©2012 Rolls-Royce plc
The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any
purpose other than that for which it is supplied without the express written consent of Rolls-Royce plc.
This information is given in good faith based upon the latest information available to Rolls-Royce plc, no warranty or representation is given
concerning such information, which must not be taken as establishing any contractual or other commitment binding upon Rolls-Royce plc or
any of its subsidiary or associated companies.
Ve
rsio
n 2
Feb
20
12
Global NDT Specifications
Change Awareness
Insert filename
Develop Global Specifications and Standards
Generic Controlling Documentation
Common Engineering Language Single Database
Standardised Design and Materials Selection Culture
Determine Corporate Best Practice
Maximise the use of Industry Standards (AMS etc.)
Identify Cost Reduction Opportunities
Reduce Documentation Complexity
Generate Supplier Friendly Systems
Enable Supply Chain Simplification
Facilitate Global Design Make Capability
Assist Global Procurement Material Strategy
vision
Insert filename
Materials: MSRR EMS RRMS
Processes: RPS EPS RRP
Quality: RQS EIS RRQ
Outcome Based Documents
Non-prescriptive „driven by outcome‟ Specifications (except NDT)
Parameter/Method Definition placed on Supplier (except NDT)
Industry Standard Friendly
Industry Standard Aligned
Paragraph Format – Similar to other Industry Standards
Global Specs to be used where Industry Standard does not satisfy
Requirements
philosophy
Go
Fo
rward
Insert filename
A ‘Go-Forward’ Implementation Strategy
Global Specifications will be used on all future engine projects
The first engine to call out Global Specifications is Trent XWB
NDT Rationalised Process Specifications (RPS‟s) will be replaced by RR
Process (RRP) specifications on 2nd May 2012.
implementation
Trent XWB powering the AirbusXWB
Insert filename
publication
Insert filename
family of NDT specs RRP58000
Technical Control of Non Destructive
Testing
RRP58001
Ultrasonic Immersion Inspection of
Rectilinear Machined Forms
RRP58002
Ultrasonic Examination of Billet and
Bar Material for Sub Surface Defects
RRP58003
Fluorescent Penetrant Inspection
RRP58004
Magnetic Particle Inspection
RRP58005
Training & Approval of NDT
Personnel
RRP58006
Radiographic Inspection
RRP58007
Visual Inspection
RRP58008
Method for Construction of Ultrasonic
Limitation Diagrams
RRP58009
Digital Radiography
RPS906
RPS705
RPS707
RPS702
RPS700
RPS908
RPS704
RPS709
RPS907
RPS720
Insert filename
Change The following RPS’s will be issued as cancelled on 2nd May 2012:
RPS700, 702, 704, 705, 707, 709, 720, 906, 908.
Each cancelled RPS will direct you to the RRP that supersedes it ensuring that
existing documentation flow down is not broken.
Facilities approved per the RPS will automatically be considered approved per
the relevant RRP.
NDT personnel trained and approved per a RPS will not require re-training
other than via this ppt.
Supplier level 3 personnel approved to control per RPS906 remain approved to
control NDT per RR58000.
Legacy NDT technique instructions remain valid. Application of the NDT
process and its control and maintenance must be in accordance with the
relevant RRP. Where there is a conflict between NDT technique instruction and
RRP, the NDT technique instruction shall be re-issued and re-approved in line
with RRP58000.
Insert filename
RRP58000 Technical Control of Non Destructive Testing
Requirements for planning and sequencing of NDT operations specified within
RRP58000.
Requirement for a QCTP specified within RRP58000. Rules and QCTP now
contained within RR QMS and available from RR when required.
Requirements for NDT technique instructions specified within RRP58000.
Requirements and technique instructions for NDT methods not covered by an
RRP now incorporated within RR QMS.
Guide to NDT inspection capability, limitations and constraints now
incorporated within RR QMS.
Requirements for carrying probability of detection (POD) experiments now
incorporated within RR QMS.
Requirements for control of NDT at External Suppliers is specified within
RRP58000.
Continued.......
RR QMS = Rolls-Royce Quality management System
Insert filename
RRP58000 Technical Control of Non Destructive Testing
Vision requirements are now specified within RRP58005 – Training & Approval
of NDT Personnel.
