Contractor No. of Corrections Executive Engineer
E-Bid Capacity No. - 1 For B-1 Tender No.- of 2012-13
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SUPERINTENDING ENGINEER, MECHANICAL CIRCLE (GATES), PUNE
EXECUTIVE ENGINEER
Chief Gate Erection Unit No 5, Nashik-4
DRAFT FOR BID CAPACITY DOCUMENT
Name of Work: Design, manufacture, supply, erection, testing & commissioning of 900 mm diameter valve with electrical actuators with replacement of existing valve with a new suitable type of free discharge valve of given specifications situated at 50 feet level -1 valve @ Bhandardara Project.
Estimated Cost Rs. 1,78,50,000/- Cost of booklet: Rs.2000/-
2
Contractor No. of Corrections Executive Engineer
Issue of Bid Capacity Document
Name Of Work : Design, manufacture, supply, erection, testing & commissioning of 900 mm diameter
valve with electrical actuators with replacement of existing valve with a new
suitable type of free discharge valve of given specifications situated at 50 feet level
-1 valve @ Bhandardara Project.
Class of Registration of the Bidder: Manufacturers or Authorized dealers or Registered Contractors with
Mechanical Organization of B-Class or above having experience of supply & erection of same free discharge valve as a component of Dam supplied to Mechanical Organization or Dam related mechanical works such as Manufacturing/ Erection/ Repairs & maintenance of Gates with Mechanical Organization, State Govt. of Maharashtra.
Estimated Cost : Rs. 1,78,50,000/- Issued to M/s. _____________________________________________________ ________________________________________________________________ VIDE D.R. No. __________________________ Date : / / 2013. Divisional Accountant Executive Engineer Chief Gate Erection Unit-5 Chief Gate Erection Unit-5
Nashik Nashik.4
3
Contractor No. of Corrections Executive Engineer
INDEX
Name of work; Design, manufacture, supply, erection, testing & commissioning of 900 mm diameter
valve with electrical actuators with replacement of existing valve with a new
suitable type of free discharge valve of given specifications situated at 50 feet level
-1 valve @ Bhandardara Project.
Sr. No. Particulars Page No.
Detail Tender Notice , schedule
SECTION-I : Information & Instruction to Applicants
1.0 Information & Instruction to Applicants
1.1 Method of applying
1.2 Definition
1.3 Final decision making authority
1.4 Clarification
1.5 Particulars are provisional
1.6 Site visit
1.7 Minimum eligibility criteria for Bid Capacity
1.8 Evaluation criteria for Bid Capacity
1.9 No evaluation will be done
2.0 ANNNEXTURE - A
A. Description of the project
B. Climatic conditions
C. Scope of the work
2.1 Details of the work
2.2 Information for obtaining documents
3.0 Work and site conditions
4
Contractor No. of Corrections Executive Engineer
4.0 Period of completion and Programme of work
5.0 Other data for statements and Proforma
6.0 Minimum eligibility criteria for Bid Capacity
6.1 Bid capacity
6.2 Annual Turnover
6.3 Composition of the Evaluation Committee
6.4 MACHINARY & EQUIPMENT
SECTION II : BID CAPACITY INFORMATION
Letter of Transmittal
Statement-1: Bid Capacity (Value of A)
Statement-2: Bid Capacity (Value of B)
Proforma-1(a), 1(b) and 1(c)
Proforma-2
Proforma-3
Proforma-4
Proforma-5
Proforma-6
Proforma-7
Proforma-8 (Check list)
5
Contractor No. of Corrections Executive Engineer
II Re-call e-Tender Notice No.1 for 2012-13 Government of Maharashtra
Water Resources Department Mechanical Circle (Gates) Pune
Main Portal:http;//maharashtra.etenders.in
Mech.Org. Portal:http: // mahayantriki. gov.in
Executive Engineer Chief Gate Erection Unit-5 Nashik Online digitally signed applications for B-1form for below mentioned e-Tender for the following work is invited by the Executive Engineer Chief Gate Erection Unit-5 Nashik (Phone No 0253- 2531763) on behalf of Government of Maharashtra From manufacturers or Authorized dealers or Registered contractor with Mechanical Organization B-Class or above all above bidders must have experience Dam related of Mechanical Works such as Manufacturing, Erection, Repairs & Maintenance of Gates or providing &erection of same free discharge valve as a component of Dam supplied to Mechanical Organization.. The blank tender documents are to be downloaded from the Government website http://wrd.maharashtra.etenders.in Blank tender documents will not be sold by office. Venders who have enrolled & empanelled on the above portal can download tender documents form the website, Enrollment of qualifying venders & submission of tender will have to be done online only on the portal http://wrd.maharashtra.etenders.in qualifications of venders for enrollment will be done by Superintending Engineer, Mechanical Circle (Gates) Pune. After receipt of application with required documents mentioned in Detail Tender Notice Blank Bid Capacity documents will be available from In the first phase of Bidding, Bid Capacity of the bidders will be assessed & prequalified bidders will be allowed to participate in the main bidding process. Bid Capacity documents are available for online Bid preparation on Govt. website 30 / 3 / .2013 to 15 / 4 / 2013 & MainB-1 tender documents are available for online Bid preparation on Govt. website from 22 / 4 / .2013 to 25 / 4 /2013 The time schedule for various bidding phase is given in debited tender notice. which is also available on web site http://wrd.maharashtra.etenders.in as a part of Bid documents. Sr. No
Name of work Estimated cost Rs.
Earnest money Deposit 0.75 % Rs.
Security Deposit (4 %) Rs.
Time limit For completion
Cost of B-1 Tender Document
Cost of Bid Document
1 Design, manufacture, supply, erection, Testing & commissioning with electrical actuators with replacement of existing valves situated at 50 feet level-1 valve @ Bhandardara Project with a new suitable type of free discharge valve of following specification 1) Type : Horizontal type installation 2) Nominal valve dia :900 mm 3) Pressure Rating PN – 16 Bar 4) Maximum water head : 216 feet 5) Required minimum total discharge at 8 m . head : 245 cusecs 6) Maximum discharge through each old erected valves at any head & at any opening condition : 245 cusecs 7)Mode of operation ; Electrically operated with suitable gear box & manual, with hand wheel. A: Supply : Supply from company to site at Bhandardara Dam including all Taxes ,Duties, Transportation charges etc. B: Installation: Including dismantling old valve erecting new valve by making required modification, required civil concrete work for valve basement & all necessary arrangement required for complete installation with satisfactory test & trial at site.
1,78,50,000/- 1,34,000/- 7,14,000/- 365 Days
10000/-
2000/-
The Contractors participating first time in e-Tendering Bids will have to procure Digital Signature Certificate, Username and Password from competent authorities as per guideline mentioned on homepage of the website.
All requisite information required for the submission of Prequalification documents is available on the above said website.
