glast large area telescope: integration and test phase 0 irr/trr november 3-4, 2005

12
GLAST LAT Project November 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area GLAST Large Area Telescope: Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Mechanical Integration Ken Fouts [email protected] Gamma-ray Large Gamma-ray Large Area Space Area Space Telescope Telescope

Upload: marinel

Post on 24-Jan-2016

36 views

Category:

Documents


0 download

DESCRIPTION

Gamma-ray Large Area Space Telescope. GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Mechanical Integration Ken Fouts [email protected]. Key I&T Requirement Documents. Requirements Definition Key to Successful I&T. I&T Process Procedures. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005

GLAST LAT Project November 3, 2005

I&T Phase 0 IRR/TRR 1

GLAST Large Area Telescope:GLAST Large Area Telescope:

Integration and TestPhase 0 IRR/TRRNovember 3-4, 2005

Mechanical Integration

Ken [email protected]

Gamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope

Page 2: GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005

GLAST LAT Project November 3, 2005

I&T Phase 0 IRR/TRR 2

DocumentDocument Released Released RevisionRevision

LAT-MD-00408-04c LAT Instrument Performance Verification Plan

4/7/05

LAT-MD-02730-02d2 LAT Performance and Operations Test Plan

6/7/05

LAT-MD-00676-04 LAT Assembly Sequence 9/1/05

LAT-MD-00895-04 LAT Instrument Survey Plan 2/1/05

LAT-DS-05210-52 LAT Systems KIT, Cable Installation 11/2/05

LAT-DS-02563-02 LAT Instrument Assembly 10/28/05

LAT-DS-06721-02 External Cable Assembly Sign-off

LAT-DS-06639-01 LAT Integration Config Assy 10/28/05

LAT-DS-06958-02 ACD Lift Fixture 9/28/05

Key I&T Requirement DocumentsKey I&T Requirement Documents

Requirements Definition Key to Successful I&TRequirements Definition Key to Successful I&TRequirements Definition Key to Successful I&TRequirements Definition Key to Successful I&T

Page 3: GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005

GLAST LAT Project November 3, 2005

I&T Phase 0 IRR/TRR 3

DocumentDocument Released Released RevisionRevision

LAT-PS-07240 ACD Integration Procedure 11/2/05

LAT-PS-04911 DSHP Installation Procedure Sign-off

LAT-PS-07575-02 LAT Instrument Safe to Mate Procedure Sign-off

LAT-PS-07125-02 ACD Safe to Mate Procedure 10/28/05

I&T Process ProceduresI&T Process Procedures

Document Detailed Procedures for use in I&TDocument Detailed Procedures for use in I&TDocument Detailed Procedures for use in I&TDocument Detailed Procedures for use in I&T

Page 4: GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005

GLAST LAT Project November 3, 2005

I&T Phase 0 IRR/TRR 4

Roadmap to ACD Integration and TestRoadmap to ACD Integration and Test

Install Flight PDULAT-DS-02563

Install Flight PDULAT-DS-02563

Install EM GASULAT-DS-02563

Install EM GASULAT-DS-02563

Complete Grid Thermal Control

InstallationLAT-DS-01580

Complete Grid Thermal Control

InstallationLAT-DS-01580

Safe to Mate Flight Cables for PDU/GASU/ACDLAT-PS-07575

Safe to Mate Flight Cables for PDU/GASU/ACDLAT-PS-07575

Bond Downspout Heatpipes and Fitcheck X-LAT

PlateLAT-PS-04911

Bond Downspout Heatpipes and Fitcheck X-LAT

PlateLAT-PS-04911

16 Tower CPT 16 Tower CPT

Install Instrumentation Accels and TC’sLAT-DS-02563

Install Instrumentation Accels and TC’sLAT-DS-02563

16 Tower LAT Optical SurveyLAT-MD-00895

16 Tower LAT Optical SurveyLAT-MD-00895

16 Tower CPT w/ACD16 Tower

CPT w/ACDACD IntegrationLAT-PS-07240

ACD IntegrationLAT-PS-07240

Critical steps have been identified and are in the current I&T planCritical steps have been identified and are in the current I&T planCritical steps have been identified and are in the current I&T planCritical steps have been identified and are in the current I&T plan

Page 5: GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005

GLAST LAT Project November 3, 2005

I&T Phase 0 IRR/TRR 5

MGSEMGSE

• LAT-DS-6958 ACD Lift Fixture– Fit-check complete with ACD simulator– Proof tested per LAT I&T AIDS #1588

LAT I&T ACD lift fixture fabrication and check-out complete.LAT I&T ACD lift fixture fabrication and check-out complete.LAT I&T ACD lift fixture fabrication and check-out complete.LAT I&T ACD lift fixture fabrication and check-out complete.

