government of khyber pakhtunkhwacwd.gkp.pk/images/csr/mrsanalysis2017.pdfgovernment of khyber...

2734
GOVERNMENT OF KHYBER PAKHTUNKHWA MARKET RATE SYSTEM CHAPTER NO. 01 , CARRIAGE As on Jan-Mar (Qtr-1) 2017 CSR CELL FINANCE DEPARTMENT 2017 01-01-a DESCRIPTION OF ITEM : Item Code : Item Name : Detail Qty Amount Rate (Rs) Unit Unit 50 Meter Spec. No : Carriage of 100 cft / 5 tonne of all materials by truck or other means : 1st 50 meter EQUIPMENT Carriage Charges #1 59.50 1.000 59.50 Rs/50m Rs/50m 1 TOTAL EQUIPMENT 59.50 75.00 % Cont. Profit + Over Heads (Material+Labour+Equipment) : 22 Cost Per 50 m: 72.59 13.09 72.59 Composite Rates Per Labour Rates Per Rs. Rs. 0.00 Cost Per 50 m: 0.00 50 Meter 50 Meter % 1

Upload: others

Post on 27-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-01-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 50 Meter

    Spec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other

    means : 1st 50 meter

    EQUIPMENT

    Carriage Charges #1 59.50 1.000 59.50 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 59.50 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 50 m: 72.59

    13.09

    72.59Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 50 m: 0.00

    50 Meter

    50 Meter

    %

    1

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-01-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 50 Meter

    Spec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other

    means : 2nd 50 meter

    EQUIPMENT

    Carriage Charges #2 12.75 1.000 12.75 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 12.75 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 50 m: 15.56

    2.81

    15.56Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 50 m: 0.00

    50 Meter

    50 Meter

    %

    2

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-01-c

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 50 Meter

    Spec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other

    means : 3rd to 5th 50 meter

    EQUIPMENT

    Carriage Charges #3 8.50 1.000 8.50 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 8.50 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 50 m: 10.37

    1.87

    10.37Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 50 m: 0.00

    50 Meter

    50 Meter

    %

    3

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-01-d

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 250 Meter

    Spec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other

    means : 250 to 1000 meter

    EQUIPMENT

    Carriage Charges #4 42.50 1.000 42.50 Rs/250mRs/250m 1

    TOTAL EQUIPMENT 42.50 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 250 m: 51.85

    9.35

    51.85Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 250 m: 0.00

    250 Meter

    250 Meter

    %

    4

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-01-e

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other

    means : 1st kilometer

    EQUIPMENT

    Carriage Charges #5 127.50 1.000 127.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 127.50 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 155.55

    28.05

    155.55Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    5

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-01-f

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other

    means : 2nd - 5th kilometer

    EQUIPMENT

    Carriage Charges #6 51.00 1.000 51.00 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 51.00 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 62.22

    11.22

    62.22Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    6

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-01-g

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other

    means : 6th to 10th kilometer

    EQUIPMENT

    Carriage Charges #7 42.50 1.000 42.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 42.50 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 51.85

    9.35

    51.85Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    7

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-01-h

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other

    means : 11th & subsequent kilometer

    EQUIPMENT

    Carriage Charges #8 25.50 1.000 25.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 25.50 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 31.11

    5.61

    31.11Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    8

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-02-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 50 Meter

    Spec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :

    1st 50 meter

    EQUIPMENT

    Carriage Charges #1 37.49 0.630 59.50 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 37.49 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 50 m: 45.73

    8.25

    45.73Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 50 m: 0.00

    50 Meter

    50 Meter

    %

    9

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-02-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 50 Meter

    Spec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :

    2nd 50 meter

    EQUIPMENT

    Carriage Charges #2 8.03 0.630 12.75 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 8.03 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 50 m: 9.80

    1.77

    9.80Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 50 m: 0.00

    50 Meter

    50 Meter

    %

    10

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-02-c

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 50 Meter

    Spec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :

    3rd to 5th 50 meter

    EQUIPMENT

    Carriage Charges #3 5.36 0.630 8.50 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 5.36 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 50 m: 6.53

    1.18

    6.53Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 50 m: 0.00

    50 Meter

    50 Meter

    %

    11

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-02-d

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 50 Meter

    Spec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :

    250 - 1000 meter

    EQUIPMENT

    Carriage Charges #4 26.77 0.630 42.50 Rs/250mRs/250m 1

    TOTAL EQUIPMENT 26.77 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 250 m: 32.67

    5.89

    32.67Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 250 m: 0.00

    50 Meter

    50 Meter

    %

    12

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-02-e

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :

    1st kilometer

    EQUIPMENT

    Carriage Charges #5 80.32 0.630 127.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 80.32 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 98.00

    17.67

    98.00Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    13

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-02-f

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :

    2nd - 5th kilometer

    EQUIPMENT

    Carriage Charges #6 32.13 0.630 51.00 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 32.13 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 39.20

    7.07

    39.20Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    14

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-02-g

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :

