Glossary of Terms
Page 1 of 14
AA Asset Accounting ABAP Advanced Business Application Programming Accelerated SAP (ASAP)
A standardized methodology that brings together the latest approaches and experiences in SAP ERP 2005 implementation. The methodology includes the following steps/phases in the SAP Roadmap: 1. Project Preparation 2. Design 3. Build 4. Deliver 5. Operate 6. Go-live Support 7. Continuous Improvement
Account assignment Identification of the specific account or cost object to where postings are to occur
Account Assignment Element
If you want to post actual costs and commitments to a WBS element, you have to indicate that the WBS element is an account assignment element in the WBS. All objects that can be assigned costs and commitments within a project (for example, orders, networks, or purchase orders) can only be assigned to a WBS element if you have set the account assignment indicator for the element. In addition the account assignment WBS combined with the investment profile will trigger the automatic creation of an Asset under Construction
Account determination Determines G/L accounts posted to for asset transactions ACH Automated Clearing House Activities An activity is the task in a network with a defined start and finish date as
well as relationships with other activities within the project. Activities can be; internal (work performed by people or machines), external (materials or services that need to be purchased), and general costs (plan generic costs on a cost element - no integration)
Activity Elements An activity element is used only if multiple work centers are required on an activity. The activity element is the child to the activity and has the same dates as the activity
Activity Types A unit in a controlling area that classifies the activities performed in a cost center
AD Application Development ADS Active Directory Services AIMS Account Information Management System ALE Application Link Enabling Allocations Assessing/distributing amounts from one sender object to receiver object AM Asset Management (Fixed Assets) AMO Application Maintenance Operations AP Accounts Payable APHSA American Public Human Services Association AR Accounts Receivable ASA Adaptive Security Algorithm
Glossary of Terms
Page 2 of 14
ASAP Accelerated SAP ASAP+ An enhanced version of the Accelerated SAP (ASAP) Assessment Method of Internal cost allocation, costs are transferred from one cost
center to the receiver object Asset An asset is defined as any building, land, equipment that qualifies as a
capital item. An asset is placed in service and depreciated monthly. As projects build assets, the AuCs will be replaced with final assets and the WBS status changed to TECO (technically complete)
Asset Class Main criterion for grouping fixed assets according to operational and legal requirements. It is the link between assets (sub-ledger) to balance sheet
ATP Available to Promise AUC Asset Under Construction (or CIP - Construction in Progress). Fixed
Asset that is in the process of being completed at the time a balance sheet is produced. In general assets under construction are shown as a separate balance sheet item for the enterprise
Available Balance Available balance is budget less encumbrances and expenses AVC (Availability Control)
Availability control is used to check consumable budget (budget or releases) against consumed amounts (commitment or actual postings) within a budget process. If budget consumption reaches one of the tolerance limits specified in customizing, this can trigger system activities for example, additional postings can be prevented
AYP Adequate Yearly Progress BAPI Business Application Programming Interface BAU Businiess Application User BEN Benefits Management BEx Business Explorer BI Business Intelligence BOR Business Object Repository BOSS Business Operating Solutions for Schools – the brand name the District
has chosen for this project. BPD Business Process Design BPE Business Process Engine BPML Business Process Master List BPO Business Process Owner BPP Business Process Procedure BPR Business Process Re-engineering BPT Business Process Testing BSP Business Server Pages BUDG SAP’s Project Systems Term for Budgeted Budget Spending authority for a fiscal year Budget Management SAP defines budget management as the process of controlling budget by
using the BCS budgeting tools delivered by SAP. These tools include budget preparation, budgeting, derivation strategy, availability control and reporting
Budget Returns SAP defines a budget return as a decrease in budget
Glossary of Terms
Page 3 of 14
Budget Supplements SAP defines a budget supplement as an increase in budget. In most instances any supplement has to be approved by the Board
Budget Transfers SAP defines a transfer as movement of budget without increasing or decreasing the overall budget
Build Phase The Build phase is to design, specify and configure all of the business requirements based on the Business Blueprint.
BW Business Warehouse CAFR Comprehensive Annual Financial Report Capacity Leveling You use this function to level the capacity load of resources by moving
orders into earlier or later periods using forward or backward scheduling Capacity Planning Planning for available capacities, such as personnel, on a project CATS Cross Application Time Sheets – Tool used to confirm actual time of an
employee on specific tasks executed within a project CATT Computer Assisted Testing Tool CBT Computer Based Training CCA Cost Center Accounting CCMS Computing Center Management System CCR Change Control Board CD Collection and Disbursement CDP Certificate in Data Processing CI Central Instance CICS Customer Information Control System CLSD SAP’s Project Systems term used for Closed CM Compensation Management CMT Change Management and Training CO Controlling module Commitment Item The budget and fund accounting classifications of General Ledger
Accounts and Cost Elements. Used to reflect the type of revenues and expenditures budgeted and to detail balances for each fund in FM. Usually (but not necessarily) at a higher level than GL Accounts and Cost Elements
Configuration A configuration involves selecting options in SAP that will refine how transactions cater to business requirements. It does not involve any changes to existing programs.