If any assistance is required regarding e-Tendering (upload/download) please contact Next tender (Mobile
No.9167969601) System Integrator email @ next tenders.com
Executive Engineer
Chief Gate Erection Unit-5,
Nashik
6
Contractor No. of Corrections Executive Engineer
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ VɱɺÉÆ{ÉnùÉ Ê´É¦ÉÉMÉ
uùÒiÉÒªÉ ¡äò®ú -<Ç ÊxÉÊ´ÉnùÉ ºÉÖSÉxÉÉ Gò¨ÉÉÆE ¤ÉÒ- 1 / 2012-13. Main Portal:http;//maharashtra.etenders.in
Mech.Org.Portal:http://mahayantriki.gov.in EòɪÉÇEòÉ®úÒ +ʦɪÉÆiÉÉ, ¨ÉÖJªÉ ´nùÉ®ú =¦ÉÉ®úhÉÒ {ÉlÉEò Gò.5 xÉÉʶÉEò-4 (nÚù®úv´ÉÊxÉ Gò¨ÉÉÆEò 0253-2531763) ½äþ xɨÉÖxÉÉ ¤ÉÒ -1 ¨ÉvªÉä JÉɱÉÒ xɨÉÚnù Eäò±É䱪ÉÉ EòɨÉÉEòÊ®úiÉÉ ¨ÉÚ³ý =i{ÉÉnùEò, ÊEò´ÉÆÉ ¨ÉÚ³ý
=i{ÉÉnùEòÉSÉä Ê´ÉiÉ®úEò ËEò´ÉÉ ¨ÉÚ³ý =i{ÉÉnùEòÉSÉä ¨ÉÉxªÉiÉÉ|ÉÉ{iÉ Ê´ÉGäòiÉä ÊEò´ÉÆÉ ªÉÉÆÊjÉEòÒ ºÉÆPÉ]õxÉäEòbä÷ ´ÉMÉÇ ’¤É’´É iªÉÉ ´ÉÊ®ú±É xÉÉånùhÉÒEÞòiÉ EÆòjÉÉ]õnùÉ®ú VªÉÆÉxÉÉ ªÉÆÉÊjÉEòÒ ºÉÆPÉ]õxÉäEòbä÷ Eäò±É䱪ÉÉ ´É PÉ®úhÉÉƶÉÒ ºÉƱÉMxÉ JÉɱÉÒ±É xÉÖºÉÉ®ú xɨÉÚnù £òÒ-Êb÷ºÉSÉÉVÉÇ ´½þÉì±´É {ÉÖ®ú´É`öÉ =¦ÉÉ®úhÉÒ ÊEò´ÉÆÉ +xÉÖ¦É´É VɺÉä, ´nùÉ®äú ÊxĘ́ÉiÉÒ,=¦ÉÉ®hÉÒ ,nÖù°üºiÉÒ ´É näùJɦÉÉ±É EòɨÉä Eäò±ÉÒ +ºÉ±ªÉÉSÉÉ +xÉÖ¦É´É ªÉÉÆSÉä EòbÚ÷xÉ +ÉìxɱÉÉ<ÇxÉ ÊxÉÊ´ÉnùÉ
¨ÉÉMÉÊ´ÉiÉ +ɽäþiÉ. ºÉnù®ú EòɨÉÉSÉä <Ç -ÊxÉÊ´ÉnùÉ ºÉÆSÉ ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉÉSªÉÉ http://wrd.maharashtra.etenders.in ªÉÉ ºÉÆEäòiÉ ºlɳýÉ´É®ú ={ɱɤvÉ +ɽäþiÉ. <SUÖôEò EÆòjÉÉ]õnùÉ®úÉÆxÉÒ ºÉÆEäòiÉ ºlɳýɴɯûxÉ ºÉnù®ú <Ç ÊxÉÊ´ÉnùÉ ºÉÆSÉ b÷É>ðxɱÉÉäb÷ Eò¯ûxÉ PªÉɴɪÉÉSÉä +ɽäþiÉ. EòÉä-ªÉÉ ÊxÉÊ´ÉnùÉ ºÉÆSÉÉSÉÒ Ê´ÉGòÒ EòɪÉÉDZɪÉɨÉÉ¡ÇòiÉ Eäò±ÉÒ VÉÉhÉÉ®ú xÉɽþÒ VªÉÉ ÊxÉÊ´ÉnùÉEòÉ®úÉÆSÉÒ <Ç ÊxÉÊ´ÉnùÉ Eò®úÒiÉÉ {ÉÉjÉ ÊxÉÊ´ÉnùÉEòÉ®úÉÆSÉÒ xÉÉånùhÉÒ ZÉɱÉä±ÉÒ +ɽäþ. +¶ÉÉ ÊxÉÊ´ÉnùÉEòÉ®úÉÆxÉÉ ÊxÉÊ´ÉnùÉ EòÉMÉnù{ÉjÉä ´Éä¤ÉºÉÉ<]õ ´É¯ûxÉ ={ɱɤvÉ +ɽäþiÉ. <SUÖôEò EÆòjÉÉ]õ®úÉÆxÉÒ ºÉÆEäòiÉ ºlɳýɴɯûxÉ ºÉnù®ú ÊxÉÊ´ÉnùÉ ºÉÆSÉ b÷É>ðxɱÉÉäb÷
(Download) Eò¯ûxÉ PªÉɴɪÉÉSÉä +ɽäþiÉ.VªÉÉ ÊxÉÊ´ÉnùÉEòÉ®úÉÆSÉÒ <Ç ÊxÉÊ´ÉnùÉ Eò®úÒiÉÉ xÉÉåÆnùhÉÒ ÊxÉÊ´ÉnùÉnùÉ®úÉÆÆSÉÒ xÉÉånùhÉÒ ÊxÉÊ´ÉnùÉ ¦É®úhÉä <iªÉÉnùÒ ºÉ´ÉÇ EòɪÉÉÇ É½þÒ +ÉìxÉ ±ÉÉ<ÇxÉ {ÉvnùiÉÒxÉä
http://wrd.maharashtra.etenders.in ªÉÉ ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉÉSªÉÉ ºÉÆÆEäòiÉ ºlɳýÉ´É®ú Eò®úhÉä +ɴɶªÉEò +ɽäþ. ºÉʴɺiÉ®ú ÊxÉÊ´ÉnùÉ ºÉÚSÉxÉä ÉvªÉä xɨÉÚnù Eäò±É䱪ÉÉ EòÉMÉnù{ÉjÉɺɽþ |ÉÉ{iÉ ZÉɱÉä±ÉÉ +VÉÇ UôÉxÉxÉÒ Eò¯ûxÉ ÊxÉÊ´ÉnùÉEò®úÒiÉÉ xÉÉånùhÉÒºÉÉ`öÒ {ÉÉjÉ Eò®úhªÉÉSÉÒ EòɪÉÇ ÉɽþÒ +vÉÒIÉEò +ʦɪÉÆiÉÉ ªÉÆÉÊjÉEòÒ ¨ÉÆb÷³ý (´nùÉ®äú) {ÉÖhÉä ªÉÉÆSÉäEòbÚ÷xÉ Eò®úhªÉÉiÉ ªÉä<DZÉ. ºÉnù®ú ¤ÉɤÉiÉ ¶ÉÆEòÉ ºÉ¨ÉÉvÉÉxÉÉEò®úÒiÉÉ ÊxɨxÉ xɨÉÚnù Eäò±ªÉÉ xÉÖºÉÉ®ú ºÉÆ{ÉEÇò Eò®úhªÉÉiÉ ªÉÉ´ÉÉ. 1) <Ç-]åõb÷®ú ½äþ±{É bä÷ºEò xÉÆ 020-4146666 2) xÉÉäb÷±É +ÊvÉEòÉ®úÒ EòɪÉÇEòÉ®úÒ +ʦɪÉÆiÉÉ, ¨ÉÖJªÉ´nùÉ®ú =¦ÉÉ®úhÉÒ {ÉlÉEò Gò.5 xÉÉʶÉEò-4 ¡òÉäxÉ xÉÆ
0253-2531763 ÊxÉÊ´ÉnùÉ {ÉÉjÉiÉÉ ºÉÆSÉ Ênù. 30 / 3 / 2013. {ÉɺÉÚxÉ http://wrd.maharashtra.etenders.in ´É®ú ={ɱɤvÉ +ɽäþiÉ. +.Gò.
EòɨÉÉÆSÉä xÉÉÆ É +ÆnùÉÊVÉiÉ ®úCEò¨É ¤ÉªÉÉxÉÉ ®úCEò¨É
ºÉÖ®úIÉÉ äö´É ®úCEò¨É
EòɨÉÉSÉÒ ¨ÉÖnùiÉ
¤ÉÒ-1 ÊxÉÊ´ÉnùÉ {ÉÖκiÉEäòSÉÒ ËEò¨ÉiÉ
ÊxÉÊ´ÉnùÉ ºÉIɨÉiÉÉ ºÉÆSÉ ¨ÉÖ±ªÉ °ü.