    6th - 10th kilometer

    EQUIPMENT

    Carriage Charges #7 26.77 0.630 42.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 26.77 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 32.67

    5.89

    32.67Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    15

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-02-h

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :

    11th & subsequent kilometer

    EQUIPMENT

    Carriage Charges #8 16.07 0.630 25.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 16.07 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 19.60

    3.53

    19.60Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    16

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-03-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Tonne/50 Met

    Spec. No :

    Carriage of cement(bag), bitumen/lubricants (drum) by truck or

    other means : 1st 50 meter

    EQUIPMENT

    Carriage Charges #1 11.90 0.200 59.50 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 11.90 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per tonne/50m: 14.52

    2.62

    14.52Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per tonne/50m: 0.00

    Tonne/50 M

    Tonne/50 M

    %

    17

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-03-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Tonne/50 Met

    Spec. No :

    Carriage of cement (bag) bitumen/lubricant (drum) by truck or other

    means : 2nd 50 meter

    EQUIPMENT

    Carriage Charges #2 2.55 0.200 12.75 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 2.55 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per tonne/50m: 3.11

    0.56

    3.11Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per tonne/50m: 0.00

    Tonne/50 M

    Tonne/50 M

    %

    18

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-03-c

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Tonne/50 Met

    Spec. No :

    Carriage of cement (bag), bitumen/lubricant (drum) by truck or

    other means : 3rd to 5th 50 meter

    EQUIPMENT

    Carriage Charges #3 1.70 0.200 8.50 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 1.70 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per tonne/50m: 2.07

    0.37

    2.07Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per tonne/50m: 0.00

    Tonne/50 M

    Tonne/50 M

    %

    19

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-03-d

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Tonne/250 Me

    Spec. No :

    Carriage of cement(bag), bitumen/lubricant (drum) by truck or other

    means : 250 to 1000 meter

    EQUIPMENT

    Carriage Charges #4 8.50 0.200 42.50 Rs/250mRs/250m 1

    TOTAL EQUIPMENT 8.50 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per t/250m: 10.37

    1.87

    10.37Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per t/250m: 0.00

    Tonne/250

    Tonne/250

    %

    20

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-03-e

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Tonne/1 Km

    Spec. No :

    Carriage of cement(bags), bitumen/lubricant (drum) by truck or

    other means : 1st kilometer

    EQUIPMENT

    Carriage Charges #5 25.50 0.200 127.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 25.50 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per tonne/km: 31.11

    5.61

    31.11Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per tonne/km: 0.00

    Tonne/1 K

    Tonne/1 K

    %

    21

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-03-f

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Tonne/1 Km

    Spec. No :

    Carriage of cement(bag), bitumen/lubricant (drum) by truck or other

    means : 2nd - 5th kilometer

    EQUIPMENT

    Carriage Charges #6 10.20 0.200 51.00 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 10.20 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per tonne/km: 12.44

    2.24

    12.44Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per tonne/km: 0.00

    Tonne/1 K

    Tonne/1 K

    %

    22

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-03-g

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Tonne/1 Km

    Spec. No :

    Carriage of cement(bag), bitumen/lubricant (drum) by truck or other

    means : 6th - 10th kilometer

    EQUIPMENT

    Carriage Charges #7 8.50 0.200 42.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 8.50 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per tonne/km: 10.37

    1.87

    10.37Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per tonne/km: 0.00

    Tonne/1 K

    Tonne/1 K

    %

    23

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-03-h

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Tonne/1 Km

    Spec. No :

    Carriage of cement(bag), bitumen/lubricant (drum) by truck or other

    means : 11th & subsequent km

    EQUIPMENT

    Carriage Charges #8 5.10 0.200 25.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 5.10 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per tonne/km: 6.22

    1.12

    6.22Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per tonne/km: 0.00

    Tonne/1 K

    Tonne/1 K

    %

    24

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-04-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 50 Meter

    Spec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :

    1st 50 meter

    EQUIPMENT

    Carriage Charges #1 35.70 0.600 59.50 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 35.70 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 50 m: 43.55

    7.85

    43.55Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 50 m: 0.00

    50 Meter

    50 Meter

    %

    25

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-04-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 50 Meter

    Spec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :

    2nd 50 meter

    EQUIPMENT

    Carriage Charges #2 7.65 0.600 12.75 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 7.65 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 50 m: 9.33

    1.68

    9.33Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 50 m: 0.00

    50 Meter

    50 Meter

    %

    26

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-04-c

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 50 Meter

    Spec. No :

    Carriage of 100cft of sarkanda, pichi, frash etc by road or boat :

    3rd to 5th kilometer

    EQUIPMENT

    Carriage Charges #3 5.10 0.600 8.50 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 5.10 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 50 m: 6.22

    1.12

    6.22Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 50 m: 0.00

    50 Meter

    50 Meter

    %

    27

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-04-d

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 250 Meter

    Spec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :

    250 to 1000 meter

    EQUIPMENT

    Carriage Charges #4 25.50 0.600 42.50 Rs/250mRs/250m 1

    TOTAL EQUIPMENT 25.50 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 250 m: 31.11

