Page 1: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

GL: Highway Bridge Program (TIP ID – VAR170012)

Last updated with TIP Revision 2019-30

Page 2: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

Note id: 24

1) This is the FTIP lump sum “backup” list for HBP funded projects. Please see the Local Assistance web site for the most current listings:

http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_FSTIP.html

2) The purpose of this list is to show which projects being advanced by local agencies have met the eligibility requirements of thefederal Highway Bridge Program and have been prioritized for funding by the Department in cooperation with local agencies forfunding.

3) Contractual funding levels are determined at time of federal authorization/obligation for given phase of work. For details seeChapter 3 of the Local Assistance Procedures Manual.

4) For FTIP/FSTIP purposes, Federal Highway Bridge Program (HBP) funding constraint is managed by Caltrans.

5) Prop 1B bond funds for the Local Seismic Safety Retrofit Program (LSSRP) used for matching federal funds are also managed byCaltrans.

6) Financial constraint of LOCAL matching funds (including regional STIP funds) and LOCAL Advance Construction (AC) is theresponsibility of the MPOs and their local agencies.

7) Some projects show that they are programmed using State STP funds. These funds are HBP funds transferred to the STP forbridge work that is not ordinarily eligible for HBP funds. See the HB Program Guidelines for details. Do not confuse these STPfunds with Regional STP funds.

8) Corrections to this report should be addressed to the District Local Assistance Engineer:

http://www.dot.ca.gov/hq/LocalPrograms/dlae.htm

Notes:

3/31/2020, 1:07 PM

Caltrans, Division of Local Assistance Page 13/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 3: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Alameda

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O FOOTHILL RD. Replace existing two-lanebridge with a new two-lane bridge. Chien Wu, 9/9/2016 2:44:45 PM.

Fund Source Summary:

PER/W

Total

CON

Total

4,608,800

570,000 570,000

200,000 200,000

570,000 200,000 5,378,8004,608,8004,608,800

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total504,621 177,060 4,761,852

65,379 22,940 616,948

570,000 200,000 5,378,800

4,080,171

528,629

4,608,800

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4420

5933(159)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total504,621 504,621

65,379 65,379

570,000 570,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total177,060 177,060

22,940 22,940

200,000 200,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,080,171

528,629

4,608,800

4,080,171

528,629

4,608,800

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 23/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 4: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Alameda

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Alameda County BRIDGE NO. 33C0448, ARROYO ROAD OVER DRY CREEK, 1 MILE SW OF WETMORE. Replace existing two-lane bridge with a newtwo-lane bridge. 10/1/2015: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 430,000

CON

Total

1,272,600

430,000

100,000 100,000

100,000 1,802,600

430,000

1,272,6001,272,600

Phase Summary:

Fed $

Local AC

Local Match

Total 430,000

LSSRP Bond

Total100,000 1,802,600

100,000 1,802,600

430,000 1,272,600

1,272,600

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4301

5933(138)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 430,000

LSSRP Bond

Total430,000

430,000

430,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total100,000 100,000

100,000 100,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,272,600

1,272,600

1,272,600

1,272,600

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 33/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 5: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Alameda

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Albany BRIDGE NO. 33C0184, BUCHANAN ST OVER UP RR, BNSF RY, & AMTRAK, NEAR I-80. Bridge preventive maintenance project.

Fund Source Summary:

PER/W

Total

CON

Total

291,300

40,000 40,000

4,000

40,000 335,300291,300

4,000

295,300

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total35,412 296,841

4,588 38,459

40,000 335,300

261,429

33,871

295,300

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4157

5178(017)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total35,412 35,412

4,588 4,588

40,000 40,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,541

459

4,000

3,541

459

4,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total257,888

33,412

291,300

257,888

33,412

291,300

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 43/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 6: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Alameda

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Oakland BRIDGE NO. 33C0028, ADELINE ST, OVER UP RR,BNSF,AMTRAK,EMBARC, JUST S OF 3RD ST. Voluntary Seismic retrofit only, no lanesbeing added.

Fund Source Summary:

PER/W

Total

80,000

712,000

CON

Total

2,120,000 2,120,000

632,000

80,000

2,120,000 2,832,000

632,000

Phase Summary:

Fed $

Local AC

Local Match

Total

81,666

712,000

LSSRP Bond

Total1,876,836 2,507,170

243,164 324,830

2,120,000 2,832,000

630,334

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3413

5012(103)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

72,490

632,000

LSSRP Bond

Total559,510

72,490

632,000

559,510

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

9,176

80,000

LSSRP Bond

Total70,824

9,176

80,000

70,824

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,876,836 1,876,836

243,164 243,164

2,120,000 2,120,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 53/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 7: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Alameda

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Oakland BRIDGE NO. 33C0215, LEIMERT BLVD, OVER SAUSAL CREEK, 0.1 MI E OF PARK BLVD. LSSRP Seismic Retrofit

Fund Source Summary:

PER/W

Total 1,473,000

CON

Total

7,553,466

1,473,000

115,000 115,000

115,000 9,141,466

1,473,000

7,553,4667,553,466

Phase Summary:

Fed $

Local AC

Local Match

Total

168,953

1,473,000

LSSRP Bond

Total

13,191 879,573

101,810 8,092,940

168,953

115,000 9,141,466

1,304,047

866,383

6,687,083

7,553,466

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

2130

5012(025)5012(124)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

168,953

1,473,000

LSSRP Bond

Total1,304,047

168,953

1,473,000

1,304,047

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

13,191 13,191

101,810 101,810

115,000 115,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

866,383

6,687,083

7,553,466

866,383

6,687,083

7,553,466

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 63/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 8: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Alameda

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Oakland BRIDGE NO. 33C0373L, EDGEWATER DRIVE SB OVER ELMHURST CANAL, 0.2 MI N/W ROLAND WAY. Replace existing two-lane bridgewith a new two-lane bridge , Chien Wu, 9/29/2016 9:47:53 AM.

Fund Source Summary:

PER/W

Total

CON

Total

4,480,000

800,000 800,000

100,000 100,000

800,000 100,000 5,380,0004,480,0004,480,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total708,240 88,530 4,762,914

91,760 11,470 617,086

800,000 100,000 5,380,000

3,966,144

513,856

4,480,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4457

5012(161)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total708,240 708,240

91,760 91,760

800,000 800,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530 88,530

11,470 11,470

100,000 100,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,966,144

513,856

4,480,000

3,966,144

513,856

4,480,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 73/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 9: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Alameda

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Oakland BRIDGE NO. 33C0373R, EDGEWATER DRIVE NB OVER ELMHURST CANAL, 0.2 MI N/W ROLAND WAY. Replace existing two-lane bridgewith a new two-lane bridge, Chien Wu, 9/29/2016 10:36:18 AM.

Fund Source Summary:

PER/W

Total

CON

Total

4,480,000

800,000 800,000

100,000 100,000

800,000 100,000 5,380,0004,480,0004,480,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total708,240 88,530 4,762,914

91,760 11,470 617,086

800,000 100,000 5,380,000

3,966,144

513,856

4,480,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4458

5012(160)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total708,240 708,240

91,760 91,760

800,000 800,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530 88,530

11,470 11,470

100,000 100,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,966,144

513,856

4,480,000

3,966,144

513,856

4,480,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 83/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 10: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Alameda

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Oakland PM00002, Bridge Preventive Maintenance Program (BPMP), various bridges in the City of Oakland. See Caltrans Local Assistance HBP website for backup list of bridges.

Fund Source Summary:

PER/W

Total 4,676,335

CON

Total

2,970,335 1,183,341 5,234,991

1,706,000

1,183,341 6,940,991

1,706,000

1,081,3151,081,315

Phase Summary:

Fed $

Local AC

Local Match

Total

536,376

4,676,335

LSSRP Bond

Total1,047,612 6,144,859

-0 135,729 796,132

1,183,341 6,940,991

4,139,959 957,288

124,027

1,081,315

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3304

5012(083)5012(108)5012(109)5012(111)5012(112)5012(121)5012(137)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

195,678

1,706,000

LSSRP Bond

Total1,510,322

195,678

1,706,000

1,510,322

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

340,697

2,970,335

LSSRP Bond

Total1,047,612 4,634,538

-0 135,729 600,453

1,183,341 5,234,991

2,629,638 957,288

124,027

1,081,315

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 93/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 11: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Alameda

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Pleasanton BRIDGE NO. PM00119, Bridge Preventive Maintenance Program (BPMP), various bridges in the City of Pleasanton. See Caltrans LocalAssistance HBP web site for backup list of bridges

Fund Source Summary:

PER/W

Total 151,962

CON

Total

1,291,520 1,291,520

151,962

1,291,520 1,443,482

151,962

Phase Summary:

Fed $

Local AC

Local Match

Total

17,430

151,962

LSSRP Bond

Total1,143,383 1,277,915

148,137 165,567

1,143,383 -1,143,3831,291,520 1,443,482

134,532

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4256

5101(029)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

17,430

151,962

LSSRP Bond

Total134,532

17,430

151,962

134,532

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

0

LSSRP Bond

Total1,143,383 1,143,383

148,137 148,137

1,143,383 -1,143,383

1,291,520 1,291,520

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 103/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 12: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Concord PM00023, Bridge Preventive Maintenance Program, various locations. See Caltrans Local Assistance HBP web site for backup list of bridges.

Fund Source Summary:

PER/W

Total 4,021,366

CON

Total

3,211,141 924,427 4,135,568

20,107 830,332

944,534 4,965,900

810,225

Phase Summary:

Fed $

Local AC

Local Match

Total

461,251

4,021,366

LSSRP Bond

Total836,196 4,396,311

108,338 569,589

944,534 4,965,900

3,560,115

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3392

5135(039)5135(048)5135(049)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

92,933

810,225

LSSRP Bond

Total17,801 735,093

2,306 95,239

20,107 830,332

717,292

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

TotalPrior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

368,318

3,211,141

LSSRP Bond

Total818,395 3,661,218

106,032 474,350

924,427 4,135,568

2,842,823

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 113/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 13: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Contra Costa County BRIDGE NO. 28C0024, ORWOOD ROAD, OVER INDIAN SLOUGH, 2 MI E BYRON HIGHWAY. Replace 2 lane bridge with new 2 lanebridge. 4/5/2010: Toll Credits programmed for R/W & Con.

Fund Source Summary:

PER/W

Total

100,000

9,497,700

CON

Total

8,372,700 1,558,708 1,030,059 10,961,467

387,200 1,412,200

291,781 391,781

2,237,689 1,030,059 12,765,448

1,025,000

Phase Summary:

Fed $

Local AC

Local Match

Total

205,000

9,497,700

LSSRP Bond

Total2,160,249 1,030,059 12,483,008

77,440 282,440

2,237,689 1,030,059 12,765,448

9,292,700

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1175

5928(045)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

205,000

1,025,000

LSSRP Bond

Total309,760 1,129,760

77,440 282,440

387,200 1,412,200

820,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total 100,000

LSSRP Bond

Total291,781 391,781

291,781 391,781

100,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total 8,372,700

LSSRP Bond

Total1,558,708 1,030,059 10,961,467

1,558,708 1,030,059 10,961,467

8,372,700

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 123/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 14: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Contra Costa County BRIDGE NO. 28C0121, BYRON HWY, OVER CALIFORNIA AQUEDUCT, 1.4 MI NW ALA C.L.. Replace existing 2 lane bridge with new 2 lanebridge

Fund Source Summary:

PER/W

Total 675,000

CON

Total

16,515,000 16,515,000

1,525,000 2,200,000

200,000 200,000

1,725,000 16,515,000 18,915,000

675,000

Phase Summary:

Fed $

Local AC

Local Match

Total

77,423

675,000

LSSRP Bond

Total1,527,143 14,620,730 16,745,450

0 197,858 1,894,271 2,169,551

1,725,000 16,515,000 18,915,000

597,578

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1677

5928(104)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

77,423

675,000

LSSRP Bond

Total1,350,083 1,947,660

174,918 252,340

1,525,000 2,200,000

597,578

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total177,060 177,060

0 22,940 22,940

200,000 200,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total14,620,730 14,620,730

1,894,271 1,894,271

16,515,000 16,515,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 133/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 15: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Contra Costa County BRIDGE NO. 28C0141, MARSH CREEK RD OVER MARSH CREEK, 1.8 MI E MORGAN TERITY RD. Replace existing two lane bridge withtwo lane bridge,

Fund Source Summary:

PER/W

Total

146,000

6,845,417

CON

Total

5,699,417 120,869 5,820,286

65,000 1,065,000

43,000 189,000

228,869 7,074,286

1,000,000

Phase Summary:

Fed $

Local AC

Local Match

Total5,045,694

785,169

6,845,417

LSSRP Bond

Total5,248,312 6,262,865

26,251 811,421

-5,045,694228,869 7,074,286

1,014,554

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3727

5928(107)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

114,700

1,000,000

LSSRP Bond

Total57,545 942,845

7,456 122,156

65,000 1,065,000

885,300

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

16,746

146,000

LSSRP Bond

Total38,068 167,322

4,932 21,678

43,000 189,000

129,254

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

5,045,694

653,723

5,699,417

LSSRP Bond

Total5,152,699 5,152,699

13,864 667,587

-5,045,694

120,869 5,820,286

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 143/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 16: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Contra Costa County BRIDGE NO. 28C0143, MARSH CREEK RD, OVER MARSH CREEK, 7.3 MI E MORGAN TERITY RD combined with BRIDGE NO. 28C0145,MARSH CREEK RD, OVER MARSH CREEK, 3 MI E DEER VALLEY ROAD . Replace two existing 2-lane bridges with two new 2-lane bridges.

