grand palm hotel and casino gaborone, botswana 2nd to 5th sept 2007 capsa 07

15
Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Upload: muriel-harvey

Post on 28-Dec-2015

236 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Grand Palm Hotel and Casino Gaborone, Botswana2nd to 5th Sept 2007

CAPSA 07

Page 2: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Theme

Consolidating Best PracticeWhat does this mean

Page 3: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Large Subcontinent

Page 4: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Variable Population Density and Long Distances

Page 5: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Geology

Page 6: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Heavy Loads

Page 7: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Materials and Environment

Generally Good Variety of Materials

Generally benign climate for road-building

Page 8: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Developing Countries

Weaker Governments

Limited Funds

Page 9: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Conclusions

Need to get the most bang for our buck spent on pavements

Need to maximise use of local resourcesNeed to optimise use of expensive

manufactured materialsNeed thin waterproof surfacingsNeed good pavement and surfacing

management to ensure that what is built lasts for its design life and beyond.

Page 10: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Conclusions

Need to have good Materials Engineers, Technicians and Technology

Need to come to CAPSA to consolidate the good practices of the past with a view to the future

Page 11: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Format

3 Days and 3 NightsShort and CompactOutside – ExhibitionLess FormalFocus on Practical

Page 12: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Format

No call for papersInvited Papers

Good SpeakersGood Moderators – Mostly O’Seas

Many Well Structured WorkshopsGood PlanningGood FacilitatorsEnsure Participation and Learning

Page 13: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Programme

Sunday 2nd – IcebreakerMonday 3rd

OpeningHealth Safety and Environment (HSE)Hot Mix Asphalt (HMA)4 parallel workshops

Exhibitors Braai

Page 14: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Programme

Tues 4thSurfacing SealsBit Stab2 parallel workshop sessions (4)

Gala Dinner

Wednesday 5thStructural Design2 parallel workshop sessions (4 and 3)Closing

Page 15: Grand Palm Hotel and Casino Gaborone, Botswana 2nd to 5th Sept 2007 CAPSA 07

Conclusions

Come to Participate, Learn and Enjoy

Lets get Southern Africa back on the World Map in terms of our materials knowledge, pavement design and asset management expertise.