Confirmation Can be final or partial and documents the state of processing for an activity or activity element. A confirmation is used to record the work center where the activity was performed, the person who performed the activity, and the actual time to perform the activity
Cost Center Organizational unit within a controlling area that represents a defined location of plan and cost incurrence
Cost Element A Classification code used to label cost relevant items (Labor, Materials, Travel etc)
Cost Object A cost object is a collector of costs (ie cost center, internal order, WBS or network activity) and updates the CO/PS ledger and typically derives objects for updating other ledgers
Glossary of Terms
Page 4 of 14
Cost Planning An estimate is made of the costs to be incurred for an element of a work breakdown structure element
CRA Change Readiness Assessment Critical Path The critical path is the path through the network (marked in red on the
PERT diagram) in which the activities and their relationships are ordered so that the total float is minimum. The critical path is generally the longest way to carry out the network
CRM Customer Relationship Management CRTD SAP’s Project Systems term for Created CSM Content Switching Modules CUA Central User Administration CUL Capacity Utilization Level Customization A customization is any additional coding that needs to be done in order to
meet requirements that are outside of the SAP delivered (vanilla) functionality. Examples of customization objects include Reports, Interfaces, Enhancements, and Conversions.
Dates The Start and Finish Dates refer to the life of a Project, they DO NOT affect the status of a Project or the postings
DBA Database Administration DBMS Data Base Management System DDL Data Definition Language DBR Daily Bus Report DB 4 Data base used by Contract Management for Retainage data Deliverables Design Phase The purpose of the Design phase is to create a business blueprint for a
particular business function. This blueprint is a detailed documentation of the requirements gathering and prototyping efforts conducted by respective BTS project teams.
DI Direct Input DML Data Manipulation Language DOE Department of Education DR Disaster Recovery DREF Departmental Reference Number DSS Decision Support System DTR Design Time Repository EBP Enterprise Buyer Professional EA Employee Administration EAI Enterprise Application Integration EBP Enterprise Buyer ECC Enterprise Component Core ECM Enterprise Content Management EEO Equal Employment Opportunity EPM Enterprise Performance Management ERP Enterprise Resource Planning ESA Enterprise Services Architecture
Glossary of Terms
Page 5 of 14
ESS Employee Self Service ETL Extraction, Transformation and Loading EUA Enterprise Iser Administration EUT End User Training EVD Enterprise Value Delivery EXEC Project Systems term used for Executed Expedition Repository for Project Contract Data excluding Retainage External Activity External resource (material or service) to be purchased. PS integration
point with MM purchasing. Delivery date of the material can be tied to the early start date of the activity
FA Financial Accounting FFT Free Form Text FI Finance Final Preparation Phase The Final Preparation phase is to help prepare M-DCPS for going live
with new system components. FLSA FM Funds Management FRICE-W Forms
Reports Interfaces
Documents such as invoices, credit memos, benefit statements and pay advices. Utilizing SAPScript, the standard SAP forms tool, to design, build and print forms from SAP A report is defined as any statistical or narrative information in written or tabular format. Reports can be produced directly from the SAP system using the standard SAP programming language known as "ABAP", can be produced directly from the SAP system using SAP Business Warehouse standard reporting capabilities, or can be produced using standard functionality as provided by third-party bolt-on products such as EPIUSE Query Manager and ReadSoft An Interface is the point at which a connection is made between two systems, so that they can communicate with one another. Interfaces can be one-way or bi-directional. Interfaces between two systems will require a program to be written to extract the required data in the specified format from the sending system and a program to be written to read the sent data, in the receiving system. Interfaces can be internal to SAP, such as SAP e-Recruitment module interface to SAP Personnel Administration module for master data; or posting payroll payments made to employees from SAP Payroll to SAP General Ledger and Controlling modules. Interfaces are also external to SAP, such as sending net pay to the banking institution, sending personnel master
Glossary of Terms
Page 6 of 14
Conversions Enhancements Workflows
