1 Government of India Ministry of Tribal Affairs Status report on implementation of the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 [for the period ending 30 th June, 2013] **** 1. Status of Court cases filed against the Act: Action taken in each court case is indicated in Annexure-I. 2. Readiness of the States in the implementation of the Act: (i) An updated status of State-wise implementation of the Act is given in Annexure-II. As per the information collected till 30 th , June, 2013, 32, 56,367claims have been filed and 13,08,626 titles have been distributed. Further, 15,700 titles were ready for distribution. A total of 28,27,582 claims have been disposed of (86.83%). Pending population of the web-site (www.forestrights.gov.in), a statement on claims received and distribution of title deeds in various states, as in Annexure-III, is being maintained.

Upload: others

Post on 19-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

1

Government of India Ministry of Tribal Affairs

Status report on implementation of the Scheduled Tribes and Other

Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006

[for the period ending 30th June, 2013]

****

1. Status of Court cases filed against the Act:

Action taken in each court case is indicated in Annexure-I.

2. Readiness of the States in the implementation of the Act:

(i) An updated status of State-wise implementation of the Act is

given in Annexure-II. As per the information collected till 30th,

June, 2013, 32, 56,367claims have been filed and 13,08,626

titles have been distributed. Further, 15,700 titles were

ready for distribution. A total of 28,27,582 claims have been

disposed of (86.83%). Pending population of the web-site

(www.forestrights.gov.in), a statement on claims received and

distribution of title deeds in various states, as in Annexure-III,

is being maintained.

Page 2: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

2

(ii) State wise details of claims received, titles distributed and the extent of forest land for which titles distributed (individual and community), as on 30.06.2013, in major States, is as indicated below:

States No. of claims received No. of titles distributed Extent of forest land for which titles distributed

(in acres)

Andhra Pradesh 3,30,479 (3,23,765 individual and 6,714 community)

1,67,797 (1,65,691 individual and 2,106 community)

14,51,223

Assam 1,31,911 (1,26,718 individual and 5,193 community)

36,267 (35,407 individual and 860 community)

77,609.17 for 34,286 titles#

Bihar* 2,930 28 Not Available

Chhattisgarh 4,92,068 (4,87,332 individual and 4,736 community)

2,15,443 (2,14,668 individual and 775 community)

5,38,076.38 (5,36,303.69 for individual and 1,772.69 for community) for 2,14,918 (2,14,668 individual and 250 community) titles#

Gujarat 1,91,592 (1,82,869 individual and 8,723 community

42,752 (40,994 individual and 1,758 community)

51,570.79 for 40,994titles#

Himachal Pradesh*

5,692 346

0.3548

Jharkhand 42,003 15,296

37,678.93

Karnataka 1,68,718 (1,63,638 individual and 3,080 community)

6,577 (6,487 individual and 90 community) distributed

34856.77

Kerala 37,535 (36,140 individual and 1,395 community)

23,167 (23,163 individual and 4 community) distributed

32,104

Madhya Pradesh

4,80,500 (4,63,818 individual and 16,682 community)

1,75,904 (1,66,496 individual and 9,408 community) distributed and 9,008 are ready for distribution.

6,93,986.42

Page 3: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

3

States No. of claims received No. of titles distributed Extent of forest land for which titles distributed

(in acres)

Maharashtra 3,45,975 (3,40,927 individual and 5,048 community)

1,03,225 (1,01,356 individual and 1,869 community)

7,90,735.35 (2,36,577.45 individual and 5,54,157.90 community )

Orissa 5,24,162 (5,19,055 individual and 5,107 community)

3,20,149 (3,18,375 individual and 1,774 community)

6,03,002.35 (5,08,365.33 individual and 94,637.02 community)

Rajasthan 68,501 33,645 distributed (33,586 individual and 59 community)

50,899.87 (50,477.72 individual and 422.15 community)

Tripura 1,82,617 (1,82,340 individual and 277 community)

1,20,473 distributed (1,20,418 individual and 55 community )

4,16,555.58 (4,16,498.79 for individual and 56.79 for community) for 1,16,100 titles#

Uttar Pradesh 92,433 (91,298 individual and 1,135 community)

17,705 distributed (16,891 individual and 814 community)

1,39,778.04

West Bengal 1,37,278 [1,29,454 individual and 7,824 community]

29,852 distributed (29,744 individual and 108 community) and 2,969 ready

16,648.88 (16798.59 for individual and 50.29 for community)

Total of 5 States [Chhattisgarh, Maharashtra, Orissa, Rajasthan and West Bengal]

Individual (6,99,193 titles) = 5,45,733.06 Hac ( 13,48,522.78 Acres)

Community ( 4,188 titles) = 2,54,276.20 Hac ( 6,28,324.14 Acres)

Total: 7,03,381 titles = 8,00,009.26 Hac (19,76,846.92 Acres)

Total of 9 States (Andhra Pradesh, Assam, Gujarat, Jharkhand, Karnataka, Kerala,

Madhya Pradesh, Tripura and Uttar Pradesh)

Individual + Community (5,97,826 titles) = 11,87,910.58 Hac ( 29,35,362.70 Acres)

Grand Total: 13,01,207 titles = 19,87,919.84 Hac (49,12,209.62 Acres)

Page 4: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

4

*The Governments of Bihar and Himachal Pradesh have not furnished information regarding

extent of forest land for which titles have been distributed

# The Governments of Assam, Chhattisgarh, Gujarat, Madhya Pradesh and Tripura have not

furnished updated information regarding the extent of forest land in respect of all the titles

that have been distributed.

(iii) Progress in implementation of the Act relating to the number of claims

received and the number of titles distributed in the LWE affected States

has separately been shown in Annexure-IV.

(iv) A list of States/UTs that are not uploading the website is at Annexure-V.

A list of States/UTs that have not distributed any title so far is also given

in Annexure-V. Annexures II, III, IV and V are being put up on the

Ministry’s web-site.

3. Clarifications sought by the States, if any:

Nil.