Page 6: GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005

GLAST LAT Project November 3, 2005

I&T Phase 0 IRR/TRR 6

ACD Lift FixtureACD Lift Fixture

Page 7: GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005

GLAST LAT Project November 3, 2005

I&T Phase 0 IRR/TRR 7

ACD Lift Fixture w/ ACDACD Lift Fixture w/ ACD

Page 8: GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005

GLAST LAT Project November 3, 2005

I&T Phase 0 IRR/TRR 8

ACD Integration Procedure (1 of 2)ACD Integration Procedure (1 of 2)

Page 9: GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005

GLAST LAT Project November 3, 2005

I&T Phase 0 IRR/TRR 9

ACD Integration Procedure (2 of 2)ACD Integration Procedure (2 of 2)

Page 10: GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005

GLAST LAT Project November 3, 2005

I&T Phase 0 IRR/TRR 10

Hardware SummaryHardware SummaryPending Mechanical Parts To Support LAT Grid Integration 10-26-05

STOCK OR PART NUMBER TITLE OR DESCRIPTION

QTY NEEDED

(ORDERED) PO# VENDOR NOTESLAT-DS-01247 X-LAT PLATE SCD 1 Mech LM Part in B-33. M. Campell to provide paperwork to get it into storesLAT-DS-02878 X-LAT PLATE ACCESS COVER 2 Mech 58992 Humboldt ECD:11/2/05 Call into John dates are hard fixed.50-02-1075-0000 CHO-BOND 1075,SEALANT (CHOMERICS) AR Stores HAAS Tcm Order Placed on 10-20-05. Stores material expires on 10-31-05LAT-DS-02443 HP EMI COVER 12 Mech 58992 Humboldt ECD:11/2/05 Call into John dates are hard fixed.LAT-DS-02876 RH HP FLANGE SPACER THREADED 6(7) Mech 59023 C&H Ent. ECD: 10-26-05 Order Expedited;Received Qty.7 Bldg.33, in QC.

LAT-DS-02877 HP SHIM SET 24(26) Mech 59023 C&H Ent.ECD: 10-26-05 Order Expedited;Partial delivery possible on 10/27 or full order to deliver 10/28.

LAT-DS-04878 LH HP FLANGE SPACER THREADED 6(7) Mech 59023 C&H Ent. ECD: 10-26-05 Order Expedited;Received Qty.7 Bldg.33, in QC.LAT-DS-02875 HP FLANGE SPACER 12(14) Mech 59023 C&H Ent. ECD: 10-26-05 Order Expedited;Received Qty.14 Bldg.33, in QC.311P18-09A10R THERMISTOR (YSI) 24(25) Mech 56676 In Stores B0601 LocationLAT-DS-05003 BLANKET BAR, MLI 2 Mech 58992 Humboldt ECD:11/2/05 Call into John dates are hard fixed.LAT-DS-06970 MOUNTING PAD, ACCELEROMETER 7 Mech 59023 C&H Ent. ECD: 10-26-05 Order Expedited;Received Qty.9 Bldg.33, in QC.LAT-DS-06705 +X EXTENSION BRACKET 1 Mech 59023 C&H Ent. ECD: 10-26-05 Order Expedited;Received Qty.1 Bldg.33, in QC.SS-600-61 BULKHEAD UNION 3/8" TUBE (SWAGELOK), ST STEEL 2(3) Mech C C #046 Bisco Delivery Date.(10/10) Arrive SLAC(Bldg.33) 10/18/05; In QCSS-500-R-6 REDUCING UNION BODY, .375 - .3125 (SWAGELOK), ST STEEL 2(3) Mech C C #046 Bisco Delivery Date.(10/10) Arrive SLAC(Bldg.33) 10/18/05; In QCLAT-DS-07080 -X EXTENSION BRACKET 1 Mech 59023 C&H Ent. ECD: 10-26-05 Order Expedited;Received Qty.1 Bldg.33, in QC.LAT-DS-07210 BLOCK, ACCELEROMETER MOUNTING GRID 1(2) Mech 59023 C&H Ent. ECD: 10-26-05 Order Expedited;Received Qty.1 Bldg.33, in QC.