data to benefit providers, or receiving checks cashed information back from the bank. Interfaces can be created using standard SAP programming language known as "ABAP" or using standard SAP tool know as "Legacy System Migration Workbench (LSMW)" A conversion program has two components. First the legacy extract program to pull all the identified data elements from the legacy systems as per the defined record layout and mapping rules. Second the SAP conversion program to read the file created from legacy and load into SAP. Conversion legacy extract programs will be written in the programming language specific to the legacy system, and SAP load will be created using standard SAP programming language known as "ABAP" or using standard SAP tool know as "Legacy System Migration Workbench (LSMW)" SAP provides the ability to make approved program changes within the system to meet the business requirements of the client. These are known as enhancements. Enhancements take shape in one of two ways. Either through the standard SAP process of writing SAP ABAP code directly into predefined user exits, or creating programs to enhance the areas of functionality allowed by SAP. No modifications will be made to SAP foundational source code without written approval and signoff by SAP SAP Business Workflow provides M-DCPS with the ability to automate specific business process flows across the organization. Workflow examples include approval of purchase requisitions based on spending authority and the routing of that document to all relevant parties who are required to view and signoff. Standard SAP workflow will be used in conjunction with the SAP Organization Management module in SAP Business Suite - Human Resource Management
FTE Full Time Equivalent referring to students Functional Area SAP Defines the functional area as a master data element that is
maintained within the funds management module. It is used to classify revenue and expenditures of an organization by function. Functional area is often referred to as program/mission
Fund A separate and distinct fiscal/accounting object containing a self-balancing set of accounts used to budget and control costs and to identify source and use of funding. Financial data will be separated by Funds so
Glossary of Terms
Page 7 of 14
that certain activities can be performed or objectives achieved in accordance with special regulations, restrictions, or limitations. Fund is not hierarchical. The Fund is the lowest level at which a balance sheet can be created
Funded Program Funded program enables an organization to record budget, control postings, and monitor the performance of internal projects; it can vary from simple activities to complex projects. It can cross fiscal years, funding sources and organizational units. Funded program tracks budget for non-recurring projects or programs that are funded by multiple fund centers. Funded program should provide a level of detail that will allow appropriate budgetary control and internal/external management information
Funds Center An organizational unit within the Funds Management (FM) module. It represents the lowest level area of responsibility for budgetary monitoring and controlling costs by area of responsibility. Fund Centers are arranged in a multilevel hierarchy where a parent-child relationship is defined for reporting and/or controlling levels
General Costs Used to plan generic costs on a cost element. You enter the cost element and the dollar amount. There is no integration but costs will appear on a structure report
GL General Ledger Global Blueprinting The purpose of Global Blueprinting is to gather business
requirements at a high level in order to build a model that establishes the foundation for common data and organizational hierarchy elements to be used for all SAP releases.
GM Grants Management Go-live & Support The purpose of Go-live & Support phase is to move from a preproduction
environment to a live production system. A support organization will be established for the first critical days of live operation as well as provide longer term support.
GR Goods Receipt GUI Graphical User Interface HA High Availability HCM Human Capital Management Hierarchical Reports View a hierarchical overview of your cost and payment data HIPAA Health Insurance Portability and Accountability Act HR Human Resources IB Integration Builder ID Integration Directory IMG Implementation Guide or Configuration Guide IDOC Intermediate Document IGS Internet Graphics Service ILT Instructor-Led Training IM Inventory Management IMG Implementation Guide Individual Overview Obtain detailed information on selected objects, such as WBS elements,
Glossary of Terms
Page 8 of 14
Reports activities, or confirmations IndustryPrint™ Infotype Integration Points Internal Activity Used to plan labor for internal resources (people or machines). Tied to a
work center and rate (activity type). Enter the number of work hours. The rate X the hours will be calculated real time on the project
Internal Orders Internal orders are used to monitor the costs of a time restricted job. These costs can be allocated to other internal orders or departments
Investment Profile A configuration parameter that will be selected on capital WBS elements. The investment profile combined with an account assignment WBS element triggers the automatic creation of an Asset under Construction for the particular WBS when changing status to Released
IODS Integrated Operational Data Storage IPA Independent Project Assessment IR Integration Repository IS Integration Server IT Information Technology J2EE Java 2 Enterprise Edition JCO Java Connector JDBC Java Database Connectivity JDO Java Data Objects JMS Java Message Service JPR Java Proxy Runtime KPI Key Performance Indicator Line item Reports Trace the origin of your costs at document level MD Materials Master Data M-DCPS Miami Dade County Public Schools MDM Master Data Maintenance MM Materials Management
Glossary of Terms
Page 9 of 14
Master Data Account Structure Relationship Overview
Master Data Relationship
19
Master Data Relationship
GL Acct Sponsor Class
Cost Element
Commitment Item
Business Area
IO/WBS
Cost Center
Funded Program
Fund Center
Sponsored
Program(combination
of Fund Center, Funded
Program and Functional
Area)Functional Area
Fund (Internal)
Grant
Fund (External
)
Company Code ControllingArea FM Area
Mas
ter
Dat
aO
rg.