4. Matters relating to the Act pending at the level of Government of India

Nil.

**************

Page 5: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

5

Annexure-II

Statement showing State-wise status of implementation of the Scheduled Tribes and Other

Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006

(As on 30.06.2013)

Name of the State/UT

Activities

Status

Andhra Pradesh

1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c) SLMC

Yes

Yes

Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas 3,744

7) No. of claims filed at Gram Sabha level 3,30,479 (3,23,765 individual and 6,714 community)

8) No. of claims recommended by Gram Sabha to SDLC 2,30,476 (2,26,943 individual and 3,533 community)

9) No. of claims recommended by SDLC to DLC 1,94,391

10) No. of claims approved by DLC for title 1,74,693

11) Number of titles distributed 1,67,797 (1,65,691 individual and 2,106 community)

12) Extent of forest land for which title deeds issued (in acres) 14,51,223

Page 6: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

6

13) No. of claims rejected 1,53,438

14) Projected date for distribution of title deeds -

15) Problems/Remarks:

Land records

Arunachal Pradesh

1) Appointment of a Nodal officer No. However, Department of Social Welfare has been selected as the Nodal Department for implementation of the Act in the State.

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c) SLMC

Yes

Yes

Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

-

4) Creation of Awareness about the provision of the Act and the Rules -

5) Arrangements made for the training of PRI officials, SDLC, DLC members

-

6) Constitution of Forest Rights Committees by the Gram Sabhas -

7) No. of claims filed at Gram Sabha level -

8) No. of claims recommended by Gram Sabha to SDLC -

9) No. of claims recommended by SDLC to DLC -

10) No. of claims approved by DLC for title -

11) Number of titles distributed -

12) Extent of forest land for which title deeds issued (in acres) -

13) No. of claims rejected -

14) Projected date for distribution of title deeds -

Page 7: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

7

15) Problems/Remarks: State Govt. has informed that though they have constituted the SDLC, DLC and SLMC under the Act but unlike the other States where the STs and other traditional forest dwellers are in minority, Arunachal Pradesh is wholly domiciled by various ethnic tribal groups whose land and forests are specifically identified with natural boundaries of hillocks, ranges, rivers and tributaries. Barring few pockets of land under wildlife sanctuaries, reserved forests, most of the land in entire State is community land. Territorial boundaries of land and forest belonging to different communities or tribes are also identified in the same line leaving no scope for any dispute over the possession of land, forest and water bodies among the tribes. Therefore, Forest Rights Act does not have much relevance in Arunachal Pradesh.

-

Assam 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

Yes

Yes

Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Is being done

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas Yes

7) No. of claims filed at Gram Sabha level 1,31,911 (1,26,718 individual and 5,193 community)

8) No. of claims recommended by Gram Sabha to SDLC 1.23,330 (1,18,535 individual and 4,795

community)

9) No. of claims recommended by SDLC to DLC 72,891 (69,224 individual and 3,667

community)

10) No. of claims approved by DLC for title -

Page 8: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

8

11) Number of titles distributed 36,267 (35,407 individual and 860

community)

12) Extent of forest land for which title deeds issued (in acres) 77609.17 Acres for 34,286 titles

13) No. of claims rejected 37,669

14) Projected date for distribution of title deeds 31-12-2011

15) Problems/Remarks:

1. Disputes in settling claims get converted into law and order problem which adversely affects the pace of implementation.

2. Claims from false claimants under the category of other traditional forest dwellers are being received.

-

Bihar 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

9

13

1

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

-

4) Creation of Awareness about the provision of the Act and the Rules Is being created in a limited way through advertisements in local newspapers

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Out of 390 Gram Sabhas, training has been completed in about 50 Gram Sabhas

6) Constitution of Forest Rights Committees by the Gram Sabhas 1299

7) No. of claims filed at Gram Sabha level 2,930 (1019 ST and 1911 OTFDs)

8) No. of claims recommended by Gram Sabha to SDLC -

Page 9: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

9

9) No. of claims recommended by SDLC to DLC -

10) No. of claims approved by DLC for title -

11) Number of titles distributed 28 (28 ST)

12) Extent of forest land for which title deeds issued (in acres) -

13) No. of claims rejected 1,644

14) Projected date for distribution of title deeds -

15) Problems/Remarks: Not reported.

Chhattisgarh 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

Yes

Yes

Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Going on in a large scale

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas Yes

7) No. of claims filed at Gram Sabha level 4,92,068 (4,87,332 individual (3,49,976 ST and 1,37,356 OTFD) and 4,736 community)

8) No. of claims recommended by Gram Sabha to SDLC -

9) No. of claims recommended by SDLC to DLC -

10) No. of claims approved by DLC for title Not Given

Page 10: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

10

11) Number of titles distributed 2,15,443 (2,14,668 individual and 775 community)

12) Extent of forest land for which title deeds issued (in acres) 5,38,076.38 (536303.69 individual and 1772.69 community) for 2,14,918 titles

13) No. of claims rejected 2,72,664

14) Projected date for distribution of title deeds 31.12.2009 (over)

15) Problems/Remarks

Out of 85 blocks, at least 40 blocks are affected by naxalism and this had slowed down the pace of implementation of Forest Rights Act.

-

Goa 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

(a) Yes

(b) Yes

(c) Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Work in progress.

4) Creation of Awareness about the provision of the Act and the Rules Done.

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Training to PRI Institutions has been imparted.

6) Constitution of Forest Rights Committees by the Gram Sabhas So far 91 FRCs have been constituted.

7) No. of claims filed at Gram Sabha level Nil

8) No. of claims recommended by Gram Sabha to SDLC Nil

9) No. of claims recommended by SDLC to DLC Nil

10) No. of claims approved by DLC for title Nil

11) Number of titles distributed Nil

12) Extent of forest land for which title deeds issued (in acres) -

Page 11: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

11

13) No. of claims rejected Nil

14) Projected date for distribution of title deeds

15) Problems/Remarks:

Claims in CRZ areas are to be processed. There are objections from OBC population. Progress, therefore, is lagging behind.

