techexcel.intechexcel.in/wp-content/uploads/2015/06/hdfcbank_nse_fno_split1.pdf · godrejcp...

8
BELOW CHANGES ARE TO BE DONE AFTER UPLOADING THE TRADE FILE AND POSITION FILE OF 19/09/2019 Corporate action of HDFCBANK on 19/09/2019 Trading-NSE_FNO-Masters-Corporate Action Input type select- SPLIT, trade date-19/09/2019, scrip- HDFCBANK, ratio input (1:2) & Add After update will display screen

Upload: others

Post on 28-Oct-2019

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: techexcel.intechexcel.in/wp-content/uploads/2015/06/HDFCBANK_NSE_FNO_SPLIT1.pdf · GODREJCP 04/09/2018 INFY 14/08/2018 CHENNPETRO 26/06/2018 CONCOR 71 Ratio : 1 DAY-TO-DAY Corporate

BELOW CHANGES ARE TO BE DONE AFTER UPLOADING THE TRADE FILE AND POSITIONFILE OF 19/09/2019

Corporate action of HDFCBANK on 19/09/2019Trading-NSE_FNO-Masters-Corporate Action

Input type select- SPLIT, trade date-19/09/2019, scrip- HDFCBANK, ratio input (1:2)& Add

After update will display screen

Page 2: techexcel.intechexcel.in/wp-content/uploads/2015/06/HDFCBANK_NSE_FNO_SPLIT1.pdf · GODREJCP 04/09/2018 INFY 14/08/2018 CHENNPETRO 26/06/2018 CONCOR 71 Ratio : 1 DAY-TO-DAY Corporate

Close existing mkt lot-Go to -Trading-->NSE_FNO-->Masters-Market Lot

Close the existing market lot size 250 of HDFCBANK by inputting To date as 18/09/2019

After Close will display below screen

Page 3: techexcel.intechexcel.in/wp-content/uploads/2015/06/HDFCBANK_NSE_FNO_SPLIT1.pdf · GODREJCP 04/09/2018 INFY 14/08/2018 CHENNPETRO 26/06/2018 CONCOR 71 Ratio : 1 DAY-TO-DAY Corporate

And add new entry for market lot size 500 from 19/09/2019 as shown below

After adding the screen will appear as below

Note : After this, please cancel the bill for 18/09/2019 and do mark to market of18/09/2019 and process the Bill for 18/09/2019 and continue with today’s work.

Page 4: techexcel.intechexcel.in/wp-content/uploads/2015/06/HDFCBANK_NSE_FNO_SPLIT1.pdf · GODREJCP 04/09/2018 INFY 14/08/2018 CHENNPETRO 26/06/2018 CONCOR 71 Ratio : 1 DAY-TO-DAY Corporate

Note : to check strike price with new strike priceAs per the attached exchange circular if there is an option outstanding portion. Pleaserefer the strike price table in there, strike price may differ as ratio of corporateaction is odd.

Page 5: techexcel.intechexcel.in/wp-content/uploads/2015/06/HDFCBANK_NSE_FNO_SPLIT1.pdf · GODREJCP 04/09/2018 INFY 14/08/2018 CHENNPETRO 26/06/2018 CONCOR 71 Ratio : 1 DAY-TO-DAY Corporate
Page 6: techexcel.intechexcel.in/wp-content/uploads/2015/06/HDFCBANK_NSE_FNO_SPLIT1.pdf · GODREJCP 04/09/2018 INFY 14/08/2018 CHENNPETRO 26/06/2018 CONCOR 71 Ratio : 1 DAY-TO-DAY Corporate
Page 7: techexcel.intechexcel.in/wp-content/uploads/2015/06/HDFCBANK_NSE_FNO_SPLIT1.pdf · GODREJCP 04/09/2018 INFY 14/08/2018 CHENNPETRO 26/06/2018 CONCOR 71 Ratio : 1 DAY-TO-DAY Corporate
Page 8: techexcel.intechexcel.in/wp-content/uploads/2015/06/HDFCBANK_NSE_FNO_SPLIT1.pdf · GODREJCP 04/09/2018 INFY 14/08/2018 CHENNPETRO 26/06/2018 CONCOR 71 Ratio : 1 DAY-TO-DAY Corporate