    BUSINESS PROCESS DOCUMENT

    Customer 1001 CapFrance BAT

    Project Name 10-110 le SAP

    Module MM Materials Management

    Business Process 10-01 Goods ReceiptIssue Date 11-Jun-11

    Revision 1.0

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    2/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Contents

    Contents

    Contents............................................................................................................................................................................................................... 2

    About Document .............................................................................................................................................................................................. 3Document Control ..................................................................................................................................................................................... 3

    Document Approval .................................................................................................................................................................................. 3Document Approval .................................................................................................................................................................................. 3Copyright ................................................................................................................................................................ ....................................... 4

    Icons Used ..................................................................................................................................................................................................... 5

    1. Introduction ........................................................................................................................................................ .................................... 8

    1.1 Purpose .......................................................................................................................................................................................... 81.2 Definitions ................................................................................................................................................................................... 141.3 Pre-Requisites ........................................................................................................................................................................... 14

    1.4 Master Data ................................ ................................................................................................................................................ 151.5 Business Conditions .................................................................................................................................................... ........... 15

    1.6 User Roles ...... .................................................................................................................................................................. ........... 161.7 Process Group Overview ...................................................................................................................................................... 17

    1.8 Process Flow ...................................................... ........................................................................................................................ 181.9 Process Steps - Summary ..................................................................................... ................................................................ 181.10 Process Steps In Detail ............................................................................................................................................ ........... 20

    1.10.1 Initiate ................................................................................................................................. 20

    1.10.2 Process ................................................................................................................................ 20

    2 Supplementary Processes .................................................................................................................................................... ........... 24

    2.1 List of Supplementary Processes ...................................................................................................................................... 24

    2.1.1 Display Goods Receipt document ....................................................................................... 24

    2.1.2 Cancel Material Document ................................................................................................. 27

    3 Document References ....................................................................................................................................................................... 30

    3.1 Record Retention ............................................. ........................................................................................................................ 303.2 References................................................................................................................................................................................... 30

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    3/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    AboutDocument

    About Document

    Document ControlCustomer Number 1001

    Customer Name CapFrance BAT

    Project Number 10-110

    Project Name le SAP

    Document Type Business Process Document

    Module MM - Materials Management

    Document No 10-01

    Document Name Goods Receipt

    Issue Date 11-Jun-11

    Revision 1.0

    Document ApprovalDocument Project Role Name Date

    Prepared by Application Consultant 11-Jun-11

    Reviewed by Project ManagerClick here to

    enter a date.

    Approved by Project Manager Click here toenter a date.

    Customer Project ManagerClick here to

    enter a date.

    Document Approval

    Version Changed by Effective Date Reasons for Change Sections/Pages Revised

    Click here to

    enter a date.Click here to

    enter a date.Click here to

    enter a date.

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    4/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    AboutDocument

    Copyright 2010-2011 SAP AG and Inntree All rights reserved.

    No part of this publication may be reproduced or transmitted in any form or for any purpose without the express

    permission of SAP AG. The information contained herein may be changed without prior notice. Some software products marketed by SAP AG and its distributors contain proprietary software components of other

    software vendors.

    Microsoft, Windows, Excel, Outlook,and PowerPointare registered trademarks of Microsoft Corporation.

    IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System

    z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390

    Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER,

    OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF,

    Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are

    trademarks or registered trademarks of IBM Corporation.

    Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

    Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe

    Systems Incorporated in the United States and/or other countries.

    Oracle is a registered trademark of Oracle Corporation.

    UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group. Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered

    trademarks of Citrix Systems, Inc.

    HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C, World Wide Web Consortium,

    Massachusetts Institute of Technology.

    Java is a registered trademark of Sun Microsystems, Inc.

    JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and

    implemented by Netscape.

    SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, Clear Enterprise, SAP BusinessObjects Explorer, and other

    SAP products and services mentioned herein as well as their respective logos are trademarks or registered

    trademarks of SAP AG in Germany and other countries.

    Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence,

    Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are

    trademarks or registered trademarks of SAP France in the United States and in other countries.