1 Design, manufacture, supply, erection, Testing & commissioning with electrical actuators with replacement of existing valves situated at 50 feet level-1 valve @ Bhandardara Project with a new suitable type of free discharge valve of following specification 1) Type : Horizontal type installation 2) Nominal valve dia :900 mm 3) Pressure Rating PN – 16 Bar 4) Maximum water head : 216 feet 5) Required total minimum discharge at 8 m. head : 245 cusecs 6) Maximum discharge through each old erected valves at any head & at any opening condition : 245 cusecs 7)Mode of operation ; Electrically operated with suitable gear box & manual with hand wheel. A: Supply : Supply from company to site at Bhandardara Dam including all Taxes ,Duties, Transportation charges etc. B: Installation: Including dismantling old valve erecting new valve by making required modification, required civil concrete work for valve basement & all necessary arrangement required for complete installation with satisfactory test & trial at site.
1,78,50,000/- 134000/- 714000/- 365 Ênù´ÉºÉ
10000/-
2000/-
EòɪÉÇEòÉ®úÒ +ʦɪÉÆiÉÉ,
¨ÉÖJªÉ ´nùÉ®ú =¦ÉÉ®úhÉÒ {ÉlÉEò Gò.5 xÉÉʶÉEò-4
VÉä `äöEäònùÉ®ú {Éʽþ±ªÉÉÆnùÉSÉ <Ç-ÊxÉÊ´ÉnùÉ |ÉÊGòªÉäiÉ ¦ÉÉMÉ PÉäiÉ +ɽäþiÉ iªÉÉÆxÉÉ ´É®úÒ±É ºÉÆEäòiÉ ºlɳýÉ´É®ú Ênù±É䱪ÉÉ ¨ÉÉMÉÇnù¶ÉÇEò iÉi´ÉÉxÉÖºÉÉ®ú |ÉlÉ¨É ÊbVÉÒ]õ±É ʺÉMxÉäSÉ®,ú ªÉÖZÉ®ú +ɪÉb÷Ò ´É {ÉɺɴÉbÇ÷ |ÉÉ{iÉ Eò¯ûxÉ PÉähÉä +ɴɶªÉEòò +ɽäþ.
ÊxÉÊ´ÉnùÉ ºÉÆÆƤÉÆÆvÉÒ EòɽþÒ ºÉ½ÉþªªÉ +ɴɶªÉEòò +ºÉ±ªÉÉºÉ (b÷É>ðxÉ ±ÉÉäb÷/+{É ±ÉÉäb÷) (¨ÉÉä¤ÉÉ<Ç±É xÉƤɮ. 9167969601) ªÉÆÆÉÆSªÉɶÉÒ ºÉÆ{ÉEÇò ºÉÉvÉÉ´ÉÉ. System Integrator email –Support.gom@ next tenders.com
7
Contractor No. of Corrections Executive Engineer
Detail e-Tender Notice No. 1 for 2011-12 (e-Tender No. )
Government of Maharashtra
Water Resources Department Mechanical Circle (Gates), Pune
Chief Gate Erection Unit-5 Nashik Main Portal: http;//maharashtra.etenders.in
Mech.Org.Portal: http://mahayantriki.gov.in
Online digitally signed applications for B-1Tender for the following work is invited by The Executive Engineer, Chief Gate Erection Unit-5 Nashik-4 (Phone No 0253- 2531763) on behalf of Government of Maharashtra From manufacturers or Authorized dealers or Registered Contractors with Mech. Organization of B class or above of having experience of Dam related Mechanical works such as manufacturing, erection, Repairs & Maintenance of Gates or providing & erection of same free discharge valve @ Dam site to Mechanical Organization.
Sr.
No
Name of work Estimated
cost
Rs.
Earnest
Money
Deposit
Rs.
Security
Deposit
Rs.
Time
limit for
completi
on
Cost of
B-1
Tender
Document
Cost of Bid
Doc.Rs.
1 Design, manufacture, supply, erection, Testing & commissioning with electrical actuators with replacement of existing valves situated at 50 feet level-1 valve @ Bhandardara Project with a new suitable type of free discharge valve of following specification 1) Type : Horizontal type installation 2) Nominal valve dia :900 mm 3) Pressure Rating PN – 16 Bar 4) Maximum water head : 216 feet 5)operating Required minimum total discharge at 8m. head : 245 cusecs 6) Maximum discharge through each old erected valves at any head & at any opening condition : 245 cusecs 7)Mode of operation ; Electrically operated with suitable gear box & manual with hand wheel. A: Supply : Supply from company to site at Bhandardara Dam including all Taxes ,Duties, Transportation charges etc. B: Installation: Including dismantling old valve erecting new valve by making required modification, required civil concrete work for valve basement & all necessary arrangement required for complete installation with satisfactory test & trial at site.
1,78,50,000/- 134000/- 714000/- 365 days
10,000/-
2000/-
2. Bid Capacity Document:
The forms of Bid Capacity documents are available on the e-Tendering government website
http://maharashtra.etenders.in. The aspiring Bidders will have to download Bid Capacity form
from the website only. While submitting the dully filled Bid Capacity Documents the Bidder are
required to Deposit Rs.2000/- ( Rs. Two thousand only) in the form D.D. only in favour of
Executive Engineer, Chief Gate Erection Unit-5 Nashik. Original D.D. should be sent to the
office of the Executive Engineer, Chief Gate Erection Unit-5 Nashik, before the last date of
submission of bid document. This is essential for enrollment of the contractor on the above
mentioned portal and permitting the contractor to participate in pre-bid conference. The bidder
has to download the Bid Capacity application form from website, fill it and upload the scanned
copy of duly filled form, along with required documents. The list of pre-qualified bidders will be
available on website and also will be communicated to the successful bidders by e-mail.
8
Contractor No. of Corrections Executive Engineer
3. Main e-tender Document:
Main e-tender documents to be downloaded by the bid-qualified bidders only from the Govt.
website http://maharashtra.etenders.in. While submitting the dully filled e-tender documents the
bidders are required to Deposit Rs. 10000/- (Rs. Ten Thousand only) in the form D.D. only in
favour of Executive Engineer, Chief Gate Erection Unit-5 Nashik. Original D.D. should be sent
to the office of the Executive Engineer, Chief Gate Erection Unit-5 Nashik before the last date of
submission of main B-1 tender document
4 Pre- Bid conference for work at Sr.No.1 will be held on / /2013 at 14.00 p.m. hrs in the office
of the Chief Engineer (Mech.), Water Resources Department, Nasik.
5 E-Opening of e-tender forms will be done as per time schedule specified.
6
The contractor should upload the documents in readable form. He should take trial of uploads
by taking printout. The unreadable documents will be treated as null and void. The remaining
documents will be evaluated.
7 Right to reject any or all the tenders without assigning any reason thereof is reserved.
8
If any assistance is required regarding e-Tendering (upload/download) please contact Next
tender (Mobile No.9167969601)
9
Contractor No. of Corrections Executive Engineer
II Re-CAll Detail e-Tender Notice No. 1 for 2012-13
(e-Tender No for 2012-13.)
Government of Maharashtra
Water Resources Department Mechanical Circle (Gates), Pune
Chief Gate Erection Unit-5 Nashik Main Portal: http;//maharashtra.etenders.in
Mech. Org. Portal: http://mahayantriki.gov.in Name of Office:- Executive Engineer Chief Gate Erection Unit-5 Nashik.4 Name of Circle:- Suprintending Engineer Mechanical Circle (Gates) pune Name of Work: Design, manufacture, supply, erection, Testing & commissioning with electrical actuators with replacement of existing valves situated at 50 feet level-1 valve @ Bhandardara Project E-Tender Notice No- 1 for (2012-13.)
Sr.
No.