Fund Source Summary:

PER/W

Total 1,040,500

CON

Total

10,600,000

500,000 1,540,500

300,000 300,000

300,000 500,000 12,440,500

1,040,500

10,600,00010,600,000

Phase Summary:

Fed $

Local AC

Local Match

Total

119,345

1,040,500

LSSRP Bond

Total265,590 442,650 11,013,575

34,410 57,350 1,426,925

300,000 500,000 12,440,500

921,155 9,384,180

1,215,820

10,600,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3957

5928(125)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

119,345

1,040,500

LSSRP Bond

Total442,650 1,363,805

57,350 176,695

500,000 1,540,500

921,155

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total265,590 265,590

34,410 34,410

300,000 300,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total9,384,180

1,215,820

10,600,000

9,384,180

1,215,820

10,600,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 153/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 17: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Contra Costa County BRIDGE NO. 28C0154, PLEASANT HILL RD OVER TAYLOR BLVD, 0.6 MI E OF GEARY ROAD. Rehabilitate existing bridge. Deckreplacement and sliver widening for standard shoulders, no added capacity.

Fund Source Summary:

PER/W

Total

CON

Total

1,756,310

313,627 313,627

25,000

313,627 2,094,9371,756,310

25,000

1,781,310

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total277,654 1,854,648

35,973 240,289

277,654 -277,654313,627 2,094,937

1,576,994

204,316

1,781,310

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4527

5928(154)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total277,654 277,654

35,973 35,973

277,654 -277,654

313,627 313,627

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total22,133

2,868

25,000

22,133

2,868

25,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,554,861

201,449

1,756,310

1,554,861

201,449

1,756,310

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 163/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 18: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Contra Costa County BRIDGE NO. 28C0376, CANAL RD, OVER CONTRA COSTA CANAL, 0.5 MI W OF BAILEY RD. Replace existing two lane bridge with two lanebridge. 4/1/2010: Toll Credits programmed for PE, R/W, & Con.

Fund Source Summary:

PER/W

Total

112,400

2,281,775

CON

Total

1,724,900 97,100 1,822,000

444,475

43,100 155,500

140,200 2,421,975

444,475

Phase Summary:

Fed $

Local AC

Local Match

Total 2,281,775

LSSRP Bond

Total140,200 2,421,975

140,200 2,421,975

2,281,775

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

829

5928(108)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 444,475

LSSRP Bond

Total444,475

444,475

444,475

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total 112,400

LSSRP Bond

Total43,100 155,500

43,100 155,500

112,400

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total 1,724,900

LSSRP Bond

Total97,100 1,822,000

97,100 1,822,000

1,724,900

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 173/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 19: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Contra Costa County BRIDGE NO. 28C0442, MARSH DRIVE OVER WALNUT CREEK, 0.2 MI W OF SOLANO WAY. Replace existing two-lane bridge with a newtwo-lane bridge, Minor seismic contribution.

Fund Source Summary:

PER/W

Total 1,180,000

CON

Total

14,648,850

400,000 1,580,000

240,000 240,000

640,000 16,468,850

1,180,000

14,648,85014,648,850

Phase Summary:

Fed $

Local AC

Local Match

Total

135,346

1,180,000

LSSRP Bond

Total

229,400

566,592 14,579,873

73,408 1,659,577

640,000 16,468,850

1,044,654

229,400

12,968,627

1,450,823

14,648,850

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4299

5928(128)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

135,346

1,180,000

LSSRP Bond

Total354,120 1,398,774

45,880 181,226

400,000 1,580,000

1,044,654

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total212,472 212,472

27,528 27,528

240,000 240,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

229,400

12,968,627

1,450,823

14,648,850

229,400

12,968,627

1,450,823

14,648,850

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 183/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 20: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Contra Costa County BRIDGE NO. PM00159,Bridge Preventive Maintenance Program (BPMP) various bridges in Contra Costa County. See Caltrans LocalAssistance HBP website for backup list of projects.

Fund Source Summary:

PER/W

Total

CON

Total

805,778

180,370 180,370

60,000

180,370 1,046,148805,778

60,000

865,778

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total159,682 926,155

20,688 119,993

180,370 1,046,148

766,473

99,305

865,778

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4513

5928(155)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total159,682 159,682

20,688 20,688

180,370 180,370

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total53,118

6,882

60,000

53,118

6,882

60,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total713,355

92,423

805,778

713,355

92,423

805,778

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 193/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 21: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Danville BRIDGE NO. 28C0335, LA GONDA WAY, OVER SAN RAMON CREEK, AT DANVILLE BLVD. Widen existing two-lane bridge to includestandard lane width, shoulder and sidewalk. (No added capacity)

Fund Source Summary:

PER/W

Total 600,000

CON

Total

6,420,400

603,807 1,203,807

221,000 221,000

824,807 7,845,207

600,000

6,420,4006,420,400

Phase Summary:

Fed $

Local AC

Local Match

Total

68,820

600,000

LSSRP Bond

Total730,202 6,945,362

94,605 899,845

824,807 7,845,207

531,180 5,683,980

736,420

6,420,400

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4288

5434(024)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

68,820

600,000

LSSRP Bond

Total534,550 1,065,730

69,257 138,077

603,807 1,203,807

531,180

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total195,651 195,651

25,349 25,349

221,000 221,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,683,980

736,420

6,420,400

5,683,980

736,420

6,420,400

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 203/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 22: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Lafayette BRIDGE NO. PM00174, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of Lafayette. See Caltrans LocalAssistance HBP website for backup list of projects.

Fund Source Summary:

PER/W

Total

CON

Total

334,000

115,000 115,000

115,000 449,000334,000334,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total101,810 397,500

13,191 51,500

115,000 449,000

295,690

38,310

334,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4593

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total101,810 101,810

13,191 13,191

115,000 115,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total295,690

38,310

334,000

295,690

38,310

334,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 213/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 23: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Moraga BRIDGE NO. 28C0137, CANYON RD OVER W BRANCH SAN LEANDRO CR, 2.4 MI N ALA C.L.. Replace existing 2-lane bridge with new2-lane bridge.

Fund Source Summary:

PER/W

Total

150,000

1,115,875

CON

Total

7,938,750 180,000 8,118,750

624,125 33,000 1,623,000

25,000 175,000

8,587,875 213,000 9,916,750

965,875

Phase Summary:

Fed $

Local AC

Local Match

Total

127,991

1,115,875

LSSRP Bond

Total7,602,846 188,569 8,779,299

985,029 24,431 1,137,451

8,587,875 213,000 9,916,750

987,884

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4070

5415(011)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

110,786

965,875

LSSRP Bond

Total552,538 29,215 1,436,842

71,587 3,785 186,158

624,125 33,000 1,623,000

855,089

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

17,205

150,000

LSSRP Bond

Total22,133 154,928

2,868 20,073

25,000 175,000

132,795

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total7,028,175 159,354 7,187,529

910,575 20,646 931,221

7,938,750 180,000 8,118,750

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 223/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 24: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Oakley BRIDGE NO. 28C0270, MAIN STREET OVER CONTRA COSTA CANAL, .01 MI SE/O OAKLEY RD. Rehabilitate existing bridge (no added capacity), Chien Wu, 10/5/2016 10:20:29 AM.

Fund Source Summary:

PER/W

Total

CON

Total

248,402

88,715 88,715

50,000

88,715 387,117248,402

50,000

298,402

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total78,539 342,715

10,176 44,402

88,715 387,117

264,175

34,227

298,402

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4472

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total78,539 78,539

10,176 10,176

88,715 88,715

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total44,265

5,735

50,000

44,265

5,735

50,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total219,910

28,492

248,402

219,910

28,492

248,402

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 233/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 25: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Orinda BRIDGE NO. 28C0330, MINER RD, OVER SAN PABLO CREEK, AT CAMINO PABLO. LSSRP Seismic Retrofit

Fund Source Summary:

PER/W

Total 195,000

CON

Total

957,500

175,900 370,900

50,000 50,000

175,900 50,000 1,378,400

195,000

957,500957,500

Phase Summary:

Fed $

Local AC

Local Match

Total

22,367

195,000

LSSRP Bond

Total

5,735 115,560

155,724 44,265 1,220,298

20,176 42,542

175,900 50,000 1,378,400

172,634

109,825

847,675

957,500

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

2073

5444(010)5444(019)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

22,367

195,000

LSSRP Bond

Total155,724 328,358

20,176 42,542

175,900 370,900

172,634

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

5,735 5,735

44,265 44,265

50,000 50,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

109,825

847,675

957,500

109,825

847,675

957,500

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 243/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 26: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Orinda BRIDGE NO. 28C0331, BEAR CREEK RD, OVER SAN PABLO CREEK, 0.2 MI E CAMINO PABLO. LSSRP Seismic Retrofit

Fund Source Summary:

PER/W

Total 737,000

CON

Total

1,003,156

737,000

50,000 50,000

50,000 1,790,156

737,000

1,003,1561,003,156

Phase Summary:

Fed $

Local AC

Local Match

Total652,466

84,534

737,000

LSSRP Bond

Total

5,735 120,797

652,466 44,265 1,584,825

84,534

-652,46650,000 1,790,156

115,062

888,094

1,003,156

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

2074

5444(007)5444(018)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

652,466

84,534

737,000

LSSRP Bond

Total652,466 652,466

84,534

-652,466

737,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

5,735 5,735

44,265 44,265

50,000 50,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

115,062

888,094

1,003,156

115,062

888,094

1,003,156

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 253/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 27: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Pinole BRIDGE NO. 28C0062, SAN PABLO AVE, OVER BNSF RY AND AMTRAK, JUST W/O HERCULES AVE. Replace existing four-lane bridgewith a new four-lane bridge, Chien Wu, 12/24/2015 9:57:52 AM.

Fund Source Summary:

PER/W

Total 893,000

CON

Total

15,773,800

893,000

100,000 100,000

100,000 16,766,800

893,000

15,773,80015,773,800

Phase Summary:

Fed $

Local AC

Local Match

Total

102,427

893,000

LSSRP Bond

Total88,530 14,843,648

11,470 1,923,152

100,000 16,766,800

790,573 13,964,545

1,809,255

15,773,800

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4318

5126(015)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

102,427

893,000

LSSRP Bond

Total790,573

102,427

893,000

790,573

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530 88,530

11,470 11,470

100,000 100,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total13,964,545

1,809,255

15,773,800

13,964,545

1,809,255

15,773,800

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 263/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 28: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Pittsburg BRIDGE NO. 28C0165, NORTH PARKSIDE DR, OVER WILLOW PASS ROAD, OVER WILLOW PASS RD.. LSSRP Seismic Retrofit andBridge Preventive Maintenance work.

Fund Source Summary:

PER/W

Total 568,703

CON

Total

339,503 168,382 507,885

229,200

168,382 737,085

229,200

Phase Summary:

Fed $

Local AC

Local Match

Total

32,541

568,703

LSSRP Bond

Total

32,690 13,411 46,100

149,069 652,541

5,903 38,444

168,382 737,085

503,473

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

2061

5127(005)5127(024)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

26,289

229,200

LSSRP Bond

Total202,911

26,289

229,200

202,911

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

6,251

339,503

LSSRP Bond

Total

32,690 13,411 46,100

149,069 449,631

5,903 12,154

168,382 507,885

300,562

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 273/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 29: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Pleasant Hill BRIDGE NO. PM00141, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of Pleasant Hill. See Caltrans LocalAssistance HBP website for backup list of projects.

Fund Source Summary:

PER/W

Total 60,000

CON

Total

166,800 166,800

60,000

166,800 226,800

60,000

Phase Summary:

Fed $

Local AC

Local Match

Total

6,882

60,000

LSSRP Bond

Total147,668 200,786

19,132 26,014

147,668 -147,668166,800 226,800

53,118

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4336

5375(033)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

6,882

60,000

LSSRP Bond

Total53,118

6,882

60,000

53,118

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total147,668 147,668

19,132 19,132

147,668 -147,668

166,800 166,800

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 283/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 30: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Richmond BRIDGE NO. PM00093, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of Richmond. See Caltrans LocalAssistance HBP website for backup list of projects.

Fund Source Summary:

PER/W

Total

CON

Total

2,100,000

50,000 50,000

50,000 2,150,0002,100,0002,100,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total44,265 1,903,395

5,735 246,605

50,000 2,150,000

1,859,130

240,870

2,100,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4057

5137(046)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total44,265 44,265

5,735 5,735

50,000 50,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,859,130

240,870

2,100,000

1,859,130

240,870

2,100,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 293/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 31: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

San Pablo BRIDGE NO. 28C0057, SAN PABLO AVE OVER SAN PABLO CREEK, AT ROAD 20. Replace existing 6-lane bridge with a new 6-lane bridge,Chien Wu, 3/3/2016 10:07:10 AM.

Fund Source Summary:

PER/W

Total

CON

Total

8,312,920

940,000 940,000

200,000

940,000 9,452,9208,312,920

200,000

8,512,920

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total832,182 8,368,670

107,818 1,084,250

940,000 9,452,920

7,536,488

976,432

8,512,920

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4337

5303(021)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total832,182 832,182

107,818 107,818

940,000 940,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total177,060

22,940

200,000

177,060

22,940

200,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total7,359,428

953,492

8,312,920

7,359,428

953,492

8,312,920

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 303/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 32: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

San Pablo BRIDGE NO. 28C0326, GIANT HWY OVER SAN PABLO CREEK, AT PARR BLVD. Preventive maintenance to include deck methacrylate andjoint replacement work, Chien Wu, 3/22/2016 10:16:46 AM.

Fund Source Summary:

PER/W

Total 50,000

CON

Total

389,620

50,000

439,620

50,000

389,620389,620

Phase Summary:

Fed $

Local AC

Local Match

Total

5,735

50,000

LSSRP Bond

Total389,196

50,424

439,620

44,265 344,931

44,689

389,620

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4353

5303(019)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

5,735

50,000

LSSRP Bond

Total44,265

5,735

50,000

44,265

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total344,931

44,689

389,620

344,931

44,689

389,620

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 313/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 33: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Walnut Creek BRIDGE NO. 28C0052, BANCROFT RD, OVER WALNUT CREEK, 0.1 MI N DAVID ST. Bridge Rehabilitation. Widen existing two-lane bridgeto two-lane bridge.