    5.61

    31.11Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 250 m: 0.00

    250 Meter

    250 Meter

    %

    28

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-04-e

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of 100cft of sarkanda, pichi, frash etc by road or boat :

    1st kilometer

    EQUIPMENT

    Carriage Charges #5 76.50 0.600 127.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 76.50 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 93.33

    16.83

    93.33Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    29

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-04-f

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :

    2nd - 5th kilometer

    EQUIPMENT

    Carriage Charges #6 30.60 0.600 51.00 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 30.60 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 37.33

    6.73

    37.33Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    30

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-04-g

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :

    6th - 10th kilometer

    EQUIPMENT

    Carriage Charges #7 25.50 0.600 42.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 25.50 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 31.11

    5.61

    31.11Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    31

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-04-h

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :

    11th & subsequent kilometer

    EQUIPMENT

    Carriage Charges #8 15.30 0.600 25.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 15.30 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 18.67

    3.37

    18.67Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    32

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-05-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 50 Meter

    Spec. No :

    Carriage of small consignments upto 250kg 1st 50 meter

    EQUIPMENT

    Carriage Charges #1 2.98 0.050 59.50 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 2.98 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 50 m: 3.63

    0.65

    3.63Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 50 m: 0.00

    50 Meter

    50 Meter

    %

    33

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-05-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 50 Meter

    Spec. No :

    Carriage of small consigmnments upto 250 kg 2nd 50 meter

    EQUIPMENT

    Carriage Charges #2 0.64 0.050 12.75 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 0.64 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 50 m: 0.78

    0.14

    0.78Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 50 m: 0.00

    50 Meter

    50 Meter

    %

    34

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-05-c

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 50 Meter

    Spec. No :

    Carriage of small consignments upto 250 kg 3rd to 5th 50 meters

    EQUIPMENT

    Carriage Charges #3 0.43 0.050 8.50 Rs/50mRs/50m 1

    TOTAL EQUIPMENT 0.43 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 50 m: 0.52

    0.09

    0.52Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 50 m: 0.00

    50 Meter

    50 Meter

    %

    35

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-05-d

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 250 Meter

    Spec. No :

    Carriage of small consignments upto 250 kg 250 - 1000 meter

    EQUIPMENT

    Carriage Charges #4 2.13 0.050 42.50 Rs/250mRs/250m 1

    TOTAL EQUIPMENT 2.13 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 250 m: 2.59

    0.47

    2.59Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 250 m: 0.00

    250 Meter

    250 Meter

    %

    36

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-05-e

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of small consignments upto 250 kg 1st kilometer

    EQUIPMENT

    Carriage Charges #5 6.38 0.050 127.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 6.38 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 7.78

    1.40

    7.78Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    37

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-05-f

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of small consignments upto 250 kg 2nd to 5th kilometer

    EQUIPMENT

    Carriage Charges #6 2.55 0.050 51.00 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 2.55 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 3.11

    0.56

    3.11Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    38

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-05-g

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of small consignments upto 250 kg 6th to 10th kilometer

    EQUIPMENT

    Carriage Charges #7 2.13 0.050 42.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 2.13 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 2.59

    0.47

    2.59Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    39

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-05-h

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of small consignments upto 250 kg 11th & subsequent

    kilometer

    EQUIPMENT

    Carriage Charges #8 1.27 0.050 25.50 Rs/KmRs/Km 1

    TOTAL EQUIPMENT 1.27 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 1.56

    0.28

    1.56Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    40

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-06-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of consignments (odd job) Coolie load

    LABOUR

    Coolie 45.00 0.100 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 1.35

    46.35 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 56.25

    9.90

    56.25Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 56.25 Cost Per km: 56.25

    km

    km

    %

    41

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-06-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of consignments (odd job) Donkey load

    EQUIPMENT

    Donkey 25.50 0.075 340.00 DayDay 1

    TOTAL EQUIPMENT 25.50 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 31.11

    5.61

    31.11Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    42

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-06-c

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of consignments (odd job) Cart Load

    EQUIPMENT

    Bullock Cart 22.31 0.038 595.00 DayDay 1

    TOTAL EQUIPMENT 22.31 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 27.22

    4.91

    27.22Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    43

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-06-d

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit km

    Spec. No :

    Carriage of consignments (odd job) Camel load

    EQUIPMENT

    Camel 51.00 0.075 680.00 DayDay 1

    TOTAL EQUIPMENT 51.00 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per km: 62.22

    11.22

    62.22Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per km: 0.00

    km

    km

    %

    44

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-07-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Day

    Spec. No :

    Hire Charges of Truck

    EQUIPMENT

    Truck (10ton) 6,570.05 7.729 850.00 HourHour 1

    TOTAL EQUIPMENT 6,570.05 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per Day: 8,015.46

    1,445.41

    8,015.46Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per Day: 0.00

    Day

    Day

    %

    45

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-07-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Day

    Spec. No :