WRD Stage Contractor’s Stage Start Date Start
Time
Expiry Date & Time
1 Release e-Tender - 28.03.2013 10:00 30.03.13 10:01
2 - Pre Qual Document
Purchase 30.3.2013 10.01 15.04.2013 14.00
3 -
Pre Qual Document
Download & Online
Preparation
30.03.2013 10:01 15.04.2013 16:00
4 Close for Bidding of
preQul - 15.04.2013 16:01 15.04.2013 18:00
5
Re-encryption of preQul. 15.04.2013 18:01 17.04.2013 17:00
6 Pre Qual Document
Opening and Short listing - 17.04.2013
17:01 20.04.2013 14:00
7 Main Tender Preparation - 20.04.2013 14:01 22.04.2013 17:00
8 - Main Tender Document
Purchase 22.04.2013 17:01 25.04.2013 10.00
9 - Main Tender Document &
Online Bid 22.04.2013 17:01 26.04.2013 10:00
10 - Main Tender Schedule A
Document & Online Bid 22.04.2013 17:01 26.04.2013 10:00
11 Close for Bidding of
Main Tender - 26.04.2013 10:01 26.04.2013 14:00
12 - Re-encryption of Main
Tender 26.04.2013 14:01 29.04.2013 10:00
13 Tender Opening and Short
listing (Technical) - 29.04.2013 10:01 04.05.2013 16:00
14 Financial Bid Opening - 29.04.2013 10:01 04.05.2013 16:00
Note- 1) Prebid meeting will be held on 23/04/2013 at 14.00 p.m. in the office of the Chief Engineer
(Mechanical) Water Resources Deptt. Trimbak Road, Nashik 422002.
2) Any change in above schedule will be communicated accordingly.
Executive Engineer Chief Gate Erection Unit-5 Nashik
10
Contractor No. of Corrections Executive Engineer
SECTION - I
INFORMATION AND INSTRUCTIONS TO THE
APPLICANTS
11
Contractor No. of Corrections Executive Engineer
SECTION – I
1.00 Information and Instructions to applicants:
1.01 The online tender in B-1 form with following conditions invited by the Executive Engineer, Chief Gate
Erection Unit-5 Nashik on behalf of The Governor of Maharashtra From manufacturers / Authorized
dealers/Registered Contractors with Mech. Organization who have the similar type of work experience
Providing & erection of free discharge valve who are capable and willing to execute the whole work with
their own financial resources.
1.02 The enclosed form shall be filled in completely and all questions shall be answered. All information
requested for in the enclosed form shall be furnished against the respective columns in the form. If any
particular query is not relevant, it should be stated as “Not Applicable”. Only “dash” reply will be treated
as incomplete information. All relevant statements, Proforma, documents must be duly signed with
name & office seal of contractor. All applicants are cautioned that incomplete information in the
application or any change(s) made in the prescribed forms with tender application & statements,
Proforma, documents without signature, name & office seal will be treated as non-responsive.
1.03 The Bid Capacity document shall be typed on applicant’s letterhead and shall be uploaded.
1.04 Any over writing or correction shall be attested. All pages of the bid capacity document shall
be numbered and should be submitted as a package with a signed letter of transmittal.
1.05 All the information must be filled in English Language only.
1.06 Information and Certificate(s) furnished along with the application form (the respective application who
vouch to the suitability, technical know-how and capability of the applicant) should be signed by the
applicant with name & seal.
1.07 The applicant is encouraged to attach any additional information (photographs of works which were
already carried out which he thinks necessary in regards to his capabilities). No further information will be
entertained after submission of bid capacity documents unless it is requested.
1.08 The bid capacity documents in prescribed forms as required in this booklet duly completed and signed shall be uploaded along with all relevant documents.
1.09 a) The cost incurred by applicant in preparing this offer, in providing clarification or attending discussions, conferences in connection with this document, shall not be reimbursed under any circumstances.
b) In the event of any applicant wishing to withdraw from Bid Capacity documents, the applicant must
write an explanatory letter to the Superintending Engineer Mechanical Circle(Gates) Pune/ Chief
Engineer ,( Mechanical ) water Resources Deptt. Nashik.
12
Contractor No. of Corrections Executive Engineer
1.10 METHOD OF APPLYING:
1.11 If the application is made by an individual, it shall be signed by the individual above his full name and
current address & with office seal.
1.12 If the application is made by proprietary firm it shall be signed by the proprietor above his full
name and the full name of his firm with its current address.If the application is made by the firm in
partnership, it shall be signed by all the partners of the firm above their full names and current
addresses or by a partner holding valid power of attorney for the firm by signing the application, in
which case a certified copy of the power of attorney shall accompany the application. A certified copy of
the partnership deed, current address of all the partners of the firm shall also accompany the
application.
1.13 If the application is made by a limited company or a corporation, it shall be signed by a duly
Authorized person holding the power of attorney for signing the application, in which case a certified
copy of the power of attorney shall accompany the application. Such limited company or corporation
may be required to furnish satisfactory evidence of its existence before the Bid Capacity is awarded.
1.14 Manner of Submission of Bid Capacity and its accompaniment:
The contractor shall upload the documents listed as below along with Bid Capacity booklet.
i) Valid manufacturer or Authorized dealers or registration certificate as an approved registered
contractor with Class-B or above with Mechanical Organization see page No. 1 of D.T.P. Govt. of
Maharashtra. In original or certified copy there of as a registered contractor having experience of
Supply & erection of same free discharge valve as a component of Dam & supplied to mechanical
Organisation or Dam related mechanical works such as Manufacturing, erection, repairs &
maintenance of Gates with Mechanical Organization.
ii) Details of work in hand other works tendered & clearance certificate duly sign by Executive
Engineer
iii) Work Experience of Supply & erection of Free discharge valve as a component of Dam &supplied
to Mechanical Organization or Dam related works such as manufacturing, erection, repairs &
maintenance of gates with Mechanical Organization.
iv) Details of plant & machineries (owner & otherwise)
v) Details of Technical persons with tenderer.
vi) The balance sheet of last 5 years duly certified by the Chartered Accountant.
vii) Value Added Tax (VAT) registration certificate by Maharashtra State Value Added Tax Act.
(Maharashtra act No. 2005) & its clearance certificate up to March-2012..
viii) Deed of partnership of articles of Association and Memorandum of Association for limited
company.
ix) Power of Attorney in original / attested true copy.
x) Copy of Pan Card
13
Contractor No. of Corrections Executive Engineer
xi) Professional Tax Certificate
xii) Copy of certificate of Registration under Central Sales Tax (Registration and Turnover) Rules
1957.
All documents are required to be uploaded with Bid Capacity Document shall be attested by Gazetted Officer
and if required, original copies shall be made available for verification.
1.2 DEFINITIONS :
In this tender document the following terms shall have the meanings hereby
assigned to them except where the context otherwise requires.
I Govt. / Deptt.
This means State Govt. of Maharashtra, Water Resources Department.
II C.E(M)
C.E (M) means Chief Engineer (Mechanical), Water Resources Department,
Nashik.
III S.E.(M)
S.E. (M) means Superintending Engineer (Mech.) of the circle in overall charges of
the work pertaining to the contract.
IV E.E(M)/ENGINEER INCHARGE
E.E (M)/ENGINEER INCHARGE Means the Executive Engineer incharge of the work.
V Engineer’s representative: Mean the Deputy Engineer, who is in direct charge of the
works.
VI Applicant :
Applicant means individual proprietary firm, firm in partnership, Limited company
Corporation applying to become eligible to tender.
VII Website:
Website means http:// www.maharashtra.etenders.in.
VIII Contractor: Mean the person, firm or company who enters into contract, with the Govt. and
shall include their executors, administrators, successors and submitted assignees
1.3 FINAL DECISION MAKING AUTHORITY :
The committee headed by Superintending Engineer Mechanical Circle (Gates.),, Pune. reserves right to
accept or reject any of the application for Bid Capacity without assigning any reasons thereof and he
will submit evaluation report to chief Engineer (mech.) Nashik. final decision in this regards will be taken
by chief Engineer (mech.) WRD Nashik.