    All other product and service names mentioned are the trademarks of their respective companies. Data contained in

    this document serves informational purposes only. National product specifications may vary.

    These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated

    companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP

    Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group

    products and services are those that are set forth in the express warranty statements accompanying such products

    and services, if any. Nothing herein should be construed as constituting an additional warranty

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    5/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    AboutDocument

    Icons Used

    Use the following symbols selectively where you need highlight a particular portion of the

    document and to draw the attention of the user

    Icon Meaning

    Caution

    Example

    Note

    Recommendation

    Syntax

    External Process

    Business Process Alternative/Decision Choice

    Manual Entry

    SAP Form generated. Choose Print option

    SAP Report generated. Choose Print option

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    6/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    AboutDocument

    Document Preparation Instructions

    Please select the text in the column below and replace for each of them at the start of the document

    preparation

    Replacement Text

    TypeReplacement Text Example

    [CompanyId] CFB

    [CompanyName] CapFrance Bat

    [ProcessGroup} Purchasing

    [ProcessName] Goods Receipt

    [Module] MM

    To add more

    How to do it

    1.

    Press Ctrl-F

    2. Select Replace

    3. Enter the Replacement text type in Find What

    4.

    Enter the Replacement text in Replace with

    5. Ensure Match Case is ticked

    6.

    Press Replace All

    7. If you have to select a particular open window (as below), then press FN-ALT-PrtSC

    simultaneously

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    7/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    AboutDocument

    Example for use of Icons

    Please ensure you have been assigned a user name (Check with SystemAdministrator)

    Ensure that the role specific to you has been assigned in your User Profile

    (Check with System Administrator)

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    8/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    1. Introduction

    1.1 Purpose

    This scenario describes the typical processes used in the construction industry to generate

    and process Goods Receipt (GR).

    Goods Receipt is to post the receipt of goods from an external Vendor. A goods receipt leads

    to an increase in warehouse stock.

    The system distinguishes between the following types of goods receipt:

    Goods receipts with reference to a reservation

    Goods receipts with reference to an order

    Other goods receipts

    Planning Goods Receipt:

    Planning a goods receipt in advance means storing certain information that is important for

    the goods receipt before the actual goods receipt is posted, for example:

    What? (Which material?)

    How much? (In which quantity?)

    When? (On which delivery date?)

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    9/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    From where? (From which vendor or plant?)

    To where? (To which destination, into which stock?)

    The goal of this planning is to simplify and accelerate the goods receipt process and to better

    organize the work at the goods receiving point, so that bottlenecks can be avoided, for

    example.Also, if goods receipts are planned, Materials Planning can monitor the stocks of ordered or

    manufactured materials and achieve an optimal inventory balance.

    Unless receipts are planned, the system cannot track materials that have been ordered.

    Planned receipts, therefore, are crucial to regulating the level of inventory in the warehouse.

    Planned receipts are also important for determining whether you have received materials

    promised by vendors. Without them, the system cannot establish a link between orders and

    received material.

    Goods Receipt for Purchase Orders:

    Posting a goods receipt to stock with reference to a purchase order has a number of

    advantages, including:

    The goods receiving point can check whether the delivery is the same as the purchaseorder data, that is, whether the goods that were ordered have been delivered.

    The system suggests data from the purchase order when you enter the goods receipt

    (for example, items and quantities). This makes it easier to enter the goods receipt and

    check over deliveries and under deliveries when goods arrive.

    Among other things, the purchase order history is automatically updated as a result of

    the deliveries. The Purchasing Department can send a reminder about late deliveries.

    When you post a goods receipt to the warehouse, the system creates a material

    document containing information such as the material delivered and the quantity

    delivered. The system also records the storage location in which you place the material

    into stock in the plant concerned.

    In transactions relevant for material valuation, the system creates at least one

    accounting document, which records the effects of the goods movement on the value ofthe stock.

    Under deliveries, Over deliveries, and Final Deliveries:

    During entry of a goods receipt for a purchase order, the SAP system proposes the item's

    open purchase order quantity as the quantity received. If the quantity delivered differs from

    the open order quantity, you can change the proposed quantity.

