grants awarded by fy · grants awarded by fy faa - office of airports report date 03/13/2007 fy...
TRANSCRIPT
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
AL AAL AK Akutan GA 006 129,355 Conduct Airport Master Plan Study [(Phase 5, Complete EA)]
Aniak P 008 57,706 Conduct Airport Master Plan Study [Erosion Study Phase II Aniak Master Plan]
Barter Island LRRS CS 003 927,772 Update Airport Master Plan Study [(Phase 2, Environmental)]
004 1,894,960 Rehabilitate Runway [(Maintenance)] - 06/24
Bethel P 015 5,701,583 Construct Apron
Clark Bay SPB (Prop GA Hollis replacement) 001 2,475,596 Construct Seaplane Base
Coffman Cove GA 002 1,437,164 Construct Seaplane Base
Fairbanks International P 032 21,738,658 Construct Apron [(Construction)], Construct Apron [(Multi-yeared in 2006)], Install
Juneau International P 047 1,000,000Taxiway Lighting [(Centerline for Alpha & Bravo)], Rehabilitate Runway - 01R/19L Expand Terminal Building [(Planning & Design)]
Kenai Municipal P 035 8,432,329 Improve Seaplane Base [extend & widen waterlane (phase 1)], Improve Seaplane Base [extend & widen waterlane (phase 2a)], Rehabilitate Runway [(Phase 2)] -
Ketchikan International P 015 259,570
01L/19R, Rehabilitate Runway [RSA, provide standard(Phase 2)] - 01L/19R, Rehabilitate Runway [Rehabilitate runway lighting] - 01L/19R Install Emergency Generator
016 24,158,613 Rehabilitate Runway [(Extend RSA, Phase 1)] - 11/29, Rehabilitate Runway - 11/29
King Salmon P 009 7,489,430 Extend Runway Safety Area [Phase 1] - 11/29
Lake Hood P 011 2,891,416 Construct Apron [Phase 2 (06 EP + 05 Carryover)], Construct Apron [Phase 2 (MY - Reimbursement)]
Manokotak (Proposed GA) 001 8,311,638 Construct New Airport [Phase 1 (Construct Embankments)]
Matanuska-Susitna Borough Planning 001 673,858 Conduct Metropolitan System Plan Study
McGrath CS 004 1,571,036 Construct Sand and Chemical Storage Building
005 6,574,950 Construct Apron, Construct Runway - Plan-1
Merle K (Mudhole) Smith P 010 4,346,424 Construct Runway Safety Area [(Install EMAS, Phase 2)] - 09/27
Merrill Field P 040 551,000 Acquire Snow Removal Equipment
041 1,727,100 Rehabilitate Apron [phase 1 (block 5)], Security Enhancements [(RSAT Recommendations, Phase 2)]
Nanwalek / Port Graham Regional (Proposed GA)
001 500,000 Conduct Airport Master Plan Study
New Stuyahok (Proposed GA) 003 5,387,450 Construct New Airport [Phase 3], Construct Snow Removal Equipment Building
Newtok GA 003 104,000 Conduct Airport Master Plan Study [(Collection of Wind Data)]
Nome P 014 1,481,187 Construct Aircraft Rescue & Fire Fighting Building [(Phase 2)], Construct Snow
Selection Criteria Year: 2006
Page 1 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq Level Number
AL AAL AK 014
015
Palmer Municipal GA 013
Point Lay LRRS GA 003
Ralph Wien Memorial P 012
Shishmaref CS 005
State of Alaska 005
Ted Stevens Anchorage International P 090
091
092
093
094
095
Trident Basin GA 002
Tuntutuliak CS 002
Unalakleet P 003
Unalaska P 012
Various Locations in Alaska 053
054
055
056
AIP FederalFunds
6,463,358
1,850,291
5,650,000
3,023,863
150,000
2,667,552
4,718,750
9,466,000
1,413,363
6,593,124
3,446,276
1,040,100
4,080,000
19,051,000
12,376,438
1,439,950
1,675,724
1,093,256
3,931,553
3,662,806
Brief Description Of Work
Removal Equipment Building [(Phase 2)]
Rehabilitate Runway [(Phase 1)] - 03/21, Rehabilitate Runway - 10/28, RemoveObstructions [(Utility Pole Removal)]Install Runway Vertical/Visual Guidance System [PAPIs & REILs] - 16/34,Rehabilitate Runway Lighting [Install new runway lighting and lighted windcone] 16/34, Rehabilitate Taxiway [rehab. twy B, interlinks & lighting]Expand Apron, Extend Runway - 05/23
Construct Sand and Chemical Storage Building
Conduct Airport Master Plan Study [Phase 1]
Update State System Plan Study
Construct Apron [LOI #98-1 (grant 8): Postmark RRA (pymt 2)]
Rehabilitate Runway [LOI #2-01 [grant 4]; Reconst. rwy to DG6 [pymt 1]] - 06R/24L,Rehabilitate Taxiway [LOI #2-01 [grant 4]; DG 6 twy K(J-Y) [pymt 2]]Conduct Airport Master Plan Study [phase 1]
Rehabilitate Taxiway [(DG6)], Rehabilitate Taxiway [Reconstr K from C-A (non-LOI), phase 2]Rehabilitate Apron [Rehab gates N4 & N6], Rehabilitate Apron [Rehab gates N4 &N6 (MY phase 2)]Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF vehicle 2]
Improve Seaplane Base
Construct New Airport [(Includes SREB) Phase 2]
Construct Apron, Strengthen Runway [(phase 2)] - 08/26, Strengthen Runway[(phase 2)] - 14/32Conduct Environmental Study [(Planning to Support EIS)]
