Good Construction Practices – Part II This report is solely for the internal use. No part of it may be circulated, quoted, or reproduced for distribution outside the company organization without prior written approval from ACC Limited. This material was used during an oral presentation; it is not a complete record of the discussion.

Upload: abhinav-singh

Post on 12-Jul-2015

207 views

Category:

Real Estate


2 download

TRANSCRIPT

Page 1: Good construction practices - Part 2 - ACC

Good Construction Practices – Part II

This report is solely for the internal use. No part of it may be circulated, quoted, or reproduced for distribution outside the company organization without prior written

approval from ACC Limited. This material was used during an oral presentation; it is not a complete record of the discussion.

Page 2: Good construction practices - Part 2 - ACC

� Very necessary for strength and durability of concrete structure

� Do not start plastering before completion of Brickwork curing.

Curing

2

ACC Limited 26.06.2010Good construction practices

Page 3: Good construction practices - Part 2 - ACC

� By Hessian Clothes for columns & sides of beams

� Ponding on flat horizontal surface.

Curing

3

ACC Limited 26.06.2010Good construction practices

Page 4: Good construction practices - Part 2 - ACC

Curing

4

ACC Limited 26.06.2010Good construction practices

Page 5: Good construction practices - Part 2 - ACC

5

ACC Limited 26.06.2010Good construction practices

Page 6: Good construction practices - Part 2 - ACC

6

ACC Limited 26.06.2010Good construction practices

Page 7: Good construction practices - Part 2 - ACC

Strength and Curing

moist cured entire time

in air after 3 days

in air after 7 days

Strength

100%

7

ACC Limited 26.06.2010Good construction practices

time

in air entire time

in air after 3 days

28

Page 8: Good construction practices - Part 2 - ACC

� All bricks should be of same size and color� Bricks should be properly baked.� If a brick is dropped from a height of 1 m, it should not break.

How to choose Bricks?

Brickwork

Correct Practice:

8

ACC Limited 26.06.2010Good construction practices

� Bricks should be immersed in water at least two hours before use.� Cement to sand proportion should be 1:5.� Use the Mixed material within half n hour of mixing, otherwise it start loosing strength.� Maximum 1 m work should be done in a day.� All joints should be raked properly.

Correct Practice:

Page 9: Good construction practices - Part 2 - ACC

Mortar and Plaster

� Even though mortar makes up as little as 7% of the total volume of a masonry wall, it plays a crucial role in the performance of the structure.

� It not only bonds the individual units together, but it also seals the building against moisture and air penetration. It can be used to bond to anchors, ties or reinforcing.

9

ACC Limited 26.06.2010Good construction practices

� The mortar is literally the glue that holds the wall system together.

� The primary ingredient in mortar is Portland cement. Since Portland cement is also used in concrete, we need to make a few distinctions here.

Page 10: Good construction practices - Part 2 - ACC

Mortar

� Concrete is formulated to become a solid monolithic wall system by itself.

� The most important characteristic of concrete is compressive strength.

� Mortar, on the other hand, is formulated to bind masonry

10

ACC Limited 26.06.2010Good construction practices

� Mortar, on the other hand, is formulated to bind masonry units together.

� There are several properties of mortar that can influence bond strength and durability.

The most important qualities of mortar are bond strength and durability.

Page 11: Good construction practices - Part 2 - ACC

Requirements of mortar

� The single most important property of mortar is bond strength,.

� It is critical that this bond be complete, strong, and durable.

� The mechanical bond between individual bricks, blocks, or stones unifies the wall as a system, provides resistance to tensile stress, and seals against the penetration of

11

ACC Limited 26.06.2010Good construction practices

tensile stress, and seals against the penetration of moisture.

Page 12: Good construction practices - Part 2 - ACC

Factors affecting mortar properties

� The strength and extent of the bond are affected by many variables of material and workmanship.

� Complete and intimate contact between the mortar and the unit is essential,

� Workability influences the ease with which the mortar spreads and covers the surfaces.

12

ACC Limited 26.06.2010Good construction practices

spreads and covers the surfaces.

� Rough units have a very porous surface that is highly receptive to the wet mortar and increases adhesion

Page 13: Good construction practices - Part 2 - ACC

Factors affecting mortar properties

� The moisture content and suction of the units, the

water retention of the mortar.

� Curing conditions such as temperature, relative

humidity, and wind combine to influence the

completeness and integrity of the mechanical and

chemical bond.

13

ACC Limited 26.06.2010Good construction practices

� Voids at the mortar-to-unit interface offer little

resistance to water infiltration and facilitate

subsequent disintegration

� In aligning the masonry, laboratory tests show that

tapping the unit to level will increase bond strength

50 to 100% over hand pressure alone

Page 14: Good construction practices - Part 2 - ACC

Factors affecting mortar properties

� Often overlooked is the size/shape of mortar joints in

that the ultimate compressive load capacity of a typical

3/8 in. bed joint will probably be well over twice the

value obtained when the mortar is tested as a 2 in.

(50.8 mm) cube.

Mortars should typically be weaker than the masonry

14

ACC Limited 26.06.2010Good construction practices

� Mortars should typically be weaker than the masonry

units, so that any cracks will occur in the mortar joints

where they can more easily be repaired.

Page 15: Good construction practices - Part 2 - ACC

Factors affecting mortar properties

� Compressive strength of mortar increases with an increase in cement content and decreases with an increase lime, sand, water or air content.

� Retempering is associated with a decrease in mortar compressive strength.

� The amount of the reduction increases with water addition and time between mixing and retempering.

15

ACC Limited 26.06.2010Good construction practices

and time between mixing and retempering.