14
Contractor No. of Corrections Executive Engineer
1.4CLARIFICATIONS :
The clarification(s) if any, may please be sought separately from either Executive Engineer, Chief Gate
Erection Unit-5 Nashik or from the Superintending Engineer, Mechanical Circle (Gates), Pune (Tel. 020-
26121605) It is binding on the applicant / contractors to produce the clarifications in original of the any
or all documents uploaded in bid with date & time specified by S.E/E.E.
1.5 PARTICULARS ARE PROVISIONAL:
The particulars of the proposed works given in Annexure-A to this section are provisional & must be
considered only as advance information to assist applicants. The accuracy of the particulars is not
guaranteed in any form and this Bid Capacity document or the Model. Tender Provision shall not form
part of any contract which may subsequently be entered into tender documents.
1.6 SITE VISIT :
The work site can be inspected by the applicant, if he so desires, by prior appointment with the
Executive Engineer, Chief Gate Erection Unit-5 Nashik-4
1.7 MINIMUM ELIGIBILITY CRITERIA FOR BID CAPACITY:
The applicant shall submit the information in the format as enclosed vide section-II.
The applicant must be well established manufacturer or Authorized Dealer or registered
Contractor with mechanical organization with experience as in tender Notice capability in to carry out
work. work given in this document. The applicant applying for bid qualification must provide
evidence of having adequate experience in modern technology with adequate quality control
facilities supported by testing laboratory.
In order to assess the experience and capability of contractor for execution of
work under consideration, a minimum criteria has been specified. This minimum criteria is
judged from the past experience of the contractor. The applicant bidder, should have
adequate bid capacity, & minimum turnover and that of execution of similar work are also stated in
para. 6 of Annex – A.(see page No. 22,23)
15
Contractor No. of Corrections Executive Engineer
The formula of evaluation of bid capacity is:
BID CAPACITY = (A x N x 2) – B
Where,
A = Maximum value of Mechanical Engineering works executed in any one year during the period of
last 5 years (Updated to the price level of the year in which the tenders are opened) which will take in to
account the completed and ongoing works. The updating of value of work to bring it on price level of
year in which
tenders are opened shall be done as follows
Year as stated @ 5.3 in Annex-A
Cost of work done during the year (Rs. In Lakh)
Multiplying factor (N)
Updated value of works (by multiplying amount
in col, 2 by factor in col.3) (Rs in Lakh)
1 2 3 4 V th Year IV th Year III rd Year II nd Year I st Year
2007-2008 2008-2009 2009-2010 2010-2011 2011-2012
1.5 1.4 1.3 1.2 1.1
The maximum value of Mechanical Engineering works (A) executed in a year shall be
minimum of following.
1) Ascertained from the certificates by the Executive Engineer in case of Govt. and Semi
Government and form the head of offices in case of limited companies and
Registered Co-op. societies or organizations. The information is
to be submitted in proforma 1(a) and Statement 1 as enclosed in Section-II. Information
given in any other format than prescribed shall not be taken into account for calculating
value of “A”.
2) Ascertained from balance sheet of last. 5 years duly certified by the
Chartered Accountant.
The submission of information in (1) & (2) to above is obligatory. In case of non
submission of any one or both, it shall be concluded that the contractor does not have
adequate Bid capacity and shall not be considered for pre- qualification.
B = Value of existing commitment and ongoing works (updated to price level of the
year in which the tenders are opened) to be completed in the period stipulated for
completion of thework in the present tender.All certificates should be counter signed
by Engineer-In-Charge not below the rank of Executive Engineer of the concerned
Department). The value of B shall be ascertained from the certificates as prescribed in
proforma -1 (b) and statement No. 2 enclosed in section II.
N = No. of years prescribed for completion of the work for which the bids are invited as
stated in Annex – A Para 4
16
Contractor No. of Corrections Executive Engineer
Only those applicants who satisfy the minimum criteria as stated in Para 6 of Annex – A will be
eligible for purchase of blank tender documents
1.8 EVALUATION CRITERIA FOR BID CAPACITY:
a) Bid Capacity of prospective Tenderers is to be done to ensure that final bids for the work are received
from well established contractors with experience and capability for executing this work. Any
applicant, who is able to satisfactorily establish that he/they can undertake the work and complete it
satisfactorily within the stipulated time, will be able to get pre-qualified.
b) The Evaluation for Bid Capacity of the applicants shall be done by the committee as mentioned in
Para 6.3 of Annexure-A
The committee shall have freedom to ask for clarifications and further related information from the
applicant, check references and make inquiries in respect of work of prospective tender.
The evaluation will be done from the information submitted by the bidder. The various formats of
giving information are given in section-II. Bidder is expected to go through these formats carefully
and submit the information properly. The bid capacity information booklet should be indexed and
paged. The evaluation for bid capacity is to be done for the eligible applicants who satisfy minimum
criteria. It will be, therefore advisable that applicant gives a short note (Please refer Proforma-5,
section-II explaining how he is eligible and fulfills the criteria by giving references of the information
given in the booklet.
1.8 (c) If an applicant is judged to be financially unsound, he would be disqualified.
1.8 (d) In case the number of qualifying applicants are less than three, the committee may use its discretion
to relax the appropriate criteria with a view to qualify at least three applicants and thus ensure
adequate competition in tendering.
1.8 (e) Necessary information will be collected from the details furnished in proforma and additional
information may be called for at the discretion of the committee.
1.8 (f) ONLY PRE QUALIFIED TENDERERS SHALL BE ELIGIBLE FOR RECEIVING BLANK TENDER
DOCUMENTS OF B-1 TENDER.
17
Contractor No. of Corrections Executive Engineer
1.90 NO EVALUATION WILL BE DONE:
If following omissions are observed during scrutiny of documents submitted by the applicant no further evaluation shall be done and his application shall stand rejected.
1. If the information given in section 2, proforma 1 to 7 is incomplete / misleading / false such application shall be considered as non responsive.
2. If the record of poor performance such as abandoning work, not properly completing contract, inordinate delays in completion and financial failure, is noticed. The contractor shall give the undertaking to this regard in proforma 7
3. If the applicant does not fulfill the criteria for minimum eligibility laid down in Para 6
4. If the applicant fail to submit any of the following documents / certificates.(as stated in Para 1.14 Page 12
5. If each page of the work done certificate is not attested.
6. If the applicant doesn’t submit the information in the prescribed format.
7. If not presented neatly and readable manner & if any changes made in tender documents.
8. If the application is not submitted properly as per procedure Given in Para 1 Method of applying.
18
Contractor No. of Corrections Executive Engineer
ANNEXURE-A
(Section - I)
A. DESCRIPTION OF THE PROJECT:
Design, manufacture, supply, erection, Testing & commissioning with electrical actuators with replacement of existing valves situated at 50 feet level-1 valve @ Bhandardara Project with a new suitable type of free discharge valve of following specification CLIMATIC CONDITIONS:
Above work is to be carried out in Taluka-Akole.Dist. Ahmednagar.having rainfall 400 to 500 mm. The rainy season normally commences from June & lasts up to end of September. Few sporadic pre monsoon and post monsoon showers however can not be ruled out
B. SCOPE OF THE WORK :
The work to be performed under this contract includes the following principal features.
2.1 Details of Work:
1. Name of Work : Design, manufacture, supply, erection, Testing & commissioning with electrical actuators with replacement of existing valves situated at 50 feet level-1 valve @ Bhandardara Project with a new suitable type of free discharge valve of Given specification
2 Estimated Cost : Rs. 1,78,50,000/- (in words Rs. one crore seventy eight lakhs fifty thousands only.)
3 Earnest Money (EMD) : Rs. 1,34,000/-one year T.D.R for 12 month issued by the Nationalized Bank / Scheduled Bank in prescribed from in the name of the Executive
Engineer Chief Gate Erection Unit-5 Nashik-4 4 Security Deposit : 4% : Rs. 7,14,000/- In the form of irrecoverable Bank Guarantee of any Nationalized Bank/ scheduled Bank Situated in the
State of Maharashtra. 5 Date, time & place of Pre Tender conference : 10 /02 /2012, In the office of the Chief Engineer (Mech.), W.R.D. Nashik.2
6 Class of Contractor : :
viii) Class –B or Above or Manufacturers or Authorized Dealers or Contractors registered with Mechanical Organization or having Work Experience of Dam related mechanical works such as manufacturing, Erection, Repairs & Maintenance of gate, registered with Mechanical Organization Or Providing and erecting of same free discharge Valve @ Dam site to Mechanical Organisation.