Acquire Snow Removal Equipment (Ketchikan International; Klawock; PetersburgJames A Johnson; Wrangell)Acquire Snow Removal Equipment (Chitina; Nome; Valdez Pioneer Field; Wiley Post-Will Rogers Memorial)Acquire Snow Removal Equipment (Adak; Birchwood; Chevak; Clarks Point;Dillingham; Ekwok; Iliamna; King Cove; Perryville; Port Heiden; Red Devil; Sand Point;Seldovia; Unalaska)Rehabilitate Runway (Bethel - 11/29; Bettles - 01/19; Birchwood - 01L/19R; BobBaker Memorial - 06/24; Boundary - 05/23; Brevig Mission - 04/22; Chenega Bay 15/33; Circle Hot Springs - 08/26; Cold Bay - 14/32; Council - 10/28; Dahl Creek 08/26; Dillingham - 01/19; Eagle - 06/24; Eek - 17/35; False Pass - 13/31; Girdwood
Selection Criteria Year: 2006
Page 2 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
AL AAL AK
Wasilla
Wrangell
GA
P
056
012
012
3,672,748
21,455,637
- 01/19; Gustavus - 11/29; Hoonah - 05/23; Hope - 16/34; Iliamna - 07/25; Kalskag 06/24; Karluk - 10/28; Ketchikan International - 11/29; Kodiak - 07/25; Kotlik - 02/20; Kwethluk - Plan-1; Larsen Bay - 04/22; Napaskiak - 02/20; Old Harbor - 02/20; Ouzinkie - 11/29; Petersburg James A Johnson - 04/22; Pilot Point - 07/25; Port Graham - 12/30; Port Heiden - 13/31; Port Lions - 06/24; Seldovia - 16/34; Shageluk - 16/34; Stebbins - 05/23; Tatitlek - 12/30; Togiak - 10/28; Tok Junction - 07/25; Yakutat - 11/29) Construct Apron [Construction, ph. 1)], Construct Runway - 03/21
Rehabilitate Runway [(Runway Safety Area, Phase 2)] - 10/28
State Total: 47 Grants 228,744,584
ADO Total: 47 Grants 228,744,584
Region Total: 47 Grants 228,744,584
Report Total: 2059 Grants 3,539,103,886
CE ACE IA Algona Municipal
Ames Municipal
Ankeny Regional
Atlantic Municipal
Audubon County
Belle Plaine Municipal
Bloomfield Municipal
Boone Municipal
Centerville Municipal
Chariton Municipal
Charles City Municipal
Clarion Municipal
GA
GA
R
GA
GA
GA
GA
GA
GA
GA
GA
GA
004
016
012
013
006
002
001
002
002
008
001
002
004
006
003
394,250
72,385
116,537
714,202
1,703,047
486,341
193,800
72,295
491,763
119,510
38,237
133,286
223,119
77,900
26,331
Construct Building [8 stall T-Hangar]
Update Airport Master Plan Study
Conduct Environmental Study [EA], Update Airport Master Plan Study
Expand Apron [NORTH], Remove Obstructions [Lower POWER LINE FOR R36 50:1]
Construct Runway [PAVE R2/20] - Plan-1
Construct Taxiway [(Phase 2 - Const.)], Expand Apron [(Phase 2 - Const.)]
Improve Access Road
Conduct Environmental Study [EA]
Rehabilitate Runway - 18/36
Rehabilitate Runway - 15/33
Update Airport Master Plan Study [ALP]
Install Weather Reporting Equipment [AWOS3]
Install Miscellaneous NAVAIDS, Rehabilitate Runway - 17/35, Rehabilitate Runway Lighting - 10/28 Acquire Snow Removal Equipment [NEW TRUCK & BLADE]
Update Airport Master Plan Study [ALP]
Selection Criteria Year: 2006
Page 3 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
CE ACE IA Council Bluffs Municipal
Creston Municipal
Decorah Municipal
Des Moines International
Dubuque Regional
Emmetsburg Municipal
Fairfield Municipal
Forest City Municipal
Fort Dodge Regional
George L Scott Municipal
Greenfield Municipal
Hampton Municipal
Humboldt Municipal
Independence Municipal
Iowa City Municipal
Iowa Falls Municipal
James G. Whiting Memorial Field
Jefferson Municipal
Keokuk Municipal
Lamoni Municipal
Le Mars Municipal
FY 2006
Service Grant Seq Level Number
GA 012
GA 003
GA 003
P 042
043
044
P 040
041
GA 002
GA 009
GA 007
CS 022
GA 001
GA 002
GA 002
GA 003
GA 004
GA 012
013
GA 001
GA 003
GA 005
GA 014
GA 002
GA 001
002
AIP Federal Funds
3,581,858
237,500
332,500
546,000
147,500
5,755,212
820,264
241,347
484,215
2,599,649
210,900
792,495
150,000
567,430
108,300
129,649
340,501
14,250
1,647,826
126,701
266,513
28,231
163,826
97,875
77,995
42,590
Report Date 03/13/2007
Brief Description Of Work
Construct Runway [18/36 (PH 6) PAVE 1500'] - Plan-1
Rehabilitate Taxiway
Construct Taxiway [Runway end Turnarounds], Install Runway Vertical/VisualGuidance System - 11/29, Rehabilitate Runway Lighting - 11/29Conduct Miscellaneous Study [BCA], Update Airport Master Plan Study
Conduct Noise Compatibility Plan Study [Update Contours]
Construct Runway [13R/31L (PH 3)] - Plan-1, Construct Runway [13R/31L (PH 4)] Plan-1Acquire Aircraft Deicing Equipment [Truck], Acquire Aircraft Rescue & Fire FightingVehicle [VEHICLE]Acquire Equipment
Rehabilitate Apron, Rehabilitate Taxiway
Construct Runway - 18/36
Rehabilitate Apron
Rehabilitate Taxiway [B,D,E]
Widen Runway - 17/35
Construct Apron, Construct Taxiway
Acquire Snow Removal Equipment, Construct Snow Removal Equipment Building[PH 1 Design]Acquire Miscellaneous Land [BRL Runway 12]
Rehabilitate Runway [Reconstruct] - 17/35, Rehabilitate Runway Lighting [MIRL] 17/35Update Airport Master Plan Study [Update ALP]
Extend Runway [7/25 (PH 4 Grade & Obstruction Removal)] - 07/25
Install Weather Reporting Equipment [Install AWOS III]
Extend Taxiway [extend connecting taxiway turnarounds out of OFA.]
