goals for shared ils. 2012 development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (feb – april,...

14
SCLS All Director’s Meeting July 19, 2012 Goals for Shared ILS

Upload: christine-byrd

Post on 12-Jan-2016

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Goals for Shared ILS. 2012 Development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late

SCLS All Director’s MeetingJuly 19, 2012Goals for Shared ILS

Page 2: Goals for Shared ILS. 2012 Development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late

2012 Development√ 4.10 upgrade (2/7/12)√ 4.10.1-4.10.5 (Feb – April, 2012)√ 4.12 upgrade (5/31/12)4.12 bug fix release – late summer4.14 SOLR enhancement – August4.16 late fall – planned projects for 2012Koha evaluation – complete by end of

December

Page 3: Goals for Shared ILS. 2012 Development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late

2012 DevelopmentCataloging

Authority Control Authority loader (4.16) RDA Compliance and other authority control features

(4.16)√ Invalid barcodes (4.12)

Automated materials handling & Self checks√ Lost items identified (4.10.3)√ Add Shelving location to sort criteria (4.10.3)Renew items on self checks (4.16)

Page 4: Goals for Shared ILS. 2012 Development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late

2012 DevelopmentPAC / Patrons

√ Relevancy ranking improvement (4.10)√ Fix holds message when placing additional

hold (4.10)Title browse (4.16)Display full titles in PAC & staff (4.16)√ Limiting by all books and adult (4.12)Sort facets alphabetically – may be available

with SOLR√ Add drop down box with format search limits

on main search page (4.12)√ Change wording of Browse shelf feature

Page 5: Goals for Shared ILS. 2012 Development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late

2012 DevelopmentCirculation

√ Retain last patron (4.10)√ Add agency code to checkin messages (4.10)Ability to save messages to history (4.16)√ Have Talking Tech check to see if patron

picked up hold (4.12)Improve fines & lost payment process (4.16) –

possibly a major re-vamp

Page 6: Goals for Shared ILS. 2012 Development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late

2012 DevelopmentResponse time

√ Retrieving magazine titles (4.10)Improving new bib indexing time (SOLR 4.14)

Data archiving planned for fallGetIt Acquisitions

√ EDI is fully workingCreate items on order

√ Bulk send to catalog works to create on order items

Individual PO lines will create items for new titles Still need updating items at point of receipt

Page 7: Goals for Shared ILS. 2012 Development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late

Other ProjectsEcommerce (2012 plan)√ Downloadable mobile app for patrons (2012

plan) – 2,793 users in June visited 11,357 times√ Text message holds notices√ Series & Awards, Social tags & reviews,

Similar Titles, Excerpts (ILS Users Group in March)

Library online authentication√ Remove fines history for patrons now in

sandbox (ILS Users Group)

Page 8: Goals for Shared ILS. 2012 Development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late

Reports√ Email list set up to solicit input on report

development √ Circulation “pipeline”

√ Circulation by Dewey by library√ Circulation by collection code subtotallingCirculation by PSTAT subtotalling coming

√ Reports calendar – daily reports and semi-monthly reports

Page 9: Goals for Shared ILS. 2012 Development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late

Reports -- NextHolds Pipeline and Items PipelineInvestigating options for on demand circ by

hour and last patron requestsCrystal reports – LSTA grant

Purchasing serverPlanning trainingContracting for report development

Page 10: Goals for Shared ILS. 2012 Development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late

ILS SupportUpdating manuals – incorporating workflowsOffering training in late summer and fallILS Problem & Questions form submissions

3908 submitted since April 17, 2011Highest month: May, 2011 – 897Lowest month: January, 2012 – 58Last three months: range from 63 to 77

Page 11: Goals for Shared ILS. 2012 Development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late

ILS Problems & Questions Form

Apr-11May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12Mar-12Apr-12May-12 Jun-120

100

200

300

400

500

600

700

800

900

1000

Page 12: Goals for Shared ILS. 2012 Development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late

2012 & 2013Complete additional “wish list” items as

possible in 4.16 or later (see 2012 development plan)

Prepare 2013 development plan in the fallImprovements to Last Patron Linked authorities (RDA, etc.)

Integrate ability to access and download electronic resource records

Review notice workflow in Koha

Page 13: Goals for Shared ILS. 2012 Development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late

Fun FactsLINK2.0Koha

197 subscribers23 page views per dayFollowers from Canada & New Zealand

LINKcat 234,938 visits in JuneCountries include Canada, Ecuador, Germany,

UK, Peru, China, Italy, JapanLINKcat on Facebook has 835 followers

Page 14: Goals for Shared ILS. 2012 Development √ 4.10 upgrade (2/7/12) √ 4.10.1-4.10.5 (Feb – April, 2012) √ 4.12 upgrade (5/31/12) 4.12 bug fix release – late

DemosLINK2.0Koha

NewsReports

ReportsLINKcat enhanced contentSOLR