7 Period of completion of work : 12 months ( 365 Days) (including monsoon).
19
Contractor No. of Corrections Executive Engineer
2.20 INFORMATION FOR OBTAINING BID CAPACIY DOCUMENTS, TENDER PAPER AND ITS
SUBMISSION.
1 Name & Address of Executive Engineer in charge of work issuing tender papers /Bid Capacity document and in whose name Earnest Money and Security Deposit is to be pledged.
Executive Engineer, Chief Gate Erection Unit No.-5; Nashik-4.
2 Period for issue of application forms for Bid Capacity documents.
30/3/2013 to 15/4/2013
3 Cost of application forms for Bid Capacity documents
2000/-
4 Time & date of submission of Bid Capacity document
30/3/2013 to 15/4/2013
5 Name & Address of the officer receiving and opening Bid Capacity document
Superintending Engineer, Mechanical Circle (Gates), Pune
6 Period of issue of blank tender forms
22/4/2013 to 25/4/2013
7 Cost of blank tender forms
Rs. 10,000/-
8 Extra cost if tender papers / Bid Capacity documents required by post (for each)
N.A.
9 Date, time & place of Pre-Tender conference Dated- 23 / 4 /2013 , 14.00 p.m. In the office of the Chief Engineer (Mechanical) W.R.D. Nashik.-2
10 Time & Date of submission of tenders
22/42013 to 26/4/20132/22222224/2013 to
11 Name and Address of the officer receiving & opening the tender document
Superintending Engineer, Mechanical Circle (Gates), Pune
12 Time & date of opening of tender 29/42013 to 4/5/20132/222222
13 The name of Authority of accepting the tender. i) Chief Engineer (Mechanical) W.R.D. Nashik.-2
20
Contractor No. of Corrections Executive Engineer
3.00 WORK AND SITE CONDITIONS:
1. Location : About 160 Km. from District place Ahmadnagar. About 40 Km. from Taluka place Akole
About 50 kms from Ghoti,Tal.Igatpuri.
2. 2 . Nearest Railway Station : About 98 Km. from District place Nashik.
3. Nearest Airport : Mumbai.
4. Roads : Approachable by road in all. Nashik-Mumbai Highway
5. Nearest Telephone & : Tal : Akole & Shendi Village.
Telegraph facility
21
Contractor No. of Corrections Executive Engineer
4. 0 Time Schedule for Providing and erecting on Dam Site Design, manufacture, supply, erection, testing & commissioning of 900 mm Ǿ valves with electrical actuators with replacement of existing valve with a new suitable type of free discharge valve of given specifications situated at 50 feet level -1 valve @ Bhandardara Project.
as per specifications under this contract shall be as follows:
Period in months from date of work order Sr.
No. Particulars of work Testing at
factory and delivery at site
Erection at site & Testing
&Commissioning
1
Design, manufacture, supply, erection, Testing & commissioning with electrical actuators with replacement of existing valve situated at 50 feet level-1 valve @ Bhandardara Project with a new suitable type of free discharge valve of following specification 1) Type : Horizontal type installation 2) Nominal valve dia :900 mm 3) Pressure Rating PN – 16 Bar 4) Maximum water head : 216 feet 5) Required minimum total discharge 8 m. any head : 245 cusecs 6) Maximum discharge through each old erected valves at any head & at any opening condition : 245 cusecs 7)Mode of operation ; Electrically operated with sutaibleGear Box & hand wheel. A: Supply : Supply from company to site at Bhandardara Dam including all Taxes ,Duties, Transportation charges etc. B: Installation: Including dismantling of old valve, erecting new valve by making required modification, required civil concrete work for valve basement & all necessary arrangement required for complete installation with satisfactory test & trial at site.
245 days after date of order or earlier if possible.
120 days after delivery at site or if earlier.
Completion certificate will be issued after completion of work commissioning & satisfactory Test and Trial.
Maximum 365 Days from the date of work order.
Note:
1. The programme for supply, erection & testing is given as above. If the tenderer does not agree with the
programme, he shall submit his own programme without changing total period of tender along with tender
documents, with sufficient time span for activities to be carried out and with the best sequence.
2. The delay of work from the above schedule will attract the provision of “Compensation for Delay” vide clause-2 of
conditions of contract (B-1) form.
22
Contractor No. of Corrections Executive Engineer
5.0 OTHER DATA FOR FILLING STATEMENT/PROFORMA:
1. Date for calculating balance cost of : / /2013. : 31/03/2011
the work in the hand of the bidder for
Statement-2
2. The period for calculating value of the work : one year
In the hand of the bidder which he has to
Complete vide Statement-2
3) items for which information about quantities executed for use.
4) The Five year period
(For use in Proforma- 1, 2 and Statement 1, 2 etc.)
Year No. Year
1) 2007-08
2) 2008-09
3) 2009-10
4) 2010-11.
5) 2011-12
6.00 MINIMUM ELIGIBILITY CRITERIA FOR BID CAPACITY:
The applicant shall meet the following minimum criteria. Only those applicants who satisfy the
minimum criteria of eligibility as stated below will be evaluated further for pre – qualification.
BID CAPACITY:
The required bid capacity for this work is Rs. 1,78,50,000/-
6.1 ANNUAL TURNOVER :
The contractor should have completed aggregate work of supply and erection of same free discharge valve as a component of DAM & supplied to Mechanical Organization OR Dam related mechanical works, such as manufacturing/ erection/ repairs & maintenance of gates with Mechanical Organization, costing Rs. 90 Lakhs during any one year of the last 5 years.
23
Contractor No. of Corrections Executive Engineer
6.30 COMPOSITION OF THE EVALUATION COMMITTEE:
The evaluation committee for pre-qualification of applicants shall be as below:
1. Superintending Engineer, Chairman
Mechanical Circle (Gates.),
Pune
2. Superintending Engineer, Member
Mechanical Circle (C.P.),
Kolhapur.
3. Executive Engineer, Member Secretary
Chief Gate Erection Unit-5 Nashik-4
The committee shall have freedom to ask for clarification and further related information from
the applicants, check references and make enquiries in respect of works of prospective
tenderers.
6.4 MACHINARY & EQUIPMENT
* The contractor should have minimum machinery & equipment as below.
6.5 The contractor shall furnish undertaking regarding poor performance as given in Proforma
No.4. The non compliance of Declaration of performance would lead to teat the contractor’s Bid
document as non-responsive.
25
Contractor No. of Corrections Executive Engineer
LETTER OF TRANSMITTAL
To, The Superintending Engineer, Mechanical Circle (Gates), Pune.
Subject :- Design, manufacture, supply, erection, testing & commissioning of 900 mm diameter valve with
electrical actuators with replacement of existing valve with a new suitable type of free
discharge valve of given specifications situated at 50 feet level -1 valve
@ Bhandardara Project. Dear Sir,
� Having examined the details given in invitation and technical note for the above mentioned work. � I/(We) hereby submit the Bid Capacity information and relevant documents.
� I/(We) hereby certify the truth and correctness of all statements made and information supplied in the
enclosed statements 1,2 and proforma 1 to 8. � I /(We) have furnished all information and details necessary for prequalification as bidder(s) and that no
further information remains to be supplied.
� I/(We) authorize the project authorities to verify the correctness thereof as well as to approach any
Govt. department individuals, employees, firms and/or corporation to verify correctness of information and certificate submitted by me/us to prove my/our competence and general reputation.
� I/(We) submit the following certificate(s) in support of our eligibility, technical know-how, capability and
having successfully completed the works from the clients/owners of respective works.