    Hire charges of Tractor with trolley

    EQUIPMENT

    Tractor With Trolly 6,570.50 7.730 850.00 HourHour 1

    TOTAL EQUIPMENT 6,570.50 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per Day: 8,016.01

    1,445.51

    8,016.01Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per Day: 0.00

    Day

    Day

    %

    46

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-07-c

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Day

    Spec. No :

    Hire charges of Tractor without trolley

    EQUIPMENT

    Tractor Without Trolly 80 HP 4,311.37 7.246 595.00 DayDay 1

    TOTAL EQUIPMENT 4,311.37 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per Day: 5,259.87

    948.50

    5,259.87Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per Day: 0.00

    Day

    Day

    %

    47

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-08-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Each

    Spec. No :

    Hand shunting loaded railway wagons Upto 500 meter

    LABOUR

    Coolie 675.00 1.500 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 20.25

    695.25 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per Each: 843.75

    148.50

    843.75Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 843.75 Cost Per Each: 843.75

    Each

    Each

    %

    48

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-08-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Each

    Spec. No :

    Hand shunting loaded railway wagons Upto 1 kilometer

    LABOUR

    Coolie 1,012.50 2.250 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 30.38

    1,042.88 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per Each: 1,265.63

    222.75

    1,265.63Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 1,265.63 Cost Per Each: 1,265.63

    Each

    Each

    %

    49

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-08-c

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Each

    Spec. No :

    Hand shunting loaded railway wagons Upto 2 kilometer

    LABOUR

    Coolie 1,237.50 2.750 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 37.13

    1,274.63 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per Each: 1,546.88

    272.25

    1,546.88Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 1,546.88 Cost Per Each: 1,546.88

    Each

    Each

    %

    50

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-08-d

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Each

    Spec. No :

    Hand shunting loaded railway wagons 3rd & subsequent kilometer

    LABOUR

    Coolie 562.50 1.250 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 16.88

    579.38 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per Each: 703.13

    123.75

    703.13Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 703.13 Cost Per Each: 703.13

    Each

    Each

    %

    51

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-09-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Each

    Spec. No :

    Hand shunting empty railway wagons Upto 500 meter

    LABOUR

    Coolie 337.50 0.750 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 10.13

    347.63 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per Each: 421.88

    74.25

    421.88Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 421.88 Cost Per Each: 421.88

    Each

    Each

    %

    52

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-09-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Each

    Spec. No :

    Hand shunting empty railway wagons Upto 1 kilometer

    LABOUR

    Coolie 506.25 1.125 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 15.19

    521.44 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per Each: 632.81

    111.38

    632.81Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 632.81 Cost Per Each: 632.81

    Each

    Each

    %

    53

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-09-c

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Each

    Spec. No :

    Hand shunting empty railway wagons Upto 2 kilometer

    LABOUR

    Coolie 618.75 1.375 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 18.56

    637.31 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per Each: 773.44

    136.13

    773.44Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 773.44 Cost Per Each: 773.44

    Each

    Each

    %

    54

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 01 , CARRIAGE

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    01-09-d

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Each

    Spec. No :

    Hand shunting empty railway wagons 3rd & subsequent kilometer

    LABOUR

    Coolie 281.25 0.625 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 8.44

    289.69 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per Each: 351.56

    61.88

    351.56Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 351.56 Cost Per Each: 351.56

    Each

    Each

    %

    55

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-01

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 cft

    Spec. No :

    Load into or unload from railway wagons within 50m shingle, sand,

    ballast, tiles, etc, laid & stacked

    (British) :

    LABOUR

    Coolie 450.00 1.000 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 13.50

    463.50 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 198.65

    99.00

    562.50Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 562.50 Per CUM : Rs 198.65

    100 cft

    100 cft

    %

    56

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-02-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 No.

    Spec. No :

    Load into or unload from railway wagons within 50m laid & stacked :

    Bricks 10" size

    (British) :

    LABOUR

    Coolie 562.50 1.250 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 16.88

    579.38 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 1000 No.: 703.13

    123.75

    703.13Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 703.13 Cost Per 1000 No.: 703.13

    1000 No.

    1000 No.

    %

    57

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-02-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 No.

    Spec. No :

    Load into or unload from railway wagons within 50m laid & stacked :

    Bricks 9" or smaller size

    (British) :

    LABOUR

    Coolie 450.00 1.000 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 13.50

    463.50 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 1000 No.: 562.50

    99.00

    562.50Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 562.50 Cost Per 1000 No.: 562.50

    1000 No.

    1000 No.

    %

    58

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-03

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Load into or unload from railway wagons, cement in bags and

    stacking within 50m.

    (British) :

    LABOUR

    Coolie 562.50 1.250 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 16.88

    579.38 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 703.13

    123.75

    703.13Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 703.13 Cost Per 100 No.: 703.13

    100 No.

    100 No.

    %

    59

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-04

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 No.

