global maritime jack up marine and engineering services
TRANSCRIPT
-
8/13/2019 Global Maritime Jack Up Marine and Engineering Services
1/6
This doc
rig mari
1.
1.1
1.2
2.
1.3
1.4
1.5
1.6
i
1.7i
1.8
ument provi
e operatio
Summary
summary
Site
Loc
Geo
Jack
Jack
Sta
Dea
Seis
Jack
Jack
Can Life
Fati
Jack
Safe
Exp
Safe
Further info
Site Specifi
Geotechnica
Review geo
Perform acalculating t
ssess pote
Pun
Unc
Sco
Spu
Une
Shal
Deb Exis
Site Specific
Global MaritHowever, inin-house.
Review meindependen
Perform a s
condition,assessment
ides a detail
s support,
f Services
of the servi
specific ass
tion approv
technical se
-up dry tra
-up dry tra
ility analys
dweight sur
mic analyse
-up design
-up modific
ilever loadExtension S
ue Analysi
-Up Rig Sur
ty Case wri
rt Opinion
ty Evaluati
mation for
c Assessm
l Assessme
echnical da
etailed gehe likely fo
tial founda
h-through
ntrolled le
r
can/footpri
en seabed
low gas
ris / Bouldeting infrastr
Assessmen
ime has anthe event
tocean datly derive it.
ite specific
ccountingcan be perf
ed list of se
ngineering
es that Glo
essments
als & marin
vices
sportation
sportation
s
eys & Incli
s
tions / upg
alculationstudies
(e.g. leg st
veys / Insp
ing
nd Casualt
n and Risk
ach of the
ent
t
a provided.
technical ating penetr
ion hazards
settlement
nt interactio
scture
t (Elevated
extensive dhat we do
provided.
assessment
or foundatirmed in ac
Page 1 of 6
vices that
and Marine
al Maritime
warranty f
marine wa
Heavy Lift
ing experi
rades
ructure, sp
ctions
Investigati
ssessment
bove is giv
ssessmenttions.
including t
n
Condition)
tabase of Fot have m
If metoce
of the uni
ion fixity iordance wi
lobal Mariti
Warranty S
can provid
or rig movin
rranty
Vessel
ents
dcan, hull, j
on
en in Sectio
and produc
e following:
EA modelsdels of a p
an data is
operating i
deemedh either of
e can prov
rvices.
is given be
g
ackhouse)
s 2 15 be
load/pene
overing moarticular de
unavailabl
n the stor
ecessary/ahe followin
ide towards
low:
low.
tration cur
st rig desigsign, these
e, we are
survival (
propriate.criteria:
jack-up
es, thus
s on file.can build
able to
levated)
The site
-
8/13/2019 Global Maritime Jack Up Marine and Engineering Services
2/6
1.9
1.10
3.
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
4.
4.1
a) SNA
b) Glo
Perform the
Ove
Prel
Leg
Fou
Leg
Leg
Prepare a fo
Location A
Review geo
Perform afoundation
Pun
Unc
Sco
Spu
Une
Shal
Deb
Exis
Perform a fi
elevated (stPerform cal
Review theanchor and/obstructions
Review rig-offshore oilseabed inst
essel suitamove, thispossibility oaspects of t
Provide a sSurveyor du
he delivera
Loc
Cert
MW
ack-up Dr
he ownertechnical de
ME 5-5A
al Maritime
following c
rturning sta
ad require
sliding
dation bea
strength
holding sys
rmal report.
proval &
echnical &
geotechnicaazards, suc
h-through
ntrolled le
r
can/footpri
en seabed
low gas
ris / Boulde
ting infrastr
st pass site
orm survivaulations to
detailed,or wire depand the pr
ove procecomplexes,llations.
bility studieallows thef towage ree jack-up a
uitably qualring rig mo
bles will be:
tion Approv
ificate of Ap
rig move r
y Transpor
f the HLVsign/calcula
criteria (for
ecks to det
ility
ents
ing
em strengt
arine Wa
eophysical
l assessmeh as:
settlement
nt interactio
s
cture
specific as
l) operationetermine b
roject speloyment anximity of o
ures for thefield devel
s are consiability to
lated incidend the relat
ified and ees and ass
al
proval for t
eport (incl.
tation - Ma
arrier (ortions, detail
Page 2 of 6
location ap
rmine com
ranty for
ata, seabe
t to deter
n
essment to
at the proollard pull r
ific procedrecovery ther installa
moving anpment and
ered to bereselect s
nts whiched projects.
