BeSpoke Solutions Engineers: Patrick O’Donnell , Mark Mortimer, Scott McPherson , Robert MacLean 09/06/2016 HAWT Project

Upload: patrick-odonnell

Post on 15-Apr-2017

24 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: GRADED UNIT POWERPOINT FINISHED!!!!!

BeSpoke Solutions

Engineers: Patrick O’Donnell , Mark Mortimer, Scott McPherson , Robert MacLean

09/06/2016HAWT Project

Page 2: GRADED UNIT POWERPOINT FINISHED!!!!!

Clients Brief• Voltage = 12• Wind speed = 15mph• Bulb = 20 Watts• Budget = £150• Stage 1 deadline 8 Jan 16 to 26 Mar 16• Stage 2&3 Deadline 31Mar16 to 26 May16

Design Specification• Facilities, tools, • Budget• Environment• Health and safety• Documentation• Structure of the turbine

Page 3: GRADED UNIT POWERPOINT FINISHED!!!!!

Concepts

HAWT Savonius Darius Giro

Page 4: GRADED UNIT POWERPOINT FINISHED!!!!!

Design Matrix

Page 5: GRADED UNIT POWERPOINT FINISHED!!!!!

Project Communication

• Facebook Messenger

• Emails

• Meetings

Page 6: GRADED UNIT POWERPOINT FINISHED!!!!!

Project Schedule

• Gantt Charts

• Time Line

• Deadlines

Page 7: GRADED UNIT POWERPOINT FINISHED!!!!!

Health & Safety

• Permits to work

• Personal Protective Equipment (PPE)

• Risk Assessments

Page 8: GRADED UNIT POWERPOINT FINISHED!!!!!
Page 9: GRADED UNIT POWERPOINT FINISHED!!!!!

Materials• The two most important aspects: quality and cost efficiency • The initial bill of materials that Patrick made in stage one for the

HAWT was revised and added too before being ordered in.

Page 10: GRADED UNIT POWERPOINT FINISHED!!!!!

Components• The main components of the turbine are identified. • Sub-assemblies: base, main-shaft and top-section.

Page 11: GRADED UNIT POWERPOINT FINISHED!!!!!

Base• The sub-assembly ‘base’• The legs and braces• Platforms

Page 12: GRADED UNIT POWERPOINT FINISHED!!!!!

Main shaft • The sub-assembly ‘main-shaft’ is designed to support the top

section • Angle iron• The nylon bar • The steel pipe

Page 13: GRADED UNIT POWERPOINT FINISHED!!!!!

Top-Section• The top-section is the most complex sub-assembly • The tailfin • The hub• The blades• Angle iron

Page 14: GRADED UNIT POWERPOINT FINISHED!!!!!

Electrical Components

• Motor• Voltage Regulator

Page 15: GRADED UNIT POWERPOINT FINISHED!!!!!

Final Design• SolidWorks 2015• Drawings • Revisions• Dimensions and tolerances• A drawing order

Page 16: GRADED UNIT POWERPOINT FINISHED!!!!!

Development in the workshop• 33 hours (11 days)• Tools: hand drill, jig saw, etc.• Challenges

Page 17: GRADED UNIT POWERPOINT FINISHED!!!!!

Testing • Before Testing, pre check list

1 Ensure test area is clear P2 All Persons wearing proper PPE P3 check all wires are secure P4 Check Blades spin P5 check tail fin turns turbine to correct position P6 Ensure all connections are secure P7 check turbine generator turns P8 check rev counter P9 check brake is in working order P

10 Voltage regulator is Working P11 light bulb is being powered P

Page 18: GRADED UNIT POWERPOINT FINISHED!!!!!

Controlled environment testing• Turbine did not preform well• Equipment: Fan, Manometer, regulator • Initial test 4.8m, repeated 2 times• Highest voltage 6V• Reason for such low voltage

Page 19: GRADED UNIT POWERPOINT FINISHED!!!!!

Natural Environment Testing• Turbine break • Turbine producing 23V at 7.1 m/s• Regulator turned down voltage 12V

Page 20: GRADED UNIT POWERPOINT FINISHED!!!!!

Testing ResultsControlled Environment

Natural Environment

No Column2 Before Voltage Divider After Voltage Divider1 Voltage Reading (V) 23 122 wind speed (m/s) 4.4 - 7.1 4.4 -7.1

Page 21: GRADED UNIT POWERPOINT FINISHED!!!!!

Specifications• The turbine produces 12 Volts of electricity.• Powers a 20-watt bulb.• Doing this using 15mph winds or upwards

Page 22: GRADED UNIT POWERPOINT FINISHED!!!!!

Project Evaluation/Summary• How the team found the project• Anything the team would change ?

Page 23: GRADED UNIT POWERPOINT FINISHED!!!!!

Questions ?