant to adequately service the North Eastern part of Mogale City including the N14 corridor The new 100 mega litre wastewater treatment works which will be situated in Lindley will be able to service all of the areas in the municipality not serviced including future developments

Project Title

Gauteng Schools Programme

Promoter Gauteng Dept of Education Estimated Project Cost ZAR 7 Billion Expected Delivery Model Regulated PPP Finance Lease Status Feasibility Completed Sector Education

Project Background and Scope

The design construction and financing of 110 new schools to provide additional spaces and replace some dilapidated structures The extent of the programme will potentially result in a substantial reduction in the backlogs in school infrastructure The school designs will be in line with the Gauteng Department of Educationrsquos initiatives to provide smart classrooms as a way of modernising public education and responding to new educational imperatives for quality learning

Projects Under Feasibility ndash 201718

Project Title

Sedibeng Agro-Processing Hub

Estimated Project Cost ZAR 11 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the upgrade of a Fresh Produce Market and the development of an Agro Processing hub in the EmfuleniSedibeng district

Project Title

Tshwane Agro-Processing Hub

Estimated Project Cost ZAR 600million Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the development of an Agro Processing hub in Tshwane The agro-processing industry is among the sectors identified by the National Development Plan (NDP) Industrial Policy Action Plan (IPAP) the New Growth Path Gauteng Employment Growth and Development Strategy (2009) and Gauteng Agricultural Development Strategy (2010) for its potential to spur growth and create jobs because of its strong backward linkage with the primary agricultural sector The proposed agro-processing facility will only focus on food and beverages category as per International Standards Industrial Classification (ISIC 2013) The facility will include some value added services such as food laboratory training centre and offices and make provision for nine food processing line opportunities Nine (9) food processing opportunities were identified ie Powdering Mixing and Packaging Drying Canning Pastes Juicing Bottling Dairy Jam and Chutney Market testing will be conducted in the second half of 2017 to solicit appetite for potential developerinvestors through a turnkey approach

Project Title

West Rand Agro-Processing Hub

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project entails the development of an integrated intervention to enhancesupport agricultural production establishment andor strengthening of fresh produce markets as well as agro-processing in the West Rand

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 9: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

SedibengWest Rand Waste Water Treatment Works Energy

Promoter Sedibeng amp West Rand District Municipalities Estimated Project Cost ZAR 300 million Expected Delivery Model Lease Operate amp Transfer Status Feasibility Study completed Sector Energy

Project Background and Scope

The Sedibeng and West Rand Districts Municipalities waste water treatment facilities are experiencing challenges in sludge disposal and plant inefficiencies The existing infrastructure requires upgrade to incorporate new technologies In order to solve the above the Sedibeng and West Rand District Municipalities intend to embark on a project that aims to generate alternative energy from 4 (four) waste water treatment works 2 (two) in each District municipality respectively

Project Title

Lindley Waste Water Treatment Works

Promoter Mogale City Estimated Project Cost ZAR 15 Billion Expected Delivery Model Finance Lease (BOT) Status Feasibility Study completed Sector Water

Project Background and Scope

The project entails development of a new waste water treatment plant to adequately service the North Eastern part of Mogale City including the N14 corridor The new 100 mega litre wastewater treatment works which will be situated in Lindley will be able to service all of the areas in the municipality not serviced including future developments

Project Title

Gauteng Schools Programme

Promoter Gauteng Dept of Education Estimated Project Cost ZAR 7 Billion Expected Delivery Model Regulated PPP Finance Lease Status Feasibility Completed Sector Education

Project Background and Scope

The design construction and financing of 110 new schools to provide additional spaces and replace some dilapidated structures The extent of the programme will potentially result in a substantial reduction in the backlogs in school infrastructure The school designs will be in line with the Gauteng Department of Educationrsquos initiatives to provide smart classrooms as a way of modernising public education and responding to new educational imperatives for quality learning