Fund Source Summary:

PER/W

Total 485,000

CON

Total

1,557,403

440,000 925,000

100,000 100,000

540,000 2,582,403

485,000

1,557,4031,557,403

Phase Summary:

Fed $

Local AC

Local Match

Total

55,630

485,000

LSSRP Bond

Total478,062 2,286,201

61,938 296,202

540,000 2,582,403

429,371 1,378,769

178,634

1,557,403

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4233

5225(027)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

55,630

485,000

LSSRP Bond

Total389,532 818,903

50,468 106,098

440,000 925,000

429,371

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530 88,530

11,470 11,470

100,000 100,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,378,769

178,634

1,557,403

1,378,769

178,634

1,557,403

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 323/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 34: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Contra Costa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Walnut Creek BRIDGE NO. 28C0075, SOUTH MAIN ST, OVER LAS TRAMPAS CREEK, 0.1 MI S OLYMPIC BLVD. Replace existing 5-lane bridge with anew 5-lane bridge.

Fund Source Summary:

PER/W

Total 615,000

CON

Total

11,222,000

1,200,000 1,815,000

750,000 750,000

1,950,000 13,787,000

615,000

11,222,00011,222,000

Phase Summary:

Fed $

Local AC

Local Match

Total

70,541

615,000

LSSRP Bond

Total1,726,335 12,205,631

223,665 1,581,369

1,950,000 13,787,000

544,460 9,934,837

1,287,163

11,222,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4234

5225(026)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

70,541

615,000

LSSRP Bond

Total1,062,360 1,606,820

137,640 208,181

1,200,000 1,815,000

544,460

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total663,975 663,975

86,025 86,025

750,000 750,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total9,934,837

1,287,163

11,222,000

9,934,837

1,287,163

11,222,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 333/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 35: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Fairfax BRIDGE NO. 27C0008, MEADOW WAY, OVER SAN ANSELMO CREEK, IN FAIRFAX. Replace FO 1 lane timber bridge with wider 1 lanebridge. 4/5/2010: Toll Credits programmed for Con. 3/8/2019: Toll credits used for R/W.

Fund Source Summary:

PER/W

Total 932,238

CON

Total

4,585,000

105,562 619,800 1,657,600

216,100 216,100

105,562 835,900 6,458,700

932,238

4,585,0004,585,000

Phase Summary:

Fed $

Local AC

Local Match

Total

106,928

932,238

LSSRP Bond

Total93,454 764,809 6,268,573

12,108 71,091 190,127

105,562 835,900 6,458,700

825,310 4,585,000

4,585,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

662

5277(025)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

106,928

932,238

LSSRP Bond

Total93,454 548,709 1,467,473

12,108 71,091 190,127

105,562 619,800 1,657,600

825,310

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total216,100 216,100

216,100 216,100

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,585,000

4,585,000

4,585,000

4,585,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 343/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 36: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Fairfax BRIDGE NO. 27C0142, AZALEA AVE OVER FAIRFAX CREEK, IN FAIRFAX. Replace existing 2-lane bridge with new 2-lane bridge.3/6/2013: Toll credits used for PE. Toll credits used for CON.

Fund Source Summary:

PER/W

Total 854,121

CON

Total

4,000,000

350,000 1,204,121

200,000 200,000

550,000 5,404,121

854,121

4,000,0004,000,000

Phase Summary:

Fed $

Local AC

Local Match

Total 854,121

LSSRP Bond

Total527,060 5,381,181

22,940 22,940

550,000 5,404,121

854,121 4,000,000

4,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4062

5277(028)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 854,121

LSSRP Bond

Total350,000 1,204,121

350,000 1,204,121

854,121

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total177,060 177,060

22,940 22,940

200,000 200,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,000,000

4,000,000

4,000,000

4,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 353/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 37: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Fairfax BRIDGE NO. 27C0144, CREEK ROAD, OVER SAN ANSELMO CREEK, IN FAIRFAX. LSSRP Seismic Retrofit 7/8/2013 and PreventiveMaintenence: Toll credits used for PE. 12/3/2014: Toll credits used for R/W and CON.

Fund Source Summary:

PER/W

Total 795,994

CON

Total

1,594,600

336,156 1,132,150

13,000 13,000

349,156 2,739,750

795,994

1,594,6001,594,600

Phase Summary:

Fed $

Local AC

Local Match

Total 795,994

LSSRP Bond

Total349,156 2,739,750

349,156 2,739,750

795,994 1,594,600

1,594,600

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

2052

5277(027)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 795,994

LSSRP Bond

Total336,156 1,132,150

336,156 1,132,150

795,994

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total13,000 13,000

13,000 13,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,594,600

1,594,600

1,594,600

1,594,600

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 363/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 38: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Fairfax BRIDGE NO. PM00083, Bridge Preventive Maintenance Program (BPMP) various bridges in the Town of Fairfax. See Caltrans Local AssistanceHBP website for backup list of projects.

Fund Source Summary:

PER/W

Total 425,420

CON

Total

625,086

366,108 791,528

12,500 12,500

378,608 1,429,114

425,420

625,086625,086

Phase Summary:

Fed $

Local AC

Local Match

Total

48,796

425,420

LSSRP Bond

Total335,182 1,265,195

43,426 163,919

378,608 1,429,114

376,624 553,389

71,697

625,086

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4019

5277(026)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

48,796

425,420

LSSRP Bond

Total324,115 700,740

41,993 90,788

366,108 791,528

376,624

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total11,066 11,066

1,434 1,434

12,500 12,500

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total553,389

71,697

625,086

553,389

71,697

625,086

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 373/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 39: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Larkspur BRIDGE NO. 27C0028, BON AIR RD, OVER CORTE MADERA CREEK, .5 MI SW SR FRANCIS DRK B. Replace 2 lane bridge with new 2lane bridge with class 1 bikeway.

Fund Source Summary:

PER/W

Total 41,193,750

CON

Total

36,708,750 36,708,750

200,000 4,685,000

200,000 41,393,750

4,485,000

Phase Summary:

Fed $

Local AC

Local Match

Total23,866,581

5,107,494

41,193,750

LSSRP Bond

Total6,609,474 8,791,675 8,625,433 36,246,256

40,000 5,147,494

-6,609,474 -8,631,675 -8,625,433200,000 41,393,750

12,219,675

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1480

5166(015)5166(025)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

897,000

4,485,000

LSSRP Bond

Total160,000 3,748,000

40,000 937,000

200,000 4,685,000

3,588,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

23,866,581

4,210,494

36,708,750

LSSRP Bond

Total6,609,474 8,631,675 8,625,433 32,498,256

4,210,494

-6,609,474 -8,631,675 -8,625,433

36,708,750

8,631,675

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 383/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 40: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Marin County BRIDGE NO. 27C0016, LUCAS VALLEY ROAD OVER MILLER CREEK, 1.8 MI N OF SR 101. Replace existing 2-lane bridge with 2-lanebridge.

Fund Source Summary:

PER/W

Total

CON

Total

7,546,000

1,347,500 1,347,500

1,347,500 8,893,5007,546,0007,546,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,192,942 7,873,416

154,558 1,020,084

1,347,500 8,893,500

6,680,474

865,526

7,546,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4558

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,192,942 1,192,942

154,558 154,558

1,347,500 1,347,500

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total6,680,474

865,526

7,546,000

6,680,474

865,526

7,546,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 393/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 41: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Marin County BRIDGE NO. 27C0051, SAN ANTONIO RD OVER SOUTH SAN ANTONIO CREEK, 0.6 MI N OF S.H. 101. Replace existing two lane bridgewith two lane bridge. 1/3/2012: Toll Credits programmed for PE, R/W & CON.

Fund Source Summary:

PER/W

Total 821,000

CON

Total

6,539,155

389,710 1,210,710

448,500 448,500

448,500 389,710 8,198,365

821,000

6,539,1556,539,155

Phase Summary:

Fed $

Local AC

Local Match

Total 821,000

LSSRP Bond

Total448,500 389,710 8,198,365

448,500 389,710 8,198,365

821,000 6,539,155

6,539,155

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3891

5927(104)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 821,000

LSSRP Bond

Total389,710 1,210,710

389,710 1,210,710

821,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total448,500 448,500

448,500 448,500

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total6,539,155

6,539,155

6,539,155

6,539,155

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 403/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 42: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Marin County BRIDGE NO. 27C0098, NICASIO VAL RD, OVER ARROYO NICASIO, NEAR LUCAS VALLEY RD. Replace existing two-lane bridge with newtwo-lane bridge.

Fund Source Summary:

PER/W

Total 556,300

CON

Total

4,389,000

227,450 783,750

225,000 225,000

452,450 5,397,750

556,300

4,389,0004,389,000

Phase Summary:

Fed $

Local AC

Local Match

Total

63,808

556,300

LSSRP Bond

Total400,554 4,778,628

51,896 619,122

452,450 5,397,750

492,492 3,885,582

503,418

4,389,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3998

5927(097)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

63,808

556,300

LSSRP Bond

Total201,361 693,854

26,089 89,896

227,450 783,750

492,492

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total199,193 199,193

25,808 25,808

225,000 225,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,885,582

503,418

4,389,000

3,885,582

503,418

4,389,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 413/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 43: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Marin County BRIDGE NO. 27C0104, SIR FRANCIS DRAKE OVER OLEMA CREEK, 0.32 MI W SH 1. Replace existing two-lane bridge with new two-lane bridge.

Fund Source Summary:

PER/W

Total 610,000

CON

Total

2,618,000

610,000

250,000 250,000

250,000 3,478,000

610,000

2,618,0002,618,000

Phase Summary:

Fed $

Local AC

Local Match

Total

69,967

610,000

LSSRP Bond

Total221,325 3,079,073

28,675 398,927

250,000 3,478,000

540,033 2,317,715

300,285

2,618,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3996

5927(099)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

69,967

610,000

LSSRP Bond

Total540,033

69,967

610,000

540,033

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total221,325 221,325

28,675 28,675

250,000 250,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total2,317,715

300,285

2,618,000

2,317,715

300,285

2,618,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 423/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 44: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Marin County BRIDGE NO. 27C0107, MUIR WOODS RD OVER REDWOOD CREEK, 2.0 MI N OF SR 1. Replace existing two-lane bridge with newtwo-lane bridge.

Fund Source Summary:

PER/W

Total 496,079

CON

Total

1,974,500

182,921 679,000

159,485 159,485

182,921 159,485 2,812,985

496,079

1,974,5001,974,500

Phase Summary:

Fed $

Local AC

Local Match

Total

56,900

496,079

LSSRP Bond

Total161,940 141,192 2,490,336

20,981 18,293 322,649

182,921 159,485 2,812,985

439,179 1,748,025

226,475

1,974,500

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3995

5927(098)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

56,900

496,079

LSSRP Bond

Total161,940 601,119

20,981 77,881

182,921 679,000

439,179

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total141,192 141,192

18,293 18,293

159,485 159,485

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,748,025

226,475

1,974,500

1,748,025

226,475

1,974,500

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 433/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 45: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Marin County BRIDGE NO. 27C0111, MARSHALL PETALUMA RD, OVER SALMON CREEK, 3.0MI W OF HICKSVALLEY RD. Replace existing 2-lane bridgewith a 2-lane bridge.

Fund Source Summary:

PER/W

Total

CON

Total

2,818,200

503,250 503,250

503,250 3,321,4502,818,2002,818,200

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total445,527 2,940,480

57,723 380,970

503,250 3,321,450

2,494,952

323,248

2,818,200

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4557

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total445,527 445,527

57,723 57,723

503,250 503,250

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total2,494,952

323,248

2,818,200

2,494,952

323,248

2,818,200

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 443/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 46: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Marin County BRIDGE NO. 27C0135, MOUNT LASSEN DR OVER MILLER CREEK, 0.06 MI N LUCAS VALLEY RD. Bridge Preventive MaintenanceProgram project to correct soil erosion. 1/4/2012: Toll Credits programmed for PE & CON. 9/28/2015: Toll credits used for R/W.

Fund Source Summary:

PER/W

Total 350,000

CON

Total

354,200

350,000

81,252 81,252

81,252 785,452

350,000

354,200354,200

Phase Summary:

Fed $

Local AC

Local Match

Total 350,000

LSSRP Bond

Total81,252 785,452

81,252 785,452

350,000 354,200

354,200

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3892

5927(100)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 350,000

LSSRP Bond

Total350,000

350,000

350,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total81,252 81,252

81,252 81,252

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total354,200

354,200

354,200

354,200

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 453/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 47: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Novato BRIDGE NO. 27C0021, GRANT AVE OVER NOVATO CREEK, IN NOVATO. Bridge rehabilitation no additional lanes added.

Fund Source Summary:

PER/W

Total 705,424

CON

Total

3,568,320 3,568,320

705,424

3,568,320 4,273,744

705,424

Phase Summary:

Fed $

Local AC

Local Match

Total

80,912

705,424

LSSRP Bond

Total3,159,034 3,783,546

409,286 490,198

3,568,320 4,273,744

624,512

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3524

5361(023)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

80,912

705,424

LSSRP Bond

Total624,512

80,912

705,424

624,512

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,159,034 3,159,034

409,286 409,286

3,568,320 3,568,320

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 463/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 48: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Ross BRIDGE NO. 27C0074, WINSHIP ROAD OVER CORTE MADERA CREEK, IN THE CITY OF ROSS. Replace existing two-lane bridge withnew two-lane bridge. 3/25/2014: Toll credits used for PE, R/W and CON.

