good quality, timely delivery - the center group · we won the first kpmg / mwananchi communication...

20
Good Quality, Timely Delivery

Upload: ngoxuyen

Post on 31-Aug-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

Good Quality, Timely Delivery

Page 2: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth2

Greetings to Clients & Suppliers

Integrating Local Resources and Best Practices to Offer as

Superior Quality Construction Works

Two Decades of Unsurpassed Growth

BQ Contractors Limited celebrates 20 years of unsurpassed growth with much enthusiasm. The

unwavering support from our clients, industry players, stakeholders and the community we work in has particularly driven our dream of championing industry change of quality provision and timely delivery of construction projects.

We have expanded our activities in the glowing oil and gas sectors as an emerging opportunity for growth. We look beyond the key pillars of trust and integrity to inspire the construction of a sustainable and cost effective energy infrastructure while we create maximum value for our client investment.

Page 3: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth3

Early Days

From humble beginnings as a family business initiative in 1996 with very limited resources, BQ Contractors

Limited has evolved to become a key player in the construction sector in mechanical, civil and building.

Corporate restructuring in 2007 saw to the establishment of a strong foundation for good corporate governance and strict financial control. The enterprising relations with industry players were a huge motivation.

Doing the Right Thing in a Modern Way

Our philosophy towards professionalism, experience and commitment for success meant that we focus on an enterprising investment on machinery and the use of the latest technology.

This went hand in hand with training of our own staff on the best practices in view not to compete but to do the right thing in a modern way.

To complement our efforts, foreign expertise was engaged to transfer knowledge to Tanzanians. Today we take pride in our ability to combine expertise with diversity as we creatively and innovatively endeavor to complement our client’s expectations and secure value for money.

Our Dream

We are inspired by the founder’s desire to build an efficient contracting firm that would consistently exceed client expectations in the delivery of quality construction works and services at international standards.

Eng. John Bura, BSc Mech Eng - University of Zagreb, CroatiaManaging Director

Corporate

restructuring

in 2007 saw

to the es-

tablishment

of a strong

foundation

for good

corporate

governance

and strict

financial

control. The

enterprising

relations

with industry

players were

a huge

motivation.

Temporary connection to well head at Mnazi Bay Natural Gas Field.

Page 4: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth4

AboutBQ Contractors

BQ Contractors Limited is a

Tanzanian firm established

in 1996 to champion

industry change in the provision of quality

works in mechanical, civil and building

construction.

Today, we have moved the extra mile in the

provision of superior client experience in

the glowing energy sector with particular

focus in Oil and Gas. The firm is registered

with CRB as Mechanical, Civil and Building,

and is a member of the Contractors

Association of Tanzania (CATA).

Our Purpose

Throughout our history we have strived to improve peoples’ lives, especially our working community both permanent as well as on contract. By doing so we improve their know how and work commitment. In such a way, we are assured of growth. This is our role and purpose.

Our Vision

To be an efficient contracting firm delivering quality works and services at international standards.

Our Mission

We exist to champion quality partnerships with other industry players and professional bodies while investing on modern technology and improving national capacities to achieve superior client satisfaction and value for money.

Our Key Strengths

20 years on ground experience BQ Contractors Limited takes pride in its 20 years practical and field experience in construction. We have evolved with flexibility and timeliness, effectively delivering quality works in an efficient manner. This particularly promises our clients a friendly collaboration and partnership while handling their specific needs and meeting project requirements within approved budget parameters.

STePhen PeTeR - BA Public Administration - UDOMHuman Resources, Administration & Finance Manager

We have invested on cost effective machinery with a huge reward in a strong record of growth.

Page 5: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth5

Quality Investment in Machinery

Value investment in machinery has been the backbone of our successful existence. We take our client’s specific quality measurements at heart. We have invested in cost effective machinery with a huge reward in a strong record of growth. Our clients will therefore expect quality works at affordable costs that promise long-term equity returns.

Civil Works on Rehabilitation of 36 million litres Fuel Storage Tank for Tanzania International Petroleum Reserve (TIPER)

Our clients will therefore expect quality works at affordable costs that promise long-term equity returns.