    Whenever you enter a goods receipt item, the system compares the quantity delivered with

    the open order quantity. The SAP System can therefore determine and report under or

    overdeliveries immediately.

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    10/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    Goods Receipt for Stock Material:

    If you entered a purchase order to procure a material, you have to reference the purchase

    order when you enter the goods receipt. The system can check, for example, whether the

    material delivered is the same as the material ordered, whether the order quantity matchesthe goods receipt quantity or whether the shelf life is still guaranteed for highly perishable

    goods (when the shelf life expiration date check is active for the relevant material).

    The purchase order history for a purchasing document item is also updated when a goods

    receipt is posted with reference to a purchase order. This allows the buyer to send the

    vendor a reminder about outstanding deliveries, for example.

    Several goods receipt items can be entered for a purchase order item in one operation. This

    is advisable if, for example, the material is delivered in batches or is distributed among

    several storage locations. You enter the goods receipt data in a single material document.

    If the delivery note accompanying the goods receipt does not contain a purchase order

    number, you can use the material number or the vendor number to search for the

    corresponding purchase order number.

    You can print a goods receipt slip when entering the goods receipt.

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    11/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    Effects of Goods Receipt:

    The diagram once again shows an overview of all the key effects of a goods receipt

    referencing a purchase order.

    Documents for a Goods Movement:

    The document principle also applies in IT-based Inventory Management. A

    document is proof that a transaction involving stock changes has taken place. It is

    stored in the system.

    A material document is created in the R/3 System as proof of a transaction involving

    stock changes.

    If the goods movement is relevant to valuation, the system creates at least one

    accounting document in addition to the material document.

    Goods movements (goods receipts, goods issues, or transfer postings) are relevant to

    valuation when your company's Accounting department is affected by them. For

    example, a goods receipt posting of a raw material usually results in an increase in

    the stock value of your current assets. If the raw material is only transferred within

    one plant, no postings are made in Financial Accounting.

    As soon as a goods movement is posted, the quantities, material, movement type,

    and organizational level can no longer be changed. You can only make changes to

    some text fields. If you want to correct errors, you have to create a new document.

    You have to cancel/reverse the incorrect document beforehand.

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    12/31

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    13/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    Stock Overview:

    The material stocks are displayed in the stock overview for each individual organizational level.Quantities posted for a particular stock type are totaled for each organizational unit.

    You can display the stock overview for batches/valuation types and special stocks (for example,

    consignment material), as well as for the client, company code, plant, and storage location.

    The stock overview is a static display of stocks. This means that you can only view the current

    stock situation. You cannot see future planned goods receipts and goods issues in this list. Butyou can call up additional information functions via the menu bar.

    There are several display versions for stock overviews, which vary in the way the stock types arelisted and in the order they appear. In Customizing for Inventory Management, the systemadministrator defines which stocks are displayed in each column and the order in which they are

    displayed.

    The following diagram shows the overview of stocks, for example.

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    14/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    1.2 Definitions

    PR Purchase Requisition

    RFQRequest for Quotation

    PO Purchase Order

    1.3 Pre-Requisites

    The following pre-requisites must be completed prior to initiating this process

    Activity Description

    Purchase OrderYou should know the number of a SAP Purchase Order for the

    materials going to be posted to stock.

    Quantity ReceivedThe quantity of the material received from Vendor, since it may be

    under delivery or over delivery.

    PlantYou need the key of the plant for which the material or service is to

    be received.

    Storage LocationName of thestorage location at which materials are stored. There

    can be one or more storage locations within aplant.

    MM period Roll MM period to Current Period

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    15/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    1.4 Master Data

    Essential master and organizational data was created in your SAP system in the

    implementation phase, such as the data that reflects the organizational structure of your

    company and master data that suits its operational focus, for example, master data formaterials, vendors, and customers.