Projects Under Feasibility ndash 201718

Project Title

Sedibeng Agro-Processing Hub

Estimated Project Cost ZAR 11 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the upgrade of a Fresh Produce Market and the development of an Agro Processing hub in the EmfuleniSedibeng district

Project Title

Tshwane Agro-Processing Hub

Estimated Project Cost ZAR 600million Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the development of an Agro Processing hub in Tshwane The agro-processing industry is among the sectors identified by the National Development Plan (NDP) Industrial Policy Action Plan (IPAP) the New Growth Path Gauteng Employment Growth and Development Strategy (2009) and Gauteng Agricultural Development Strategy (2010) for its potential to spur growth and create jobs because of its strong backward linkage with the primary agricultural sector The proposed agro-processing facility will only focus on food and beverages category as per International Standards Industrial Classification (ISIC 2013) The facility will include some value added services such as food laboratory training centre and offices and make provision for nine food processing line opportunities Nine (9) food processing opportunities were identified ie Powdering Mixing and Packaging Drying Canning Pastes Juicing Bottling Dairy Jam and Chutney Market testing will be conducted in the second half of 2017 to solicit appetite for potential developerinvestors through a turnkey approach

Project Title

West Rand Agro-Processing Hub

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project entails the development of an integrated intervention to enhancesupport agricultural production establishment andor strengthening of fresh produce markets as well as agro-processing in the West Rand

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 10: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

Lindley Waste Water Treatment Works

Promoter Mogale City Estimated Project Cost ZAR 15 Billion Expected Delivery Model Finance Lease (BOT) Status Feasibility Study completed Sector Water

Project Background and Scope

The project entails development of a new waste water treatment plant to adequately service the North Eastern part of Mogale City including the N14 corridor The new 100 mega litre wastewater treatment works which will be situated in Lindley will be able to service all of the areas in the municipality not serviced including future developments

Project Title

Gauteng Schools Programme

Promoter Gauteng Dept of Education Estimated Project Cost ZAR 7 Billion Expected Delivery Model Regulated PPP Finance Lease Status Feasibility Completed Sector Education

Project Background and Scope

The design construction and financing of 110 new schools to provide additional spaces and replace some dilapidated structures The extent of the programme will potentially result in a substantial reduction in the backlogs in school infrastructure The school designs will be in line with the Gauteng Department of Educationrsquos initiatives to provide smart classrooms as a way of modernising public education and responding to new educational imperatives for quality learning

Projects Under Feasibility ndash 201718

Project Title

Sedibeng Agro-Processing Hub

Estimated Project Cost ZAR 11 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the upgrade of a Fresh Produce Market and the development of an Agro Processing hub in the EmfuleniSedibeng district

Project Title

Tshwane Agro-Processing Hub

Estimated Project Cost ZAR 600million Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the development of an Agro Processing hub in Tshwane The agro-processing industry is among the sectors identified by the National Development Plan (NDP) Industrial Policy Action Plan (IPAP) the New Growth Path Gauteng Employment Growth and Development Strategy (2009) and Gauteng Agricultural Development Strategy (2010) for its potential to spur growth and create jobs because of its strong backward linkage with the primary agricultural sector The proposed agro-processing facility will only focus on food and beverages category as per International Standards Industrial Classification (ISIC 2013) The facility will include some value added services such as food laboratory training centre and offices and make provision for nine food processing line opportunities Nine (9) food processing opportunities were identified ie Powdering Mixing and Packaging Drying Canning Pastes Juicing Bottling Dairy Jam and Chutney Market testing will be conducted in the second half of 2017 to solicit appetite for potential developerinvestors through a turnkey approach

Project Title

West Rand Agro-Processing Hub

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project entails the development of an integrated intervention to enhancesupport agricultural production establishment andor strengthening of fresh produce markets as well as agro-processing in the West Rand

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 11: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

Gauteng Schools Programme

Promoter Gauteng Dept of Education Estimated Project Cost ZAR 7 Billion Expected Delivery Model Regulated PPP Finance Lease Status Feasibility Completed Sector Education

