GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Upload: venus

Post on 25-Jan-2016

33 views

Category:

Documents


1 download

DESCRIPTION

GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012. Improvements in 2011. DNR Permitting – Public Freshwater Lakes Floodplain Analysis / Regulatory Assessment (FARA) Maps LiDAR/Orthoimagery Availability. Public Freshwater Lake Permits. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

GIS: Improvements to DNR Permitting and Floodplain Management

Lacey DuncanMay 2012

Page 2: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Improvements in 2011

• DNR Permitting – Public Freshwater Lakes

• Floodplain Analysis / Regulatory Assessment (FARA) Maps

• LiDAR/Orthoimagery Availability

Page 3: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Public Freshwater Lake Permits

IC 14-26-2 Lake Preservation Act

*Underwater Beaches**SeawallsDredgingBoatwells

Group PiersFish Attractors

Aerators

*Shoreline classification required**Shoreline delineation and classification required

Page 4: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Year Permits Inspected

2011 56%

2010 57%

2009 67%

2008 68%

2007 73%

2006 73%

2005 77%

2004 88%

2003 93%

2002 96%

2001 93%

• Rule Changes

• Improved research capabilities

• Triage

• Overall Development on PFL

Inspection Reduction

Page 5: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Transfer of Inspections to Central Office

2000-2010 1 field inspector

2011 8 inspectors

Creation of 3 Regions

Page 6: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Total Public Freshwater Lake Permits

Region 3 Region 2 Region 1

Page 7: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Lake Inspections

Page 8: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Old Method of Shoreline Delineation

• Triangulate every measurement– Required 3 measurements for 1 shoreline break

• Final sketch skewed without compass• IntelliCAD 2000

Page 9: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Old Method of Shoreline Delineation

Page 10: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Lake Inspection Need

• Efficient data collection prior to inspection• Decrease time in field • Little commitment in office upon return• Keep re-inspections to a minimum• Improved quality product for customer

Page 11: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Inspection Preparation

• Prepare lake sketch– Identify 250’ range for site

• Locate staff gage and legal lake level data• Research relevant permits

– Shoreline Classification– Permitted Seawalls– Unresolved Violations

Page 12: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Inspection Preparation

Permit Application

Page 13: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Inspection Preparation

Using routefinder9:31 Total Travel Time5:45 Drive Time

Page 14: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Final Lake Sketch

Page 15: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Final Lake Sketch

Page 16: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Long Lake Sketch

West

East

Old Method

New Method

Breaks in Shoreline 18 18

Tie Points Needed 72 54

Page 17: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Floodplain Analysis and Regulatory Assessment (FARA)

A thorough approach to the response letter

– Connect the FARA to the legend in the map– Address floodway and flood insurance– Electronic signatures– Emailed Response

Page 18: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Old Method

Page 19: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Pre-DFIRM

Page 20: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

The Driving Forces

April 201232 Counties

March 201111 Counties

New Floodplain Mapping

Electronic Submittals

Page 21: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

INdiana Floodplain Information Portal

Page 22: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

New DFIRM

Page 23: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

New FARA Format

Page 24: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Development of the .mxd

• Getting the Shapefiles– Published Special Flood Hazard Area– Preliminary Special Flood Hazard Area– Ohio River Floodway

• Improving the Process– Using the DFIRM Political Areas to determine

local Floodplain Administrator

• Developing the map language

Page 25: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

The .mxd

Page 26: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

DNR Floodplain Map

Zone AE/Floodway

Page 27: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

DNR Floodplain Map

Zone A

Page 28: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

2011 LiDAR and Orthoimagery

• New Imagery for DNR Floodplain Map and Lake Sketches

• Increasing Hydraulic Ratings

20112005

Page 29: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

3D Analyst

2011

Page 30: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Improving the Accuracy of the FARA

2005

Page 31: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Improving the Accuracy of the FARA

2011

2005

Page 32: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012

Increasing Elevation Determinations

Tot

al N

umbe

r

Year

Page 33: GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012