    The business process is enabled with this organization-specific master data, examples which

    are provided below

    Org. Structure Value Comment

    Company Code 1000 Company Code 1000

    Plant 1000 Plant Code 1000

    Storage Location 0001 Storage Location Code

    1.5 Business ConditionsList one or more business conditions that must have been completed before the user starts this

    scenario:

    Business Condition Scenario

    You have completed all steps described in the Business ProcessDocumentation Prerequisite Process Steps. These process steps include

    the step Roll MM Period to Current Period. Perform this activity if the

    MM period in the system is not set to the current period. Usually, this

    activity has to be done once a month.

    PrerequisiteProcess Steps

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    16/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    1.6 User RolesThe following roles have been defined for this Process [Goods Receipt].

    These roles have been designed to fulfill the particular business requirements of the

    process.

    Please ensure you have been assigned a user name (Check with System

    Administrator)

    Ensure that the role specific to you has been assigned in your User Profile

    (Check with System Administrator)

    Business Role Technical Name Process StepStores-In-Charge SAP_NBPR_STORESIN-S Enter Goods receipt

    Display Purchase order

    Display Material document

    Print Material Document

    Stock Overview

    Overview display of Material documents

    Purchasing

    Manager

    SAP_NBPR_PURCHASER-

    M Display Material document

    Print Material Document

    Stock Overview

    Overview display of Material documents

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    17/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    1.7 Process Group OverviewThe following diagram depicts the overall process flow for the Process Group [Process

    Group]. The particular process within the scope of this document is highlighted.

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    18/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    1.8 Process FlowThe following diagram depicts the overall process flow for Goods Receipt. The particular

    process within the scope of this document is highlighted.

    1.9 Process Steps - SummaryThe following section describes the process flow diagram in detail

    UseOnce you are ready to enter the goods receipt after having reviewed the

    pre-requisites and business conditions

    Step Process Step Performed by Description

    1Material received from

    VendorStores In-Charge

    Stores In-charge receives the

    material Goods receipt as a

    document from the vendor

    2Evaluate and enter the

    Goods ReceiptStores In-Charge

    Stores In-charge evaluates the

    received material Goods receipt

    document and enters into the SAP

    system

    3 Review the Goods Receipt Stores In-Charge

    Stores In-Charge review the Goods

    Receipt document and data enter

    in the system, before saving the

    document

    4Place materials into proper

    locationStore Keeper

    Store keeper places the material in

    proper location. i.e., if the material

    is subjected inspection, then the

    material is placed in the

    Inspection area.

    5Check Stocks Report and

    Material documentStores In-charge

    Stores In-Charge checks for stocks

    in the Stocks Overview report and

    material document for correctness

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    19/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    6Checks for Accounting

    documentsAccountant

    Account checks for the Accounting

    documents for correctness

    7 Notify Vendor Stores In-Charge

    Send acknowledgement document

    with received material status to

    the vendor in PDF format

    8 Print Goods Receipt Stores In-Charge GR can be transmitted as ahardcopy or as PDF to the vendor

    10 Follow up Stores In-Charge Follow up for materials

    ResultGoods received and posted to stock, notified to Vendor and follow-up

    maintained

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    20/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    1.10Process Steps In DetailThe following section describes the process flow diagram in detail

    You can create the Goods Receipt with the following

    1.10.1 Initiate

    SAP Menu Path Logistics Materials Management Inventory Management Goods

    Receipt

    SAP T-code MIGO

    Business Role

    (NWBC)

    Screen View

    1.10.2 Process

    Step Process Step Description

    Enter data when initiating a PO

    with no reference to a document

    Enter the through Menu path or

    enter the Transaction code in the

    command box. The following

    screen appears

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    21/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    Enter the following values in the relevant fields as mentioned below and execute,

    Field name DescriptionUser action and values

    (For Example)

    Executable Action in MIGO

    Transaction

    Indicates the business

    transaction that you want

    to enter in the system

    Goods Receipt

    Reference Document for MIGO

    Transaction

    Indicates the document you

    want to reference when

    you enter the transaction

    Purchase Order

    Purchase OrderAlphanumeric key uniquely

    identifying the document10000159

    Document Date The document date is thedate on which the original

    document was issued

    Posting Date

    Date which is used when

    entering thedocument in

    Financial Accounting or

    Controlling.