Requirements for reduced radiological examination levels on castings is now
contained in RRP58006 – Radiographic Inspection and RRP58009 – Digital
Radiography.
NDT code of ethics now defined within RRP58005 – Training & Approval of
NDT Personnel.
Requirements for performance assessment of NDT inspection personnel is now
specified within RRP58005 – Training & Approval of NDT Personnel.
Human factors within NDT is specified within RRP58000 appendix C.
Insert filename
RRP58001 Ultrasonic Immersion Inspection of Rectilinear Machined Forms
No significant changes.
Changes to immersion tank calibration will be revised back to RPS705
requirements at next revision.
Insert filename
RRP58002 Ultrasonic Examination of Billet and Bar Material for Sub Surface
Defects
No significant changes
Application: Flow chart removed, now contained within RPS 920/12
GENERAL INSPECTION REQUIREMENTS: References to AMS-STD-2154,
ASTM E 428 & AMS 2628 for calibration standards added. Paragraph on
Probes removed.
Acoustic compatibility measurement changed
AUTOMATIC INSPECTION: Paragraph added to clarify on which material
classes this method shall be employed. Paragraph added to control water path.
Paragraphs (covering Flaw Detector, Monitor Gates, DAC, Recording, Alarm
Systems, Couplant and Inspection Sensitivity) moved to General Inspection
Requirements section
Continued……
Insert filename
RRP58002 Ultrasonic Examination of Billet and Bar Material for Sub Surface
Defects
MANUAL INSPECTION: Paragraph added to clarify on which material classes
this method shall be employed. Reference to AMS-STD-2154 for transducers
added.
CONTROL CHECKS & MAINTENANCE: Instrument calibration & scan
speed/index calibration interval changed to 12-monthly.
TABLE 2 QUALITY STANDARDS: Title changed to “Rejection and Alarm
Threshold Levels Based on Material Class”. Note added for titanium alloys
where AMS2628 is used.
Insert filename
RRP58003 Fluorescent Penetrant Inspection
Control preparation section has been amended to remove RPS references and
replace with RRP51000.
RPS702 states the facility ambient temperature range however does not state
how this is to be controlled whereas RRP58003 now requires temperature
verification of both facilities and processing solutions if it is suspected that the
ambient temperature fall out of the specified range.
Removal of the maximum penetrant contact time of 1 hour
Change from 4 minute maximum emulsification time to 2 minutes unless
otherwise approved by the Rolls-Royce Technical Authority
The maximum 5 lux requirement for inspection areas has been removed
Continued……
Insert filename
RRP58003
Fluorescent Penetrant Inspection
Frequency of calibration of automatic lines changed from quarterly to
annually.
Amended mandatory default drying requirements of 120oC (248oF) for 1 hour
to “unless otherwise agreed by Rolls-Royce Technical Authority”.
Section on Non Aqueous developer (NAWD) amended with reference to
“localised application” removed.
Minimum number of indications per penetrant type for the initial calibration of
PSM5 panel amended to comply with ASTM 1417.
14
Insert filename
RRP58004 Magnetic Particle Inspection
Inspection Techniques
Change from historical approach of generating “machine transferrable”
inspection techniques by formulation, to “machine specific” techniques by on-
machine trial. Technique instruction to reference specific machine/ equipment
and parameters used. Reduced emphasis on current waveform relationships.
Inspection techniques to be verified by demonstration of presence of adequate
flux density for all parts (not limited to parts of Critical classification, complex
geometry and focus inspection).
Verification of Flux Density
Verification of flux density to be demonstrated on all surfaces (chamfers, radii
etc. not required where adjacent surfaces demonstrated).
Verification of adequate flux density may be made using gaussmeter for
circular magnetisation. Longitudinal magnetisation requires artificial shim.
Continued……
Insert filename
RRP58004 Magnetic Particle Inspection
Min. gaussmeter reading 30 gauss at part surface. Readings greater than 50
gauss acceptable providing background fluorescence satisfactory.
Artificial shims to be in accordance with AS 5371 (“QQIs”).