� I submit the D.D. No. ------------- of Rs.------------Drawn in favour of the Executive Engineer, Chief Gate Erection Unit No.5 Nashik-4
Seal & Signature with name/names of Applicant Contractor Encl.: Date of Submission:
26
Contractor No. of Corrections Executive Engineer
2.1 STATEMENT NO.I (Value of “A”)
Value of Mechanical Engineering works done during the year (Excluding advance such as mobilization advance and machinery advance etc.) Rs. in lakhs
Sr. No.
Name of work
Ist Year (2007-2008)
IInd Year(2008-2009)
IIIrd Year(2009-2010)
IVth Year(2010-2011)
Vth Year(2011-2012)
Total
1 2 3 4 5 6 7 8
Factor for updating 1.5 1.4 1.3 1.2 1.1 Updated Value of Work
NOTE
1) For number of years please refer Para 5.4 of Annex. A to Section 1 2) Figures in Col 3 to 7 should be supported by certificates given by Executive Engineer, in case of Govt./ Semi Govt. Works and by project authorities
in all other cases. 3) The maximum value of Mechanical Engineering works (A) executed in a year shall be minimum of the following. a) Ascertained from the Certificates mentioned above. b) Ascertained from the total contract amount received by the contractor. For this, he shall submit the balance sheets of last five years duly certified by
the chartered Accountant.
Seal & Signature
27
Contractor No. of Corrections Executive Engineer
2.2 STATEMENT NO.2 (Value of “B”) Statement for the value of “B” i.e. value of existing commitments and ongoing works to be completed in the period stipulated for completion of the work Certificates regarding this will be required to be countersigned by the Engineer-in-charge.
Sr. No.
Name of Work Month & year of commencement of work
Amount of contract
Revised Tender cost
Period of completion
Schedule date of completion
Balance cost as on date given in Annexr-.A Para 5.1 31/3/12
Value of Works to be completed between period given in Annex. A para 5-2
Ref. page No. of Certificate
1 2 3 4 5 6 7 8 9 10
NOTE Figures in Col. 3 to 9 should be supported by the certificate issued by the Executive Engineer in case of Govt./Semi Govt. Works and head of offices in case of other organizations and project authorities in all other cases. Certified that the above information is true and correct to the best of my knowledge and belief. Seal & Signature
28
Contractor No. of Corrections Executive Engineer
PROFORMA-1(a)
Details of the Works completed
(Separate information for each works)
1. Name of work :: -
2. Agreement No and year ::
3. Place and country ::
4. Total tendered cost of work (Rs. in lakhs) ::
5. Brief description of works including principal ::
features and quantities of main items of the work
6. Annual turnover. ::
Sr.
No.
Items Unit Quantities executed (Certificate of
concerned authorities is essential)
6.1 Physical
Vth
Year(2011-
2012)
Ivth
Year(2010-
2011)
IIIrd
Year(2009-
2010)
IInd
Year(2008-
2009)
Ist
Year
(2007-
2008)
Items as stated in
Annex-A Para
1
2
3
4
Financial Rs. in Lakhs Financial turnover in lakhs defined on billing for work (Excluding Advanced payment such as mobilization and machinery advance received) duly certified by concerned authority
Rs. in
Lakh
29
Contractor No. of Corrections Executive Engineer
7. Period of Completion :- ::
a) Date of Commencement
b) Originally stipulated period of completion
c) Scheduled date of completion
d) Expected date of completion
e) Actual Period taken for completion
f) Certificate of concerned authority regarding
completion of work if completed in time (Y/N)
g) Reasons for non compaction of work in
stipulated time limit if so.
8. Were there any penalties / fines / stop notices ::
compensation/liquidated damages imposed. (Yes or
No) (if yes give amount and explanation)
9. No) (if yes give amount and explanation) ::
whom the contents of the proceeding paragraphs
1 to 8 could be verified
10. Name of applicant's Engineer-in-charge of the work ::
and educational qualification.
11. Give details of your experience in monthly ::
placement of important items such as those in
Annex-A
12. Give Details of your experience in mobilizing large ::
value contract with modern technology
13. Details of quality control arrangement made by the ::
contractor of his own on these works.
Certified that the above information is true and correct to the best of my knowledge & belief
30
Contractor No. of Corrections Executive Engineer
Sign of contractor with Seal of Firm
PROFORMA-1(b)
Details of the Works in hand
(Separate information for each works)
1. Name of work :
2. Agreement No and year :: 3. Place and country :: 4. Total tendered cost (Rs. in lakhs) :: 5. Name of Applicant's Engineer in charge with ::
Education qualification
6. Annual turnover. ::
Sr.
No.
Items Unit Quantities executed (Certificate of
concerned authorities is essential)
6.1 Physical
Vth
Year
IVth
Year
IIIrd
Year
IInd
Year
Ist
Year
Items as stated in Annex-A
Para
1
2
3
4
6.2 Financial Rs. in Lakhs
Rs. in Lakh
31
Contractor No. of Corrections Executive Engineer
7. i) Percentage of Physical completion ::
ii) cost of the work completed
iii)Revised Tendered cost
iv) Balance cost on the date
Stipulated (Refer para 5.1 in Annex-A)
v) Stipulated date of completion
vi) Anticipated date of completion
8. Whether work progress is as per tender ::
programme (Yes/No) If not, explain the reasons
9. Expected year wise programme of completion ::
(for year refer para 5.4 of Annex-A)
i) Present Year
ii) Next Year
iii)
10. Were there any fines, claims or stop notices ::
filed by the Employer (Yes/No)
11. Details of Quality control arrangements made by ::
the contractor of his own on these works.
12. Name, Designation and complete address with ::
whom the contents can be verified.
Certified that the above information is true and correct to the best of my knowledge & belief
Sign of contractor with Seal of Firm
32
Contractor No. of Corrections Executive Engineer
PROFORMA-1 (c)
Details of quantities executed and amount of work (completed and ongoing) for last five years
Year Items as per Annex – A
Sr.
No.
1 2 3 4 etc
Total
Financial
turn over
amount Rs.
in Lakhs
Ref.
page
No.
Fifth Year- 2011-12
Completed
Ongoing
1.
Total
Fourth Year- 2010-11
Completed
Ongoing
2.
Total
Third Year- 2009-10
Completed
Ongoing
3.
Total
Second Year- 2008-09
Completed
Ongoing
4.
Total
First Year -2007-08
Completed
Ongoing
5.
Total
6. Any time before 5 years
completed
Certified that the above information is true and correct to the best of my knowledge and belief.
Sign of contractor with Seal of Firm
33
Contractor No. of Corrections Executive Engineer
PROFORMA - 2
FINANCIAL STATEMENT
( To be given Separately for each partner in case of Joint Venture.)
1. Capital
a)Authorized ::
b)Issued and paid up. ::
2. a)Date of incorporation of the firm ::
b)Duration of existence of the firm. ::
3. Furnish balance sheet and profit and loss statement ::
with Auditor's report for the last five years, it
should interalia with the following information.
i) Your working capital
ii) Your Turnover on Mechanical Engineering works
Year as stated in
Annex – A
Amount of Turnover
during the year (Rs.
in Lakhs)
Multiplying Factor
Amount of turnover brought to
current price level by Multiplying
amounts in col.2 by factors given
in col.3 (Rs.in Lakhs)
1 2 3 4
Fifth Year- 2007-08 1.50
Fourth Year- 08-09 1.40
Third Year- 09-10 1.30
Second Year- 10-11 1.20
First Year- 11-12 1.10
34
Contractor No. of Corrections Executive Engineer
4. Your Gross income Rs. in Lakh
Year Gross income
Rs. in Lakhs
Year Gross in Income
Rs. in lakhs
Vth IInd
IVth Ist
IIIrd
5. Total liabilities
a) Current Ratio
1. Current assets (Rs.in lakhs)
2. Current liabilities (Rs.in lakhs)
b) Total liabilities to net worth
6. Equity ratio
(Defined as Equity)
7. What is the maximum value of the project
that you can handle (Rs.in lakhs)
8. Have you ever denied tendering facilities by any
Govt. Dept./Public Sector undertaking (Give details)
9. What are your sources of finance ? (Please give complete
details, Bank reference also)
10. Certificate of Financial soundness from
Bankers applicant.