    Delivery NoteNumber of External

    Delivery Note

    Bill of LadingNumber of Bill of Lading at

    Time of Goods Receipt

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    22/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    Enter PO Number, Document Date, Posting date, Delivery Note, Bill of Lading, Header Text andexecute as shown above

    Automatically the Purchase Order will copied to the goods Receipt Transaction.The system can

    check, for example, whether the material delivered is the same as the material ordered,

    whether the order quantity matches the goods receipt quantity.

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    23/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Introduction

    Enter delivery quantity for example 5 EA as shown and enter

    Flag item Ok and enter, system will update the quantity as shown below

    Check for document correctness, , if the document is correct then system will display themessages

    Since the difference between the Order quantity and delivered quantity exists, so the above

    message displays.

    Select ok and save.

    Result Material Document (GR) Posted

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    24/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    SupplementaryProcesses

    2 Supplementary Processes

    2.1 List of Supplementary Processes

    Process Name Description

    Display GR Display Goods Receipt document

    Cancel GR Cancellation of Goods Receipt document

    2.1.1 Display Goods Receipt document

    2.1.1.1 Initiate

    SAP Menu Path Logistics Materials Management Material Document Display

    SAP T-code MB03

    Business Role

    (NWBC)

    Screen View

    Enter

    2.1.1.2 Process

    Step Process Step Description

    Display the Material

    Document

    Display the Material document

    through transaction code or

    menu path.

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    25/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    SupplementaryProcesses

    Enter the following values in the relevant fields as mentioned below and enter

    Field name DescriptionUser action and values

    (For Example)

    Material DocumentAlphanumeric key uniquely

    identifying the document.4900000030

    Material Document Year

    Calendar year in which the

    material document was posted. 2011

    Enter , the document details will display as shown below

    Select the Item line, and Choose details from Item push button

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    26/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    SupplementaryProcesses

    Display Accounting documents

    Select Accounting documents push button,

    Select Accounting document for display

    Result Material Document displayed

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    27/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    SupplementaryProcesses

    2.1.2 Cancel Material Document

    2.1.2.1 Initiate

    SAP Menu Path Logistics Materials Management Material Document

    Cancel/Reverse

    SAP T-code MBST

    Business Role

    (NWBC)

    Screen View

    2.1.2.2 Process

    Step Process Step Description

    Cancel the Material

    document

    Cancel the Material document

    through transaction code or

    menu path.

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    28/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    SupplementaryProcesses

    Enter the following values in the relevant fields as mentioned below and enter

    Field name DescriptionUser action and values

    (For Example)

    Posting Date

    Date which is used when entering

    thedocument in Financial

    Accounting or Controlling.05.07.2011

    Material DocumentAlphanumeric key uniquely

    identifying the document.4900000030

    Material Document Year

    Calendar year in which the

    material document was posted. 2011

    Reason for movement

    Specifies a key you can use to call

    up a standard text stipulating the

    reason for agoods movement

    (for example, reason for areturn

    delivery).

    Enter the required data as shown above and choose Adopt + Details push button,

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    29/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    SupplementaryProcesses

    Save the document.

    Result Material Document Cancelled

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    30/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    DocumentReferences

    3 Document References

    3.1 Record Retention

    Outputs Retention Period/Remarks

    GR Document 5 years

    3.2 References

    Type of Document Reference

    Company Policy

    ISO 9000 Clause

    Quality Manual

    Quality Procedure

  • 8/10/2019 Goods Receipt in Sap the Process Manual

    31/31

    Customer 1001 CapFrance BAT Effective Date 11-Jun-11

    Project Name 10-110 le SAP Revision No 1.0

    Business Proc 10-01 Goods Receipt Module MM

    Solution built on SAP Business All-in-One and SmartBuild from ROFF

    All rights reserved

    Copyright Inntree Technology Services Middle East 2010-2011