Update Airport Master Plan Study [ALP]
Rehabilitate Runway [Clean and seal joints] - 08/26
Rehabilitate Runway [crack seal] - 18/36, Remove Obstructions [trees]
Rehabilitate Runway [crack sealing & panel repair] - 18/36
Conduct Environmental Study [CATEX], Remove Obstructions [Trees], UpdateAirport Master Plan Study [ALP Update]
Selection Criteria Year: 2006
Page 4 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
CE ACE IA Maquoketa Municipal GA 002 923,505 Rehabilitate Runway [Overlay Runway] - 15/33
Marshalltown Municipal GA 009 497,800 Construct Taxiway
Mason City Municipal P 026 1,132,072 Rehabilitate Runway - 12/30
027 1,498,715 Rehabilitate Taxiway [A]
Monticello Regional GA 003 154,600 Rehabilitate Runway - 15/33
Mount Pleasant Municipal GA 006 166,250 Improve Access Road [Reconstruct access road]
Muscatine Municipal GA 011 39,349 Rehabilitate Runway [Pavement maint joint cleaning & filling] - 06/24
012 419,852 Acquire Miscellaneous Land [for BRL]
Newton Municipal GA 009 427,500 Construct Taxiway
Oelwein Municipal GA 002 169,100 Acquire Snow Removal Equipment [Snow plow with 10' blade], Rehabilitate
Ottumwa Industrial GA 012 816,132Runway [Crack sealing & cleaning] - 13/31 Rehabilitate Apron
Pella Municipal GA 004 39,900 Conduct Airport Master Plan Study [ALP]
Perry Municipal GA 001 182,753 Install Weather Reporting Equipment [AWOS3PT]
Red Oak Municipal GA 006 1,001,300 Extend Runway [PH 3 - PAVE/LIGHT] - 05/23
Rockwell City Municipal GA 001 238,110 Construct Taxiway [R30 Turnaround], Rehabilitate Runway Lighting - 12/30
Sac City Municipal GA 003 128,500 Rehabilitate Runway [Rehab runway selected panel replacement] - 18/36
Schenck Field GA 003 90,900 Acquire Snow Removal Equipment [Truck plow]
004 106,469 Construct Snow Removal Equipment Building
Sheldon Municipal GA 006 55,000 Construct Terminal Building [PH 1 Design]
Spencer Municipal GA 016 115,061 Expand Apron
State of Iowa 009 741,331 Conduct State System Plan Study
The Eastern Iowa P 033 5,120,588 Construct Taxiway [B-4 SOUTH], Rehabilitate Runway [PH 2 REHAB 27] - 09/27, Update Miscellaneous Study [land use zoning ordinance update and Pavement
Washington Municipal GA 003 151,848Condition Index Study] Improve Access Road, Rehabilitate Apron
Waterloo Regional P 029 2,683,940 Acquire Friction Measuring Equipment, Rehabilitate Runway - 12/30, Rehabilitate
Webster City Municipal GA 004 58,900Runway Lighting [REPLACE] - 12/30 Update Airport Master Plan Study
005 100,462 Rehabilitate Apron [Repair & PMP]
006 120,542 Acquire Snow Removal Equipment
Selection Criteria Year: 2006
Page 5 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
CE ACE IA West Metro Regional Airport
Winterset-Madison County
State Total:
CE ACE KS Abilene Municipal
Allen County
Amelia Earhart
Anthony Municipal
Atwood-Rawlins County City-County
Augusta Municipal
Chanute Martin Johnson
Cheyenne County Municipal
Cimarron Municipal
Clay Center Municipal
Coffeyville Municipal
Colonel James Jabara
Dodge City Regional
Elkhart-Morton County
Ellsworth Municipal
Eureka Municipal
Forbes Field
Fort Scott Municipal
Freeman Field
Garden City Regional
Garnett Municipal
Great Bend Municipal
Hays Regional
FY 2006
Service Grant Seq Level Number
001
GA 003
70 Grants
GA 004
GA 006
GA 004
GA 002
GA 004
005
GA 011
GA 005
GA 004
GA 001
GA 005
GA 010
R 014
CS 018
GA 003
GA 001
GA 002
P 021
GA 007
008
GA 004
CS 023
GA 002
GA 015
CS 018
AIP Federal Funds
101,982
132,620
41,789,211
63,891
503,896
340,643
131,958
71,250
13,300
109,114
65,574
185,024
91,200
156,255
445,436
598,883
1,162,342
248,429
90,222
249,688
66,332
91,010
28,357
314,222
43,320
93,930
1,594,261
50,424
Report Date 03/13/2007
Brief Description Of Work
Conduct Airport Master Plan Study [MP/ALP], Conduct Miscellaneous Study [BCA]
Construct Runway [Land for lots 1 and 2] - 14/32
Acquire Land For Approaches
Construct Taxiway [Construct Partial Parallel Taxiway, Phase 2]
Rehabilitate Apron [phase 2 (construction)]
Construct Building
Update Airport Master Plan Study
Construct Fuel Farm [Design], Install Miscellaneous NAVAIDS [Design]
Rehabilitate Apron [Project Design], Rehabilitate Taxiway [Project Design]
Remove Obstructions
Construct Apron [Construct Apron (5000 sq. yds)]
Update Airport Master Plan Study [Prepare Master Plan; ALP Update;]
Rehabilitate Apron [repair and crack seal], Rehabilitate Runway - 17/35
Install Perimeter Fencing
Acquire Miscellaneous Land
Rehabilitate Taxiway [Phase 2 - Reconstruction]
Rehabilitate Apron [Reconstruct Apron - Phase 2]
Conduct Airport Master Plan Study [Conduct MP and ALP]