Stru
c.
Milestones In general milestones are used to mark the transition between various
phases or departments. Milestones can be created at either the WBS element level or for activities
MM SAP’s Material Management module NAS Network Attached Storage Network A series of activities or tasks defined by duration and relationship Network Scheduling Scheduling determines the earliest and latest start and finish dates for
carrying out activities in the network
FI Financial Accounting
( external accounting )
GM Grantee
Management FM
Funds Management ( budgetary accounting )
CO Controlling
( managerial / cost
accounting )
GL Account
Grant
Functional Area
Business Area
Fund
Fiscal Year
Cost Element
Primary & Secondary
Grant
Functional Area
Internal Order WBS Element
Cost Center
Fund
Fiscal Year
Commitment
Item
Grant
Functional Area
Funded Program
Funds Center
Fund
Fiscal Year
Sponsor Class
Grant
Sponsored Program
Fund
Budget Validity
Period
Object
Grant
Location
Function
Fund
MSAF
Program & Project
(sponsor’s view/reporting
requirements)
Glossary of Terms
Page 10 of 14
Network Type The network type distinguishes networks by their usage NW Netweaver ODS Operational Data Storage OLAP Online Analytical Processing OM Organizational Management PA Payroll or Personnel Administration PAS Pluggable Authentication Services PBC Position Budget Control PERNR Personnel Number PERT Project Evaluation Review Table is another graphical version of the
project builder best used for viewing or assigning relationships between network tasks
PI Process Infrastructure PIER Post Implementation Evaluation Review Planning Element If the planning element indicator has been set in the create/change project
profile, you can only plan costs on those elements that have been designated as planning elements.
PLM Project Lifecycle Management PM Plant Maintenance PMIS Project Management Information Systems used for Contract Management
Systems - Retainage PMO Program Management Office PO Purchase Order Posting Period The posting period is a period of time within a fiscal year during which
transactions can be posted Primavera Project Management Scheduling Tools Project Projects are tasks with special characteristics and are: 1) generally
complex, unique, and involve a high degree of risk, 2) comprised of precise and predetermined goals, 3) limited in duration and are cost intensive, 4) often shared by more than one department within an organization, 5) operative structures are created to control the many tasks involved
Project Builder One stop’ location in Project System which enables you to fully maintain a project.
Project Definition This is the same as the top level WBS element and is the “header of the project”. It contains key configuration parameters defaulted from the project profile
Project Materials Reports Obtain information on the materials situation in your projects
Project Planning Board PPB is the GANTT chart (graphical) version of the project builder best used for graphical display of baseline to current schedule
Project Preparation Phase (Logistics/ Vision/ Plan)
The purpose of the Project Preparation Phase is to perform the initial project planning and preparation. During this phase, the focus is to build an infrastructure for the project, to identify the project team members and to develop a detailed project plan. Initial training is performed, giving the project team a foundation in both the SAP software package and the
Glossary of Terms
Page 11 of 14
implementation methodology and tools. The key processes required to monitor and guide the progress of the project are designed and put into place during this phase.
