    GOOD SAFETY PRACTI CES

  • 7/30/2019 Good safety practices

    2/39

    Hoarding constructed accordance with Commissioner ofBuilding Control requirements.

  • 7/30/2019 Good safety practices

    3/39

    Piling Machine

    Inspected by Approved person

    Daily inspection by designatedperson

    Warning sign provided

    Footing in sound condition

  • 7/30/2019 Good safety practices

    4/39

    Shoring constructed in accordance to P.E. design forexcavation of more than 1.5 metre with the use of

    mechanical digger

  • 7/30/2019 Good safety practices

    5/39

    Shoring constructed in accordance to P.E. design forexcavation of more than 4.0 metre.

  • 7/30/2019 Good safety practices

    6/39

    Open side of excavation more than 3 metre depthguarded by adequate barricade

  • 7/30/2019 Good safety practices

    7/39

    Valid LM certificate

    Daily check by crane operator

    Lifting Supervisor supervising lifting operationRigger and signalman appointed for lifting operation

  • 7/30/2019 Good safety practices

    8/39

    M t i l/ h i t

  • 7/30/2019 Good safety practices

    9/39

    Hoist operated by authorized person

    Material/passenger hoist

  • 7/30/2019 Good safety practices

    10/39

    Worksite to be kept clean and free from effluents, nuisancesand conditions that can be detrimental to the workers andPublic health

  • 7/30/2019 Good safety practices

    11/39

    Materials neatly stacked in safe and orderly manner

  • 7/30/2019 Good safety practices

    12/39

    Temporary material

    platform constructedand installed in

    accordance to PE

    design.

  • 7/30/2019 Good safety practices

    13/39

    Generator With Bund Wall

  • 7/30/2019 Good safety practices

    14/39

    Generator fenced off against unauthorized use.

  • 7/30/2019 Good safety practices

    15/39

    Main distribution boardand switch gear

    Checked and tested

    monthly by LEW

  • 7/30/2019 Good safety practices

    16/39

  • 7/30/2019 Good safety practices

    17/39

  • 7/30/2019 Good safety practices

    18/39

    DIESEL STORAGE WITH SIGNAGES

  • 7/30/2019 Good safety practices

    19/39

    DIESEL STORAGE WITH SIGNAGES

    AND PROVISION OF BUND WALL.

  • 7/30/2019 Good safety practices

    20/39

    Tower crane base barricaded with warningsign. Free of water and obstructions.

  • 7/30/2019 Good safety practices

    21/39

    Crawler Craneaccess laid withsteel plate

  • 7/30/2019 Good safety practices

    22/39

    Crane access properly constructed and weekly check carried out

  • 7/30/2019 Good safety practices

    23/39

    Scaffold erected in accordance to P.E. design.Working platform at alternate lift.Overlay or screen netting envelope scaffold

  • 7/30/2019 Good safety practices

    24/39

    Base plate secured to soleplate and on solid ground

    Scaffold stair providedaccess to working platform

  • 7/30/2019 Good safety practices

    25/39

    Working platform closely decked and continuous with toeboard and guardrails

  • 7/30/2019 Good safety practices

    26/39

    Signboard showingmaximum loads

  • 7/30/2019 Good safety practices

    27/39

    Oxy-acetylene cylinders kept

    upright in wheeled trolley

    Gas cylinder fitted with

    regulating valve andflashback arrestor

  • 7/30/2019 Good safety practices

    28/39

    A worker anchored to a safety belt and anindependent lifeline when working on agondola. Materials on gondola are evenlydistributed

  • 7/30/2019 Good safety practices

    29/39

    Peripheral overhead shelter erected around the building

  • 7/30/2019 Good safety practices

    30/39

    Overhead shelters erected at every point of entry/exit of buildings

  • 7/30/2019 Good safety practices

    31/39

    Formwork checked before, during and after concreting by

    formwork supervisor

  • 7/30/2019 Good safety practices

    32/39

    Formwork shall be design by P.E. where the ceilingheight exceed 9.14 metres

    P.E. shall be responsible for the supervision of theconstruction and stability of the structure.

  • 7/30/2019 Good safety practices

    33/39

    All openings are closed barricaded or effectively protected

  • 7/30/2019 Good safety practices

    34/39

    Lift opening effectively barricaded

    Lifting operation

  • 7/30/2019 Good safety practices

    35/39

    Lifting operation

  • 7/30/2019 Good safety practices

    36/39

    Large bin at lower end of each chute

  • 7/30/2019 Good safety practices

    37/39

    Storage of material 610 mmaway from edge of building

  • 7/30/2019 Good safety practices

    38/39

    Adequate ventilationprovided at work area

    Exhaust fan provided to

    remove dust particlegenerate from grinding

  • 7/30/2019 Good safety practices

    39/39

    Safety harness