Page 6: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth6

QS Innocent Peter - MSc, CEM ARU. Contract Manager

Our Projects

Pipe welding work for Replacement of 8 Inches Submarine Pipeline at Mtoni, Zanzibar.for transportation of Jet-A1 fuel for PUMA Energy Tanzania Ltd

Ongoing Construction of Kibwele Tea Factory at Mufindi, Tanzania for Unilever Tea Tanzania Ltd

Setting Outlet Pipeline Pressure at Presure Reducing Station

Natural Gas Pipeline Integrity Tests During construction of a 7.7Km natural Gas Pipeline from Ubungo to Mikocheni for TPDC

expansion of Kibwele Tea Factory at Mufindi, Tanzania for Unilever Tea Tanzania Ltd

Page 7: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth7

Our Works

Setting Outlet Pipeline Pressure at Presure Reducing Station

Construction & Rehabilitation of Fuel Storage Tanks Rehabilitation of Tank S2 for TIPER

Contruction of Packing Plant Steel Structures at Mbeya Cement Company Ltd

Improvement of Pressure Reducing Station at TPDC Village, MikocheniInstallation of Red Soil Discharger for

Tanga Cement Company Limited

On-shore well head connection at Songo Songo Island

Page 8: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth8

OurServices

Construction of Condensate Export Pipepline at Songo Songo Island for Pan African Energy Tanzania Ltd

Eng. Teddy Chungu - MSc. Engineering University of Southampton, UK IGEM IEng

Gas Specialist

• Construction of Fuel and Gas Facilities including Pipelines

• Well-Head Connections – Offshore and Onshore

• Construction, Rehabilitation and Maintenance of Cement and Mining Facilities

• Construction, Rehabilitation and Modification of Natural Gas Facilities

• Plant Shutdown Works and Manpower Hire

• Scaffolding Services

Page 9: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth9

OngoingProjects

1

2

3

1. Well Head Con-nection at Mnazi Bay Natural Gas Field

2. Replacement of 8” JET-A1 Submarine Pipeline at Mtoni Zanzibar

Tanzania.

3. Eng. John Bura ©, the CEO of BQ Contractors in a Group Photo with Site Project Team at Unilever Tea Tanzania, Mufindi – Tanzania

Page 10: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth10

OtherProjects

natural Gas off-shore wellhead connection at Songo Songo Island for Panafrican Energy Tanzania Limited

Welding of Natural Gas Pipes and Fittings

Fire escape steel construction for Estim co. At PCCB Hq, Dar es SalaamTanzania

Replacement and Commissioning of Corroded Underground Steel Pipeline with HDPE at Somanga

Funga TANESCO Gas Plant for Power Generation.

Erection of Roof

Structure for Storage Tank S2 for TIPER

Page 11: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth11

Project HighlightsYear Client ProjeCt DesCriPtion

2

0

1

5

tPF Basse saMBre sasubcontract Works -Pipeline interconnection Project:Mechanical and Civil Works at Mnazi Bay natural Gas Field for Maurel & Prom

Unilever tea tanzania limitedExpansion of Kibwele Tea Factory at Mufindi, Tanzania - Civil, Building and Mechanical Works

Puma Energy Tanzania LimitedReplacement of 8” JET-A1 Submarine Pipeline at Mtoni Zanzibar, Tanzania.- Supply, Fabrication, Submarine Works including Launching, Floatation and Commissioning

by Receiving Aviation Fuel from the Ship Tanker.

total tanzania limited• Sand Blasting & Painting of JET-A1 Fuel tank No. 10 & 12• Construction of Lugoba Petrostation at Lugoba, Chalize for Twiga Aggregates

Panafrican Energy Tanzania Ltd May 2015 Plant Shut Down Works at Songo Songo Island for Songas Gas Processing Plant

Tanga Cement Co. Tanzania Ltd 2015 Kiln shut-down rehabilitation and Maintenance Work

