Grand Haven Budget. Changes to the 2011 Landscape Projects Grand Haven. Circle Island will start next week. Rock was ordered & the first load was delivered. Property is being prepared Irrigation modified Plant material ordered Irrigation parts for islands was delivered - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Grand Haven Budget

Changes to the 2011

Landscape Projects Grand Haven

Page 2: Grand Haven Budget

Rock was ordered & the first load was delivered.

Property is being preparedIrrigation modifiedPlant material orderedIrrigation parts for islands was deliveredPhase 1 Islands were marked and reviewedPlan reviewedPhase 2 islands reviewed with AustinMulch ordered

Page 3: Grand Haven Budget

35 Circle Islands within the community Islands will have a common themeRemove existing bad landscapingPrep bedsInstall rock themeReplant new landscapingReplace, repair and adjust irrigation to specs

for the new landscaping Mulch

Page 4: Grand Haven Budget

The circle islands should take about 8 weeks from start to finish.

Clean up 2 weeksRock install 2 weeksPlant install 2 weeksIrrigation 2 weeksTotal time 8 weeks.We are entering storm season I estimated a little

high to allow for storms, but nature can be cruel and if we are hit by storms the time frame may be extended.

Page 5: Grand Haven Budget

Lot usage will be used for storing rock Storing the plant material for the circle islandsWill be irrigated to keep the plants healthy.Upon completion the lot will be restored to its

original state with leveling to remove ruts and sod replacement Bahia sod will be used.

No cost to Grand HavenThe time frame for storage will be for the

Circle Island project only and upon completion the usage will end.

Page 6: Grand Haven Budget

Wild Oaks main entrance remove oleander replace with Jack Frost Ligustrum.

Transplant four crape myrtle trees to south side of main entrance along bridge .

Correct main entrance at Wild Oaks inside community by card reader install plants to improve the look and clean up area.

Main entrance in Wild Oaks repair and replace the landscape after wash out was repaired.

Page 7: Grand Haven Budget

Main Gate Wild Oaks Oleander removal Project$2895.00Card reader area Wild Oaks = $1304.00Repair the wash out area Wild Oaks = $751.50Transplant Crape myrtles from Waterside

Parkway to Wild Oaks $ 992.00Entrance Wild Oaks inside main gate south side

remove odd mismatched & dead grasses and fill with new grass that match = $1061.50

Total Wild Oaks = $7004.00

Page 8: Grand Haven Budget

Remove the dead and damaged oleander trees at the south arbor.

Replace with 7 - 15 gal Arizona Cypress total = $504.00

Transplant Ligustrum trees from Front Street south park to Montague lake bank. = $750.00

Puffin / Waterside line of sight = $2467.12This project will give us additional plants to fill in

areas on Waterside where blank holes are present in beds and will be transplanted while the Puffin project is being completed in this price as well.

Page 9: Grand Haven Budget

The 2011 vine project was budgeted for $30,000. the projects listed above total $10,725. These projects would greatly enhance the landscape at Wild Oaks and other important areas in the community.

I recommend we change the line item budgeted amount for the vine removal and use some of the funds to complete these projects.

We will still have funds for vine removal and Austin has been removing a lot of the vine as part of their contractual agreement in areas that we should be charged for at no additional charge.