Project Profile The primary configuration parameter which determines the ‘DNA’ of the project. Specifically what additional functionality and controls the project will have
Project progress Reports Reports on progress analysis, milestone trend analysis, and confirmation Project Settlement Full or partial allocation of costs from one object to another
Project Type
A reportable field on the WBS element. Selection values can be easily maintained in a table. Typically represents the type of project but can be used for anything that needs to be reported on
PS Project Systems or Public Sector PU Purchasing QA Quality Assurance QRC Quick Reference Card QRG Quick Reference Guide RDBMS Relational Database Management System REL SAP’s Project Systems term used for Released Relationships Link between activities within a network that establishes their sequence in
time Release 1 Finance Release 1 Finance refers to the first roll-out of the new SAP system and
focuses on Financials implementation, with the majority of the financial capabilities implemented during this phase. The go-live date for Release 1 is January 2009
Release 2 Human Resources & Payroll
Release 2 Human Resources & Payroll refers to the second rollout after Finance and focuses primarily on the implementation of the core Human Resources and Payroll functionality. The go-live for Parallel Testing date for Release 2 is March 2009
Release 3 Finance & Procurement
Release 3 Finance and Procurement implements the major elements of procurement, and completes the implementation of Workflow and Business Warehouse. The go-live date for Release 3 is July 2009
Requesting Cost Center
The cost center that requested the project task. This becomes the owner of any asset records created by the project and the receiver of depreciation expense once asset is completed
Resources Reports View detailed information at area level on, for example, purchase orders or capacities
Responsible cost center A cost center that is responsible for the execution of the project task
Responsible person
A reportable field on the WBS element. Selection values can be easily maintained in a table. Typically represents the person responsible for the project but can be used for anything that needs to be reported on
RFC Remote Function Call RPO Recovery Point Objective RTO Recovery Time Objectives RWB Runtime Workbench SAB Space Available Basis S&D Stores and Mail Distribution
Glossary of Terms
Page 12 of 14
SAN Storage Area Network Sandbox SAP SAP stands for Systems, Application and Products. It is the name of the
software company (SAP AG) and the software product itself. SAP Org Structure overview
18
SAP Org structure OverviewSAP Data structure
Drives the fundamental data framework within the SAP system
SAP’s static informational and processing data
Tasks which combine to form integratedbusiness processes
Master Data
Transactions
Org Structure
SAPClient
CONFIGURATION SIDE
FUNCTIONAL SIDE
SAP Organizational overview – Procurement Definitions
6
SAP Organizational Structure – Definitions
A purchasing organization is an organizational unit in Logistics . A
purchasing organization procures materials and services, negotia tes
conditions of purchase with vendors, and is responsible for such
transactions.
Purchasing Purchasing
OrganizationOrganization
A storage location is an organizational unit where inventory is maintained.
Stock reports for various materials can be obtained at a storage location
level.
Storage LocationStorage Location
In Logistics, a plant is an organizational unit for dividing an enterprise
according to production, procurement, maintenance, and materials
planning. A plant is a place where materials are produced, or go ods and
services are provided. Plant is an operational unit within a com pany code.
PlantPlant
This level represents an independent accounting unit within a cl ient. Each
company code includes the entry of all transactions that must be posted
and the creation of all items for legal individual financial sta tements.
Company CodeCompany Code
A purchasing group is a buyer or a group of buyers responsible f or certain
purchasing activities.Purchasing GroupPurchasing Group
Settlement Rules Rule that determines which portions of a sender’s costs are allocated to which receivers
Shopping Cart The Legacy Shopping Cart
Glossary of Terms
Page 13 of 14
SIT System Integration Testing SLD System Landscape Directory SMA Subject Matter Advisors - Individual with expert knowledge in a
particular subject matter area. SMTP Simple Mail Transport Protocol SNC Secure Network Communications SOW Statement of Work SPOF Single Point of Failure SQL Structured Query Language SRM Supplier Relationship Management module SSO Single Sign On SSU SSelf-Service User
Standard structures Template project structures that are not active/live and are used to make creating new projects easier
Structure Overview Reports
The system displays the basic structure of the project in overview. You can view the structure in a variety of ways and save variants for future use
STO’s Stock Transfer Orders Summit SUS Supplier Self Service Systems Integrator The systems integrator specializes in assisting a client install and maintain
ERP software and hardware; reengineer their business processes; configure and customize software; develop training materials and reorganize IT for long term sustainability.
System Status Project System status which controls what business transactions are allowed on the project
T-Code Transaction Code TA Time and Attendance TECO SAP’s Project Systems terms used for Technically Completed Technical Project Reports Mainly covers aspects of technical project monitoring and control ThreadManager™ TMT Transportation Management System TR Travel Management or Treasury TXT Textbook System TV Travel UAT User Acceptance Testing UMR User Master Record UOM Unit of Measure Validation Session A meeting/session held to confirm and endorse system
Requirements. VLAN Virtual Local Area Network VM Vendor Master WBS Work Breakdown Structure WBS – Project Systems WBS is the work breakdown structure which represents the hierarchy of a
project. This structure should be designed to facilitate management and
Glossary of Terms
Page 14 of 14
reporting. Costs are posted at the lowest level of the hierarchy and roll up for reporting
WBS Element – Project Systems
PS master data records which make up the hierarchy. Some of the attributes and functionality are taken from the project definition but typically additional information is required on the WBS elements
WBT Web Based Training WCBU Web-based Capital Budgeting used for budget preparation and
maintenance
Work Center A work center is a group of people, a machine or an individual who performs work
WPNR Web-based Project Numbering System used for Project number generation
XI Exchange Infrastructure