2

0

1

2

-

2

0

1

4

enikon tanzania Branchrevamp Project for 36 million litre tanks s5 & s6 subcontractor Civil Works for Rehabilitation of Tanks’ Foundation Asphalt Laying and Concrete Works for Tiper

Panafrican Energy Tanzania Ltd Condensate Export Pipeline Reconstruction at Songo Songo Island

natoil tanzania ltdCompletion of Construction of 4Km - 12" Diameter Pipeline from tPa Koj to natoil tanks Farm

Arch Diocese of Mbulu, St. Siril of jerusalem Church - endabash Parish

Completion of 1200 Capacity Endabash Roman Catholic Church in Karatu, Arusha Region

Unilever tea tanzania ltd-Construction of Withering Troughs for Unilever Tea Tanzania Limited including Fabrication of steel structure of about 140 tonnes

tanesCoReplacement of Corroded underground steel pipeline with HDPE pipes at TANESCO Gas Plant - Somanga Funga.

tanzania Petroleum Development Corporation (tPDC)

Construction of a 7.7 Km Natural Gas Distribution Pipeline from CNG Ubungo to Mikocheni and Connection of 57 Houses to the Gas Supply Network for Domestic and Industrial Use.

Panafrican Energy Tanzania Ltd

• SS 11 – SS 3 Flowline and Wellhead Connection at Songo Songo Island• SS 11 Mechanical Works and Wellhead Connection and Rehabilitation of Offshore Wellhead Platform SS5, SS7 and ss9• Concreting Works at Serena Hotel Bay CNG Daughter Station.• Construction of Firewall and Ubungo CNG Renovation

Tanga Cement Co. LimitedInstallation of New Red Soil Discharger and Weigh Feeder and Tanga Cement factory, Tanga

total tanzania limitedInstallation of 4 Horizontal Fuel Storage Tanks at Strabag Korogwe Site.- Rehabilitation of Fuel Storage Tanks and Loading Gantry

Puma Energy Tanzania Ltd Bottom Plates replacement tank # 17 at Dar es salaam installation terminal

jacobsen elektro as- Sub Contractor Mechanical Works at TANESCO 100MW Power Generation Plant –Installation of CO2 and Deluge Piping

Lonargo Tanzania Limited Concrete Hard Standing for John Deere Tractor Parking Bay

symbion Power tanzania limited -Installation, Testing and Commissioning of Power Generators Feed Pipeline with Fuel Tanks at TANESCO Ubungo , Zuzu Dodoma and Njiro Arusha

French embassy in Dar es salaam roof replacement at French embassy residence in Dar es salaam tanzania

ndovu resources limited Mtwara - Modification of 30 inch Drilling Cases at Mtwara Project

Page 12: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth12

Welders & Fitters at Work

Welder Ismail Mbinga (W10) welding Weld Neck Flange onto Rich Spool Elbow Section

Handling & lifting of Rich Jump-Over Spool for installationGrinding preparation of field weld (golden weld) Joint No.: FW-L1

Dimensional checking in progress during fitting of new 1,500lb weld neck flange onto existing Lean Piping by Fitter edwin Mtaki

Welder Damian Samson (W8) performing tack welding onto Joint No. FW-L1 (tie-in golden weld)

Project – 2015 Shut Down Works • Client – Panafrican energy Tanzania Ltd • Consultant – UltraScan, RSA

Page 13: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth13

BQ Contractors Limited has evolved to become one of the most

reliable, trusted and efficient local contracting firm in the areas of energy, oil, natural gas major in mechanical works. The multimillion projects that we undertake are indicative of our enterprising existence.

We have thrived to become an equal opportunity employer and boast over 45 professional staff, while over 150 on project employees have and continue to benefit.

Milestones

BQ Contractors Limited has engineered the transfer of knowledge and technology to the national workforce by attracting the best foreign expertise in the oil and gas industry.

We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011.

We enjoy quality partnerships and relations with the government, policy makers, and industry players across the board.

We won the

first KPMG /

Mwananchi

Communication

Top 100 Mid

Sized Enterprises

during the

prestigious

awards

inauguratin in

2011.