-

Gujarat 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

18

12

01

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas 5,775 FRCs have been constituted.

7) No. of claims filed at Gram Sabha level 1,91,592 (1,82,869 individual and 8,723 community

8) No. of claims recommended by Gram Sabha to SDLC 1,89,161 (1,82,018 individual and 7,143 community)

9) No. of claims recommended by SDLC to DLC 50,156 (48,175 individual and 1,981community)

10) No. of claims approved by DLC for title 40,029 (38,421 individual and 1,608 community)

11) Number of titles distributed 42,752 (40,994 individual and 1,758 community)

Page 12: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

12

12) Extent of forest land for which title deeds issued (in acres) 51570.79 Acres for 40,994 titles

13) No. of claims rejected 19,613 (14,573 individual and 5,040 community)

14) Projected date for distribution of title deeds 30.11.2012

15) Problems/Remarks:

1. Member of Gujarat Tribal Advisory Council had raised concern over high rate of rejected claims and the matter was discussed in the meeting held on 01.06.2011 and it was decided to review all rejected claims at various level. Following the decision of GTAC, Government of Gujarat has created a special review cell on 01.08.2011 and circulated procedure to review all rejected claims.

2. As a result, number of claims disposed of has been reduced considerably.

Haryana The State Govt. has informed that there are no Scheduled Tribes and other traditional forest dwellers living in the forests of Haryana

Himachal Pradesh

1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

Yes

Yes

Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

No need

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas Yes, in all 151 Gram Sabha

7) No. of claims filed at Gram Sabha level 5,692

8) No. of claims recommended by Gram Sabha to SDLC 2,888

9) No. of claims recommended by SDLC to DLC 1097

10) No. of claims approved by DLC for title 346

11) Number of titles distributed 346

12) Extent of forest land for which title deeds issued (in acres) 0.3548

Page 13: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

13

13) No. of claims rejected 2,144

14) Projected date for distribution of title deeds

-

15) Problems/Remarks:

1. Pace of implementation of Forest Rights Act in this State has been considerably affected by migration of tribal population from snow-bound areas during winter season last year;

2. Promulgation of Model Code of Conduct from March to May last year for the Elections;

3. Sowing season in May and June.

Jharkhand 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

Yes

Yes

Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas

20,484

7) No. of claims filed at Gram Sabha level 42,003

8) No. of claims recommended by Gram Sabha to SDLC 23,617

9) No. of claims recommended by SDLC to DLC 17,046

10) No. of claims approved by DLC for title 16,351

11) Number of titles distributed 15,296

12) Extent of forest land for which title deeds issued (in acres) 37,678.93

13) No. of claims rejected 16,958

14) Projected date for distribution of title deeds -

Page 14: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

14

15) Problems/Remarks:

Forest areas are affected by left wing extremism.

-

Karnataka 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

Yes

Yes

Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Has been undertaken

6) Constitution of Forest Rights Committees by the Gram Sabhas 2,521 FRCs have been constituted

7) No. of claims filed at Gram Sabha level 1,68,718 (1,63,638 individual (24,107 STs and 14,153 OTFDs) and 3,080 community)

8) No. of claims recommended by Gram Sabha to SDLC 48,266

9) No. of claims recommended by SDLC to DLC 6,899

10) No. of claims approved by DLC for title -

11) Number of titles distributed 6,577 (6,487 individual and 90 community)

12) Extent of forest land for which title deeds issued (in acres) 34856.77

13) No. of claims rejected 1,56,031 (1,53,820 individual and 2211 community)

14) Projected date for distribution of title deeds 31-12-2009 (over)

15) Problems/Remarks: Not reported

Page 15: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

15

Kerala

1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

Yes

Yes

Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas 510 FRCs have been constituted

7) No. of claims filed at Gram Sabha level 37,535 (36,140 individual and 1,395 community)

8) No. of claims recommended by Gram Sabha to SDLC 35,049 (34,821 individual and 228 community)

9) No. of claims recommended by SDLC to DLC 29,932

10) No. of claims approved by DLC for title 25,278

11) Number of titles distributed 23,167 (24,163 individual and 4 community)

12) Extent of forest land for which title deeds issued (in acres) 32,104

13) No. of claims rejected 4,252

14) Projected date for distribution of title deeds -

15) Problems/Remarks:/Remarks:

Due to high density in forest, only manual survey is feasible. This takes much time.

-

Page 16: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

16

Madhya Pradesh

1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

Yes

Yes

Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas Yes

7) No. of claims filed at Gram Sabha level 4,80,500 [4,63,818 individual and 16,682 community]

8) No. of claims recommended by Gram Sabha to SDLC 4,77,600

9) No. of claims recommended by SDLC and sending to DLC 4,68,377

10) No. of claims approved by DLC for title 1,84,912 [1,73,204 individual and 11,708 community]

11) Number of titles distributed 1,75,904 (1,66,496 individual and 9,408 community) distributed and 9,008 title deeds are ready for distribution.

12) Extent of forest land for which title deeds issued (in acres) 6,93,986.42

13) No. of claims rejected 2,77,731 (ST-42.87%) (OTFD-95.78%)

14) Projected date for distribution of title deeds 30.06.2013

15) Problems/Remarks: Not reported

Page 17: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

17

Maharashtra 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

Yes

Yes

Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas Yes

7) No. of claims filed at Gram Sabha level 3,45,975 (3,40,927 individual and 5,048 community)

8) No. of claims recommended by Gram Sabha to SDLC 2,95,480 (2,90,500 individual and 4,980 community)

9) No. of claims recommended by SDLC to DLC 1,15,014 (1,13,912 individual and 3,102 community)

10) No. of claims approved by DLC for title 1,09,458 (1,06,661 individual and 2,797community)

11) Number of titles distributed 1,03,225 (1,01,356 individual and 1,869 community)

12) Extent of forest land for which title deeds issued (in acres) 7,90,735.35 2,36,577.45 individual and 5,54,157.90 community )

Page 18: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

18

13) No. of claims rejected

2,33,689 (2,31,689

individual and 2,000

community)

14) Projected date for distribution of title deeds

June 2010 (over)

15) Problems/Remarks:

Large number of false claimants have filed claims.