Project Background and Scope

The design construction and financing of 110 new schools to provide additional spaces and replace some dilapidated structures The extent of the programme will potentially result in a substantial reduction in the backlogs in school infrastructure The school designs will be in line with the Gauteng Department of Educationrsquos initiatives to provide smart classrooms as a way of modernising public education and responding to new educational imperatives for quality learning

Projects Under Feasibility ndash 201718

Project Title

Sedibeng Agro-Processing Hub

Estimated Project Cost ZAR 11 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the upgrade of a Fresh Produce Market and the development of an Agro Processing hub in the EmfuleniSedibeng district

Project Title

Tshwane Agro-Processing Hub

Estimated Project Cost ZAR 600million Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the development of an Agro Processing hub in Tshwane The agro-processing industry is among the sectors identified by the National Development Plan (NDP) Industrial Policy Action Plan (IPAP) the New Growth Path Gauteng Employment Growth and Development Strategy (2009) and Gauteng Agricultural Development Strategy (2010) for its potential to spur growth and create jobs because of its strong backward linkage with the primary agricultural sector The proposed agro-processing facility will only focus on food and beverages category as per International Standards Industrial Classification (ISIC 2013) The facility will include some value added services such as food laboratory training centre and offices and make provision for nine food processing line opportunities Nine (9) food processing opportunities were identified ie Powdering Mixing and Packaging Drying Canning Pastes Juicing Bottling Dairy Jam and Chutney Market testing will be conducted in the second half of 2017 to solicit appetite for potential developerinvestors through a turnkey approach

Project Title

West Rand Agro-Processing Hub

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project entails the development of an integrated intervention to enhancesupport agricultural production establishment andor strengthening of fresh produce markets as well as agro-processing in the West Rand

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 12: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Projects Under Feasibility ndash 201718

Project Title

Sedibeng Agro-Processing Hub

Estimated Project Cost ZAR 11 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the upgrade of a Fresh Produce Market and the development of an Agro Processing hub in the EmfuleniSedibeng district

Project Title

Tshwane Agro-Processing Hub

Estimated Project Cost ZAR 600million Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the development of an Agro Processing hub in Tshwane The agro-processing industry is among the sectors identified by the National Development Plan (NDP) Industrial Policy Action Plan (IPAP) the New Growth Path Gauteng Employment Growth and Development Strategy (2009) and Gauteng Agricultural Development Strategy (2010) for its potential to spur growth and create jobs because of its strong backward linkage with the primary agricultural sector The proposed agro-processing facility will only focus on food and beverages category as per International Standards Industrial Classification (ISIC 2013) The facility will include some value added services such as food laboratory training centre and offices and make provision for nine food processing line opportunities Nine (9) food processing opportunities were identified ie Powdering Mixing and Packaging Drying Canning Pastes Juicing Bottling Dairy Jam and Chutney Market testing will be conducted in the second half of 2017 to solicit appetite for potential developerinvestors through a turnkey approach

Project Title

West Rand Agro-Processing Hub

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project entails the development of an integrated intervention to enhancesupport agricultural production establishment andor strengthening of fresh produce markets as well as agro-processing in the West Rand

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 13: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

Tshwane Agro-Processing Hub

Estimated Project Cost ZAR 600million Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project involves the development of an Agro Processing hub in Tshwane The agro-processing industry is among the sectors identified by the National Development Plan (NDP) Industrial Policy Action Plan (IPAP) the New Growth Path Gauteng Employment Growth and Development Strategy (2009) and Gauteng Agricultural Development Strategy (2010) for its potential to spur growth and create jobs because of its strong backward linkage with the primary agricultural sector The proposed agro-processing facility will only focus on food and beverages category as per International Standards Industrial Classification (ISIC 2013) The facility will include some value added services such as food laboratory training centre and offices and make provision for nine food processing line opportunities Nine (9) food processing opportunities were identified ie Powdering Mixing and Packaging Drying Canning Pastes Juicing Bottling Dairy Jam and Chutney Market testing will be conducted in the second half of 2017 to solicit appetite for potential developerinvestors through a turnkey approach