Construct Access Road, Install Weather Reporting Equipment
Rehabilitate Taxiway
Update Airport Master Plan Study
Install Taxiway Lighting
Rehabilitate Apron
Install Runway Vertical/Visual Guidance System - 12/30
Expand Apron [Phase 1 - Design], Install Miscellaneous NAVAIDS
Rehabilitate Taxiway [parallel txy phase 2]
Rehabilitate Apron [Design]
Selection Criteria Year: 2006
Page 6 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
CE ACE KS Hill City Municipal GA 006 165,822 Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System
Independence Municipal GA 013 185,000 Update Airport Master Plan Study [Update Master Plan & ALP due to anticipated
014 103,099significant increase in turbine traffic] Rehabilitate Taxiway [Reconstruct/reallign Taxiway A]
Kingman Airport - Clyde Cessna Field GA 008 144,193 Install Weather Reporting Equipment [Construct/install AWOS]
Larned-Pawnee County GA 008 119,063 Install Weather Reporting Equipment [Install AWOS]
Lawrence Municipal GA 013 1,398,945 Construct Taxiway, Improve Runway Safety Area [Improve grading of RSA for 15/33 - Design] - 15/33
Liberal Municipal CS 014 2,217,809 Rehabilitate Runway [Phase 3 Rehab RWY 17-35] - 17/35
Lyons-Rice County Municipal GA 007 65,935 Rehabilitate Apron [Project Design], Rehabilitate Taxiway [Phase 1 - Design]
Manhattan Regional P 028 183,330 Install Perimeter Fencing
McPherson GA 010 90,745 Update Airport Master Plan Study
Meade Municipal GA 006 538,875 Rehabilitate Apron [Rehab apron and connecting taxiway]
Miami County GA 007 116,365 Acquire Land for Development [Acquire land at NE corner of airport]
008 81,514 Install Perimeter Fencing [Phase 1 - Design Only]
Moritz Memorial GA 004 275,172 Expand Apron [phase two]
Ness City Municipal GA 002 68,782 Construct Runway [Environmental Assessment] - Plan-1
New 002 32,490 Conduct Environmental Study
New Century Aircenter R 020 547,747 Rehabilitate Taxiway Lighting [Rehab Taxiway Lighting A, F, and H]
Newton-City-County R 020 629,101 Rehabilitate Apron [APRON REHAB CONSTRUCTION]
Norton Municipal GA 001 77,661 Improve Access Road [Design], Rehabilitate Taxiway [Design Only]
Ottawa Municipal GA 008 803,723 Install Runway Vertical/Visual Guidance System - 17/35, Rehabilitate Apron [Construction]
Philip Billard Municipal GA 012 740,752 Rehabilitate Runway - 18/36
Pratt Industrial GA 009 285,000 Acquire Land For Approaches, Acquire Land For Approaches
Renner Field /Goodland Municipal/ GA 013 212,425 Install Miscellaneous NAVAIDS [Supplemental wind cones], Rehabilitate Runway 12/30
Russell Municipal GA 005 796,364 Rehabilitate Apron
Scott City Municipal GA 007 326,374 Extend Taxiway [Extend Taxiway to North Turnaround Pad], Rehabilitate Runway
Shalz Field GA 007 181,143 [Crackfill Rehab of RW 17-35] - 17/35 Rehabilitate Apron [Crackseal apron], Rehabilitate Runway [Joint seal and slab replacement]
Selection Criteria Year: 2006
Page 7 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
CE ACE KS Smith Center Municipal
Stanton County Municipal
State of Kansas
Strother Field
Syracuse-Hamilton County Municipal
Tri-City
Ulysses
Wichita Mid-Continent
CE
State Total:
ACE MO Columbia Regional
Joplin Regional
Kansas City International
Lambert-St Louis International
Missouri State Block Grant Program
Springfield-Branson Regional
FY 2006
Service Grant Seq Level Number
GA 003
GA 005
004
GA 012
GA 004
GA 003
GA 008
P 050
051
052
61 Grants
P 024
025
P 024
P 048
049
050
051
052
P 096
098
099
100
101
027
030
031
P 031
AIP Federal Funds
101,478
246,991
232,750
256,025
1,121,632
2,203,418
694,867
122,894
262,828
99,343
22,538,616
81,368
69,732
3,395,000
2,778,347
2,250,000
141,047
3,240,745
4,463,462
374,817
15,837,519
1,811,620
9,809,128
3,525,000
17,000,377
734,300
3,572,787
10,654,443
Report Date 03/13/2007
Brief Description Of Work
Rehabilitate Runway [Slurry Seal Pavements] - 17/35
Acquire Land for Development
Conduct State System Plan Study
Rehabilitate Runway
Construct Runway [Pave Runway] - Plan-1
Rehabilitate Runway - 17/35
Construct Taxiway [Construction - Phase 1]
Update Miscellaneous Study [Pavement Condition Inventory]
Install Airport Beacons
Construct Terminal Building [Phase 1a Terminal Environmental Assessment]
Rehabilitate Apron [GA apron]
Acquire Snow Removal Equipment
Construct Terminal Building
Rehabilitate Apron [reimbursement]
Acquire Snow Removal Equipment
Acquire Land for Noise Compatibility within 65 - 69 DNL
Rehabilitate Taxiway
Construct Deicing Containment Facility
Conduct Airport Master Plan Study [ALP update with narrative report]