-

Manipur Reasons why no action has been initiated for implementation of the Act are not available nor were they forthcoming in the Review Meeting held on 11.11.2008 and also during the Conference held on 4

th and 5

th

November 2009.

Problems/ Remarks:

In tribal communities and tribal chiefs are already holding ownership of forest land as their ancestral land in non-Reserved Forest Area. Therefore, implementation of the Forest Rights Act is perceived minimal in Manipur.

NO RESPONSE

Meghalaya 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

Monitoring Committees at District and Sub-Divisional levels have been set up. The SLMC has been constituted.

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

No

4) Creation of Awareness about the provision of the Act and the Rules No information available

5) Arrangements made for the training of PRI officials, SDLC, DLC members

No information available

6) Constitution of Forest Rights Committees by the Gram Sabhas No information available

7) No. of claims filed at Gram Sabha level -

8) No. of claims recommended by Gram Sabha to SDLC -

Page 19: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

19

9) No. of claims recommended by SDLC to DLC -

10) No. of claims approved by DLC for title -

11) Number of titles distributed -

12) Extent of forest land for which title deeds issued (in acres) -

13) No. of claims rejected -

14) Projected date for distribution of title deeds No projected date fixed so far by the State Government.

15) Problems/Remarks:s

96% of forest land is owned by clan / community / individuals. Implementation of the Act has, therefore, limited scope.

Mizoram 1) Appointment of a Nodal officer No

2) Status of formation of various Committees

(a) SDLC (b) DLC (c)SLMC

(a) Yes (b) Yes

(c) Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Is being made

5) Arrangements made for the training of PRI officials, SDLC, DLC members

No

6) Constitution of Forest Rights Committees by the Gram Sabhas Yes

7) No. of claims filed at Gram Sabha level -

8) No. of claims recommended by Gram Sabha to SDLC -

9) No. of claims recommended by SDLC to DLC -

10) No. of claims approved by DLC for title -

11) Number of titles distributed -

12) Extent of forest land for which title deeds issued (in acres) -

13) No. of claims rejected -

Page 20: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

20

14) Projected date for distribution of title deeds No projected date fixed so far by the State Government.

15) Problems/Remarks:

The Act was to be approved by the State Legislative Assembly as per the Article 371 (G) of the Constitution. In the sitting on 29.10.2009 of its Fourth Session, the Sixth Legislative Assembly of Mizoram has resolved that the Forest Rights Act shall be adopted in the entire State of Mizoram with effect from 31.12.2009. The same has also been notified by Govt. of Mizoram on 3.3.2010.

Nagaland Government of Nagaland has informed that the land holding system and the village system of the Naga people is peculiar in that the people are the landowners. There are no tribes or group of people or forest dwellers in the State of Nagaland.

Hence, the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 per se may not be applicable to the State of Nagaland. However, a committee has been constituted to examine the applicability of the Act in Nagaland as per provision of Art. 371(A) of Constitution of India

Orissa 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees

(a) SDLC (b) DLC (c) SLMC

(a) Yes (b) Yes

(c) Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas Yes

7) No. of claims filed at Gram Sabha level 5,24,162 (5,19,055 individual and 5,107community)

8) No. of claims recommended by Gram Sabha to SDLC 4,36,149 (4,32,299 individual and 3,850 community)

Page 21: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

21

9) No. of claims recommended by SDLC to DLC 3,44,343 (3,41,264 individual and 3,079 community)

10) No. of claims approved by DLC for title 3,38,746 (3,35,763 individual and 2,983community)

11) Number of titles distributed 3,20,149 (3,18,375 individual and 1,774 community)

12) Extent of forest land for which title deeds issued (in acres) 6,03,002.35 (5,08,365.33 individual and 94,637.02 community)

13) No. of claims rejected 1,38,576 (1,37,962 individual and 614 community )

14) Projected date for distribution of title deeds Balance certificate of title to be distributed within next fort-night.

15) Problems/Remarks:

Certain forest land in the State is unsurveyed & detailed maps/records are not available;

1.

Rajasthan 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees

(a) SDLC (b) DLC (c)SLMC

(a) Yes (b) Yes

(c) Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas Yes

7) No. of claims filed at Gram Sabha level 68,501

Page 22: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

22

8) No. of claims recommended by Gram Sabha to SDLC 43,939

9) No. of claims recommended by SDLC to DLC 32,972

10) No. of claims approved by DLC for title 32,398

11) Number of titles distributed 33,645 (33,586 individual and 59 community)

12) Extent of forest land for which title deeds issued (in acres) 50,899.87 (50,477.72 individual and 422.15 community)

13) No. of claims rejected 31,441

14) Projected date for distribution of title deeds -

15) Problems/Remarks: Not reported.

Sikkim The Government of Sikkim has issued a notification dated 28.1.2008 regarding constitution of an Expert Committee for identification of Critical Wildlife habitats in Protected Areas (PAs) and have also constituted the various Committees under the Act namely SDLC, DLC and SLMC, but has not sent any report regarding the progress of implementation of the Act in the State so far.

Problems/ Remarks:

In Sikkim, there are no Forest Dwelling STs and Other Traditional Forest Dwellers in the true sense of the terms. Most of the STs of Sikkim hold revenue land in their own name and they are not solely dependent on the forests for their livelihood.