11. Furnish the following information for last five
years (duly certified by the respective Banks)
a) Bank guarantee limit enjoyed by the firm
during each of the last five years with Bank wise
break up.
b) Portion of Bank guarantee already utilized as on date of application.
35
Contractor No. of Corrections Executive Engineer
12. Overdraft limits enjoyed during each of the
Last five years with Bank wise breakup (Rs.in lakhs)
13. Name and address of Bankers to whom reference can be made.
14. Have you ever been declared bankrupt?
(If yes, please give details)
15. Have you ever been declared as black listed in any Govt./Semi Govt./Corpn./ Organizations (If
yes please give details)
Certified that the above information is true and correct to the best of my knowledge and belief.
Sign of contractor with Seal of Firm
36
Contractor No. of Corrections Executive Engineer
PROFORMA-3
RESOURCES : PERSONNEL
(Please give details of key Technical & Administrative Personnel in the following proforma)
1. Details of the Board of Directors
a) Name of the Directors
b) Organization
c) Address
d) Remarks.
2. Details of key Technical and administrative
personnel and consultants and supervisory
technical staff which the applicant will employ
on the proposed work.
a) Individual's Name
b) Educational Qualification.
c) Details of training given for each type of works
d) Present position of office.
e) Professional experience and number of years
of experience on similar works
f) Years with the applicant
g) Languages known.
h) Distribution of above personal on works in hand
and on this work for which applied for pre qualification
i) Remarks
3. Contractor shall submit a valid and current license issued in his
favour under the provision of Contract Labour (Regulation
and abolition) Act, 1970 and the Maharashtra contract
Labour (R&A) Rules 1971
Certified that the above information is true and correct to the best of my knowledge and belief.
Sign of contractor with Seal of Firm
37
Contractor No. of Corrections Executive Engineer
PROFORMA-4
STRUCTURE AND ORGANISATION
1. Name of Applicant ::
2. Nationality of Applicant ::
3. Office Address ::
Telegraphic Address
Telephone No
Telex No.
Fax Number
4. Year established (When and where) ::
and legal name as formed individual/
Firm/Company.
5. Whether the Applicant is
a) An individual ::
b) A Proprietary firm ::
c) a Limited company or corporation. ::
d) A member of a group of companies ::
(if yes, give name, address, connections
and description of other companies)
e) A Subsidiary of a large organisation (if yes, ::
give name and address of the organisation)
if the company is subsidiary what
involvement, if any will the parent
company have in the project.
38
Contractor No. of Corrections Executive Engineer
6. Attach the organization chart showing the ::
Structure of the organization including the
position of the directors and key personnel.
7. What best describes you ::
a) Engineers and contractors ::
b) Consulting Engineers & Contractors ::
c) If other, please specify ::
8. Number of years of experience ::
a) As a prime contractor.
i) In own country (Specify country) ::
ii) Internationally (Specify country) ::
b) As a Sub Contractor
i) In own country
ii) Internationally
9. How many years has your organization been in
Business under your present name? And what
were your fields when you established your
organization? When did you add new fields
(if any) ?
10. Were you required to suspend construction for a
period of more than six months continuously after
you started ? If so, the reasons thereof.
11. Have you ever failed to complete any work awarded ::
to you (If so, which, where and why) ?
12. In How many projects have you asked arbitration ::
after ratification (if so, when where, and why)
and how many cases settled in your favour.
39
Contractor No. of Corrections Executive Engineer
13. In how many projects you were imposed penalties ::
for delay ?
14. Have any key personnel or partner of your ::
organization ever been an officer or partner of some
other organization that failed to complete the
construction contract (if so, state name of indicidual
/other organization)
15. Have any key personnel or partner of your ::
organization ever failed to complete the contract
awarded in his name.
16. In what fields do you claim specialization and are ::
interested to work?
17. Give details of your experience in modern concerte ::
technology and work for manufacturing and
quality control.
18. Give details of your material testing laboratory and ::
mobile laboratories.
Certified that the above information is true and correct to the best of my knowledge
& belief .
Sign of contractor with Seal of Firm
40
Contractor No. of Corrections Executive Engineer
PROFORMA-5
ADDITIONAL INFORMATION
1. Please add any further information which the applicant
considers relevant in regard to his capabilities.
2. Please give a brief note indicating how he applicant
considers himself eligible for pre-qualification for the work
Certified that the above information is true and correct to the best of my knowledge
& belief.
Sign of contractor with Seal of Firm
41
Contractor No. of Corrections Executive Engineer
PROFORMA-6
Details of Works tendered for as on the date of submission of Bid Capacity document
Sr.
No.
Particulars 1) 2) 3) 4) 5) 6)
1. Name of work
2. Estimated Cost
3. Tendered Cost (Rs. in lakhs)
4. Date when decision is expected
5. Stipulated date and period of
completion
6. Name , designation and address with
whom the contents of the above
information can be verified.
7. Remarks
Certified that the above information is true and correct to the best of my knowledge & belief.
Sign of contractor with Seal of Firm
42
Contractor No. of Corrections Executive Engineer
PROFORMA – 7
(Declaration of contractor)
To,
The Superintending Engineer,
Mechanical Circle (Gates)
Pune
Sir,
I ________________ Contractor declare that
1) As a contractor, I have never been penalized for any work carried out by me nor any Govt.
Dept. has blacklisted me previously.
2) I have not abandoned any work for reasons attributable to me.
3) I have not delayed completion of any work for reasons attributable to me
I undertake that the above information is true to the best of my knowledge and belief. I
am fully aware that my pre qualification bid or tender will be treated as non responsive and
will be summarily rejected at any time if above information is found to be false & misleading
by the concerned authority.
4) I am aware that If any abandonment of work or poor performance is noticed by dept. than my
pre-qualification. or Tender shall be rejected at any time.
Seal & Signature
43
Contractor No. of Corrections Executive Engineer
PROFORMA – 8
CHECK LIST (To be filled in by Contractor)
Name of Contractor :
Particulars Yes/No (Ref. page no.
1 2 3
1)
Manufacturers or Authorized dealers or Registered Contractors with Mechanical Organization of B-Class or above having experience of supply & erection of same free discharge valve as a component of Dam supplied to Mechanical Organization or Dam related mechanical works such as Manufacturing/ Erection/Repairs & maintenance of Gates registered with Mechanical Organization, State Govt. of Maharashtra.
2) 1) Documents to be submitted as per para 1.14
2) Information given in proforma-1 (a)
3) Information given in proforma-1 (b)
4) Information given in proforma-2.1 (value of A)
5) Information given in proforma-2.2 (value of B)
6) Information given in proforma-3
7) Information given in proforma-4
8) Information given in proforma-5
9) Information given in proforma-6
10) Information given in proforma-7
11) Information given in proforma-8 checklist
12) Balance sheet of (Last five years)attached
13( i) VAT Registration certificate & List clearance certificate up to March-12
14 (ii) Sales Tax (ST) Registration certificate & its clearance certificate up to
March-12
15) Deed of partnership of Articles of Association & Memorandum of
Association for limited Company
16) Power of Attorney in original/attested true copy
17) Copy of pan card of firm
18) Professional Tax clearance certificate up to 31/3/2012.
44
Contractor No. of Corrections Executive Engineer
19) Copy of Letter of allotment of coad by employees provident fund
organization under EPF & miscellaneous provision act.1952.
20) Copy of certificate of Registration Under Cenral Sales Tax
(Registration & Turnover) Rules-1957
3) Whether Blank (signed PQ documents are uploaded
4) Required minimum criteria as per para 6.0
A Bid Capacity (quoted by firm)
B Annual Turnover in Rs. Lakhs
C General experience
5) Labour Licence