FOCUS
SETuP funding and construction models
Consequent behaviours
Land, procurement & contracts
Consequent behaviours
Expectations and reality
Photo gallery
![Page 3: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/3.jpg)
SETuP = Solar Energy Transformation Program 10 megawatts (MW) of solar power installed across 30
remote Indigenous NT communities over 3 years
Two main components:
• A medium penetration solar rollout:
– Reduce annual fuel use by 15% in over 30 communities
• Nauiyu (Daly River) high penetration solar site:
– 50% fuel savings
– Test integration of new technologies
– Enables diesel engines OFF
![Page 4: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/4.jpg)
SETuP Financing
ARENA
PWC
Grant Funding
($27.5m) $
$
Loan
($27.5m) Diesel Fuel
Savings ($)
SETuP
NTG/Tcorp
![Page 5: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/5.jpg)
Financial model drives behaviours
High political interest in project viability
Focus on diesel prices & short-run inputs
Focus on how the loan payback works
NPV ‘doorstops’ – should certain communities be dropped?
![Page 6: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/6.jpg)
SETuP rollout timing:
2015/16 2016/17 2017/18
4 sites
16+ sites
10 + sites
![Page 7: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/7.jpg)
Timetable drives behaviours
Aggressive timetable pressures learnings
but:
Focuses the mind
Aggressive timetable pressures land availability
but:
Alternative (‘fall-back’) communities are contentious
![Page 8: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/8.jpg)
Construction & Ownership
DC AC
Solar panels PV Controller
Connection point
To community
Power Station
Control Room Communications
![Page 9: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/9.jpg)
Technology drives behaviour
The 10 MW of SETuP is not insignificant in the NT
Interest & involvement
The $55m of SETuP is very significant in the NT
Great expectations
Diesel/gas generation - leave it to experts
PV? Everyone’s an expert!
![Page 10: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/10.jpg)
LAND
Allowed ~ 3 hectares/MW + shading (trees) - ample
Average lease cost is $5500/ha/pa
On average, we produce 560wp/$ of annual lease cost
Lowest is 100wp/$
Highest is 2100wp/$
![Page 11: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/11.jpg)
TECHNOLOGY
Inverters: SMA 25000 Tripower inverters
PV Controller: SMA Cluster Control
Panels: included Hanwha Q Cells, Canadian Solar, Jinko, Conergy and LG – 315 watt
Framing system: Clenergy Solar Terrace, Sigma XL, Conergy Linea
![Page 12: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/12.jpg)
Prices per watt
Capital Cost Item Estimate Emerging Reality
Panel & inverters erected on frames
$3.10 $3.30
Balance of system $0.40 $0.45
Land costs $0.04 $0.037
Project management $0.50 $0.45
![Page 13: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/13.jpg)
PvSyst power production
Section Latitude Average Mwhpa produced
1 MWp solar produces Mwhpa
1 (1.625 MWp) 25 - 22 South 3292.5 2026.1
2 (0.4 Mwp) 22 South 799.1 1997.6
3 (1.3 MWp) 12 South 2470.1 1900.0
![Page 14: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/14.jpg)
ISSUES MANAGEMENT I
Balance: land availability with scheduled ARENA Milestones with climate (Wet)
Manage: Desire for large private pv penetration in SETuP communities
Massage: Solar-diesel hybrid won’t
negatively impact reliability
shorten diesel life
complicate day-to-day operation
drive up O&M
![Page 15: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/15.jpg)
ISSUES MANAGEMENT II
Keep the focus: on SETuP as a whole, try to avoid cherry-picking
Manage Expectations:
of communities for local employment (construction & longer-term)
of NT contractors & suppliers of big SETuP ‘paydays’
of parties that SETuP can be simultaneously a cash cow, a major employment generator and a technological showcase
of everyone that everything will work straight up
![Page 16: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/16.jpg)
FINAL OBSERVATIONS
Hofstadter's Law: It always takes longer than you expect, even when you take into account Hofstadter's Law.
Less elegantly - Dates in a calendar are closer than they appear to be.
Data: Is not the plural of anecdote
![Page 17: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/17.jpg)
SETuP
A Photo Journal…
![Page 18: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/18.jpg)
Land & Leases
Areyonga
![Page 19: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/19.jpg)
Land & Leases
Areyonga Power Station – new solar area
being fenced
![Page 20: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/20.jpg)
Early days – complete clearing at Areyonga
![Page 21: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/21.jpg)
Typical Central Australian site – ground cover to be
left & rubbish and shrubs to go
![Page 22: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/22.jpg)
Nyirripi – Buffel grass and other rubbish
![Page 23: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/23.jpg)
Typical satellite installation
![Page 24: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/24.jpg)
Feral animal or culturally important animal?
![Page 25: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/25.jpg)
Nyirripi – undulations on site
![Page 26: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/26.jpg)
Kintore – Time lapse camera on roof of power
station
![Page 27: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/27.jpg)
Time lapse camera
![Page 28: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/28.jpg)
Typical satellite installation
![Page 29: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/29.jpg)
Time lapse camera
![Page 30: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/30.jpg)
![Page 31: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/31.jpg)
![Page 32: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/32.jpg)
![Page 33: Graeme Marshall - NT Power & Water Corporation - Solar Transformation in the NT – Early lessons from SETuP](https://reader031.vdocuments.net/reader031/viewer/2022022203/5876e7011a28ab046d8b63df/html5/thumbnails/33.jpg)
Thank You