Tamil Nadu 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

Yes

Yes

Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Has started in a limited way

5) Arrangements made for the training of PRI officials, SDLC, DLC members

-

Page 23: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

23

6) Constitution of Forest Rights Committees by the Gram Sabhas Work of setting up FRCs has started. Gram Sabha meetings convened on 15.08.2008

7) No. of claims filed at Gram Sabha level 21,781 (18,420 individual and 3,361 community)

8) No. of claims recommended by Gram Sabha to SDLC Number not available

9) No. of claims recommended by SDLC to DLC Number not available

10) No. of claims approved by DLC for title 3,723

11) Number of titles distributed 3,723 ready

12) Extent of forest land for which title deeds issued (in acres) Not Available

13) No. of claims rejected -

14) Projected date for distribution of title deeds 31-12-2009 (over)

15) Problems/Remarks:

Title deeds would be distributed after the vacation of restrictive order of Madras High Court.

As the High Court of Madras has not yet vacated the stay, distribution of titles deeds could not be executed. In fact, High Court of Madras have now passed orders on 22.4.2010 in W.P. No. 4533 of 2008, 2762 and 2839 of 2009 and M.P. Nos. 1 & 3/08 & M.P. No. 1/2009 in W.P. No. 2762/09 and formed a Committee to verify the correctness of beneficiaries numbering 2312 by visiting the districts.

Tripura 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

Yes

Yes

Yes

Page 24: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

24

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Workshop organized for the officials of PRI/SDLC/DLC.

6) Constitution of Forest Rights Committees by the Gram Sabhas 1,040

7) No. of claims filed at Gram Sabha level 1,82,617 (1,82,340 individual and 277 community)

8) No. of claims recommended by Gram Sabha to SDLC 1,49,008 (1,48,906 individual and 102 community)

9) No. of claims recommended by SDLC to DLC 1,32,472 (1,32,376 individual and 96 community)

10) No. of claims approved by DLC for title 1,20,473 (1,20,418 individual and 55 community)

11) Number of titles distributed 1,20,473 (1,20,418 individual and 55 community)

12) Extent of forest land for which title deeds issued (in acres) 4,16,555.58 (4,16,498.79 individual and 56.79 community) for 1,16,100 titles

13) No. of claims rejected 21,384 (21,164 individual and 220 Community)

14) Projected date for distribution of title deeds

Not Given

15) Problems/Remarks:

Not reported.

Page 25: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

25

Uttar Pradesh 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

43

17

01

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

No need

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas 1107

7) No. of claims filed at Gram Sabha level 92,433 (91,298 individual and 1,135 community)

8) No. of claims recommended by Gram Sabha to SDLC 19,064 (18,208 individual and 856 community)

9) No. of claims recommended by SDLC to DLC 17,705

10) No. of claims approved by DLC for title 17,705

11) Number of titles distributed 17,705 (16,891 individual and 814 community)

12) Extent of forest land for which title deeds issued (in acres) 1,39,778.04

13) No. of claims rejected 73,028 (72,754 individual and 274 community)

14) Projected date for distribution of title deeds 31.08.2012

15) Problems/Remarks: Not reported.

Uttarakhand 1) Appointment of a Nodal officer Yes

Page 26: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

26

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c) SLMC

Yes

Yes

Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

-

4) Creation of Awareness about the provision of the Act and the Rules -

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas Yes

7) No. of claims filed at Gram Sabha level 182

8) No. of claims recommended by Gram Sabha to SDLC -

9) No. of claims recommended by SDLC to DLC -

10) No. of claims approved by DLC for title -

11) Number of titles distributed -

12) Extent of forest land for which title deeds issued (in acres) -

13) No. of claims rejected 1

14) Projected date for distribution of title deeds 31-12-2009 (over)

15) Problems/Remarks:

Formation of committees could not be done earlier due to the coming into force of model code of conduct for elections. The pace of implementation of Forest Rights Act was therefore adversely affected.

West Bengal 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

Yes

Yes

Yes

Page 27: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

27

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas 2,819 FRCs have been constituted

7) No. of claims filed at Gram Sabha level

1,37,278

8) No. of claims recommended by Gram Sabha to SDLC 45,421

9) No. of claims recommended by SDLC to DLC 34,746

10) No. of claims approved by DLC for title 32,725

11) Number of titles distributed 29,852 distributed (29,744 individual and 108 community) and 2,969 ready

12) Extent of forest land for which title deeds issued (in acres) 16,848.88

13) No. of claims rejected 79,891

14) Projected date for distribution of title deeds State Govt. requires more time for completion of the process.

15) Problems/Remarks:

The State Government has informed that most of the claims have been filed in four districts namely Paschim Medinipur, Bankura, Purulia & Jalpaiguri. Due to law and order problem in these districts, the progress is very slow. Hence, more time is required for completion of the process.

A & N Islands 1) Appointment of a Nodal officer

Yes

Page 28: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

28

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

Yes

Yes

Being constituted.

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Translation has been completed but publication of the translated version yet not done.

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Under process

6) Constitution of Forest Rights Committees by the Gram Sabhas Yes

7) No. of claims filed at Gram Sabha level -

8) No. of claims recommended by Gram Sabha to SDLC -

9) No. of claims recommended by SDLC to DLC

-

10) No. of claims approved by DLC for title

-

11) Number of titles distributed

-

12) Extent of forest land for which title deeds issued (in acres) -

13) No. of claims rejected

-

14) Projected date for distribution of title deeds

-

Page 29: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

29

15) Problems/Remarks:

The Andaman & Nicobar Administration has informed that there are no non-tribal forest dwellers as defined in the Act in A&N Islands. The Act, therefore, is applicable only to the Forest Dwelling Scheduled Tribes of these islands. The area inhabited by the Scheduled Tribes of A&N Islands has been declared as reserved area under the A&N Islands Protection of Aboriginal Tribes (Regulation), 1956. The interest of the tribals in the land situated in the reserved areas is fully protected under the provision of the regulation. The tribal reserves have been notified as reserved or protected forest reserve.