� It is frequently desirable to sacrifice some compressive strength of the mortar in favor of improved bond, consequently retempering within reasonable time limits is recommended to improve bond.

Page 16: Good construction practices - Part 2 - ACC

RCC Band at 1 m height which should be of 4 ‘ thick with two bars of minimum 8 mm

16

ACC Limited 26.06.2010Good construction practices

Avoid corner windows in Load bearing structures

Page 17: Good construction practices - Part 2 - ACC

17

ACC Limited 26.06.2010Good construction practices

Page 18: Good construction practices - Part 2 - ACC

18

ACC Limited 26.06.2010Good construction practices

Page 19: Good construction practices - Part 2 - ACC

Surface Preparation

� Before plastering concrete surface should be hacked properly ( Minimum 50 per sq.ft.)

� It is advisable to apply a base coat of cement paste on concrete surface, and cure it for three days to have a better bonding .

19

ACC Limited 26.06.2010Good construction practices

days to have a better bonding .

� A brick wall should be made wet a day before plastering

Page 20: Good construction practices - Part 2 - ACC

� The surface to be plastered should be accurately positioned overall and zones should not deviate excessively from a plane (or curved) surface.

� Ideally, the substrate should be rough; absorbent to a limited extent; strong; and clean, i.e. free of any film, such as dust, oil or paint, that could impair bond between plaster and substrate..

� Roughness improves adhesion by providing a positive

Surface Properties required

20

ACC Limited 26.06.2010Good construction practices

� Roughness improves adhesion by providing a positive “key” for plaster to grip. Absorption removes the water film, between substrate and plaster, that would tend to weaken adhesion. Excessive absorption will however dry out the

� The strength of the substrate material should be greater than, or equal to, that of the hardened plaster.

Page 21: Good construction practices - Part 2 - ACC

Surface Preparation

� Background surfaces should ideally be at least as rough as coarse sandpaper or rough-sawn timber.

� Surface roughness can be achieved in one of the following ways:

� Using formwork with a rough surface,

21

ACC Limited 26.06.2010Good construction practices

� Using formwork with a rough surface,� Stripping formwork early and wire brushing concrete

� Hacking� Abrasive blasting (e.g. sand blasting)� Applying a spatter dash layer

Page 22: Good construction practices - Part 2 - ACC

Surface Preparation

� Spatter dash is a mixture of one part of cement to one and a half parts of coarse sand with enough water for sluggishly pourable consistence.

� The mixture is thrown forcibly on to the wall, using a scoop or a brush with long, stiff bristles. (The impact drives out the water film at the interface between spatterdash and substrate and hence improves adhesion.)

22

ACC Limited 26.06.2010Good construction practices

� The Spatterdash should cover the substrate surface completely and form a rough texture with nodules about5 mm high.

� Spatterdash must not be allowed to dry out for at least three days.

Page 23: Good construction practices - Part 2 - ACC

Absorption

� Assess absorptiveness by throwing about a cupful of water against the surface.

� The surface will fall into one of the three categories:

� No water is absorbed.� Some water is absorbed but most runs off.� Most of the water is absorbed.

� First type of surfaces, include hard-burnt clay face bricks, glazed bricks and very dense high-strength concrete,

23

ACC Limited 26.06.2010Good construction practices

glazed bricks and very dense high-strength concrete, should be prepared by applying a spatter dash

� Second type of surfaces should not require any treatment to control suction.

� Third type of surfaces should be wetted thoroughly and then allowed to become surface dry before the plaster is applied.

Page 24: Good construction practices - Part 2 - ACC

Surface - Monolithic concrete.

� Provide a rough surface by using rough-textured formwork, early stripping of formwork and wire brushing the concrete,

� hacking or abrasive blasting. (If none of these is practicable, apply a spatter dash coat after ensuring that the surface is clean.)

� Ensure that no form-release oil is left on the surface to be

24

ACC Limited 26.06.2010Good construction practices

� Ensure that no form-release oil is left on the surface to be plastered. Clean down by water jetting or vacuuming.

� Conventional structural concrete should not require wetting to control suction. High-strength concrete may require the application of a spatter dash coat.

Page 25: Good construction practices - Part 2 - ACC

Surface - Brickwork

� Burnt clay brickwork

� If the surface is dusty, clean by brushing, water jetting� Burnt clay stock bricks normally have a very high suction; pre-wet the wall and allow it to become surface dry before applying the plaster.

� Sun dried or poorly burnt soft clay brickwork

� This type of walling may be found in very old buildings,

25

ACC Limited 26.06.2010Good construction practices

� This type of walling may be found in very old buildings, usually when restoration or repairs are being done.

� Care should be taken when removing the old plaster so as not to damage the bricks. Protect the wall from rain water once the bricks are exposed.

� Rake out the joints about 10 mm deep (the mortar is normally very soft).

� Brush down the wall to remove any loosely adhering material.

� Lightly dampen the wall and apply a spatter dash coat that improve adhesion.

Page 26: Good construction practices - Part 2 - ACC

Very Smooth Surface Result in to Poor Bonding.

26

ACC Limited 26.06.2010Good construction practices

Use Bonding agent Or Hack the surface at close spacing

Page 27: Good construction practices - Part 2 - ACC

Surface making….

27

ACC Limited 26.06.2010Good construction practices

Page 28: Good construction practices - Part 2 - ACC

28

ACC Limited 26.06.2010Good construction practices

Page 29: Good construction practices - Part 2 - ACC

29

ACC Limited 26.06.2010Good construction practices

Page 30: Good construction practices - Part 2 - ACC

30

ACC Limited 26.06.2010Good construction practices