    Spec. No :

    Load into or unload from railway wagons, empty cement bags and

    stacking

    (British) :

    LABOUR

    Coolie 504.00 1.120 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 15.12

    519.12 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 1000 No.: 630.00

    110.88

    630.00Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 630.00 Cost Per 1000 No.: 630.00

    1000 No.

    1000 No.

    %

    60

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-05

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit tonne

    Spec. No :

    Load into or unload from railway wagons and stacking white lime in

    bags

    (British) :

    LABOUR

    Coolie 112.50 0.250 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 3.38

    115.88 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per Tonne : Rs 140.63

    24.75

    140.63Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 140.63 Per Tonne : Rs 140.63

    tonne

    tonne

    %

    61

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-06

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit tonne

    Spec. No :

    Load into or unload from railway wagons structural steel, RS

    joists, rails, rail fastenings etc

    (British) :

    LABOUR

    Coolie 270.00 0.600 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 8.10

    278.10 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per Tonne : Rs 337.50

    59.40

    337.50Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 337.50 Per Tonne : Rs 337.50

    tonne

    tonne

    %

    62

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-07

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Each

    Spec. No :

    Load into or unload from 45 gallon drums full, into or from railway

    wagons,lead upto 50m

    (British) :

    LABOUR

    Coolie 36.00 0.080 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 1.08

    37.08 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per Each: 45.00

    7.92

    45.00Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 45.00 Cost Per Each: 45.00

    Each

    Each

    %

    63

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-08

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Each

    Spec. No :

    Loading or unloading packages of all sorts upto 50 kg.

    (British) :

    LABOUR

    Coolie 31.50 0.070 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 0.95

    32.45 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per Each: 39.38

    6.93

    39.38Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 39.38 Cost Per Each: 39.38

    Each

    Each

    %

    64

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-09-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Load or unload sleepers other than wooden, incl stacking, lead upto

    50 m : Broad gauge

    (British) :

    LABOUR

    Coolie 1,125.00 2.500 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 33.75

    1,158.75 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 1,406.25

    247.50

    1,406.25Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 1,406.25 Cost Per 100 No.: 1,406.25

    100 No.

    100 No.

    %

    65

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-09-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Load or unload sleepers other than wooden, including stacking, lead

    upto 50 m : Metre gauge &

    (British) :

    LABOUR

    Coolie 562.50 1.250 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 16.88

    579.38 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 703.13

    123.75

    703.13Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 703.13 Cost Per 100 No.: 703.13

    100 No.

    100 No.

    %

    66

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-10

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit tonne

    Spec. No :

    Load or unload timber logs or shuttering into or from railway

    wagons, including stacking within 50m

    (British) :

    LABOUR

    Coolie 148.50 0.330 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 4.46

    152.96 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per Tonne : Rs 185.63

    32.67

    185.63Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 185.63 Per Tonne : Rs 185.63

    tonne

    tonne

    %

    67

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-11

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit tonne

    Spec. No :

    Loading or unloading bhoosa in railway wagons lead upto 50 m.

    (British) :

    LABOUR

    Coolie 337.50 0.750 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 10.13

    347.63 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per Tonne : Rs 421.88

    74.25

    421.88Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 421.88 Per Tonne : Rs 421.88

    tonne

    tonne

    %

    68

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-12

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit tonne

    Spec. No :

    Load or unload timber scrap or wooden plugs into or from railway

    wagons & stacking within 50m

    (British) :

    LABOUR

    Coolie 225.00 0.500 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 6.75

    231.75 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per Tonne : Rs 281.25

    49.50

    281.25Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 281.25 Per Tonne : Rs 281.25

    tonne

    tonne

    %

    69

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-13

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 cft

    Spec. No :

    Load or unload pitching stone/spawl from railway wagons of any

    guage including clearing 1.5m away

    (British) :

    LABOUR

    Coolie 166.50 0.370 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 5.00

    171.50 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 73.50

    36.63

    208.13Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 208.13 Per CUM : Rs 73.50

    100 cft

    100 cft

    %

    70

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-14

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 cft

    Spec. No :

    Loading or unloading building stone including clearing away 1.5m

    from rails

    (British) :

    LABOUR

    Coolie 216.00 0.480 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 6.48

    222.48 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 95.35

    47.52

    270.00Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 270.00 Per CUM : Rs 95.35

    100 cft

    100 cft

    %

    71

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-15-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 ltr

    Spec. No :

    Unloading oil,bitumen or tar etc : Crude Oil (to be pumped from

    tank wagon into tank)

    (British) :

    LABOUR

    Coolie 135.00 0.300 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 4.05

    139.05 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 1000 ltr: 168.75

    29.70

    168.75Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 168.75 Cost Per 1000 ltr: 168.75

    1000 ltr

    1000 ltr

    %

    72

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-15-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 ltr

    Spec. No :

    Unloading oil,bitumen or tar etc Crude oil (drained by gravity)

    (British) :

    LABOUR

    Coolie 135.00 0.300 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 4.05

    139.05 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 1000 ltr: 168.75

    29.70

    168.75Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 168.75 Cost Per 1000 ltr: 168.75

    1000 ltr

    1000 ltr

    %

    73

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-15-c

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit Ton

    Spec. No :