003M208 ACCEL CABLE SINGLE AXIS (10') 4 Mech 58970 PCBReqd number of accel cables audited by J.Ku/L.Lee and no additional 003M208 cables are needed.

085A40 ACCEL SHORTING PLUG SINGLE AXIS 10 Mech 58970 PCB ECD:10/18/05; checking status with vendor;Received 10/26/05 Bldg.33LAT-DS-07078 CABLE SUPPORT BRACKET -X -Y 1 Mech C C #052 ARVI Mnf. Purchase Request signed, drawing not release, ECD: 11/7/05LAT-DS-07077 CABLE SUPPORT BRACKET +X +Y 1 Mech C C #052 ARVI Mnf. Purchase Request signed, drawing not release, ECD: 11/7/05LAT-DS-07076 CABLE SUPPORT BRACKET +X -Y 1 Mech C C #052 ARVI Mnf. Purchase Request signed, drawing not release, ECD: 11/7/05LAT-DS-07079 CABLE SUPPORT BRACKET -X +Y 1 Mech C C #052 ARVI Mnf. Purchase Request signed, drawing not release, ECD: 11/7/05MS35649-2254 NUT,HEX,1/4-20 UNC 4(25) Mech C C #051 Bisco Arrive SLAC(Bldg.33) 10/18/05; In QCMS15795-807 WSHR,.183ID X .375OD X .049 THK 24(50) Mech C C #046 Bisco Arrive SLAC(Bldg.33) 10/18/05; In QC

TF/TW-30-TT-15 THERMOCOUPLE, 30AWG (TE WIRE) 32 Mech Thermo Elec.PO status changed from "Flight" to "Non-Flight' during sign-off process; search under way to locate parts.Parts located;Qty.388 in Bldg.33 Flight Stores.

GC 2054531 LAT-ACD INTERFACE PIN 4(2) MechNeed confirmation of parts on ACD delivered hardware(Tom Borden);Spares in () verified in Bldg.33 Flight Srores

GC 2054563 LAT-ACD INTERFACE SNUBBER 4(2) MechNeed confirmation of parts on ACD delivered hardware(Tom Borden);Spares in () verified in Bldg.33 Flight Srores

GC 2054564 LAT-ACD INTERFACE PIN RETAINER 4(8) MechNeed confirmation of parts on ACD delivered hardware(Tom Borden);Spares in () verified in Bldg.33 Flight Srores

NAS1351N6-24 SHCS, 3/8-24 X 1.50LG, A-286 ST 8 Mech C C #051 Bisco On order, ECD 10/24/05

C129009 WASHER, .625 OD X .171ID X .105, A286 ST ST 408 Mech C C # ? Bisco Order placed; ECD 11/7/05, Received P/N from vendor. Updated ECD 11/9/05NAS1352N08LB8 SHCS, #8-32 X .500L, A-286, LOCKING 408 Mech C C #051 Bisco On order, ECD 10/25/05; Received Bldg. 33 10/26/05

Hardware is in-place to support the current planHardware is in-place to support the current planHardware is in-place to support the current planHardware is in-place to support the current plan

Page 11: GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005

GLAST LAT Project November 3, 2005

I&T Phase 0 IRR/TRR 11

RisksRisks

Risks have been anticipated and plans put in place to mitigate themRisks have been anticipated and plans put in place to mitigate themRisks have been anticipated and plans put in place to mitigate themRisks have been anticipated and plans put in place to mitigate them

Risk MitigationDownspout Heatpipes not properly aligned Use bond alignment tooling

Fit-check with X-LAT PlateTest failures with new DAQ boxes Work closely with ELX to resolve issues real time.

PDU engineer moved from ELX to I&TInterference between ACD and TKR or Grid Numerous measurement checks completed.

ACD and MECH personnel on-site during integration.I&T performance Add weekend shifts as required to maintain or improve

schedule performance.Hardware shortages Weekly review of hardware availability

Additional personnel added to I&T Material Logistics

Page 12: GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005

GLAST LAT Project November 3, 2005

I&T Phase 0 IRR/TRR 12

SummarySummary

• Current plan is to maintain two shift operation.• Utilize weekends maintain schedule.• Procedures, Drawings, MGSE and Flight Hardware in place to

support current Phase 0 plan.• Additional subsystem personnel have been identified to support LAT

I&T Operations.

LAT I&T is ready to proceed with ACD integrationLAT I&T is ready to proceed with ACD integrationLAT I&T is ready to proceed with ACD integrationLAT I&T is ready to proceed with ACD integration