Fund Source Summary:

PER/W

Total 655,700

CON

Total

1,613,640

100,000 755,700

60,000 60,000

160,000 2,429,340

655,700

1,613,6401,613,640

Phase Summary:

Fed $

Local AC

Local Match

Total 655,700

LSSRP Bond

Total160,000 2,429,340

160,000 2,429,340

655,700 1,613,640

1,613,640

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3997

5176(008)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 655,700

LSSRP Bond

Total100,000 755,700

100,000 755,700

655,700

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total60,000 60,000

60,000 60,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,613,640

1,613,640

1,613,640

1,613,640

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 473/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 49: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

San Anselmo BRIDGE NO. 27C0080, MADRONE AVE OVER SAN ANSELMO CR, IN SAN ANSELMO. Bridge replacement. Replace existing two lane bridge with two lane bridge widened to accommodate standard lanes, shoulders and sidewalks.

Fund Source Summary:

PER/W

Total 664,000

CON

Total

5,756,800

583,500 1,247,500

724,900 724,900

1,308,400 7,729,200

664,000

5,756,8005,756,800

Phase Summary:

Fed $

Local AC

Local Match

Total

76,161

664,000

LSSRP Bond

Total1,158,327 6,842,661

150,073 886,539

1,308,400 7,729,200

587,839 5,096,495

660,305

5,756,800

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3906

5159(018)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

76,161

664,000

LSSRP Bond

Total516,573 1,104,412

66,927 143,088

583,500 1,247,500

587,839

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total641,754 641,754

83,146 83,146

724,900 724,900

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,096,495

660,305

5,756,800

5,096,495

660,305

5,756,800

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 483/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 50: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

San Anselmo BRIDGE NO. 27C0100, BRIDGE AVE OVER SAN ANSELMO CREEK, 80M SW OF SIR FRANCIS DRK. Replace 2-lane bridge with 2-lanebridge.

Fund Source Summary:

PER/W

Total

CON

Total

4,760,000

833,600 833,600

833,600 5,593,6004,760,0004,760,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total737,986 4,952,014

95,614 641,586

833,600 5,593,600

4,214,028

545,972

4,760,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4640

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total737,986 737,986

95,614 95,614

833,600 833,600

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,214,028

545,972

4,760,000

4,214,028

545,972

4,760,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 493/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 51: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

San Anselmo BRIDGE NO. 27C0153, NOKOMIS AVE OVER SAN ANSELMO CREEK, 300 N MADRONE AVE. Bridge Replacement. Replace existing twolane bridge with two lane bridge to accommodate standard lanes, shoulders and sidewalks. 2/15/2012: Toll Credits programmed for PE & CON.

Fund Source Summary:

PER/W

Total 670,000

CON

Total

5,553,800

545,600 1,215,600

682,400 682,400

1,228,000 7,451,800

670,000

5,553,8005,553,800

Phase Summary:

Fed $

Local AC

Local Match

Total 670,000

LSSRP Bond

Total1,149,729 7,373,529

78,271 78,271

1,228,000 7,451,800

670,000 5,553,800

5,553,800

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3905

5159(017)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 670,000

LSSRP Bond

Total545,600 1,215,600

545,600 1,215,600

670,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total604,129 604,129

78,271 78,271

682,400 682,400

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,553,800

5,553,800

5,553,800

5,553,800

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 503/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 52: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

San Anselmo BRIDGE NO. PM00090, Bridge Preventive Maintenance Program (BPMP) various bridges in the Town of San Anselmo. See Caltrans LocalAssistance HBP website for backup list of projects.

Fund Source Summary:

PER/W

Total 637,426

CON

Total

1,136,441

637,426

1,773,867

637,426

1,136,4411,136,441

Phase Summary:

Fed $

Local AC

Local Match

Total

73,113

637,426

LSSRP Bond

Total1,570,404

-0 203,463

1,773,867

564,313 1,006,091

130,350

1,136,441

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4044

5159(022)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

73,113

637,426

LSSRP Bond

Total564,313

73,113

637,426

564,313

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,006,091

-0 130,350

1,136,441

1,006,091

130,350

1,136,441

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 513/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 53: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Marin

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

San Rafael BRIDGE NO. 27C0148, SOUTHRN HEIGHTS BL, OVER HILLSIDE, JCT MEYER RD IN SAN RAFEL. Replace existing one-lane bridge with anew one-lane bridge. 3/4/2015: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total

180,000

675,000

CON

Total

4,185,000 4,185,000

105,000 600,000

45,000 125,000 350,000

150,000 125,000 4,185,000 5,135,000

495,000

Phase Summary:

Fed $

Local AC

Local Match

Total 675,000

LSSRP Bond

Total150,000 125,000 4,185,000 5,135,000

150,000 125,000 4,185,000 5,135,000

675,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4272

5043(038)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 495,000

LSSRP Bond

Total105,000 600,000

105,000 600,000

495,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total 180,000

LSSRP Bond

Total45,000 125,000 350,000

45,000 125,000 350,000

180,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,185,000 4,185,000

4,185,000 4,185,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 523/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 54: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Napa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Calistoga BRIDGE NO. 21C0115, BERRY ST OVER NAPA RIVER, CALISTOGA. Replace two-lane bridge with new two-lane bridge. 9/26/2012: TollCredits programmed for PE & CON. 9/27/2012: Toll credits used for R/W.

Fund Source Summary:

PER/W

Total

364,000

5,826,402

CON

Total

4,918,402 245,392 5,163,794

50,614 594,614

364,000

296,006 6,122,408

544,000

Phase Summary:

Fed $

Local AC

Local Match

Total 5,826,402

LSSRP Bond

Total296,006 6,122,408

296,006 6,122,408

5,826,402

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3986

5061(007)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 544,000

LSSRP Bond

Total50,614 594,614

50,614 594,614

544,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total 364,000

LSSRP Bond

Total364,000

364,000

364,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total 4,918,402

LSSRP Bond

Total245,392 5,163,794

245,392 5,163,794

4,918,402

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 533/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 55: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Napa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Napa BRIDGE NO. PM00111, Bridge Preventive Maintenance Program (BPMP) for various bridges in the City of Napa. See Caltrans LocalAssistance HBP website for backup list of projects.

Fund Source Summary:

PER/W

Total 40,375

CON

Total

510,221 13,926 524,147

40,375

510,221 13,926 564,522

40,375

Phase Summary:

Fed $

Local AC

Local Match

Total

4,631

40,375

LSSRP Bond

Total451,699 12,329 499,771

58,522 1,597 64,751

510,221 13,926 564,522

35,744

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4210

5042(059)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

4,631

40,375

LSSRP Bond

Total35,744

4,631

40,375

35,744

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total451,699 12,329 464,027

58,522 1,597 60,120

510,221 13,926 524,147

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 543/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 56: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Napa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Napa County BRIDGE NO. 21C0042, GREENWOOD AVE, OVER GARNETT CREEK, .2 MI NE/O MYRTLEDALE RD. Replace existing one-lane bridge withnew two-lane bridge. Toll credits used for PE. Toll credits used for CON. 9/28/2015: Toll credits used for R/W. This is not a capacityenhancing project, changed to lump sum programming.

Fund Source Summary:

PER/W

Total 1,142,282

CON

Total

5,778,920 5,778,920

1,142,282

200,000 200,000

200,000 5,778,920 7,121,202

1,142,282

Phase Summary:

Fed $

Local AC

Local Match

Total 1,142,282

LSSRP Bond

Total200,000 5,778,920 7,121,202

200,000 5,778,920 7,121,202

1,142,282

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4239

5921(068)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 1,142,282

LSSRP Bond

Total1,142,282

1,142,282

1,142,282

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total200,000 200,000

200,000 200,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,778,920 5,778,920

5,778,920 5,778,920

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 553/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 57: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Napa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Napa County BRIDGE NO. 21C0056, DRY CR RD OVER DRY CREEK, 0.8 MI W MT VEEDER RD. Replace existing 2-lane bridge with new 2-lane bridge plus realignment of roadway. 3/6/2013: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 899,260

CON

Total

4,762,380

899,260

400,000 400,000

400,000 6,061,640

899,260

4,762,3804,762,380

Phase Summary:

Fed $

Local AC

Local Match

Total 899,260

LSSRP Bond

Total400,000 6,061,640

400,000 6,061,640

899,260 4,762,380

4,762,380

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4063

5921(061)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 899,260

LSSRP Bond

Total899,260

899,260

899,260

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total400,000 400,000

400,000 400,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,762,380

4,762,380

4,762,380

4,762,380

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 563/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 58: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Napa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Napa County BRIDGE NO. 21C0074, BERRYESSA-KNOXVLLE OVER ETICUERA CREEK, 7.8 MI N/O POPE CYN ROAD. Replace existing 2-lane bridgewith new 2-lane bridge. 3/6/2013: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total

CON

Total

5,000,000

900,000 900,000

200,000

900,000 6,100,0005,000,000

200,000

5,200,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total900,000 6,100,000

900,000 6,100,000

5,200,000

5,200,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4066

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total900,000 900,000

900,000 900,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total200,000

200,000

200,000

200,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,000,000

5,000,000

5,000,000

5,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 573/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 59: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Napa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Napa County BRIDGE NO. 21C0075, CHILES-POPE VLY RD OVER CHILES CREEK, 2.1 MI N OF S.R. 128. Replace existing 2-lane bridge with new2-lane bridge.

Fund Source Summary:

PER/W

Total 842,260

CON

Total

4,477,000

842,260

150,000 150,000

150,000 5,469,260

842,260

4,477,0004,477,000

Phase Summary:

Fed $

Local AC

Local Match

Total

96,607

842,260

LSSRP Bond

Total132,795 4,841,936

17,205 627,324

150,000 5,469,260

745,653 3,963,488

513,512

4,477,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4068

5921(060)5921(074)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

96,607

842,260

LSSRP Bond

Total745,653

96,607

842,260

745,653

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total132,795 132,795

17,205 17,205

150,000 150,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,963,488

513,512

4,477,000

3,963,488

513,512

4,477,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 583/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 60: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Napa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Napa County BRIDGE NO. 21C0077, CONN VALLEY RD OVER CONN CREEK, 4.1 MI E SILVERADO TRAIL. Replace existing 2-lane bridge with new2-lane bridge. 3/6/2013: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total

CON

Total

5,000,000

900,000 900,000

200,000

900,000 6,100,0005,000,000

200,000

5,200,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total900,000 6,100,000

900,000 6,100,000

5,200,000

5,200,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4067

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total900,000 900,000

900,000 900,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total200,000

200,000

200,000

200,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,000,000

5,000,000

5,000,000

5,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 593/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 61: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Napa

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Napa County BRIDGE NO. 21C0088, SODA CYN RD OVER SODA CREEK, 3.1 MI N SILVERADO TRAIL. Replace existing 2-lane bridge with new 2-lanebridge. 3/6/2013: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total

CON

Total

5,000,000

900,000 900,000

200,000

900,000 6,100,0005,000,000

200,000

5,200,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total900,000 6,100,000

900,000 6,100,000

5,200,000

5,200,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4064

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total900,000 900,000

900,000 900,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total200,000

200,000

200,000

200,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,000,000

5,000,000

5,000,000

5,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 603/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 62: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Francisco

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

San Francisco BRIDGE NO. 34C0024, THIRD STREET OVER ISLAIS CREEK, JUST N/O CARGO WAY. Rehabilitate bridge. No added lane capacity. (HighCost Project agreement required)

Fund Source Summary:

PER/W

Total 5,400,000

CON

Total

84,000,000 84,000,000

1,000,000 1,600,000 8,000,000

1,000,000 84,000,000 1,600,000 92,000,000

5,400,000

Phase Summary:

Fed $

Local AC

Local Match

Total

619,380

5,400,000

LSSRP Bond

Total885,300 1,416,480 81,447,600

114,700 9,634,800 183,520 10,552,400

74,365,2001,000,000 84,000,000 1,600,000 92,000,000

4,780,620 74,365,200

-74,365,200

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4004

5934(168)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

619,380

5,400,000

LSSRP Bond

Total885,300 1,416,480 7,082,400

114,700 183,520 917,600

1,000,000 1,600,000 8,000,000

4,780,620

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total74,365,200

9,634,800 9,634,800

74,365,200

84,000,000 84,000,000

74,365,200

-74,365,200

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 613/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 63: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Francisco

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

San Francisco County BRIDGE NO. 34C0025, THIRD ST OVER CHINA BASIN, S OF BERRY ST. Rehabilitate existing bridge, Work includes rehabilitating bridgedeck and corroded members, painting, counterweight and fender pile repairs. (No added lane capacity). High Cost Project agreement needed forthis project for construction to be moved into the FTIP.

Fund Source Summary:

PER/W

Total

350,000

36,214,015

CON

Total

31,040,890 31,040,890

4,823,125

350,000

36,214,015

4,823,125

Phase Summary:

Fed $

Local AC

Local Match

Total15,315,823

4,153,748

36,214,015

LSSRP Bond

Total15,315,823 32,060,267

4,153,748

-15,315,82336,214,015

16,744,445

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4282

5934(177)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

553,212

4,823,125

LSSRP Bond

Total4,269,913

553,212

4,823,125

4,269,913

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

40,145

350,000

LSSRP Bond

Total309,855

40,145

350,000

309,855

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

15,315,823

3,560,390

31,040,890

LSSRP Bond

Total15,315,823 27,480,500

3,560,390

-15,315,823

31,040,890

12,164,677

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 623/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 64: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Department of Parks and Recreation BRIDGE NO. PM00190, Bridge Preventive Maintenance Program (BPMP) various bridges in District 4. See Caltrans Local Assistance HBPwebsite for backup list of projects.

Fund Source Summary:

PER/W

Total

CON

Total

694,908

232,000 232,000

232,000 926,908694,908694,908

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total205,390 820,592

26,610 106,316

232,000 926,908

615,202

79,706

694,908

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4628

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total205,390 205,390

26,610 26,610

232,000 232,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total615,202

79,706

694,908

615,202

79,706

694,908

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 633/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 65: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Half Moon Bay BRIDGE NO. 35C0025, MAIN ST OVER PILARCITOS CREEK, 0.25 MI S/O S.H. 92. Rehabilitate existing historic bridge. No added capacity.Chien Wu, 10/12/2016 9:30:31 AM.