    Unloading oil,bitumen or tar etc Crude oil materials from railway

    wagons

    (British) :

    LABOUR

    Coolie 25.65 0.057 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 0.77

    26.42 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per Ton: 32.06

    5.64

    32.06Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 32.06 Cost Per Ton: 32.06

    Ton

    Ton

    %

    74

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-15-d

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit tonne

    Spec. No :

    Unloading oil, bitumen or tar etc : Fuel Oil from tank into empty

    drums including stacking within 50 m

    (British) :

    LABOUR

    Coolie 225.00 0.500 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 6.75

    231.75 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per Tonne : Rs 281.25

    49.50

    281.25Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 281.25 Per Tonne : Rs 281.25

    tonne

    tonne

    %

    75

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-15-e

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Unloading oil,bitumen or tar etc Petrol (2 gallon tin)

    (British) :

    LABOUR

    Coolie 283.50 0.630 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 8.51

    292.01 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 354.38

    62.37

    354.38Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 354.38 Cost Per 100 No.: 354.38

    100 No.

    100 No.

    %

    76

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-15-f

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Unloading oil, bitumen or tar etc Kerosine oil (4 gallon tin)

    (British) :

    LABOUR

    Coolie 562.50 1.250 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 16.88

    579.38 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 703.13

    123.75

    703.13Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 703.13 Cost Per 100 No.: 703.13

    100 No.

    100 No.

    %

    77

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-15-g

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Unloading oil,bitumen or tar etc Tar & Bitumen in drums with

    carriage upto 1 km

    (British) :

    EQUIPMENT

    Bullock Cart 148.75 0.250 595.00 DayDay 1

    TOTAL EQUIPMENT 148.75 75.00 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 181.48

    32.73

    181.48Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 0.00 Cost Per 100 No.: 0.00

    100 No.

    100 No.

    %

    78

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-16-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 cft

    Spec. No :

    Removing and stacking within 50m. lead Stone, spawl, brick bats,

    shingle, sand, lime etc

    (British) :

    LABOUR

    Coolie 225.00 0.500 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 6.75

    231.75 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 99.32

    49.50

    281.25Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 281.25 Per CUM : Rs 99.32

    100 cft

    100 cft

    %

    79

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-16-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 No.

    Spec. No :

    Removing and stacking within 50m. lead Bricks

    (British) :

    LABOUR

    Coolie 652.50 1.450 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 19.58

    672.08 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 1000 No.: 815.63

    143.55

    815.63Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 815.63 Cost Per 1000 No.: 815.63

    1000 No.

    1000 No.

    %

    80

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-16-c

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Removing and stacking within 50m. lead Broad gauge wooden sleepers

    (British) :

    LABOUR

    Coolie 360.00 0.800 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 10.80

    370.80 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 450.00

    79.20

    450.00Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 450.00 Cost Per 100 No.: 450.00

    100 No.

    100 No.

    %

    81

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-16-d

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Removing and stacking within 50m. lead Metre gauge or narrow guage

    wooden sleepers

    (British) :

    LABOUR

    Coolie 205.65 0.457 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 6.17

    211.82 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 257.06

    45.24

    257.06Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 257.06 Cost Per 100 No.: 257.06

    100 No.

    100 No.

    %

    82

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-16-e

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit tonne

    Spec. No :

    Removing and stacking within 50m. lead Rails, girders, pipes,

    cement etc.

    (British) :

    LABOUR

    Coolie 103.50 0.230 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 3.11

    106.61 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per Tonne : Rs 129.38

    22.77

    129.38Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 129.38 Per Tonne : Rs 129.38

    tonne

    tonne

    %

    83

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-16-f

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Removing and stacking within 50m. lead Bridge and crossing timbers,

    etc.

    (British) :

    LABOUR

    Coolie 1,201.50 2.670 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 36.05

    1,237.55 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 1,501.88

    264.33

    1,501.88Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 1,501.88 Cost Per 100 No.: 1,501.88

    100 No.

    100 No.

    %

    84

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-17

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit tonne

    Spec. No :

    Load into wagons girders, rails, MS bars, pipes etc. including 50m

    lead & stacking inside wagons

    (British) :

    LABOUR

    Coolie 288.00 0.640 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 8.64

    296.64 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per Tonne : Rs 360.00

    63.36

    360.00Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 360.00 Per Tonne : Rs 360.00

    tonne

    tonne

    %

    85

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-18

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit tonne

    Spec. No :

    Unload from wagons girders, rails, MS bars, girder etc. including

    50m lead but excluding stacking

    (British) :

    LABOUR

    Coolie 112.50 0.250 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 3.38

    115.88 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per Tonne : Rs 140.63

    24.75

    140.63Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 140.63 Per Tonne : Rs 140.63

    tonne

    tonne

    %

    86

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-19

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Load into wagons wooden baord guage sleepers including 50m lead &

    stacking

    (British) :

    LABOUR

    Coolie 900.00 2.000 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 27.00

    927.00 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 1,125.00

    198.00

    1,125.00Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 1,125.00 Cost Per 100 No.: 1,125.00