Project Title

West Rand Agro-Processing Hub

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project entails the development of an integrated intervention to enhancesupport agricultural production establishment andor strengthening of fresh produce markets as well as agro-processing in the West Rand

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 14: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

West Rand Agro-Processing Hub

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Feasibility stage Sector Agriculturemanufacturing

Project Background and Scope

The project entails the development of an integrated intervention to enhancesupport agricultural production establishment andor strengthening of fresh produce markets as well as agro-processing in the West Rand

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 15: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

Gauteng Planning House

Estimated Project Cost ZAR 1 Billion Expected Delivery Model Regulated PPP Status Pre-Feasibility study Sector Commercial Property

Project Background and Scope

The project involves the development of a dedicated provincial planning nucleus referred to the Gauteng Planning House (GPH) This project will serve as a key catalyst to enhance integrated spatial planning in the province

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 16: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

Busmark Project

Estimated Project Cost ZAR 100m Expected Delivery Model Private Finance Status Feasibility Stage Sector Manufacturing Automotive

Project Background and Scope

The establishment of a manufacturing plant for the manufacturing of Bus Manufacturing Components (Fiberglass Cromadek Glass Seats Composite) This could be the start of a partnership with government and other private sector entities to create a mixed industrial development which will deliver jobs in West Rand and create household development opportunities allowing revival of the towns and delivering on creation of West Rand City

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 17: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

Merafong Bio-Energy Park

Estimated Project Cost ZAR 1 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project takes the form on an Energy Conversion Eco-Industrial Park based on renewable bioenergy resource recovery economic clustering as well as energy- water- and materials cascading Infrastructure will promote industrial symbiosis between lsquotenantsrsquo which will enable cost reductions and new revenue streams A modular approach with built in flexibility will enable integration with the West Rand Agri-Parks concept

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 18: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

Merafong Solar Farm Project

Estimated Project Cost TBC Expected Delivery Model Regulated PPP Status Initiation Stage Sector Energy

Project Background and Scope

The project aims to create solar farms around the Merafong area in Western Gauteng These farms would share solar infrastructure and would be linked to an industrial park Estimated generation capacity TBC (post-feasibility)

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 19: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

Constitutional Hill (ConHill) Project

Estimated Project Cost ZAR 5 billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Commercial Property

Project Background and Scope

The development and re-use of buildings in the Con Hill Precinctrsquos four land parcels The GPG is committed to supporting urban renewal and the development of vibrant tourism office accommodation human settlement and heritage development including providing ldquo live work and playrdquo opportunities in Johannesburg to ensure the sustainable balanced growth and development in the City in line with global city region standards The project aims at development of a precinct in and around the Constitutional Hill area creating linkages with Johannesburg inner City and all relevant sectors to support a growing and competitive City region which is the heartbeat of Africarsquos economic growth and an international gateway to Africa The feasibility study will be completed towards the end of 2017

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 20: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Project Title

Hospital Revitalisation Programme

Estimated Project Cost ZAR 12 Billion Expected Delivery Model Regulated PPP Status Initiation Stage Sector Health

Project Background and Scope

The project entails the revitalization of six existing hospitals The FS development would reveal whether some of the hospitals may need to be completely demolished and replaced It is envisaged that the implementation of this intervention may take place in several phases or clusters

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza

Page 21: GIFA projects for GIIC 2017 Progress on Projects from GIIC ...gifa.co.za/wp-content/uploads/2017/07/Investment-Memorandum-GIIC-2017.pdf · GIFA projects for GIIC 2017 Progress on

Contact Us

Nathaniel Munetsi

Head Structured Finance

Gauteng Infrastructure Financing Agency

82 Grayston Drive

Sandton Johannesburg

South Africa

PO Box 650780

Benmore 2010

South Africa

t +27 11 290 6600

e nmunetsigifacoza