glast lat projectcdr/cd3 review may 12-16, 2003 document: lat-pr-01967-01section 15 manufacturing...
TRANSCRIPT
GLAST LAT Project CDR/CD3 Review May 12-16, 2003
Document: LAT-PR-01967-01 Section 15 Manufacturing Process 1
GLAST Large Area TelescopeGLAST Large Area Telescope
Manufacturing Process
Jerry ClintonChief Manufacturing EngineerStanford Linear Accelerator [email protected](650) 926-5435
Gamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope
GLAST LAT Project CDR/CD3 Review May 12-16, 2003
Document: LAT-PR-01967-01 Section 15 Manufacturing Process 2
Manufacturing OverviewManufacturing Overview
• Anticoincidence Detector manufactured by GSFC
• Tracker Towers manufac-tured by INFN
• Calorimeter Module manu-factured by NRL
• DAQ/Tracker electronics manufactured by SLAC
• Grid Box manufactured by SLAC
• Radiators manufactured by Lockheed-Martin
GLAST LAT Project CDR/CD3 Review May 12-16, 2003
Document: LAT-PR-01967-01 Section 15 Manufacturing Process 3
RequirementsRequirements
• 433-MAR-001 GLAST LAT Mission Assurance Requirements• LAT-DS-00039 GLAST LAT Performance Assurance
Implementation Plan• Assemblers trained and certified to workmanship standards
NASA-STD-8739.1, 8739.2, 8739.3, 8739.4 and 8739.7• Assembly and test performed in Class 100K clean room
compliant with LAT-MD-00404• Production Readiness Reviews
GLAST LAT Project CDR/CD3 Review May 12-16, 2003
Document: LAT-PR-01967-01 Section 15 Manufacturing Process 4
Production Readiness ReviewProduction Readiness Review
• Conducted by IPO• Required before start of flight manufacturing• Iterative reviews to support subsystem delivery schedules• Review of processes, specifications, drawings, parts and
materials lists– Documentation released for manufacturing– Processes verified on prototype or engineering-model
hardware– EEE parts on Parts Identification List and approved for the
specific application– Raw materials on Program Approved Materials List and
approved for the specific application
GLAST LAT Project CDR/CD3 Review May 12-16, 2003
Document: LAT-PR-01967-01 Section 15 Manufacturing Process 5
Production Readiness Review – Cont.Production Readiness Review – Cont.
• Personnel training and certification• Facilities readiness – MGSE, EGSE, ESD controls, compliance
with LAT-MD-0404• Parts, materials, tools, test equipment, shop supplies, etc. on
hand and in place at start of manufacturing
GLAST LAT Project CDR/CD3 Review May 12-16, 2003
Document: LAT-PR-01967-01 Section 15 Manufacturing Process 6
Procurement ProcessProcurement Process
Start ProcurementProcess
Part/mat’lapproved byPCB/MPRB?
Drawing/specreleased?
Funding inplace?
Complete part/material approval
process
No
Complete drawingor spec and get it
released
No
Get fundingauthorized
Yes
Prepare purchaserequisition
QA review andapproval
Preparesupporting
documentationpackage
Sole source?Prepare sole
source justification
Yes
Yes
Specification(s) Drawing(s) Quotation (if recent) Sole Source Justification
Deliver supportingdocumentation to
purchasing
Managementreview andapproval
Submit approvedrequisition topurchasing
Yes
No
Supportpurchasing as
requested
End
GLAST LAT Procurement Process
QA review
GLAST LAT Project CDR/CD3 Review May 12-16, 2003
Document: LAT-PR-01967-01 Section 15 Manufacturing Process 7
Material ReceivingMaterial Receiving
Material arrives
Inspect shippingcontainer for
physical damage
Container OK?
Verify shippingdocuments reflectcorrect P/N, PO,
and qty
DocumentsOK?
Verify quantityreceived matches
shippingdocuments
Quantity OK?
Place receivedmaterial in stores
Open NCR Open NCR Open NCR
Notify QE and RE
QE and RE workwith purchasingand vendor to
resolvediscrepancies
Discrepanciesresolved?
Disposition andclose NCR (s)
Yes
Yes
Yes
NoNo
No
Notify QE and RE
Notify QE and RE
QE and RE workwith purchasingand vendor to
resolvediscrepancies
Yes
A
A
Discrepanciesresolved?
Disposition andclose NCR (s)
Yes
Photographdamage
BNo
Material ReviewBoard determine
disposition ofmaterial, close
NCR
Archive QualityRecords
No
B
GLAST LAT Project CDR/CD3 Review May 12-16, 2003
Document: LAT-PR-01967-01 Section 15 Manufacturing Process 8
Basic Manufacturing FlowBasic Manufacturing Flow
Prepare workorder
Built in-house?
Issue parts towork order
Pack kit forshipment to
assembly supplier
Ship kit
Assembly
Inspection
Test
Engineeringreview of test data
Final inspection Deliver to stores
ReceivingInspection
GLAST LAT Project CDR/CD3 Review May 12-16, 2003
Document: LAT-PR-01967-01 Section 15 Manufacturing Process 9
Material ControlMaterial Control
• Must be a closed loop control process • Parts/materials received from suppliers into flight stores• Parts and materials issued to work orders for assembly• Finished assemblies returned to stores• Process repeats for next higher assemblies
GLAST LAT Project CDR/CD3 Review May 12-16, 2003
Document: LAT-PR-01967-01 Section 15 Manufacturing Process 10
Non-Conforming Material HandlingNon-Conforming Material Handling
• All non-conformances are documented on a Non-Conformance Report (NCR)– Identifies non-conforming item– Describes non-conformance– Describes environment unit was in at the time the non-
conformance was discovered– Implemented using REMEDY
• Work stopped until NCR is reviewed and dispositioned by Material Review Board– Chaired by Quality Engineer– Supported by responsible engineer, manufacturing engineer,
and other specialty engineers as appropriate– NCRs archived in a data base and kept with the item work
order
GLAST LAT Project CDR/CD3 Review May 12-16, 2003
Document: LAT-PR-01967-01 Section 15 Manufacturing Process 11
Spares and RepairsSpares and Repairs
• Spares listed in Configuration Item Data List• End items delivered to SLAC for integration and test• Damaged or failed end items returned to manufacturer
• Calorimeter modules repaired by NRL• ACD repaired by GSFC• Tracker towers/trays repaired by INFN • DAQ and Grid assembly hardware repaired by SLAC
GLAST LAT Project CDR/CD3 Review May 12-16, 2003
Document: LAT-PR-01967-01 Section 15 Manufacturing Process 12
Clean Room SupportClean Room Support
• ESD-safe, clean-room lab coats• Hair covers• Face masks• Shoe covers• Nitrile gloves and finger cots• Clean-room swabs and wipes• Solvents and DI water• ESD-control wrist straps• Fastener inventory