xperiencedciated mari
e rig move
surveyors l
rine Warr
thers) willd arrange
roval)
liance with
ig-moving
survey an
mine expe
verify struc
osed locatiquirements
res, includaking accouions or ope
emplacemareas wher
a prudentitable towiay impact
Master Marine operatio
g) (optiona
nty
develop a Tents, drawi
the specifie
metocean
ted penetr
ural and fo
n..
ing if requint of site sations.
nt of jack-e there are
precautiong tonnagen both the
ner to acts.(Optional
l)
ransportatings and ma
d criteria:
data provid
tions and
ndation int
ired, procervey result
p rigs in anpipelines a
taken priorand to re
safety and
as Marine)
n Manual crine proced
d.
potential
egrity for
ures for, seabed
d aroundd multi-
to a rig-uce thefinancial
Warranty
ontainingres. This
-
8/13/2019 Global Maritime Jack Up Marine and Engineering Services
3/6
4.2
4.3
4.4
4.5
i
4.6
l
4.7i
4.8
4.9
4.10
4.11
5.
5.1
5.2
5.3
5.4
documentaticalculations
A Marine
towage.
Review andand loading
Based on thmetocean c
Conduct an
the followinintention is
a) Revi
b) Revifloa
c) Revi
d) Calc
e) Revicalcloca
f) Reviof t
g) Calcmoti
Review tranloading proc
Provide aincluding andry transpo
Perform suifloat-on & o
Provide a
offload and
Provide cert
Provide Maoperations.
Stability A
ny significrevised inta
he stabilitcompartmeack-up.
Derive allow
Fiel
Oce
Produce a s
ion will bedeemed ap
urveyor is
verify HLVballasting c
e intendediteria and v
independen
, and thuso provide a
ew of the H
ew of intact
-on, transp
ew of intact
ulation of t
ew the seaflated desig
tions where
ew cribbinge strength
ulate the jaions during
sportationedures, tow
eport sumy recommetation.
ability survfloading.
arine Warr
towage ont
ificates of a
ine Warran
alysis
ant changet and dama
y analysist models w
able KG cal
Transit (in
n Transit (i
ability book
reviewed aropriate by
to attend
nd cargo donditions.
LV transpoerify agains
verificatio
verify the cthorough r
LV ballastin
stability & l
rtation and
stability of
e critical ca
astening arrn loads, takithe seafast
arrangemef the cargo
k-up leg anhe dry tran
arine procage.
arising thdations we
ey of HLV
anty Surve
final locati
proval for f
ty Surveyo
to a vessged stabilit
includes thich will be
ulations for
act & dama
ntact & dam
let (if requir
Page 3 of 6
nd verifiedMarine Sur
the float-o
tails and a
rtation routthat used i
(performin
alculationsview with fi
plan for fl
ongitudinal
offload.
the jack-up
rgo motions
angement aing due connings are si
t and peakframes abo
d leg holdinsportation o
dures, i.e.
e findingsfeel appro
arrier, tug
yor for all
n.
loat-on, sail
site atten
els hull geanalysis fo
e creationused to cal
a range of
ged)
aged)
ed).
correct, toeyor.
, seafaste
sumptions
and deparn the dry tr
g independe
ontained inrst pass cal
at-on/offloa
strength as
for towages
for the desi
nd commenideration o
ited.
cribbing strve the cribb
g system utnboard the
cargo and
of our reviriate for th
and towin
stages of f
away, offloa
dance repo
ometry orr approval b
of windulate maxi
drafts, consi
ether with
ing, sail a
i.e. weigh
ture date, gnsportation
nt analyses
the transpulations.
d.
essment of
.
gn metocea
t on its accethe strengt
sses, takining.
ilisations forLV.
arrier prep
ew and insafe execu
equipmen
oat-on, se
d & towage.
ts for the
ind profiley class.
overturningum allowa
dering the f
any suppl
way, offloa
ts, centres
enerate indanalysis.
where nece
rtation ma
the HLV du
n criteria.
ptability forh of the car
due consi
the design
ration, floa
ependenttion of the
t to be use
fastening,
.
float-on an
make man
and hydrle KG curv
ollowing co
mentary
ing and
f gravity
pendent
ssary) of
ual. The
ing
theo at the
eration
peak
-on, off-
nalyses,proposed
for the
sailaway,
offload
datory a
ostatic /s for the
ditions:
-
8/13/2019 Global Maritime Jack Up Marine and Engineering Services
4/6
5.5
6.