-

Daman & Diu 1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

02

02

01

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC

Members

Nil

6) Constitution of Forest Rights Committees by the Gram Sabhas Nil

7) No. of claims filed at Gram Sabha level Nil

8) No. of claims recommended by Gram Sabha to SDLC Nil

9) No. of claims recommended by SDLC to DLC Nil

10) No. of claims approved by DLC for title Nil

11) Number of titles distributed Nil

12) Extent of forest land for which title deeds issued (in acres) Nil

13) No. of claims rejected Nil

14) Projected date for distribution of title deeds Not Given

Page 30: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

30

15) Problem / Remarks :

Administration of Daman & Diu has informed vide their letter no. TSP/533/2011-2012/183, dated: 17.1.2012 that the Chief Conservation of Forest, Daman and Diu, has reported that there is no forest village in U.T. of Daman Diu, However, Chief Executive Officer Dist. Panchayat Daman & Diu & Collector of Both Daman & Diu Dist have been requested to give publicity to the provision of the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights), Act, 2006.

Dadra & Nagar Haveli

1) Appointment of a Nodal officer Yes

2) Status of formation of various Committees (a) SDLC

(b) DLC

(c)SLMC

Yes

Yes

Yes

3) Translation of the Act and the Rules into the regional languages and distribution to Gram Sabha, FRCs etc.

Yes

4) Creation of Awareness about the provision of the Act and the Rules Yes

5) Arrangements made for the training of PRI officials, SDLC, DLC members

Yes

6) Constitution of Forest Rights Committees by the Gram Sabhas -

7) No. of claims filed at Gram Sabha level -

8) No. of claims recommended by Gram Sabha to SDLC -

9) No. of claims recommended by SDLC to DLC -

10) No. of claims approved by DLC for title -

11) Number of titles distributed -

12) Extent of forest land for which title deeds issued (in acres) -

13) No. of claims rejected -

14) Projected date for distribution of title deeds No projected date fixed so far by the UT Admn.

Page 31: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

31

15) Problems/Remarks: The Administration of Dadra & Nagar Haveli has informed this Ministry that despite notices in advance and propaganda, it has been difficult to hold gram sabha meetings in absence of quorum of 2/3 of all members of such gram sabhas. All out efforts are being made for constitution of Forest Rights Committees in all the gram sabhas. Position in this regard will be known shortly.

Lakshadweep The UT Administration has intimated that there are no terrestrial forests and no forest tribes or traditional forest dwellers in Lakshadweep.

******

Page 32: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

32

Annexure-III

(A) Statement of claims and distribution of title deeds under the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006

(As on 30.06.2013)

Sl. No

State Total number of claims

received up to 31.05.2013

Claims received

during the current month

Total number of claims

received up to 30.06.2013

Total number of titles deeds distributed/ ready up to 31.05.2013

Title deeds distributed/ ready during

the current month

Total number of titles deeds

distributed/ ready up to 30.06.2013

1. Andhra Pradesh

3,30,479 (3,23,765 individual and 6,714 community

- 3,30,479 (3,23,765 individual and 6,714 community

1,67,797 (1,65,691 individual and 2,106 community)

- 1,67,797 (1,65,691 individual and 2,106 community)

2. Arunachal Pradesh

- - - - - -

3. Assam 1,31,911 (1,26,718 individual and 5,193 community)

- 1,31,911 (1,26,718 individual and 5,193 community)

36,267 (35,407 individual and 860 community)

- 36,267 (35,407 individual and 860 community)

4. Bihar 2,930 - 2,930 28 - 28

5. Chhattisgarh

4,92,068 (4,87,332 individual and 4,736 community)

- 4,92,068 (4,87,332 individual and 4,736 community)

2,15,443 (2,14,668 individual and 775 community)

- 2,15,443 (2,14,668 individual and 775 community)

6. Goa - - - - - -

7. Gujarat 1,91,592 (1,82,869 individual and 8,723 community)

- 1,91,592 (1,82,869 individual and 8,723 community)

42,752 (40,994 individual and 1,758 community)

- 42,752 (40,994 individual and 1,758 community)

Page 33: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

33

Sl. No

State Total number of claims

received up to 31.05.2013

Claims received

during the current month

Total number of claims

received up to 30.06.2013

Total number of titles deeds distributed/ ready up to 31.05.2013

Title deeds distributed/ ready during

the current month

Total number of titles deeds

distributed/ ready up to 30.06.2013

8. Himachal Pradesh

5,692 - 5,692 346 - 346

9. Jharkhand 42,003 - 42,003 15,296 - 15,296

10. Karnataka 1,63,385 (1,60,489 individual and 2,896 community)

5,333 1,68,718 (1,65,638 individual and 3,080 community)

6,577 (6,487 individual and 90 community)

- 6,577 (6,487 individual and 90 community)

11. Kerala 37,535 (36,140 individual and 1,395community)

- 37,535 (36,140 individual and 1,395community)

23,167 (23,163 individual and 4

community)

- 23,167 (23,163 individual and

4 community)

12. Madhya Pradesh

4,79,317 (4,63,075 individual and 16,242 community)

1183 4,80,500 (4,63,818 individual and 16,682 community)

1,75,293 distributed (1,65,920 individual, 9,373 Community and 8,802 ready

611 1,75,904 distributed (1,66,496 individual, 9,408 Community and 9,008 ready

13. Maharashtra 3,45,975 (3,40,927 individual and 5,048 community)

- 3,45,975 (3,40,927 individual and 5,048 community)

1,03,225 (1,01,356

individual and 1,869

community)

- 1,03,225 (1,01,356

individual and 1,869

community)

14. Manipur - - - - - -

15. Meghalaya - - - - - -

16. Mizoram - - - - - -

17. Orissa

5,22,680 (5,18,075 individual and 4,605 community)

1,482 5,24,162 (5,19,055 individual and 5,107 community)

3,15,466 distributed (3,14,420 Individual and 1,046 Community

4,683 3,20,149 distributed (3,18,375 individual and 1,774 Community

Page 34: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

34

Sl. No

State Total number of claims

received up to 31.05.2013

Claims received

during the current month

Total number of claims

received up to 30.06.2013

Total number of titles deeds distributed/ ready up to 31.05.2013

Title deeds distributed/ ready during

the current month

Total number of titles deeds

distributed/ ready up to 30.06.2013

18. Rajasthan 68,272 (67,792 individual and 480 community)

239 68,501 (68,031 individual and 480 community)