Fund Source Summary:

PER/W

Total 1,291,000

CON

Total

7,230,579 7,230,579

1,291,000

5,000 5,000

5,000 7,230,579 8,526,579

1,291,000

Phase Summary:

Fed $

Local AC

Local Match

Total

148,078

1,291,000

LSSRP Bond

Total4,427 6,401,232 7,548,580

574 829,347 977,999

5,000 7,230,579 8,526,579

1,142,922

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4501

5357(010)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

148,078

1,291,000

LSSRP Bond

Total1,142,922

148,078

1,291,000

1,142,922

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,427 4,427

574 574

5,000 5,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total6,401,232 6,401,232

829,347 829,347

7,230,579 7,230,579

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 643/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 66: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Redwood City BRIDGE NO. 35C0074L, BRIDGE DR PARKWAY OVER MARINE WORLD LAGOON, EAST OF MARINE WORLD PKWY. PreventiveMaintenance.

Fund Source Summary:

PER/W

Total 75,000

CON

Total

518,000 518,000

20,000 95,000

518,000 20,000 613,000

75,000

Phase Summary:

Fed $

Local AC

Local Match

Total

8,603

75,000

LSSRP Bond

Total458,585 17,706 542,689

59,415 2,294 70,311

518,000 20,000 613,000

66,398

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3617

5029(024)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

8,603

75,000

LSSRP Bond

Total17,706 84,104

2,294 10,897

20,000 95,000

66,398

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total458,585 458,585

59,415 59,415

518,000 518,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 653/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 67: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Redwood City BRIDGE NO. 35C0074R, BRIDGE DR PARKWAY OVER MARINE WORLD LAGOON, EAST OF MARINE WORLD PKWY. Preventive Maintenance.

Fund Source Summary:

PER/W

Total 75,000

CON

Total

518,000 518,000

20,000 95,000

518,000 20,000 613,000

75,000

Phase Summary:

Fed $

Local AC

Local Match

Total

8,603

75,000

LSSRP Bond

Total458,585 17,706 542,689

59,415 2,294 70,311

518,000 20,000 613,000

66,398

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3618

5029(025)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

8,603

75,000

LSSRP Bond

Total17,706 84,104

2,294 10,897

20,000 95,000

66,398

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total458,585 458,585

59,415 59,415

518,000 518,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 663/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 68: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Redwood City BRIDGE NO. PM00082, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of Redwood City. See Caltrans LocalAssistance HBP website for backup list of projects.

Fund Source Summary:

PER/W

Total 26,250

CON

Total

78,750

26,250

105,000

26,250

78,75078,750

Phase Summary:

Fed $

Local AC

Local Match

Total

3,011

26,250

LSSRP Bond

Total92,957

12,044

105,000

23,239 69,717

9,033

78,750

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4018

5029(032)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

3,011

26,250

LSSRP Bond

Total23,239

3,011

26,250

23,239

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total69,717

9,033

78,750

69,717

9,033

78,750

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 673/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 69: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

San Mateo BRIDGE NO. 35C0077, BERMUDA DR, OVER FIESTA CHANNEL, SOUTH OF FIESTA DRIVE. Bridge Replacement. Replace existing two-lane bridge with a new two-lane bridge.

Fund Source Summary:

PER/W

Total 1,232,539

CON

Total

3,670,000

1,232,539

4,902,539

1,232,539

3,670,0003,670,000

Phase Summary:

Fed $

Local AC

Local Match

Total

141,372

1,232,539

LSSRP Bond

Total4,340,218

562,321

4,902,539

1,091,167 3,249,051

420,949

3,670,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3428

5102(033)5102(049)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

141,372

1,232,539

LSSRP Bond

Total1,091,167

141,372

1,232,539

1,091,167

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,249,051

420,949

3,670,000

3,249,051

420,949

3,670,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 683/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 70: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

San Mateo County BRIDGE NO. 35C0041, CLOVERDALE RD OVER BUTANO CREEK, NORTH BUTANO PARK ROAD. Scour countermeasure and treat deck with methacrylate, Chien Wu, 10/4/2016 1:27:52 PM. 5/7/2018: Toll Credits programmed for PE & CON.

Fund Source Summary:

PER/W

Total

CON

Total

2,025,000

150,000 75,000 225,000

50,000 50,000

150,000 125,000 2,300,0002,025,0002,025,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total150,000 119,265 2,294,265

5,735 5,735

150,000 125,000 2,300,000

2,025,000

2,025,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4469

5935(079)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total150,000 75,000 225,000

150,000 75,000 225,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total44,265 44,265

5,735 5,735

50,000 50,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total2,025,000

2,025,000

2,025,000

2,025,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 693/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 71: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

San Mateo County PM00041, Bridge Preventive Maintenance Program, various locations within the County of San Mateo. See Caltrans Local Assistance HBPwebsite for backup list of bridges.

Fund Source Summary:

PER/W

Total 873,520

CON

Total

712,500 1,103,420

161,020

1,264,440

161,020

390,920390,920

Phase Summary:

Fed $

Local AC

Local Match

Total

100,193

873,520

LSSRP Bond

Total1,119,409

145,031

1,264,440

773,327 346,081

44,839

390,920

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3466

5935(062)5935(069)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

18,469

161,020

LSSRP Bond

Total142,551

18,469

161,020

142,551

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

81,724

712,500

LSSRP Bond

Total976,858

126,562

1,103,420

630,776 346,081

44,839

390,920

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 703/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 72: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

San Mateo County BRIDGE NO. PM00067, Bridge Preventive Maintenance Program, various locations in San Mateo County. See Caltrans Local Assistance HBPweb site for backup list of bridges.

Fund Source Summary:

PER/W

Total 119,000

CON

Total

391,000

119,000

510,000

119,000

391,000391,000

Phase Summary:

Fed $

Local AC

Local Match

Total

13,649

119,000

LSSRP Bond

Total451,503

58,497

510,000

105,351 346,152

44,848

391,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3921

5935(064)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

13,649

119,000

LSSRP Bond

Total105,351

13,649

119,000

105,351

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total346,152

44,848

391,000

346,152

44,848

391,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 713/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 73: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

South San Francisco BRIDGE NO. 35C0148L, GRAND AVENUE WB OVER CALTRAIN UPRR INDUSTRIAL, 0.1 MI E OF US 101. Rehabilitate existing bridge.Structural steel painting and deck treatment, (no added capacity).

Fund Source Summary:

PER/W

Total

CON

Total

4,560,000

320,000 320,000

320,000 4,880,0004,560,0004,560,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total283,296 4,320,264

36,704 559,736

320,000 4,880,000

4,036,968

523,032

4,560,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4525

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total283,296 283,296

36,704 36,704

320,000 320,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,036,968

523,032

4,560,000

4,036,968

523,032

4,560,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 723/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 74: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

South San Francisco BRIDGE NO. 35C0148R, GRAND AVENUE WB OVER CALTRAIN UPRR INDUSTRIAL, 0.1 MI E OF US 101. Rehabilitate existing bridge -Structural steel painting and deck treatment (no added capacity).

Fund Source Summary:

PER/W

Total

CON

Total

3,960,000

320,000 320,000

320,000 4,280,0003,960,0003,960,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total283,296 3,789,084

36,704 490,916

320,000 4,280,000

3,505,788

454,212

3,960,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4526

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total283,296 283,296

36,704 36,704

320,000 320,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,505,788

454,212

3,960,000

3,505,788

454,212

3,960,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 733/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 75: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

South San Francisco BRIDGE NO. PM00153, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of South San Francisco. See CaltransLocal Assistance HBP website for backup list of projects.

Fund Source Summary:

PER/W

Total

CON

Total

389,000

130,000 130,000

130,000 519,000389,000389,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total115,089 459,471

14,911 59,529

130,000 519,000

344,382

44,618

389,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4459

5177(039)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total115,089 115,089

14,911 14,911

130,000 130,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total344,382

44,618

389,000

344,382

44,618

389,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 743/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 76: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Woodside BRIDGE NO. 35C0055, PORTOLA RD OVER ALEMBIQUE CR, 0.25 MI E OF SH 84. Replace existing two lane bridge with two lane bridge toaccommodate standard lanes and shoulders.

Fund Source Summary:

PER/W

Total 570,136

CON

Total

1,105,838

570,136

30,000 30,000

30,000 1,705,974

570,136

1,105,8381,105,838

Phase Summary:

Fed $

Local AC

Local Match

Total

65,395

570,136

LSSRP Bond

Total26,559 1,510,299

3,441 195,675

30,000 1,705,974

504,741 978,998

126,840

1,105,838

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3790

5333(012)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

65,395

570,136

LSSRP Bond

Total504,741

65,395

570,136

504,741

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total26,559 26,559

3,441 3,441

30,000 30,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total978,998

126,840

1,105,838

978,998

126,840

1,105,838

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 753/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 77: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Woodside BRIDGE NO. 35C0122, MOUNTAIN HOME RD OVER BEAR CREEK, 0.3 MI S OF S.H. 84. Rehabilitate bridge, widen to accommodatestandard lanes and shoulders. No added lane capacity.

Fund Source Summary:

PER/W

Total 107,428

CON

Total

696,004

200,000 307,428

25,000 25,000

225,000 1,028,432

107,428

696,004696,004

Phase Summary:

Fed $

Local AC

Local Match

Total

12,322

107,428

LSSRP Bond

Total199,193 910,471

25,808 117,961

225,000 1,028,432

95,106 616,172

79,832

696,004

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3793

5333(013)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

12,322

107,428

LSSRP Bond

Total177,060 272,166

22,940 35,262

200,000 307,428

95,106

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total22,133 22,133

2,868 2,868

25,000 25,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total616,172

79,832

696,004

616,172

79,832

696,004

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 763/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 78: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Woodside BRIDGE NO. 35C0123, KINGS MOUNTAIN RD OVER WEST UNION CREEK, 0.05 MI E TRIPP RD. Rehabilitate bridge, widen toaccommodate standard lanes, shoulders and bike lane. No added lane capacity

Fund Source Summary:

PER/W

Total 135,090

CON

Total

831,290

200,000 335,090

25,000 25,000

225,000 1,191,380

135,090

831,290831,290

Phase Summary:

Fed $

Local AC

Local Match

Total

15,495

135,090

LSSRP Bond

Total199,193 1,054,729

25,808 136,651

225,000 1,191,380

119,595 735,941

95,349

831,290

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3791

5333(014)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

15,495

135,090

LSSRP Bond

Total177,060 296,655

22,940 38,435

200,000 335,090

119,595

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total22,133 22,133

2,868 2,868

25,000 25,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total735,941

95,349

831,290

735,941

95,349

831,290

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 773/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 79: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 San Mateo

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Woodside BRIDGE NO. 35C0190, OLD LA HONDA ROAD OVER DRAINAGE SWALE, 0.1 MI. W. OF PORTOLA RD.Bridge rehabilitation. Rehabilitate existing bridge to function as a culvert (no added capacity.)

Fund Source Summary:

PER/W

Total 305,445

CON

Total

817,700 817,700

305,445

817,700 1,123,145

305,445

Phase Summary:

Fed $

Local AC

Local Match

Total

35,035

305,445

LSSRP Bond

Total723,910 994,320

93,790 128,825

723,910 -723,910817,700 1,123,145

270,410

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4291

5333(017)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

35,035

305,445

LSSRP Bond

Total270,410

35,035

305,445

270,410

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

-0

LSSRP Bond

Total

-0

-0

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total723,910 723,910

93,790 93,790

723,910 -723,910

817,700 817,700

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 783/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 80: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Cupertino BRIDGE NO. 37C0011, STEVENS CR BLVD OVER STEVENS CREEK, 0.2 MI E/O STEVENS CYN RD. Scour Countermeasures.

Fund Source Summary:

PER/W

Total

CON

Total

630,000

230,000 230,000

230,000 860,000630,000630,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total203,619 761,358

26,381 98,642

230,000 860,000

557,739

72,261

630,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4563

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total203,619 203,619

26,381 26,381

230,000 230,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total557,739

72,261

630,000

557,739

72,261

630,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 793/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 81: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Cupertino BRIDGE NO. PM00132, Bridge Preventive Maintenance Program (BPMP), various bridges in the City of Cupertino. See Caltrans LocalAssistance HBP web site for backup list of bridges.

Fund Source Summary:

PER/W

Total 161,500

CON

Total

483,650 483,650

161,500

483,650 645,150

161,500

Phase Summary:

Fed $

Local AC

Local Match

Total

18,524

161,500

LSSRP Bond

Total428,175 571,151

55,475 73,999

483,650 645,150

142,976

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4309

5318(029)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

18,524

161,500

LSSRP Bond

Total142,976

18,524

161,500

142,976

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total428,175 428,175

55,475 55,475

483,650 483,650

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 803/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 82: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Gilroy BRIDGE NO. PM00109, Bridge Preventive Maintenance Program (BPMP) for various bridges in the City of Gilroy. See Caltrans LocalAssistance HBP website for backup list of projects.

Fund Source Summary:

PER/W

Total

CON

Total

227,909 110,000 337,909227,909 110,000 337,909

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total201,768 97,383 299,151

26,141 12,617 38,758

227,909 110,000 337,909

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4200

5034(026)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

TotalPrior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total201,768 97,383 299,151

26,141 12,617 38,758

227,909 110,000 337,909

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 813/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 83: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Palo Alto BRIDGE NO. 37C0223, NEWELL RD OVER SAN FRANCISQUITO CR, NEAR WOODLAND AVE. Replace existing two-lane bridge with anew two-lane bridge conforming to current standards.

