Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Upload: herbert-reynolds

Post on 21-Dec-2015

218 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Grand Calumet River/Indiana Harbor Canal Feasibility Study

East Chicago Waterway Management DistrictJim Wescott

April 23, 2015

Page 2: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Grand Calumet River & Indiana Harbor Canal

• East Chicago Waterway Management District and EPA are funding an investigation and study of the GCR/IHC to develop a remedial design

• ECWMD, EPA, and their consultant, Tetra Tech, want stakeholder feedback on remedial options, funding priorities, future end use, and other stakeholder groups not represented here today.

Page 3: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

GCR/IHC Progress

Page 4: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Completed/In Progress

• EBGCR USS Steel Section: Hydraulic Dredging

• WBGCR Reaches 3-5: Mechanical Excavation and Capping

• WBGCR Reaches 1&2:Hydraulic Dredging, Mechanical Excavation, Capping, and Habitat Restoration

• EBGCR Reaches 4A&4B: Hydraulic Dredging, Mechanical Excavation, Capping, and Habitat Restoration

• WBGCR Reaches 6&7:Mechanical Excavation and Capping

• EBGCR Gary Section: Feasibility Study/Remedial Design

• WB/EB GCR, Indiana Harbor Canal, and Lake George Canal Remedial Investigation and Feasibility Study

Page 5: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Current Project Area – GCR/IHC

Page 6: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Grand Calumet River Junction

Page 7: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Indiana Harbor Canal

Page 8: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Lake George Canal

Page 9: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

RI/FS Tasks

Remedial Investigation

• Sediment Sampling• Pore Water Sampling• Source Control

Evaluation

Feasibility Study

• Bathymetric and Topographic Surveys

• Geotechnical Sampling• Clean Up Goals

Development• Remedial Alternative

Screening and Evaluation

Page 10: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

GCR Surface Sediment Total 16 PAH

Page 11: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

GCR Subsurface Sediment Total 16 PAH

Page 12: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

GCR Surface Sediment PCBs

Page 13: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

GCR Subsurface Sediment PCBs

Page 14: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

GCR Surface Sediment Metals

Page 15: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

IHC Surface Sediment Total 16 PAH

Page 16: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

IHC Subsurface Sediment Total 16 PAH

Page 17: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

IHC Surface Sediment PCBs

Page 18: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

IHC Subsurface Sediment PCBs

Page 19: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

IHC Surface Sediment Metals

Page 20: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

LGC Surface Sediment Total 16 PAH

Page 21: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

LGC Subsurface Sediment Total 16 PAH

Page 22: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

LGC Surface Sediment PCBs

Page 23: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

LGC Subsurface Sediment PCBs

Page 24: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

LGC Surface Sediment Metals

Page 25: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Remedial Options

• No Action

• Monitored Natural Recovery

• In Situ Capping

• Environmental Dredging or Excavation

Page 26: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Grand Calumet RiverOptions

Sediment

1.Dredge 10 feet of River (Majority of Impacted Sediment) and place 2 feet of sand over remaining sediment. Estimated $43,000,000

2.Dredge 3 feet of West Branch. Place active cap material over West and East Branches. Estimated $16,000,000.

3.Option 2 with targeted dredging in East Branch. Estimated $17,500,000

Habitat

1.Dredge and rebuild/restore Junction Marsh and the USS Lead Marsh. Estimated $13,000,000

2.Invasive Species control and replant both marshes. Estimated $1,000,000

3.Option 2 with partial dredging along river boundary. Estimated $7,500,000

Page 27: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Indiana Harbor Canal OptionsSediment

1.Dredge 8 feet of Canal (Majority of Impacted Sediment) and place 2 feet of sand over remaining sediment. Estimated $48,000,000

2.Option 1 with 1 foot sand. Estimated $44,000,000

3.Partial dredging for PCB areas and place 2 feet of sand over remaining sediment. Estimated $15,000,000

4.Option 3 with 1 foot sand. Estimated $11,000,000

Page 28: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Lake George Canal Options

Lake George Canal East of Railroad Bridge

1.Dredge area to navigation channel depth (10 feet) Estimated $8,000,000

2.Partial dredge to reduce resuspension (5 feet) Estimated $4,000,000

Lake George Canal between Railroad Bridge and Land Bridge

1.Partial dredge (5 feet) and 2 feet sand cap. Estimated $8,500,000

2.Six (6) foot sand cap. Estimated $4,500,000

Lake George Canal west of Land Bridge

1.Dredge 6 feet and 1 foot sand cap. Estimated $ 18,000,000

2.No Action

Page 29: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Selection Considerations• Cost• Permits• Site Access• Utilities and other Debris• Sediment Characteristics• Long Term Effectiveness• Potential for Recontamination• Future End Use• Stakeholder and Community Acceptance

Page 30: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Typical Remedial Tasks

Page 31: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Time Frame and Costs

• Begin Dredging spring 2016

• Complete remedial action 2018-2020

• Cost Ranges from $40 Mil to $145 Mil

• Schedule heavily dependent on non-federal and federal funding

• Construction could be broken into smaller pieces to facilitate funding and stakeholder priorities

• Seeking Project Partners

Page 32: Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015

Questions?

Jim WescottTetra Tech

[email protected]