6.1
6.2
6.3
6.4
7.
7.1
7.2
i
7.3
7.4
7.5
7.6
8.
8.1
8.2
9.
9.1
Prepare a c
Deadweig
Produce a
obtain appr
ttend a ppreparationclient/yard/
Conduct thprocedure t
CG.
Produce a d
Seismic An
he objecti
capacity toassessmentrabian Gul
Global MaritHowever, inin-house.
Based onpenetration
he seismicSACS hasutilised for t
he globalwill enable t
Ove
Leg
Fou
Leg strengt
equivalent awhich includ
Design Ser
Utilising ove
fit for purpo
he workClassificatiodesigners iscompany.
ack-up M
Global Mariservices foryard, and hproject runs
lculation pa
t Survey &
eadweight
val.
re-survey, procedurlass survey
deadweigdetermine
adweight s
alysis
e of a seis
withstandcan be perf, Southern
ime has anthe event
site specifi& correspo
analysis wi dedicatedhe assessm
esponse ofhe following
rturning sta
sliding
dation bea
h and leg
nd extremees the detai
vices
r 30 years
se and tailo
undertakenSociety a
enhanced
difications
ime has anjack-up mave excellesmoothly.
ckage for s
Inclining
survey and
eeting wiwalk-throuor.
ht surveythe new li
urvey and i
ic analysis
an extremeormed eitheorth Sea e
extensive dhat we do
or genernding found
ll be perfor module font.
the jack-upchecks to b
ility
ing capacity
holding sys
static loadled leg, and
f consultan
ed to our cl
runs froproval to dy the vast
& Upgrad
excellent tdification /t working r
Page 4 of 6
bmitting fo
xperimen
inclining e
h all relegh and pro
and inclinihtship weig
clining exp
is to dem
earthquakr for a site-c).
tabase of Fot have m
ic geotechation stiffne
ed usinganalysing
will be cale made;
tem streng
derived frrunning a
cy experien
ients requir
conceptetailed desiexperience
s
ack recordupgrade prelationships
Class Appr
periment
ant personvide clarific
g experimht and its c
riment rep
nstrate tha
e event whspecific loca
EA modelsdels of a p
ical data,sss.
ACS finiteresponse t
ulated usin
th will be
m the eartushover an
e, Global M
ements.
developmegn and shipof technical
providing sojects. Wewith the Cl
val.
rocedure, li
nel to distions to an
nt as perentre of gra
rt for Class
t the jack-u
ile jackedtion or for a
overing moarticular de
calculate
lement ana seismic a
g a bar sto
assessed b
quake evenlysis.
aritime deli
t, throughyard suppoand operati
ructural deork closel
ass Societie
iaising with
uss respoy concerns
the class-vity i.e. LC
approval.
p unit has
up on locageneric re
st rig desigsign, these
ppropriate
lysis (FEA)ctions whic
ol model a
y applying
t to the SA
ers design
basic dert. Our coreional staff
ign and enwith the cs to ensure
Class to
sibilities,from the
pproved, TCG &
sufficient
ion. Theion (e.g.
s on file.can build
spudcan
oftware.will be
nd which
a set of
S model
that are
ign andteam ofithin the
ineeringlient andthat the
-
8/13/2019 Global Maritime Jack Up Marine and Engineering Services
5/6
9.2
10.
10.1
10.2
l
10.3
10.4
11.
11.1
11.2
12.
12.1
13.
13.1
12.2
We wouldproposal on
Cantilever
If required,bending mo
Using an inback loads)load chart.
If required,
structure anelevated (dr
Prepare a c
Life Extens
When a jacbodies fordemonstratoperations.
We would bon a case-b
ack-up Ri
jack-up s
Stru
can
Inspcom
Insp
volt
Revi
Da
Rig
mai
man
Safety Cas
Demonstratspecific Saf
he Safety
a) Tecsafe
b) DetMan
c) Riskthequal
e pleaseda case-by-c
Load Calcu
independenent), push
house progwithin the
independen
d sub-baseilling) opera
lculation pa
ion & Fati
-up approathe jack-u that the
pleased to-case basis
Survey /
rvey will co
ctural insp
ilever and d
ection / supressors et
ection / sur
ges, motor
ew of docu
age survey.
integrity m
tenance s
agement of
Writing
adequatety Case incl
ase shall in
nical descrity case (incl
iled descripagement sy
Assessmenprobability/itative or q
to assist oase basis.
lations
tly derive t-up and hol
am, deriveenvelope of
tly carry ou
using a finitions and th
ckage for s
ue Life St
ches its desp owner/ounit has s
assist our c.