Construct Runway - Plan-1
Acquire Land for Noise Compatibility within 70 - 74 DNL [W-1W expansion land]
Rehabilitate Taxiway [Rehab taxiway Foxtrot (phase 1)]
Improve Runway Safety Area - 12L/30R
Non primary development projects in state block grant program, Non primary development projects in state block grant program Non primary development projects in state block grant program
Non primary development projects in state block grant program
Construct Terminal Building [phase 3]
Selection Criteria Year: 2006
Page 8 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
CE ACE MO State of Missouri 004 170,000 Update State System Plan Study
State Total: 18 Grants 79,909,692
CE ACE NE Albion Municipal GA 006 47,785 Update Airport Master Plan Study
Alliance Municipal GA 011 269,586 Install Airfield Guidance Signs, Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Taxiway
Alma Municipal GA 002 152,714 Construct Utilities
Beatrice Municipal GA 010 102,125 Acquire Snow Removal Equipment
Brenner Field GA 006 187,340 Construct Snow Removal Equipment Building
Brewster Field GA 005 102,600 Acquire Snow Removal Equipment
Broken Bow Municipal GA 004 472,789 Construct Building, Update Airport Master Plan Study
Cambridge Municipal GA 004 45,600 Update Airport Master Plan Study
Central City Municipal - Larry Reineke Field GA 002 1,166,287 Extend Runway - 15/33, Rehabilitate Apron, Widen Taxiway
Central Nebraska Regional CS 028 178,634 Update Airport Master Plan Study
Chadron Municipal GA 008 200,000 Improve Runway Safety Area - 02/20, Install Guidance Signs
Cozad Municipal GA 003 510,000 Extend Runway [Extend runway (Phase 2)] - 13/31
Cram Field GA 003 533,259 Rehabilitate Apron, Rehabilitate Taxiway
Creighton Municipal GA 003 28,500 Acquire Miscellaneous Land
Crete Municipal GA 006 341,240 Acquire Miscellaneous Land
Curtis Municipal GA 002 194,449 Install Miscellaneous NAVAIDS, Install Runway Lighting - 12/30
Eppley Airfield P 044 2,175,000 Improve Runway Safety Area - 18/36
Evelyn Sharp Field GA 003 131,100 Extend Runway [Land for Runway Phase I] - 13/31, Update Airport Master Plan
Fairbury Municipal GA 006 263,568Study Construct Taxiway, Construct Utilities, Rehabilitate Parking Lot
Garden County GA 003 109,543 Improve Fuel Farm, Install Taxiway Lighting [Phase 1]
Gordon Municipal GA 003 320,000 Construct Building [Hangar], Rehabilitate Runway - 04/22
Grant Municipal GA 003 139,500 Acquire Snow Removal Equipment
004 514,987 Construct Building, Construct Building
Hebron Municipal GA 004 47,500 Update Airport Master Plan Study
Imperial Municipal GA 005 145,514 Install Taxiway Lighting
Selection Criteria Year: 2006
Page 9 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
CE ACE NE 006 50,350 Update Airport Master Plan Study
Jim Kelly Field GA 008 207,993 Construct Terminal Building [Construct Terminal area (Phase 2)], Construct Terminal
Kearney Municipal CS 017 517,739Building Install Emergency Generator, Rehabilitate Runway Lighting - 13/31
018 254,106 Rehabilitate Apron
Lincoln P 034 1,451,582 Improve Service Road, Install Runway Sensors - 14/32, Modify Terminal Building,
035 394,250Rehabilitate Runway - 14/32, Rehabilitate Taxiway, Rehabilitate Terminal Building Update Airport Master Plan Study
036 522,500 Improve Runway Safety Area [Preliminary Work] - 18/36
Loup City Municipal GA 002 422,961 Install Runway Lighting - 15/33, Widen Runway - 15/33
McCook Regional
Millard
GA
R
009
006
368,646
644,500
Improve Airport Miscellaneous Improvements, Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Rehabilitate Runway - 03/21 Construct Access Road, Construct Building
Nebraska City Municipal GA 010 235,790 Construct Parking Lot, Improve Access Road
North Platte Regional Airport Lee Bird Field CS 021 2,144,895 Construct Apron, Rehabilitate Apron
Pioneer Village Field GA 006 247,427 Improve Airport Miscellaneous Improvements
Red Cloud Municipal GA 002 98,325 Acquire Snow Removal Equipment
Rock County GA 005 133,738 Rehabilitate Runway - 13/31
Sargent Municipal GA 002 42,750 Extend Runway [Land for runway expansion] - 16/34
003 207,649 Construct Apron
Seward Municipal GA 005 185,056 Install Taxiway Lighting
State of Nebraska 008 154,895 Conduct State System Plan Study, Update State System Plan Study
Tecumseh Municipal GA 005 303,443 Construct Taxiway [PH1], Rehabilitate Apron [PH1], Rehabilitate Runway [PH1]
Thomas County GA 002 49,11415/33, Rehabilitate Taxiway [PH1] Acquire Land for Development