Particle Application
Magnetisation time of min. 2 secs. may be accumulative and comprise multiple
shots of 0.5 secs.
Residual ink application allowed for geometric constraints and complex features
(e.g. splines, threads) where leakage field particle build up occurs.
Magnetisation Methods
Use of toroidal magnetisation technique permitted.
Multi-directional magnetisation allowed for standard bolts. Else specific
authorisation required.
Offset threading bar method of determination per ASTM E1444.
Continued……
Insert filename
17
RRP58004 Magnetic Particle Inspection
Coil magnetisation formulas based on requirements of ASTM E1444. Ampere
turns values 70% of ASTM E1444. Field strength greater than RPS 700,
qualified by shims.
Demagnetisation requirements “outcome based” i.e. method acceptable where
remaining field strength value < 3 gauss. No initial demagnetisation required
where field strength < 3 gauss.
Control Checks
For AS5282/ Ketos Ring amperage values required quoted in RRP 58004, in
line with ASTME 1444.
Requirement to carry out low end output stability/ repeatability check.
Magnetic field quick break check.
Calibration requirements for Hall effect gaussmeter (3 positions).
Internal short check (not required if manufacturer certifies as such).
Insert filename
RRP58005 Training and Approval of NDT Personnel
Requirements for a code of ethics to be included in the written practice added
from RPS906.
Requirement for suppliers in countries where a NANDTB exists, NDT
qualifications must come under the control of the NANDTB.
Performance review guidelines and requirements added from RPS906.
Sample template added for performance review of personnel.
Insert filename
RRP58006 Radiographic Inspection
• Reduced Radiological Examination for castings removed from RPS906 and
added into RRP58006
• All previous references to RPS720 have been changed to RRP58009
• Record retention for double scrutiny added
• Section added to mandate sensitivity checks at least each shift
• Section added to mandate backscatter checks at least at the beginning of each
shift
• Section added in to allow for technique modifications and the use of multiple x-
ray units
• Section added to allow for additional radiography following section reduction
Insert filename
RRP58007 Visual Inspection
• No significant differences
Insert filename
RRP58008 Method for Constructing Ultrasonic Limitation Diagrams
RPS 907 will not be cancelled as it will continue to be relevant to legacy parts.
New rules have been defined for determining inspection category.
Inspection category is now determined by the number of scans interrogating a
specific volume. No priority given to normal to surface scans.
There are now only three inspection categories:-
Category A – Full Inspection
Four or more ultrasonic scans interrogate a given point within the volume of the
finished component.
Category B – Limited Inspection
Between one and three ultrasonic scans interrogate a given point within the
volume of the finished component.
Category C – No inspection
No ultrasonic scans interrogate a given point within the volume of the finished
component.
Insert filename
RRP58009 Digital Radiography
• Reduced Radiological Examination for castings removed from RPS906 and
added into RRP58006
• All previous references to RPS720 have been changed to RRP58009
• Record retention for double scrutiny added
• Section added to mandate sensitivity checks at least each shift
• Section added to mandate backscatter checks at least at the beginning of each
shift for CR.
• Section added to allow for additional radiography following section reduction
• Section added to recognise and make allowances for automated systems
Insert filename
Now What?
All internal Rolls-Royce Level 3 Controllers and Supplier level 3‟s approved to
control NDT per RPS906 Section B are required to ensure that all NDT personnel
under their control are made aware of the change summarised herein, i.e. are
taken through this presentation.
Evidence of this awareness training must be documented, i,e, when, where, personnel
trained, trained by, acknowledgement signature of all parties.
All internal Rolls-Royce Level 3 Controllers and Supplier level 3‟s approved to
control NDT per RPS906 Section B should use the time between now and „Go
Live‟ date to prepare for implementation.
Implementation date is effective 2 May 2012 when the relevant RPS‟s will be
superseded by RRP‟s.
Note: There may be a slight delay between implementation date and availability of the re-
issued „cancellation‟ RPS‟s on the Supplier Portal.
Rolls-Royce will allow a 2 month transition period from „Go Live‟ date, i.e. RRP‟s
fully implemented by 2nd July 2012.
Do refer to transition instructions on the cancellation RPS documents.
23