Inspection
ver a range
ction - leg
rill package,
vey of mac.
vey of elect
etc.
ents and r
.
anagement
stem, eme
change.
site specifiuding site s
volve lookin
ption of theuding opera
tion of thestem.
t - identificarequency ofantitative b
Page 5 of 6
r clients in
e design ad-down rea
allowable cmaximum
t a structu
te elemente afloat (se
bmitting fo
dies
ign life, theerator to
ufficient fa
lient in suc
of aspects,
s, spudcan
crane pede
hinery ge
rical equip
ports of pr
review/au
rgency res
c Risk Maecific oper
g into the f
jack-up uniting capabil
perator/Ow
tion of majoccurrenceasis.
such proje
llowable cations.
ombined drirotary mov
al design v
analysis (Fvere storm
Class Appr
re is a requevaluate tigue life r
studies an
including bu
, jack-hou
stals, helid
nerators, ja
ent switc
vious rig in
it safety
ponse proc
agement btions.
llowing asp
focussinities and sa
ner Health,
r hazards tand potenti
cts and ca
tilever load
lling loads (ment and
rification o
A) method.ransit) con
val.
irement bye structurserve for
can provid
t not limite
e structure
ck etc.
king syste
hboards, di
pections.
manageme
dures, per
documen
cts:
on featureety critical
Safety & En
gether withal conseque
provide a
s (i.e. shea
hook, rotarenerate a
f the drill fl
This wouldition.
Class and ral integritythe intende
e a detailed
to the follo
s, jacking
s, winches
tribution at
nt system,
sonnel co
ing a Jack
pertinentlements).
vironmental
an assessnce either o
detailed
r force &
and setantilever
or, sub-
consider
gulatoryand to
d future
proposal
wing;
systems,
, pumps,
different
planned
petency,
Up Unit
o the
ent ofn a
-
8/13/2019 Global Maritime Jack Up Marine and Engineering Services
6/6
12.3
12.4
14.
14.1
i
15.
15.1
l
d) Opeopeund
e) Det
respmairiskPrac
f) Co
Global Mariensuring te
appropriaterequiremen
Global Mariverificationsystems.
Expert Opi
We offer exfor recoverservices arincidents in
Safety Eval
We providemarine opeadvice on re
listed below Offs
pur
Revi
Dev
Perf
Pus
pro
ration (loca
ations tor contract.
iled descrip
onsibilities,tenance prand whereticable (AL
pile a list o
ime can alt/check ar
to demons.
ime can alaudit of the
ion and C
ert opinionand repai
directedolving mobi
uation an
safety evaations. Typducing risk
:hore platfor
oses.
ew of marin
lopment of
orm SIMOP
-over anal
ability of fai
ion) specific
demonstrat
tion of the r
instructionsgrams, insot possible,RP).
identified S
o prepareperformed
trate the
o act as afunctionali
sualty Inv
services wr and preptowards enle offshore j
Risk Asse
luation andical serviceand reserv
m mainten
e operation
detailed op
assessmen
sis of offsh
lure.
Page 6 of 6
risk assess
the unit is
isk reductio
& procedurection progreduce the
afety Critic
a Writtenfor each
CE is cap
n ICP (Indey of the Sa
estigation
ich includearation ofgineeringack-up drilli
ssment
risk asseswould incle strength
nce and c
for installi
rating proc
ts prior to r
re structur
ment for sta
fit for purp
n measures
es, remedialrams, etc.)risk levels t
l Elements
cheme ofafety Critic
ble of fulfi
pendent Cfety Critical
damage surformal repond operating units an
sment forlude hazardssessment.
ndition sur
g jack-up u
edures for j
ig move
es to deter
ndalone an
se for the s
(i.e. by desi
work & preare implemo As Low A
SCEs).
xaminational Element
lling its Pe
mpetent PeElements o
veys, causerts for usenal aspectstructural
offshore str identificatiSome typic
ey and val
nits against
ck-up units
ine their u
combined
pecific oper
gn, person
ventativented to reReasonabl
(WSE) pain a mann
rformance
rson) andf the Jack-
examinatio in litigatios and infailures.
uctures ann, risk ass
al project s
uation for i
platforms.
.
ltimate stre
tion
el
ove the
kage forr that is
Standard
arry outp unit &
n, advicen. Thesearticular
relatedessment,opes are
nsurance
ngth and