003 829,359 Conduct Airport Master Plan Study, Construct Taxiway, Extend Runway - 11/29, Install Runway Lighting - 11/29, Remove Obstructions, Widen Runway - 11/29
Wahoo Municipal GA 004 1,620,000 Expand Apron, Extend Runway - 02/20, Rehabilitate Taxiway, Update Airport Master Plan Study [Reimbursement]
Western Nebraska Regional/William B. Heilig Field
CS 025 1,284,000 Install Guidance Signs, Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 05/23, Rehabilitate Runway - 12/30, Rehabilitate
Western Nebraska Regional/William B. Heilig P 027 1,329,000 Runway Lighting - 05/23, Rehabilitate Taxiway Lighting Rehabilitate Apron
Selection Criteria Year: 2006
Page 10 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
CE ACE NE Field
State Total: 50 Grants 22,079,688
ADO Total: 199 Grants 166,317,207
Region Total: 246 Grants 166,317,207
Report Total: 2059 Grants 3,539,103,886
EA BEC WV Braxton County
Eastern WV Regional/Shepherd Field
Elkins-Randolph County-Jennings Randolph Field
GA
R
GA
011
022
012
700,111
336,343
588,113
Construct Taxiway, Rehabilitate Runway [Sealing & Marking] - 01/19
Construct Terminal Building [Terminal Access], Expand Apron
Rehabilitate Runway - 14/32
Fairmont Municipal-Frankman Field
Harrison/Marion Regional
Jackson County
Kee Field
Marshall County
Mason County
Mercer County
Mid-Ohio Valley Regional
Morgantown Municipal-Walter L. Bill Hart Field
Philippi/Barbour County Regional
Raleigh County Memorial
Tri-State/Milton J. Ferguson Field
Upshur County Regional
Wheeling Ohio County
Yeager
GA
CS
GA
GA
GA
GA
GA
P
P
GA
CS
P
GA
GA
P
006
029
014
010
014
014
018
030
027
007
020
034
017
022
036
2,641,000
3,642,211
265,243
535,586
24,598
258,723
1,500,905
9,900,000
5,431,735
173,424
986,888
1,976,000
327,589
150,000
158,987
Construct Taxiway [Design & Construct], Improve Runway Safety Area [Design & Construct] - 04/22, Remove Obstructions Improve Runway Safety Area [Grading] - 03/21
Acquire Snow Removal Equipment, Expand Snow Removal Equipment Building, Update Airport Master Plan Study Remove Obstructions [RW 8 Approach]
Rehabilitate Apron [Design]
Install Airfield Guidance Signs, Rehabilitate Taxiway [Apron Area]
Construct Apron, Construct Fuel Farm [Construct], Improve Runway Safety Area 05/23, Improve Terminal Building Improve Runway Safety Area [Grading, Pavement & NAVAIDS] - 03/21, Install Guidance Signs [Replace Faded Panels] Improve Runway Safety Area - 18/36, Install Apron Lighting [Includes Signage]
Install Perimeter Fencing [Design], Remove Obstructions, Update Airport Master Plan Study Construct Taxiway [Construct], Rehabilitate Terminal Building
Improve Runway Safety Area [Design] - 12/30, Improve Terminal Building
Install Perimeter Fencing
Improve Runway Safety Area [Environmental Assessment] - 03/21, Improve Terminal Building Acquire Snow Removal Equipment [plow and spreader]
Selection Criteria Year: 2006
Page 11 of 93
FAA - Office Of Airports
Region ADO State Worksite
EA BEC WV
State Total:
ADO Total:
EA HAR DE Delaware Airpark
New Castle
EA HAR
State Total:
PA
State of Delaware
Sussex County
Allegheny County
Allentown Queen City Municipal
Altoona-Blair County
Arnold Palmer Regional
Bradford Regional
Capital City
Delaware Valley Region
Erie International/Tom Ridge Field
Grants Awarded by FY
FY 2006
Service Level
Grant Seq Number
19 Grants
19 Grants
037
GA
GA
007
024
GA
025
004
020
5 Grants
R 016
GA
CS
P
009
010
011
032
029
CS 031
R 015
P
007
042
043
AIP FederalFunds
93,799
29,691,255
29,691,255
4,013,156
565,696
356,605
236,550
1,124,531
6,296,538
1,320,500
161,975
713,349
119,000
448,851
769,500
1,536,657
576,345
400,000
750,660
647,580
Report Date 03/13/2007
Brief Description Of Work
Construct Taxiway [Environmental Permitting]
Construct Runway [Land Acquisition, Phase III] - 09/27
Improve Runway Safety Area [Design] - 09/27, Rehabilitate Runway [Design] 09/27, Update Miscellaneous Study [Wildlife Management Study]Install Perimeter Fencing [Design], Remove Obstructions [Design]
Update State System Plan Study
Conduct Environmental Study [EA/BCA for Runway 4/22 extension, Phase III],Rehabilitate Runway [Crosswind Runway, Reconstruct, Phase III] - Plan-1
Acquire Equipment [ACAA Fuel and Transformer Containment-Design], AcquireSnow Removal Equipment [Truck and Broom], Install Perimeter Fencing [AccessControl (design), Phase III], Rehabilitate Taxiway [Convert Runway 5/23 to aTaxiway]Update Airport Master Plan Study [Update Airport Layout Plan/Exhibit A]
Rehabilitate Apron [Terminal Apron, Phase II]
Extend Taxiway [Taxiway B, Design]
Acquire Snow Removal Equipment [Self-Propelled Snow Blower]