33,638 (33,579 individual and 59 community)

7 33,645 (33,586 individual and 59 community)-

19. Sikkim - - - - - -

20. Tamil Nadu 21,781 (18,420 individual and 3,361 community)

- 21,781 (18,420 individual and 3,361 community)

3,723 ready# - 3,723 ready#

21. Tripura 1,82,617 (1,82,340 individual and 277 community)

- 1,82,617 (1,82,340 individual and 277 community)

1,20,473 (1,20,418 individual and 55 community)

- 1,20,473 (1,20,418 individual and 55 community)

22. Uttar Pradesh

92,433 (91,298 individual and 1,135 community)

- 92,433 (91,298 individual and 1,135 community)

17,705 distributed (16,891 individual and 814 community)

- 17,705 distributed (16,891 individual and 814 community)

23. Uttarakhand 182 - 182 - - -

24. West Bengal 1,37,278 (1,29,454 individual and 7,824 community)

- 1,37,278 (1,29,454 individual and 7,824 community)

29,852 (29,744 individual and 108 community) and 2,969 ready for distribution

- 29,852 (29,744 individual and 108 community) and 2,969 ready for distribution

25. A & N

Islands - - - -

26. Daman & Diu

- - - -

Page 35: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

35

Sl. No

State Total number of claims

received up to 31.05.2013

Claims received

during the current month

Total number of claims

received up to 30.06.2013

Total number of titles deeds distributed/ ready up to 31.05.2013

Title deeds distributed/ ready during

the current month

Total number of titles deeds

distributed/ ready up to 30.06.2013

27. Dadra & Nagar Haveli

- - - -

Total 32,48,130 (31,79,501 individual and 68,629 community)

8237 32,56,367 (31,86,612 individual and 69,755 community)

13,03,325 (12,84 ,408 Individual and 18,917 community) and 15,494 ready.

5301 13,08,626 (12,88 ,946 individual and 19,680 community) and 15,700 ready.

(B) Statement of claims and distribution of title deeds under the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006

(As on 30.06.2013)

Sl. No.

States No. of Claims

received No. of Titles Distributed

No. of Claims Rejected

Total No. of Claims Disposed off / % respect of claims

received

1. Andhra

Pradesh

3,30,479 (3,23,765 individual and 6,714 community)

1,67,797 (1,65,691 individual and

2,106 community)

1,53,438 3,21,235

(97.20%)

2. Arunachal Pradesh

- - - -

3. Assam 1,31,911 (1,26,718 individual and 5,193 community)

36,267 (35,407 individual and 860

community)

37,669 73,936

(56.04%)

4. Bihar 2,930 28 1,644

1,672

(57.06%)

5. Chhattisgarh 4,92,068 (4,87,332 individual and 4,736 community)

2,15,443 (2,14,668 individual and 775 community)

2,72,664

4,88,107

(99.19%)

Page 36: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

36

Sl. No.

States No. of Claims

received No. of Titles Distributed

No. of Claims Rejected

Total No. of Claims Disposed off / % respect of claims

received

6. Goa - - - -

7. Gujarat 1,91,592 (1,82,869 individual and 8,723 community)

42,752 (40,994 individual and

1,758 community)

18,399(13,252 individual and

5,142 community)

61,151 (31.91%)

8. Himachal Pradesh

5,692 346 2,160 2,506

(44.02%)

9. Jharkhand 42,003

15,296 16,958

32,254 (76.78%)

10. Karnataka 1,68,718 (1,65,638 individual and 3,080 community)

6,577(6,487 individual and 90

community)

1,56,031 (1,53,820

individual and 2,211

community)

1,62,608

(96.37%)

11. Kerala 37,535 (36,140 individual and 1,395 community)

23,167 (23,163 individual and 4

community)

4,252 27,419

(73.04%)

12. Madhya

Pradesh

4,80,500 (4,63,818 individual and 16,682 community)

1,75,904 distributed (1,66,496 individual, 9,408 Community and 9,008 ready

2,77,731 4,53,635

(94.40%)

13. Maharashtra 3,45,975 (3,40,927 individual and 5,048 community)

1,03,225 (1,01,356 individual and

1,869 community)

2,33,689 (2,31,689 individual and 2,000 community)

3,36,914

(97.38%)

14. Manipur - - - -

15. Meghalaya - - - -

16. Mizoram - - - -

17. Orissa 5,24,162 (5,19,055 individual and 5,107 community)

3,20,149 distributed (3,18,375 individual and 1,774 community)

1,38,576 (1,37,962 individual and

614 community)

4,58,725

(87.51%)

18. Rajasthan 68,501 (68,031 individual and 480

33,645 (33,586 individual and 59

31,441 65,086

Page 37: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

37

Sl. No.

States No. of Claims

received No. of Titles Distributed

No. of Claims Rejected

Total No. of Claims Disposed off / % respect of claims

received

community) community) (95.01%)

19. Sikkim - - - -

20. Tamil Nadu 21,781 (18,420 individual and 3,361 community)

(3,723 titles are ready)

- -

21. Tripura 1,82,617 (1,82,340 individual and 277

community)

1,20,473 (1,20,418 individual and 55

community)

21,384 (21,164

individual and 220

community)

1,41,857

(77.68%)

22. Uttar Pradesh

92,433 (91,298 Individual and 1,135

community)

17,705 (16,891 individual and 814

community)

73,028

90,733

(98.16%)

23. Uttarakhand 182 - 1

1

(0.54 %)

24. West Bengal 1,37,278 (1,29,454 individual and 7,824 community)

29,852 (29,744 individual and 108

community) and 2,969 titles are

ready

79,891

1,09,743

(79.94%)

25. A & N Islands - - - -

26. Daman & Diu - - - -

27. Dadra & Nagar Haveli

- - - -

Total

32,56,367 (31,86,612 individual and 69,755 community)

13,08,626 and 15,700 ready.