Page 14: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth14

Health, Safety & Environment Policy : Effective Health & Safety Practices for Better Performance

As a responsible employer, BQ Contractors Limited is committed to safeguarding

the occupational health, safety and welfare of all its employees by providing, so far as reasonably practicable, a safe and healthy environment

We belief that effective healthy and safety practices contribute directly to better performance. We not only comply with health and safety legislation, but also adopt recognized good practices and industry leadership to attain the highest standards.

To promote a healthy culture, the company has:• Made good health and safety

practices an integral part of its existence.

• Complied with all relevant legislation and approved codes of practice as the Safety Policy as a minimum and to monitor new developments to continually improve the specified performance standards.

• Provided a safe and risk free work place for its employees

• Adopted a structured approach of policy, processes, training and awareness at all levels.

• Committed to carrying out operations with due regard to the health and safety of the public and other non-employees.

• Measured our health and safety performance against the industries we operate within to determine areas for improvement we can adopt.

• Sustained and develop this policy by the implementation of an accredited health and safety management system

• Committed to review the Health and Safety Policy on an annual basis and implement appropriate improvements.

• Committed to bring changes to the Health and Safety Policy and Safety Management System to the attention of all employees.

We have provided prescribed information regarding those operations which may affect health and safety.

• Ensured employees take reasonable care for their own and others’ safety and that they are competent and appropriately trained.

• Created provisions for regular health checks and occupational health and support for all employees.

• Committed to consult with employees and where appropriate their representatives to effectively communicate on health and safety matters.

Health and Safety adherence with suitable Person Protective Gears

Page 15: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth15

BQ Contractors respects the environment and is committed

to transforming the lives of the communities we work with. We use sustainable approaches that deliver lifetime results in specific and tangible projects.

Employee Training and Career Development

BQ Contractors Limited advocates for employee success and career advancement as a motivation to increased productivity and performance levels. We complement existing processes that help employees take initiatives and tap into their natural talents. We bring in foreign expertise to impart knowledge and empower our employees for our future sustainability as well as for individual development.

CSRCorporate Social Responsibility

Health Enhancing Activities

BQ youth Football Team. BQ Contractors Limited beliefs in the power of developing youth healthy living through sports and has been supporting football for young stars who in turn become good ambassadors for a healthy living in the community.

BQ youth football team Trained by Fred Tchalewa Ndeki, Head of Physical Education & Sports at Laureate International School

BQ Youth and Junior Football Teams in a Group Photo

Improving national content

Page 16: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth16

EndorsementEndorsement

Page 17: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth17

Page 18: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth18

CertificationCertification

Page 19: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth19

Our Clients and Suppliers

TPF - Basse Sambre, Belgium

Unilever Tea Tanzania Ltd

PanAfrican Energy Tanzania Limited

Puma Energy Tanzania

Total Tanzania Limited

Tanga Cement Company Limited

Tanzania Portland Cement Co. Ltd - TPCCL

Mbeya Cement Company Limited

Tanzania International Petroleum Reserve

TANESCO

Excellium Construction Limited – UK

Enikon Limited Tanzania Branch

Doshi Hardware Tanzania

Tech-Hard Oilfield Supplies FZE, UAE

Jubilee Shopping Tanzania Limited

Breezes Beach Club, Zanzibar

Minex Logistics Limited

Nabaki Africa Limited

MAC Contractors Co. Ltd

ARD Development Co. Ltd - China

Milembe Construction Co. Ltd

Page 20: Good Quality, Timely Delivery - The Center Group · We won the first KPMG / Mwananchi Communication Top 100 Mid Sized Enterprises during the prestigious awards inauguratin in 2011

20 years of growth20

Josam House Complex, Mikocheni Light Industries, Coca Cola RdP.O. Box 32396, Dar es Salaam, Tanzania

Tel: +255 22 2701132 , Mob: +255 784 608301 / 773 608301,E-mail: [email protected], [email protected]

Website: www.bqcontractors.co.tz