Fund Source Summary:

PER/W

Total 1,174,809

CON

Total

10,389,600

574,146 1,748,955

113,000 113,000

687,146 12,251,555

1,174,809

10,389,60010,389,600

Phase Summary:

Fed $

Local AC

Local Match

Total

134,751

1,174,809

LSSRP Bond

Total608,330 10,846,302

78,816 1,405,253

687,146 12,251,555

1,040,058 9,197,913

1,191,687

10,389,600

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3722

5100(017)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

134,751

1,174,809

LSSRP Bond

Total508,291 1,548,350

65,855 200,605

574,146 1,748,955

1,040,058

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total100,039 100,039

12,961 12,961

113,000 113,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

0

LSSRP Bond

Total9,197,913

1,191,687

10,389,600

9,197,913

1,191,687

10,389,600

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 823/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 84: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

San Jose BRIDGE NO. 37C0033, SANTA CLARA ST, OVER COYOTE CREEK, 0.8 MI W OF SH 101. Replace existing 4 lane bridge with new 4 lanebridge

Fund Source Summary:

PER/W

Total 885,000

CON

Total

4,424,000

885,000

5,309,000

885,000

4,424,0004,424,000

Phase Summary:

Fed $

Local AC

Local Match

Total

101,510

885,000

LSSRP Bond

Total4,700,058

608,942

5,309,000

783,491 3,916,567

507,433

4,424,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3330

5005(089)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

101,510

885,000

LSSRP Bond

Total783,491

101,510

885,000

783,491

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,916,567

507,433

4,424,000

3,916,567

507,433

4,424,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 833/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 85: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

San Jose BRIDGE NO. 37C0757, NOBEL AVE, OVER PENITENCIA CREEK, PENITENCIA CREEK RD. Replace existing 2 lane bridge with new 2 lanebridge 4/5/2010: Toll Credits programmed for PE & Con.

Fund Source Summary:

PER/W

Total

CON

Total

1,856,250

450,000 450,000

450,000 2,306,2501,856,2501,856,250

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total450,000 2,306,250

450,000 2,306,250

1,856,250

1,856,250

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3429

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total450,000 450,000

450,000 450,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,856,250

1,856,250

1,856,250

1,856,250

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 843/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 86: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Santa Clara County BRIDGE NO. 37C0094, UVAS RD, OVER UVAS CREEK, 0.6 MI S/O CROY RD. Replace 2 lane bridge with new 2 lane bridge.

Fund Source Summary:

PER/W

Total

300,000

1,700,000

CON

Total

6,000,000

1,400,000

300,000

7,700,000

1,400,000

6,000,0006,000,000

Phase Summary:

Fed $

Local AC

Local Match

Total

194,990

1,700,000

LSSRP Bond

Total6,816,810

883,190

7,700,000

1,505,010 5,311,800

688,200

6,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1710

5937(123)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

160,580

1,400,000

LSSRP Bond

Total1,239,420

160,580

1,400,000

1,239,420

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

34,410

300,000

LSSRP Bond

Total265,590

34,410

300,000

265,590

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,311,800

688,200

6,000,000

5,311,800

688,200

6,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 853/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 87: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Santa Clara County BRIDGE NO. 37C0095, UVAS RD, OVER LITTLE UVAS CREEK, 0.2 MI N/O CROY RD. Replace 2 lane bridge with new 2 lane bridge.

Fund Source Summary:

PER/W

Total

40,000

2,315,000

CON

Total

9,054,602

2,275,000

410,000 450,000

410,000 11,779,602

2,275,000

9,054,6029,054,602

Phase Summary:

Fed $

Local AC

Local Match

Total

265,531

2,315,000

LSSRP Bond

Total362,973 10,428,482

47,027 1,351,120

410,000 11,779,602

2,049,470 8,016,039

1,038,563

9,054,602

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1711

5937(124)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

260,943

2,275,000

LSSRP Bond

Total2,014,058

260,943

2,275,000

2,014,058

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

4,588

40,000

LSSRP Bond

Total362,973 398,385

47,027 51,615

410,000 450,000

35,412

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total8,016,039

1,038,563

9,054,602

8,016,039

1,038,563

9,054,602

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 863/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 88: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Santa Clara County BRIDGE NO. 37C0096, UVAS RD, OVER LLAGAS CREEK, 1.0 MI N/O OAK GLEN AV. Replace 2 lane bridge with new 2 lane bridge.

Fund Source Summary:

PER/W

Total

300,000

1,740,000

CON

Total

6,603,328

1,440,000

300,000

8,343,328

1,440,000

6,603,3286,603,328

Phase Summary:

Fed $

Local AC

Local Match

Total

199,578

1,740,000

LSSRP Bond

Total7,386,348

956,980

8,343,328

1,540,422 5,845,926

757,402

6,603,328

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1709

5937(106)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

165,168

1,440,000

LSSRP Bond

Total1,274,832

165,168

1,440,000

1,274,832

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

34,410

300,000

LSSRP Bond

Total265,590

34,410

300,000

265,590

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,845,926

757,402

6,603,328

5,845,926

757,402

6,603,328

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 873/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 89: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Santa Clara County BRIDGE NO. 37C0159, ALAMITOS RD, OVER ALAMITOS CREEK, 0.8 MI S OF ALMADEN. Replace 2 lane bridge with new 2 lane bridge.4/5/2010: Toll Credits programmed for R/W & Con.

Fund Source Summary:

PER/W

Total 1,053,596

CON

Total

9,000,000 9,000,000

1,053,596

9,000,000 10,053,596

1,053,596

Phase Summary:

Fed $

Local AC

Local Match

Total

210,719

1,053,596

LSSRP Bond

Total9,000,000 9,842,877

210,719

9,000,000 10,053,596

842,877

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1221

5937(058)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

210,719

1,053,596

LSSRP Bond

Total842,877

210,719

1,053,596

842,877

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

TotalPrior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total9,000,000 9,000,000

9,000,000 9,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 883/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 90: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Santa Clara County BRIDGE NO. 37C0172, NEW AVE, OVER RED FOX CREEK, 1.6 MI N LEAVESLY ROAD. Bridge Replacement 4/5/2010: Toll Creditsprogrammed for PE & Con. 10/3/2011: Toll credits used for R/W. Replace two-lane with two-lane bridge.

Fund Source Summary:

PER/W

Total 500,000

CON

Total

4,749,196

600,000 1,100,000

80,000 420,000 500,000

80,000 1,020,000 6,349,196

500,000

4,749,1964,749,196

Phase Summary:

Fed $

Local AC

Local Match

Total 500,000

LSSRP Bond

Total1,100,000 6,349,196

80,000 -80,00080,000 1,020,000 6,349,196

500,000 4,749,196

4,749,196

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

189

5937(182)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 500,000

LSSRP Bond

Total600,000 1,100,000

600,000 1,100,000

500,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total500,000 500,000

80,000 -80,000

80,000 420,000 500,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,749,196

4,749,196

4,749,196

4,749,196

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 893/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 91: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Santa Clara County BRIDGE NO. 37C0501, ALAMITOS RD OVER HERBERT CREEK, 0.7 MI W OF HICKS RD. Replace existing one-lane bridge with a newtwo-lane bridge (non-capacity increasing), 9/28/2015: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 580,000

CON

Total

3,500,000 3,500,000

200,000 780,000

50,000 50,000

250,000 3,500,000 4,330,000

580,000

Phase Summary:

Fed $

Local AC

Local Match

Total 580,000

LSSRP Bond

Total250,000 3,500,000 4,330,000

250,000 3,500,000 4,330,000

580,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4300

5937(210)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 580,000

LSSRP Bond

Total200,000 780,000

200,000 780,000

580,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total50,000 50,000

50,000 50,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,500,000 3,500,000

3,500,000 3,500,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 903/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 92: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Santa Clara County BRIDGE NO. 37C0502, ALAMITOS RD OVER HERBERT CREEK, 0.9 MI SW OF JCT HICKS RD. Replace existing one-lane bridge with anew two-lane bridge.(non capacity increasing) 10/20/2015: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 539,825

CON

Total

3,500,000 3,500,000

200,000 739,825

50,000 50,000

250,000 3,500,000 4,289,825

539,825

Phase Summary:

Fed $

Local AC

Local Match

Total 539,825

LSSRP Bond

Total250,000 3,500,000 4,289,825

250,000 3,500,000 4,289,825

539,825

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4280

5937(211)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 539,825

LSSRP Bond

Total200,000 739,825

200,000 739,825

539,825

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total50,000 50,000

50,000 50,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,500,000 3,500,000

3,500,000 3,500,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 913/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 93: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Santa Clara County BRIDGE NO. 37C0503, ALAMITOS RD OVER HERBERT CREEK, 1.1 MI SW JET OF HICK RD. Replace existing one-lane bridge with a newtwo-lane bridge, (not capacity increasing) 10/20/2015: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 541,825

CON

Total

3,500,000 3,500,000

200,000 741,825

50,000 50,000

250,000 3,500,000 4,291,825

541,825

Phase Summary:

Fed $

Local AC

Local Match

Total 541,825

LSSRP Bond

Total250,000 3,500,000 4,291,825

250,000 3,500,000 4,291,825

541,825

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4281

5937(212)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 541,825

LSSRP Bond

Total200,000 741,825

200,000 741,825

541,825

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total50,000 50,000

50,000 50,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,500,000 3,500,000

3,500,000 3,500,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 923/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 94: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Santa Clara County BRIDGE NO. 37C0506, ALDERCROFT HTS RD OVER HOOKER CREEK, 2.12 MI S LOS GATOS SC RD. Replace existing one-lane bridgewith a new two-lane bridge, (not capacity increasing) 10/20/2015: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 600,000

CON

Total

3,181,000

200,000 800,000

300,000 300,000

500,000 4,281,000

600,000

3,181,0003,181,000

Phase Summary:

Fed $

Local AC

Local Match

Total 600,000

LSSRP Bond

Total500,000 4,281,000

500,000 4,281,000

600,000 3,181,000

3,181,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4277

5937(205)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 600,000

LSSRP Bond

Total200,000 800,000

200,000 800,000

600,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total300,000 300,000

300,000 300,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,181,000

3,181,000

3,181,000

3,181,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 933/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 95: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Santa Clara County BRIDGE NO. 37C0507, ALDERCROFT HTS RD OVER LOS GATOS CREEK, 2.12 MI S LOS GATOS SC RD. Replace existing one-lane bridgeto a new two-lane bridge,(not capacity increasing) 10/20/2015: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 600,000

CON

Total

3,645,000 3,645,000

200,000 800,000

300,000 300,000

500,000 3,645,000 4,745,000

600,000

Phase Summary:

Fed $

Local AC

Local Match

Total 600,000

LSSRP Bond

Total500,000 3,645,000 4,745,000

500,000 3,645,000 4,745,000

600,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4276

5937(206)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 600,000

LSSRP Bond

Total200,000 800,000

200,000 800,000

600,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total300,000 300,000

300,000 300,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,645,000 3,645,000

3,645,000 3,645,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 943/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 96: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Santa Clara County BRIDGE NO. 37C0508, ALDERCROFT HTS RD OVER LOS GATOS CREEK, 2.38 MI S LOS GATOS SC RD. Replace existing one-lanebridge with a new two-lane bridge, (not capacity increasing) 10/20/2015: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 600,000

CON

Total

4,000,000 4,000,000

200,000 800,000

300,000 300,000

500,000 4,000,000 5,100,000

600,000

Phase Summary:

Fed $

Local AC

Local Match

Total 600,000

LSSRP Bond

Total500,000 4,000,000 5,100,000

500,000 4,000,000 5,100,000

600,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4275

5937(207)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 600,000

LSSRP Bond

Total200,000 800,000

200,000 800,000

600,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total300,000 300,000

300,000 300,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,000,000 4,000,000

4,000,000 4,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 953/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 97: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Santa Clara County BRIDGE NO. 37C0574, STEVENS CYN RD, OVER STEVENS CREEK, 2.5 MI SW/O MT EDEN RD. Replace 2 lane bridge with new 2 lanebridge. 4/1/2010: Toll Credits programmed for R/W, & Con.

Fund Source Summary:

PER/W

Total 3,159,600

CON

Total

2,559,600 213,358 2,772,958

600,000

213,358 3,372,958

600,000

Phase Summary:

Fed $

Local AC

Local Match

Total

68,820

3,159,600

LSSRP Bond

Total213,358 3,304,138

68,820

213,358 3,372,958

3,090,780

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1378

5937(107)5937(208)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

68,820

600,000

LSSRP Bond

Total531,180

68,820

600,000

531,180

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

TotalPrior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total 2,559,600

LSSRP Bond

Total213,358 2,772,958

213,358 2,772,958

2,559,600

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 963/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 98: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Santa Clara County BRIDGE NO. 37C0575, STEVENS CYN RD, OVER STEVENS CREEK, 2.7 MI SW/O MT EDEN RD. Replace 2 lane bridge with new 2 lanebridge. 4/1/2010: Toll Credits programmed for R/W, & Con.

Fund Source Summary:

PER/W

Total 3,571,000

CON

Total

2,971,000 141,347 3,112,347

600,000

141,347 3,712,347

600,000

Phase Summary:

Fed $

Local AC

Local Match

Total

68,820

3,571,000

LSSRP Bond

Total141,347 3,643,527

68,820

141,347 3,712,347

3,502,180

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1377

5937(109)5937(209)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

68,820

600,000

LSSRP Bond

Total531,180

68,820

600,000

531,180

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

TotalPrior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total 2,971,000

LSSRP Bond

Total141,347 3,112,347

141,347 3,112,347

2,971,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 973/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 99: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Saratoga BRIDGE NO. 37C0114 & 37C0113, QUITO RD, OVER SAN TOMAS CREEK, NORTH AND SOUTH OF OLD ADOBE RD. Replace 2 lanebridges with new 2 lane bridges.