15,18,956 28,27,582

(86.83%)

Page 38: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

38

(C) Statement showing ranking in terms of percentage of titles distributed over number of claims received in each State under the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006

(As on 30.06.2013)

Sl. No. State Total number of claims received

Total number of titles deeds distributed/

ready

% of titles distributed over number of claims

received

1 Tripura 1,82,617 1,20,473 distributed 65.97%

2 Kerala 37,535 23,167 distributed

61.72%

3 Orissa 5,24,162 3,20,149 distributed

61.07%

4 Andhra

Pradesh

3,30,479 1,67,797 distributed

50.77 %

5 Rajasthan 68,501 33,645distributed 49.11%

6 Chhattisgarh 4,92,068 2,15,443 distributed 43.78%

7 Madhya

Pradesh 4,80,500

1,75,904 distributed and

9,008 ready 36.60%

8 Jharkhand 42,003 15,296 distributed 36.41%

9 Maharashtra 3,45,975 1,03,225 distributed 29.83%

10 Assam 1,31,911 36,267 distributed 27.49 %

11 Gujarat 1,91,592 42,752 distributed 22.31%

12 West Bengal

1,37,278 29,852 distributed and

2,969 ready

21.74%

13 Uttar

Pradesh 92,433 17,705 distributed 19.15%

Page 39: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

39

Sl. No. State Total number of claims received

Total number of titles deeds distributed/

ready

% of titles distributed over number of claims

received

14 Himachal

Pradesh 5,692 346 6.07%

15 Karnataka 1,68,718 6,577 3.89%

16 Bihar 2,930 28 0.95 %

17 Tamil Nadu# 21,781 3,723 ready# 0.00%

18 Uttarakhand 182 Nil 0.00%

19 Arunachal

Pradesh* - - -

20 Goa* - - -

21 Manipur* - - -

22 Meghalaya* - - -

23 Mizoram* - - -

24 Sikkim* - - -

25 A & N Islands*

- - -

26 Daman & Diu*

- - -

27 Dadra &

Nagar

Haveli*

- - -

Total 32,56,367 13,08,626 and 15,700 ready

40.18%

* No claims received.

# High Court’s restrictive order.

Page 40: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

40

ANNEXURE-IV

Status of implementation of the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 in the Left Wing Extremism (LWE) affected States

(As on 30.06.2013)

S.No. State No. of Claims received

No. of titles distributed

No. of claims

rejected

Total No of Claims Disposed & %age of disposal

1. Andhra Pradesh 3,30,479 (3,23,765 individual and 6,714 community)

1,67,797 (1,65,691 individual and 2,106 community)

1,53,438

3, 21,235 (97.20%)

2. Bihar 2,930 28 1,644 1,672 (57.06%)

3. Chhattisgarh 4,92,068 (4,87,332 individual and 4,736 community)

2,15,443 (2,14,668 individual and 775 community)

2,72,664

4, 88,107 (99.19%)

4. Jharkhand 42,003 15,296 16,958 32,254 (76.78%)

5. Madhya Pradesh 4,80,500 (4,63,818 individual and 16,682 community)

1,75,904 (1,66,496 Individual and 9,408 community) and 9,008 ready

2,77,731

4, 53,635 (94.40%)

6. Maharashtra 3,45,975 (3,40,927 individual and 5,048 community)

1,03,225 (1,01,356 individual and 1,869 community)

2,33,689 (2,31,689 individual and 2,000 community)

3, 36,914 (97.38%)

7. Orissa 5,24,162 (5,19,055 individual and 5,107 community)

3,20,149 distributed (3,18,375 individual and 1,774 community)

1,38,576 (1,37,962 individual and 614 community)

4, 58,725 (87.51%)

8. Uttar Pradesh 92,433 (91,298 individual and 1,135 community)

17,705 (16,891 individual and 814 community)

73,028

90,733 (98.16%)

9. West Bengal 1,37,278 (1,29,454 individual and 7,824 community)

29,852 (29,744 individual and 108 community) and 2,969 ready

79,891

1, 09,743 (79.94%)

Total 24,47,828 (24,00,582 individual and 47,246 Community)

10,45,399 (10,28,545

individual and 16,854 community)

12,47,619 (12,45,005 individual and 2,614 Community)

22, 93,018

(93.67%)

Page 41: Government of India Ministry of Tribal Affairs [for the period ...in.one.un.org/wp-content/uploads/2016/09/...5) Arrangements made for the training of PRI officials, SDLC, DLC members

41

Annexure-V List of States/UTs that are not uploading the web-site http://forestrights.gov.in :

(As on 30.06.2013)

(A) List of States Not Entering Committee Data:

1. ANDAMAN AND NICOBAR ISLANDS 2. ARUNACHAL PRADESH 3. DAMAN AND DIU 4. GOA 5. GUJARAT 6. MEGHALAYA 7. TAMIL NADU 8. UTTARAKHAND 9. UTTAR PRADESH

(B) List of States Not Entering Claim Data:

1. # ANDAMAN AND NICOBAR ISLANDS 2. ARUNACHAL PRADESH 3. DADRA AND NAGAR HAVELI 4. DAMAN AND DIU 5. GOA 6. GUJARAT 7. MIZORAM 8. MANIPUR 9. MEGHALAYA 10. SIKKIM 11. TAMIL NADU 12. UTTARAKHAND 13. UTTAR PRADESH

# Only Forest Dwelling Scheduled Tribes.

(C) List of States/UTs that have not distributed any titles so far:

1. ARUNACHAL PRADESH 2. GOA 3. MANIPUR 4. MEGHALAYA 5. MIZORAM 6. SIKKIM 7. TAMIL NADU (because of High Court’s restrictive order) 8. UTTARAKHAND 9. DAMAN & DIU 10. DADRA & NAGAR HAVELI

*********