    100 No.

    100 No.

    %

    87

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-20

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Unload wooden broad gauge sleepers from wagons including 50m lead

    and stacking

    (British) :

    LABOUR

    Coolie 450.00 1.000 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 13.50

    463.50 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 562.50

    99.00

    562.50Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 562.50 Cost Per 100 No.: 562.50

    100 No.

    100 No.

    %

    88

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-21

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Loading metre gauge or narrow guage wooden sleepers including 50m

    lead & stack inside wagons

    (British) :

    LABOUR

    Coolie 495.00 1.100 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 14.85

    509.85 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 618.75

    108.90

    618.75Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 618.75 Cost Per 100 No.: 618.75

    100 No.

    100 No.

    %

    89

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-22

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Unloading metre gauge or narrow guage wooden sleepers including 50m

    lead but excluding stacking

    (British) :

    LABOUR

    Coolie 238.50 0.530 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 7.15

    245.65 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 298.12

    52.47

    298.12Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 298.12 Cost Per 100 No.: 298.12

    100 No.

    100 No.

    %

    90

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-23

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Loading bridge and crossing timber including 50m lead & stacking

    (British) :

    LABOUR

    Coolie 450.00 1.000 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 13.50

    463.50 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 562.50

    99.00

    562.50Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 562.50 Cost Per 100 No.: 562.50

    100 No.

    100 No.

    %

    91

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-24

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 100 No.

    Spec. No :

    Unloading bridge and crossing timbers including 50m lead but

    excluding stacking

    (British) :

    LABOUR

    Coolie 225.00 0.500 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 6.75

    231.75 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Cost Per 100 No.: 281.25

    49.50

    281.25Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 281.25 Cost Per 100 No.: 281.25

    100 No.

    100 No.

    %

    92

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    02-25

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit tonne

    Spec. No :

    Load or unload bitumen, asphalt, tar in drums, into or from

    railway wagons, lead upto 50m

    (British) :

    LABOUR

    Coolie 225.00 0.500 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 6.75

    231.75 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per Tonne : Rs 281.25

    49.50

    281.25Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 281.25 Per Tonne : Rs 281.25

    tonne

    tonne

    %

    93

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    03-01-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 Cft

    Spec. No :

    Earth excavation undressed upto single throw of kassi phaorah or

    shovel etc : in ashes, sand, soft soil or silt clearance

    (British) :

    LABOUR

    Coolie 1,687.50 3.750 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 50.63

    1,738.13 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 74.49

    371.25

    2,109.38Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 2,109.38 Per CUM : Rs 74.49

    1000 Cft

    1000 Cft

    %

    94

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    03-01-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 Cft

    Spec. No :

    Earth excavation undressed upto single throw of kassi phaorah or

    shove etc : in ordinary soil,

    (British) :

    LABOUR

    Coolie 2,025.00 4.500 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 60.75

    2,085.75 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 89.39

    445.50

    2,531.25Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 2,531.25 Per CUM : Rs 89.39

    1000 Cft

    1000 Cft

    %

    95

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    03-02

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 Cft

    Spec. No :

    Earth excavation in ashes, sand & soft soil or silt clearance,

    undressed lead upto 25m.

    (British) :

    LABOUR

    Coolie 2,475.00 5.500 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 74.25

    2,549.25 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 109.25

    544.50

    3,093.75Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 3,093.75 Per CUM : Rs 109.25

    1000 Cft

    1000 Cft

    %

    96

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    03-03-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 Cft

    Spec. No :

    Bed clearance and dressing slopes of drains including removing of

    weeds and roots etc. Excavated material undressed within 25m

    (British) :

    LABOUR

    Coolie 3,150.00 7.000 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 94.50

    3,244.50 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 139.05

    693.00

    3,937.50Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 3,937.50 Per CUM : Rs 139.05

    1000 Cft

    1000 Cft

    %

    97

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    03-03-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 Cft

    Spec. No :

    Bed clearance and dressing slopes of drains including removing of

    weeds and roots etc. Excavated material dressed within 25m lead

    (British) :

    LABOUR

    Coolie 3,483.00 7.740 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 104.49

    3,587.49 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 153.75

    766.26

    4,353.75Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 4,353.75 Per CUM : Rs 153.75

    1000 Cft

    1000 Cft

    %

    98

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    03-04-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 Cft

    Spec. No :

    Borrowpit excavation undressed lead upto 50m in Ordinary soil

    (British) :

    LABOUR

    Coolie 3,150.00 7.000 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 94.50

    3,244.50 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 139.05

    693.00

    3,937.50Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 3,937.50 Per CUM : Rs 139.05

    1000 Cft

    1000 Cft

    %

    99

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    03-04-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 Cft

    Spec. No :

    Borrowpit excavation undressed lead upto 50m in Hard soil

    (British) :

    LABOUR

    Coolie 3,870.00 8.600 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 116.10

    3,986.10 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 170.83

    851.40

    4,837.50Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 4,837.50 Per CUM : Rs 170.83

    1000 Cft

    1000 Cft

    %

    100

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    03-04-c

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 Cft

    Spec. No :

    Borrowpit excavation undressed lead upto 50m in shingle/gravel

    formation

    (British) :

    LABOUR

    Coolie 7,650.00 17.000 450.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 229.50

    7,879.50 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 337.70

    1,683.00

    9,562.50Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 9,562.50 Per CUM : Rs 337.70

    1000 Cft

    1000 Cft

    %

    101

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    03-05-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 Cft

    Spec. No :

    Embankment formation in ordinary soil & compaction by mechanical

    means at optimum moistures content to 95% to 100% max. modified.