Fund Source Summary:

PER/W

Total

400,000

1,239,500

CON

Total

3,490,001 3,490,001

839,500

400,000

3,490,001 4,729,501

839,500

Phase Summary:

Fed $

Local AC

Local Match

Total

213,780

1,239,500

LSSRP Bond

Total3,089,698 4,115,418

400,303 614,083

3,490,001 4,729,501

1,025,720

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

932

5332(004)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

167,900

839,500

LSSRP Bond

Total671,600

167,900

839,500

671,600

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

45,880

400,000

LSSRP Bond

Total354,120

45,880

400,000

354,120

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,089,698 3,089,698

400,303 400,303

3,490,001 3,490,001

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 983/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 100: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Saratoga BRIDGE NO. 37C0294, 4TH ST, OVER SARATOGA CREEK, NEAR BASIN WAY. Replace deck, railings, widen lanes & shoulders, newsidewalks. No added lane capacity.

Fund Source Summary:

PER/W

Total 105,000

CON

Total

435,000

250,000 355,000

10,000 10,000

260,000 800,000

105,000

435,000435,000

Phase Summary:

Fed $

Local AC

Local Match

Total

12,044

105,000

LSSRP Bond

Total230,178 708,240

29,822 91,760

260,000 800,000

92,957 385,106

49,895

435,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1793

5332(020)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

12,044

105,000

LSSRP Bond

Total221,325 314,282

28,675 40,719

250,000 355,000

92,957

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total8,853 8,853

1,147 1,147

10,000 10,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total385,106

49,895

435,000

385,106

49,895

435,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 993/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 101: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Santa Clara

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sunnyvale BRIDGE NO. 37C0765, FAIROAKS AVE, OVER CALTRAIN,UP RR, HENDY AVE. Bridge rehabilitation. No adding lane capacity.

Fund Source Summary:

PER/W

Total

1,985,000

4,926,000

CON

Total

17,365,000 5,706,436 23,071,436

2,941,000

1,339,505 3,324,505

18,704,505 5,706,436 29,336,941

2,941,000

Phase Summary:

Fed $

Local AC

Local Match

Total

565,012

4,926,000

LSSRP Bond

Total16,559,098 5,051,908 25,971,994

2,145,407 654,528 3,364,947

16,559,098 -16,559,09818,704,505 5,706,436 29,336,941

4,360,988

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3262

5213(039)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

337,333

2,941,000

LSSRP Bond

Total2,603,667

337,333

2,941,000

2,603,667

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

227,680

1,985,000

LSSRP Bond

Total1,185,864 2,943,184

153,641 381,321

1,185,864 -1,185,864

1,339,505 3,324,505

1,757,321

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total15,373,235 5,051,908 20,425,142

1,991,766 654,528 2,646,294

15,373,235 -15,373,235

17,365,000 5,706,436 23,071,436

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1003/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 102: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Solano

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Solano County BRIDGE NO. 23C0092, STEVENSON BR RD, OVER PUTAH CREEK, SOL/YOL CO LINE. Bridge rehabilitation. No adding lane capacity.

Fund Source Summary:

PER/W

Total

500,000

1,800,000

CON

Total

6,372,000

428,000 1,728,000

500,000

428,000 8,600,000

1,300,000

6,372,0006,372,000

Phase Summary:

Fed $

Local AC

Local Match

Total

317,350

1,800,000

LSSRP Bond

Total342,400 7,466,182

85,600 1,133,818

428,000 8,600,000

1,482,650 5,641,132

730,868

6,372,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1498

5923(059)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

260,000

1,300,000

LSSRP Bond

Total342,400 1,382,400

85,600 345,600

428,000 1,728,000

1,040,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

57,350

500,000

LSSRP Bond

Total442,650

57,350

500,000

442,650

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,641,132

730,868

6,372,000

5,641,132

730,868

6,372,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1013/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 103: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Solano

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Solano County BRIDGE NO. 23C0118, MAIN PRAIRIE RD OVER ULATIS CREEK, 0.3 MI E OF RTE 113. Replace existing 2-lane bridge with a new 2-lanebridge. Chien Wu, 3/3/2017 10:09:01 AM.

Fund Source Summary:

PER/W

Total

CON

Total

3,873,800

691,750 691,750

100,000

691,750 4,665,5503,873,800

100,000

3,973,800

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total612,406 4,130,411

79,344 535,139

691,750 4,665,550

3,518,005

455,795

3,973,800

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4524

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total612,406 612,406

79,344 79,344

691,750 691,750

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530

11,470

100,000

88,530

11,470

100,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,429,475

444,325

3,873,800

3,429,475

444,325

3,873,800

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1023/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 104: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Solano

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Vacaville BRIDGE NO. 23C0011, BUCK AVE OVER ALAMO CREEK, 0.1 MI E OF ALAMO AVE. Replace existing two-lane bridge with a new two-lanebridge.

Fund Source Summary:

PER/W

Total 716,512

CON

Total

3,926,000 3,926,000

13,560 89,928 820,000

20,000 101,001 15,999 137,000

20,000 4,040,561 105,927 4,883,000

716,512

Phase Summary:

Fed $

Local AC

Local Match

Total

82,184

716,512

LSSRP Bond

Total17,706 101,421 3,569,465 4,322,920

2,294 463,452 12,150 560,080

3,475,688 -3,475,68820,000 4,040,561 105,927 4,883,000

634,328

-0

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3944

5094(057)5094(066)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total

82,184

716,512

LSSRP Bond

Total12,005 79,613 725,946

1,555 10,315 94,054

13,560 89,928 820,000

634,328

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total17,706 89,416 14,164 121,286

2,294 11,585 1,835 15,714

20,000 101,001 15,999 137,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

0

LSSRP Bond

Total3,475,688 3,475,688

450,312 450,312

3,475,688 -3,475,688

3,926,000 3,926,000

-0

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1033/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 105: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Solano

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Vacaville BRIDGE NO. 23C0236, ALDRIDGE RD OVER PUTAH SOUTH CANAL, 500 W EUBANKS DR . 10/22/2015: Replace existing 2-lane bridge with new 2-lane bridge. No added capacity. 5/9/2012: Toll Credits programmed for PE, R/W, &CON.

Fund Source Summary:

PER/W

Total 671,812

CON

Total

2,291,498

671,812

30,000 30,000

30,000 2,993,310

671,812

2,291,4982,291,498

Phase Summary:

Fed $

Local AC

Local Match

Total 671,812

LSSRP Bond

Total30,000 2,993,310

30,000 2,993,310

671,812 2,291,498

2,291,498

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3943

5094(058)5094(065)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total 671,812

LSSRP Bond

Total671,812

671,812

671,812

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total30,000 30,000

30,000 30,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total2,291,498

2,291,498

2,291,498

2,291,498

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1043/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 106: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Solano

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Vallejo BRIDGE NO. 23C0152, SACRAMENTO ST, OVER US NAVY RR, BTWN ILLINOIS FARRAGUT ST. Scope changed to replacement. Replaceexisting two-lane bridge with a new two-lane bridge. No added lane capacity. Seismic funds used for portion of the project.

Fund Source Summary:

PER/W

Total

380,000

1,369,000

CON

Total

8,087,000 8,087,000

159,000 1,148,000

175,000 555,000

334,000 8,087,000 9,790,000

989,000

Phase Summary:

Fed $

Local AC

Local Match

Total

157,024

1,369,000

LSSRP Bond

Total

218,504 218,504

295,690 7,159,421 8,667,087

38,310 709,075 904,410

334,000 8,087,000 9,790,000

1,211,976

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

2041

5030(056)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

113,438

989,000

LSSRP Bond

Total140,763 1,016,324

18,237 131,676

159,000 1,148,000

875,562

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

43,586

380,000

LSSRP Bond

Total154,928 491,342

20,073 63,659

175,000 555,000

336,414

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

218,504 218,504

7,159,421 7,159,421

709,075 709,075

8,087,000 8,087,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1053/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 107: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Solano

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Vallejo BRIDGE NO. 23C0248, G STREET, OVER NAPA RIVER, 1 MILE WEST OF SR 29. Bridge Preventive Maintenance (Painting, applyingMethacrylate, piles and boards of fender system repairs, replacing anodes at Piers 26 and 27).

Fund Source Summary:

PER/W

Total 494,280

CON

Total

10,011,400

701,220 1,195,500

701,220 11,206,900

494,280

10,011,40010,011,400

Phase Summary:

Fed $

Local AC

Local Match

Total

56,694

494,280

LSSRP Bond

Total620,790 9,921,469

80,430 1,285,431

701,220 11,206,900

437,586 8,863,092

1,148,308

10,011,400

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4240

5030(060)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

56,694

494,280

LSSRP Bond

Total620,790 1,058,376

80,430 137,124

701,220 1,195,500

437,586

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total8,863,092

1,148,308

10,011,400

8,863,092

1,148,308

10,011,400

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1063/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 108: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Petaluma BRIDGE NO. 20C0045, WASHINGTON ST OVER PETALUMA RIVER, NEAR DOWNTOWN PETALUMA. Voluntary seismic retrofit project.

Fund Source Summary:

PER/W

Total 250,000

CON

Total

1,680,000

80,000 546,000 876,000

80,000 546,000 2,556,000

250,000

1,680,0001,680,000

Phase Summary:

Fed $

Local AC

Local Match

Total

28,675

250,000

LSSRP Bond

Total70,824 483,374 2,262,827

9,176 62,626 293,173

80,000 546,000 2,556,000

221,325 1,487,304

192,696

1,680,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3570

5022(050)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

28,675

250,000

LSSRP Bond

Total70,824 483,374 775,523

9,176 62,626 100,477

80,000 546,000 876,000

221,325

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,487,304

192,696

1,680,000

1,487,304

192,696

1,680,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1073/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 109: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma BRIDGE NO. 20C0497, CHASE ST OVER NATHANSON CREEK, 0.1 MI E SR 12 SONOMA. Replace existing two lane bridge with two lanebridge widened to accommodate shoulders and sidewalks.

Fund Source Summary:

PER/W

Total

90,000

501,079

CON

Total

1,809,266 1,809,266

411,079

30,000 120,000

1,809,266 30,000 2,340,345

411,079

Phase Summary:

Fed $

Local AC

Local Match

Total

57,474

501,079

LSSRP Bond

Total1,601,743 26,559 2,071,907

207,523 3,441 268,438

1,809,266 30,000 2,340,345

443,605

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3643

5114(016)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

47,151

411,079

LSSRP Bond

Total363,928

47,151

411,079

363,928

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

10,323

90,000

LSSRP Bond

Total26,559 106,236

3,441 13,764

30,000 120,000

79,677

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,601,743 1,601,743

207,523 207,523

1,809,266 1,809,266

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1083/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 110: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. 20C0005, GEYSERS RD, OVER BIG SULPHUR CREEK, 18.6 MI N OF SH 128. Replace 1 lane bridge with 2 lane bridge.(LSSRP Seismic) 10/11/2011: Toll credits used for R/W. Toll credits used for CON.

Fund Source Summary:

PER/W

Total 1,208,387

CON

Total

6,766,964

1,208,387

100,000 100,000

100,000 8,075,351

1,208,387

6,766,9646,766,964

Phase Summary:

Fed $

Local AC

Local Match

Total

138,602

1,208,387

LSSRP Bond

Total100,000 7,936,749

138,602

100,000 8,075,351

1,069,785 6,766,964

6,766,964

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1993

5920(111)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

138,602

1,208,387

LSSRP Bond

Total1,069,785

138,602

1,208,387

1,069,785

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total100,000 100,000

100,000 100,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total6,766,964

6,766,964

6,766,964

6,766,964

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1093/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 111: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. 20C0017, WATMAUGH ROAD, OVER SONOMA CREEK, 0.3 MI W HWY 12. Replace 2 lane bridge with new 2 lane bridge.(minor seismic contribution)

Fund Source Summary:

PER/W

Total 900,000

CON

Total

6,812,000 6,812,000

567,000 1,467,000

250,000 250,000

250,000 567,000 6,812,000 8,529,000

900,000

Phase Summary:

Fed $

Local AC

Local Match

Total

103,230

900,000

LSSRP Bond

Total

50,529 50,529

221,325 501,965 6,030,664 7,550,724

28,675 65,035 730,808 927,748

250,000 567,000 6,812,000 8,529,000

796,770

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1160

5920(092)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

103,230

900,000

LSSRP Bond

Total501,965 1,298,735

65,035 168,265

567,000 1,467,000

796,770

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

0

LSSRP Bond

Total221,325 221,325

28,675 28,675

250,000 250,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

50,529 50,529

6,030,664 6,030,664

730,808 730,808

6,812,000 6,812,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1103/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 112: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. 20C0018, BOHEMIAN HWY, OVER RUSSIAN RIVER, AT MONTE RIO. Replace the two lane bridge with a new two lane bridgeas LSSRP Seismic Retrofit strategy.

Fund Source Summary:

PER/W

Total 2,977,500

CON

Total

16,674,000

1,000,000 3,977,500

400,000 400,000

1,000,000 400,000 21,051,500

2,977,500

16,674,00016,674,000

Phase Summary:

Fed $

Local AC

Local Match

Total

341,519

2,977,500

LSSRP Bond

Total

45,880 1,958,388

885,300 354,120 18,636,893

114,700 456,219

1,000,000 400,000 21,051,500

2,635,981

1,912,508

14,761,492

16,674,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1999

5920(135)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

341,519

2,977,500

LSSRP Bond

Total885,300 3,521,281

114,700 456,219

1,000,000 3,977,500

2,635,981

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

45,880 45,880

354,120 354,120

400,000 400,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

1,912,508

14,761,492

16,674,000

1,912,508

14,761,492

16,674,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1113/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 113: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. 20C0139, WOHLER RD, OVER MARK WEST CREEK, NEAR RIVER RD. Bridge Replacement, no added lane capacity 4/5/2010:Toll Credits programmed for R/W & Con. LSSRP

Fund Source Summary:

PER/W

Total

100,000

865,000

CON

Total

6,659,000 6,659,000

609,161 1,374,161

220,458 320,458

7,488,619 8,353,619

765,000

Phase Summary:

Fed $

Local AC

Local Match

Total

153,000

865,000

LSSRP Bond

Total707,787 6,659,000 8,078,787

121,832 274,832

6,659,000 -6,659,0007,488,619 8,353,619

712,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

2007

5920(056)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

153,000

765,000

LSSRP Bond

Total487,329 1,099,329

121,832 274,832

609,161 1,374,161

612,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total 100,000

LSSRP Bond

Total220,458 320,458

220,458 320,458

100,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total6,659,000 6,659,000

6,659,000 -6,659,000

6,659,000 6,659,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1123/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 114: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. 20C0155, WOHLER RD, OVER RUSSIAN RIVER, 1.5 MI FROM RIVER RD. LSSRP Seismic Retrofit. 11/13/2012: Toll creditsused for PE. 10/18/2017: Toll credits used for R/W.