Acquire Aircraft Deicing Equipment, Improve Building [Air Traffic Control Tower,design], Improve Terminal Building [Acquire Passenger Loading Bridge], RehabilitateAccess Road [Including Parking Area, design]Acquire Emergency Generator, Acquire Snow Removal Equipment [4x4 CarrierVehicle], Construct Taxiway [Parallel Taxiway to Runway 32], Rehabilitate Runway[Design] - 14/32Acquire Snow Removal Equipment [Truck], Improve Runway Safety Area[Easement Acquisition/Drainage for Runway 8, Phase IV] - 08/26, Improve RunwaySafety Area - 12/30, Rehabilitate Apron [including associated apron]Conduct Metropolitan System Plan Study [CASP XXIV]
Extend Runway [Phase IV] - 06/24
Acquire Snow Removal Equipment [2 Snow Plows]
Selection Criteria Year: 2006
Page 12 of 93
Grants Awarded by FY FAA - Office Of Airports
EA HAR PA
Region ADO State
Gettysburg Airport and Travel Center
Harrisburg International
John Murtha Johnstown-Cambria County
Worksite
Lehigh Valley International
Northeast Philadelphia
Pennsylvania State Block Grant Program
Philadelphia International
Pittsburgh International
Report Date 03/13/2007
FY 2006
Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
044 2,571,541 Extend Runway [Phase V] - 06/24
002GA 1,504,325 Acquire Existing Airport, Acquire Land for Development [7.0 Acres]
043P 8,340,000 Construct Apron [Phase V], Construct Taxiway [Phase IV], Install Runway Lighting [Phase III] - 13/31
044 3,885,806 Construct Apron [Cargo Apron, Phase III], Construct Terminal Building [Phase IV]
034P 874,950 Acquire Equipment [FOD Collector and Tow Vehicle], Acquire Snow Removal Equipment [2 Plow Trucks and Tractor], Construct Apron [GA Apron - Site Preparation/Environmental Mitigation/Land Appraisals], Expand Apron [Terminal Apron, Design], Expand Snow Removal Equipment Building
035 1,895,250 Construct Runway Safety Area - 15/33
065P 6,200,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
066 250,000 Extend Runway [Phase I Environmental] - 13/31
067 3,881,540 Acquire Land For Approaches [Runway 13 Approach (58 acres), Phase II]
068 1,750,000 Rehabilitate Apron [Air Carrier Apron]
013R 1,176,993 Rehabilitate Runway Lighting [Including Lighting for Taxiway A, Phase V] - 15/33
028 5,699,760 Non primary development projects in state block grant program - GA/RL
029 6,300,000 Non primary development projects in state block grant program - GA/RL
030 1,369,056 Non primary development projects in state block grant program - GA/RL
031 1,999,999 Non primary development projects in state block grant program
032 322,000 Non primary development projects in state block grant program
033 1,331,250 Non primary development projects in state block grant program
076P 4,575,000 Improve Runway Safety Area [Phase II] - 09R/27L
077 5,024,478 Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate Apron [Cargo Apron, Phase IV]
078 29,677,166 Extend Runway [Design and Construction] - 17/35
079 4,000,000 Construct Runway [Environmental Impact Statement-New Runway, Phase IV] Plan-1
088P 6,039,844 Improve Runway Safety Area [Runway 28R, Phase III] - 10L/28R
089 2,663,274 Environmental Mitigation [Design and permitting of deicing treatment plant, Phase II]
090 37,176 Acquire Snow Removal Equipment [Truck with plow]
091 2,546,106 Construct Snow Removal Equipment Building, Rehabilitate Apron [Main Apron]
Selection Criteria Year: 2006
Page 13 of 93
Grants Awarded by FY FAA - Office Of Airports
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
EA HAR PA Reading Regional/Carl A Spaatz Field 041CS 1,311,358
Rostraver 011R 925,300
University Park 038P 212,856
Wilkes-Barre/Scranton International
Williamsport Regional
040
039
040
041
042
030
P
P
1,938,871
570,000
3,909,709
3,288,936
1,430,341
1,274,900
031 152,000
State Total: 46 Grants 126,374,202
ADO Total: 51 Grants 132,670,740
EA NYC NJ Atlantic City International 062
063
064
P 190,000
235,821
95,000
Cape May County 021GA 304,442
Essex County
Greenwood Lake
Hammonton Municipal
Lakewood
023
024
002
011
007
R
GA
GA
GA
259,500
113,500
263,267
775,094
739,996
Report Date 03/13/2007
Brief Description Of Work
Construct Runway Safety Area [Phase II Design/Land] - 18/36, Install GuidanceSigns, Install Miscellaneous NAVAIDS [(4 wind cones)], Rehabilitate Runway[(sealcoat/cracksealing)] - 13/31Acquire Snow Removal Equipment, Expand Apron [Main Apron and Lighting,Design], Improve Runway Safety Area [Land Acquisition] - 08/26Construct Access Road, Construct Taxiway [General Access Taxiway, Ph III],Extend Taxiway [Taxiway A]Acquire Land for Development [Alexander Property]