    AASHTO dry density (borrow area)

    (British) :

    LABOUR

    Coolie 562.50 1.250 450.00 DayDay 1

    Dresser 270.00 0.500 540.00 DayDay 1

    Water Sprinkler 48.60 0.090 540.00 DayDay 1

    Water Carrier 50.40 0.080 630.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 27.95

    959.45 11.70 %

    %

    EQUIPMENT

    Tractor With Trolly 612.00 0.720 850.00 HourHour 1

    Comp Roller 864.00 0.720 1,200.00 HourHour 1

    Grader 165 HP 5,440.00 1.600 3,400.00 HourHour 1

    Rammer Mech 136.00 0.320 425.00 HourHour 1

    Lab Test 47.60 0.080 595.00 NoNo 1

    TOTAL EQUIPMENT 7,099.60 66.30 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 347.00

    1,766.84

    9,825.89Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 1,164.38 Per CUM : Rs 41.12

    1000 Cft

    1000 Cft

    %

    102

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    03-05-b

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 Cft

    Spec. No :

    Embankment formation in ordinary soil & compaction by mechanical

    means at optimum moistures content to 90% max. modified AASHTO dry

    density (borrow area)

    (British) :

    LABOUR

    Coolie 562.50 1.250 450.00 DayDay 1

    Dresser 270.00 0.500 540.00 DayDay 1

    Water Sprinkler 43.20 0.080 540.00 DayDay 1

    Water Carrier 44.10 0.070 630.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 27.59

    947.39 11.71 %

    %

    EQUIPMENT

    Tractor With Trolly 612.00 0.720 850.00 HourHour 1

    Comp Roller 768.00 0.640 1,200.00 HourHour 1

    Grader 165 HP 5,440.00 1.600 3,400.00 HourHour 1

    Rammer Mech 136.00 0.320 425.00 HourHour 1

    Lab Test 47.60 0.080 595.00 NoNo 1

    TOTAL EQUIPMENT 7,003.60 66.29 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 342.35

    1,743.15

    9,694.14Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 1,149.75 Per CUM : Rs 40.60

    1000 Cft

    1000 Cft

    %

    103

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    03-05-c

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 Cft

    Spec. No :

    Embankment formation in ordinary soil & compaction by mechanical

    means at optimum moistures content to 85% max. modified AASHTO dry

    density (borrow area)

    (British) :

    LABOUR

    Coolie 562.50 1.250 450.00 DayDay 1

    Dresser 270.00 0.500 540.00 DayDay 1

    Water Sprinkler 37.80 0.070 540.00 DayDay 1

    Water Carrier 37.80 0.060 630.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 27.24

    935.34 11.71 %

    %

    EQUIPMENT

    Tractor With Trolly 612.00 0.720 850.00 HourHour 1

    Comp Roller 672.00 0.560 1,200.00 HourHour 1

    Grader 165 HP 5,440.00 1.600 3,400.00 HourHour 1

    Rammer Mech 136.00 0.320 425.00 HourHour 1

    Lab Test 47.60 0.080 595.00 NoNo 1

    TOTAL EQUIPMENT 6,907.60 66.29 %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 337.69

    1,719.45

    9,562.40Composite Rates Per

    Labour Rates Per

    Rs.

    Rs. 1,135.12 Per CUM : Rs 40.09

    1000 Cft

    1000 Cft

    %

    104

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    MARKET RATE SYSTEM

    CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)

    As on Jan-Mar (Qtr-1) 2017

    CSR CELL FINANCE DEPARTMENT

    2017

    03-06-a

    DESCRIPTION OF ITEM :

    Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs)Unit

    Unit 1000 Cft

    Spec. No :

    Earth fill in lawns including dressing & compaction with earth

    available from cutting/excavation

    (British) :

    LABOUR

    Coolie 675.00 1.500 450.00 DayDay 1

    Bhishti 225.00 0.500 450.00 DayDay 1

    Dresser 540.00 1.000 540.00 DayDay 1

    Carrier 720.00 2.000 360.00 DayDay 1

    TOTAL LABOUR

    Sundries (Labour Only): 3 64.80

    2,224.80 78.00 %

    %

    Cont. Profit + Over Heads (Material+Labour+Equipment) : 22

    Per CUM : Rs 95.35

    475.20

    2,700.00Composite Rates Per