Fund Source Summary:

PER/W

Total 1,650,000

CON

Total

13,875,880 13,875,880

1,650,000

100,000 150,000 250,000

100,000 150,000 13,875,880 15,775,880

1,650,000

Phase Summary:

Fed $

Local AC

Local Match

Total 1,650,000

LSSRP Bond

Total

1,591,563 1,591,563

250,000 12,284,317 14,184,317

100,000 -100,000100,000 150,000 13,875,880 15,775,880

1,650,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

2011

5920(137)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 1,650,000

LSSRP Bond

Total1,650,000

1,650,000

1,650,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total250,000 250,000

100,000 -100,000

100,000 150,000 250,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

1,591,563 1,591,563

12,284,317 12,284,317

13,875,880 13,875,880

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1133/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 115: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. 20C0227, GEYSERS RD, OVER FRASIER CREEK, 20.4 MI N OF ST HWY 128. Replace deficient 2-lane bridge with new 2-lanebridge meeting current geometrics standards. 9/14/2010: Toll credits for all phases.

Fund Source Summary:

PER/W

Total 811,250

CON

Total

4,543,000

350,000 1,161,250

80,000 80,000

430,000 5,784,250

811,250

4,543,0004,543,000

Phase Summary:

Fed $

Local AC

Local Match

Total 811,250

LSSRP Bond

Total430,000 5,784,250

430,000 5,784,250

811,250 4,543,000

4,543,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3626

5920(129)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 811,250

LSSRP Bond

Total350,000 1,161,250

350,000 1,161,250

811,250

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total80,000 80,000

80,000 80,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,543,000

4,543,000

4,543,000

4,543,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1143/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 116: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. 20C0242, CHALK HILL RD, OVER MAACAMA CREEK, 1 MI S OF ST HWY 128. Replace one-lane bridge with two-lane bridge.11/10/2010: Toll credits used for PE, R/W, and CON.

Fund Source Summary:

PER/W

Total 1,289,180

CON

Total

12,936,000

1,510,820 2,800,000

250,000 250,000

1,510,820 250,000 15,986,000

1,289,180

12,936,00012,936,000

Phase Summary:

Fed $

Local AC

Local Match

Total 1,289,180

LSSRP Bond

Total1,510,820 250,000 15,986,000

1,510,820 250,000 15,986,000

1,289,180 12,936,000

12,936,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

2016

5920(049)5920(118)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total 1,289,180

LSSRP Bond

Total1,510,820 2,800,000

1,510,820 2,800,000

1,289,180

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total250,000 250,000

250,000 250,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total12,936,000

12,936,000

12,936,000

12,936,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1153/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 117: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. 20C0248, LAMBERT BRIDGE RD, OVER DRY CREEK, 0.4 MI W OF DRY CREEK RD. Replace one-lane bridge with two-lanebridge. Formerly LSSRP Seismic Retrofit 11/10/2010: Toll credits used for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 1,068,750

CON

Total

5,985,000

1,068,750

250,000 250,000

250,000 7,303,750

1,068,750

5,985,0005,985,000

Phase Summary:

Fed $

Local AC

Local Match

Total 1,068,750

LSSRP Bond

Total250,000 7,303,750

250,000 7,303,750

1,068,750 5,985,000

5,985,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

2017

5920(050)5920(138)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total 1,068,750

LSSRP Bond

Total1,068,750

1,068,750

1,068,750

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total250,000 250,000

250,000 250,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,985,000

5,985,000

5,985,000

5,985,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1163/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 118: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. 20C0262, BOYES BLVD, OVER SONOMA CREEK, JUST EAST OF RIVERSIDE DR. Replace 2 lane bridge with 2 lane bridgewith LBSRP contribution.

Fund Source Summary:

PER/W

Total

550,000

1,537,369

CON

Total

5,672,353 5,672,353

719,529 1,706,898

255,915 805,915

6,647,797 8,185,166

987,369

Phase Summary:

Fed $

Local AC

Local Match

Total

260,559

1,537,369

LSSRP Bond

Total

73,809 73,809

802,185 5,021,734 7,100,729

823,878 -73,809 0 1,010,627

5,021,734 -5,021,7346,647,797 8,185,166

1,276,810

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

1827

5920(059)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

197,474

987,369

LSSRP Bond

Total575,623 1,365,518

143,906 341,380

719,529 1,706,898

789,895

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

63,085

550,000

LSSRP Bond

Total226,562 713,477

29,353 92,438

255,915 805,915

486,915

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

73,809 73,809

5,021,734 5,021,734

650,619 -73,809 0 576,809

5,021,734 -5,021,734

5,672,353 5,672,353

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1173/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 119: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. 20C0326, FRANZ VALLEY SCH RD, OVER FRANZ CREEK, JUST N/O FRANZ RD. Replace existing 2-lane bridge with new2-lane bridge. Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 500,750

CON

Total

3,000,000

250,000 750,750

100,000 100,000

350,000 3,850,750

500,750

3,000,0003,000,000

Phase Summary:

Fed $

Local AC

Local Match

Total 500,750

LSSRP Bond

Total350,000 3,850,750

350,000 3,850,750

500,750 3,000,000

3,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4237

5920(149)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 500,750

LSSRP Bond

Total250,000 750,750

250,000 750,750

500,750

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total100,000 100,000

100,000 100,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,000,000

3,000,000

3,000,000

3,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1183/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 120: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. 20C0406, RIVER ROAD OVER GILL CREEK, 2.0 MI NW OF SR 128. Replace existing two-lane bridge with new two-lane bridge.Chien Wu, 3/14/2014 2:55:46 PM. 3/20/2014: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 868,250

CON

Total

4,862,220

200,000 1,068,250

120,000 120,000

320,000 6,050,470

868,250

4,862,2204,862,220

Phase Summary:

Fed $

Local AC

Local Match

Total 868,250

LSSRP Bond

Total320,000 6,050,470

320,000 6,050,470

868,250 4,862,220

4,862,220

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4197

5920(144)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 868,250

LSSRP Bond

Total200,000 1,068,250

200,000 1,068,250

868,250

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total120,000 120,000

120,000 120,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,862,220

4,862,220

4,862,220

4,862,220

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1193/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 121: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. 20C0407, WEST DRY CREEK RD, OVER PENA CREEK, 0.7 MI NW YOAKIM BR RD. Replace one-lane bridge with two-lanebridge. Formerly LSSRP Seismic Retrofit 4/26/2010: Toll Credits programmed for PE, R/W & Con.

Fund Source Summary:

PER/W

Total 540,000

CON

Total

4,000,000

300,000 840,000

250,000 250,000

550,000 5,090,000

540,000

4,000,0004,000,000

Phase Summary:

Fed $

Local AC

Local Match

Total 540,000

LSSRP Bond

Total550,000 5,090,000

550,000 5,090,000

540,000 4,000,000

4,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

2020

5920(139)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 540,000

LSSRP Bond

Total300,000 840,000

300,000 840,000

540,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total250,000 250,000

250,000 250,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,000,000

4,000,000

4,000,000

4,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1203/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 122: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. 20C0433, KING RIDGE RD, OVER BIG AUSTIN CREEK, 2.3 MI N FORT ROSS RD. Replace one lane bridge to two-lane bridge4/1/2010: Toll Credits programmed for PE, R/W, & Con.

Fund Source Summary:

PER/W

Total 628,000

CON

Total

5,000,000

200,000 828,000

150,000 150,000

350,000 5,978,000

628,000

5,000,0005,000,000

Phase Summary:

Fed $

Local AC

Local Match

Total 628,000

LSSRP Bond

Total350,000 5,978,000

350,000 5,978,000

628,000 5,000,000

5,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3319

5920(106)5920(146)

Project #:

PE Summary:Fed $

Local AC

Local Match

Total 628,000

LSSRP Bond

Total200,000 828,000

200,000 828,000

628,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total150,000 150,000

150,000 150,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,000,000

5,000,000

5,000,000

5,000,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1213/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 123: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. 20C0440, FREESTONE FLAT RD OVER SALMON CREEK, 0.2 MI E BOHEMIAN HWY. Replace existing one-lane bridge withnew two-lane bridge. 10/4/2010: Toll credits used for PE.

Fund Source Summary:

PER/W

Total 562,500

CON

Total

3,150,000

478,000 1,040,500

400,000 400,000

878,000 4,590,500

562,500

3,150,0003,150,000

Phase Summary:

Fed $

Local AC

Local Match

Total 562,500

LSSRP Bond

Total878,000 4,590,500

878,000 4,590,500

562,500 3,150,000

3,150,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

3707

5920(127)Project #:

PE Summary:Fed $

Local AC

Local Match

Total 562,500

LSSRP Bond

Total478,000 1,040,500

478,000 1,040,500

562,500

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

R/W Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total400,000 400,000

400,000 400,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,150,000

3,150,000

3,150,000

3,150,000

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1223/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 124: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Sonoma County BRIDGE NO. PM00101, Bridge Preventive Maintenance Program (BPMP) for various bridges in the County of Sonoma. See Caltrans LocalAssistance HBP website for backup list of projects.

Fund Source Summary:

PER/W

Total 182,642

CON

Total

547,925

182,642

730,567

182,642

547,925547,925

Phase Summary:

Fed $

Local AC

Local Match

Total

20,949

182,642

LSSRP Bond

Total646,771

83,796

730,567

161,693 485,078

62,847

547,925

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

4165

5920(163)Project #:

PE Summary:Fed $

Local AC

Local Match

Total

20,949

182,642

LSSRP Bond

Total161,693

20,949

182,642

161,693

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

CON Summary:Fed $

Local AC

Local Match

Total

LSSRP Bond

Total485,078

62,847

547,925

485,078

62,847

547,925

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

Caltrans, Division of Local Assistance Page 1233/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 125: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

2018/19-2023/24 Highway Bridge Program

District: County:Responsible Agency

04 Sonoma

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Number of Projects:

MPO Summary:

Fed $

Local AC

Local Match

Total for all Phases

44,880,564

18,046,960

191,907,003

LSSRP Bond

Total

32,690 13,411 305,503 11,470 1,637,443 50,529 5,284,223

26,850,372 67,510,043 31,350,886 31,524,002 20,388,437 58,725,276 752,287,241

4,498,104 11,723,228 1,450,088 2,529,403 4,264,015 65,502,299

16,259,867 27,470,836 -12,825,030 -1,421,037

47,621,754 107,009,610 19,975,944 32,643,838 22,025,880 63,039,820 823,073,764

128,946,790

3,233,178

386,991,436

22,990,501

-74,365,200

338,849,915

Totals:

Metropolitan Transportation Commission

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond

122

Caltrans, Division of Local Assistance Page 1243/31/2020, 1:07 PM Det2 FL4 SmlTxt brf

Page 126: GL: Highway Bridge Program (TIP ID – VAR170012) - GL HBP.pdf · HBP-ID Project Description Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O

Modifications Made to Programming Totals

Source Prior FY17 FY18 FY19 FY20 FY21 FY22 Beyond TotalFed $ $78,133,378 $28,566,694 $44,585,820 $26,850,372 $67,510,043 $31,350,886 $31,524,002 $466,105,149 $774,626,344Local Match $9,897,730 $2,445,962 $5,632,522 $4,498,104 $11,723,228 $1,450,088 $2,529,403 $27,254,516 $65,431,553LSSRP Bond $108,965 $1,182,557 $13,411 $305,503 $11,470 $4,921,150 $6,543,056Local AC $15,521,149 $12,102,308 $16,259,867 $27,470,836 -$12,825,030 -$1,421,037 -$74,365,200 -$17,257,107Total for all Phases $103,661,222 $31,012,656 $63,503,207 $47,621,754 $107,009,610 $19,975,944 $32,643,838 $423,915,615 $829,343,846

Source Prior FY17 FY18 FY19 FY20 Beyond TotalFed $ -$78,133,378 -$78,133,378Local Match -$9,897,730 -$9,897,730LSSRP Bond -$108,965 -$108,965Local AC -$15,521,149 $12,825,030 $1,421,037 $74,365,200 $73,090,118Total for all Phases -$103,661,222 $12,825,030 $74,365,200 -$15,049,955

Source Prior FY17 FY18 FY19 FY20 FY21 FY22 Beyond TotalFed $ $28,566,694 $44,585,820 $26,850,372 $67,510,043 $31,350,886 $31,524,002 $466,105,149 $696,492,966Local Match $2,445,962 $5,632,522 $4,498,104 $11,723,228 $1,450,088 $2,529,403 $27,254,516 $55,533,823LSSRP Bond $1,182,557 $13,411 $305,503 $11,470 $4,921,150 $6,434,091Local AC $12,102,308 $16,259,867 $27,470,836 $55,833,011

Total for all Phases $31,012,656 $63,503,207 $47,621,754 $107,009,610 $32,800,974 $34,064,875 $498,280,815 $814,293,891

Back-up Listing Total

Total Funding for VAR170012

Project Listing Adjustments

Note: Negative amounts not programmed in FMS; Funding for prior years is programmed on VAR110045