Improve Runway Safety Area [Runway 22 Threshold (design), Phase II] - 04/22
Improve Runway Safety Area [Site Prep, Phase III] - 04/22
Construct Terminal Building [Phase VI]
Construct Apron [Aircraft Parking Apron, Phase III]
Acquire Friction Measuring Equipment, Acquire Snow Removal Equipment [Tractor& Loader], Construct Snow Removal Equipment Building [Phase II], RehabilitateApron [T-Hangar Apron, design], Rehabilitate Taxiway Lighting [Lighting forTaxiways A, E and F], Security Enhancements [Vehicles], Update Airport MasterPlan StudyImprove Runway Safety Area [Design] - 09/27
Environmental Mitigation [Phase III]
Install Weather Reporting Equipment [Two Lighted Wind Direction Indicators]
Acquire Interactive Training System [Purchase and Install an Interactive EmployeeTraining Program]Acquire Snow Removal Equipment [Snow Blower], Acquire Snow RemovalEquipment [Snow Blower]Install Perimeter Fencing [2,600'X6' & 3,000'X10' - Construct]
Remove Obstructions [Environmental Assessment-Phase I]
Install Perimeter Fencing [9,960' X 8' - Construct]
Construct Apron
Rehabilitate Apron
Selection Criteria Year: 2006
Page 14 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
EA NYC NJ Lincoln Park R 007 52,801 Remove Obstructions [On/Off Airport Obstruction Study]
Linden R 010 256,500 Install Weather Reporting Equipment [Install Automated Weather Observation
Millville Municipal GA 019 150,000System (AWOS - III) - Design & Construct] Rehabilitate Runway [Phase 1 (Design)] - 14/32
020 1,462,864 Rehabilitate Taxiway [T/W "J"]
Morristown Municipal R 033 282,482 Install Weather Reporting Equipment [AWOS-Construction]
034 5,751,105 Rehabilitate Taxiway [Rehabilitate Taxiway 'A' & 'B' - Phase I Including Lighting, Drainage, Grading Improvements & Markings (Construct)]
Newark Liberty International P 107
109
2,604,604
1,770,300
Noise Mitigation Measures for Public Buildings [Soundproofing of St. Stephen School- Phase IV] Improve Access Road [Phase II]
112 18,563,157 Improve Access Road [Terminal B Access Roadway Improvements - Phase I]
Robert J. Miller Air Park GA 015 850,000 Rehabilitate Apron [Construction- Phase II]
Sussex R 006 633,363 Rehabilitate Runway Lighting [Construction] - 03/21
Teterboro R 033 13,150,000 Improve Runway Safety Area [Construction] - 06/24
034 301,966 Noise Mitigation Measures for Public Buildings [Soundproofing of St Francis]
035 1,667,558 Noise Mitigation Measures for Public Buildings [Noise Compatibility Project - School Soundproofing Program - Soundproofing Memorial School - Phase IV - South Hackensack, N.J]
Trenton Mercer P 033 407,370 Security Enhancements [Airport Security Improvements Phase II]
Woodbine Municipal GA 009 188,931 Install Weather Reporting Equipment [Construction]
013 96,713 Rehabilitate Runway [Design and Permits] - 12/30
State Total: 26 Grants 51,166,334
EA NYC NY Adirondack Regional CS 038 2,264,852 Rehabilitate Runway [Rehabilitate Runway 5-23 (Construction) - Phase II] - 05/23
039 948,124 Construct Taxiway [Access Taxiway - Phase II (Construction)]
040 174,964 Expand Snow Removal Equipment Building [SRE/ARFF Expansion (Design Only)]
Albany International P 084 240,798 VALE Vehicle [VALE Program - Clean Fuel/American Fuel Fleet Conversion - Phase 1I]
087 3,176,166 Improve Airport Drainage [Runway 1/19 Drainage Improvements], Rehabilitate Apron [Terminal Apron and General Aviation Apron Rehabilitation], Rehabilitate Apron [Terminal Apron and General Aviation Apron Rehabilitation]
Selection Criteria Year: 2006
Page 15 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
EA NYC NY
Buffalo Airfield
Buffalo Niagara International
Buffalo-Lancaster
Canandaigua
Cattaraugus County-Olean
Chautauqua County/Dunkirk
Chautauqua County/Jamestown
Columbia County
Corning-Painted Post
Cortland County-Chase Field
Dansville Municipal
Dutchess County
Elizabeth Field
FY 2006
Service Grant Seq Level Number
088
089
090
R 015
016
P 061
062
R 011
014
R 020
021
GA 010
GA 033
034
P 033
034
GA 022
023
GA 007
008
GA 013
GA 015
GA 024
GA 012
013
AIP Federal Funds
1,651,065
309,700
900,000
218,841
133,779
816,891
1,194,565
81,651
148,590
215,506
95,566
612,437
1,346,435
166,757
12,483,000
864,500
693,500
124,612
708,920
102,361
156,100
830,000
747,650
88,350
80,750
Report Date 03/13/2007
Brief Description Of Work
Acquire Land For Approaches [Runway 19 RPZ Property Acquisitions]
Improve Terminal Building [Terminal Checkpoint Mezzanine Improvements (Construction)] Noise Mitigation Measures [FAR Part 150 Noise Compatibility Program - Engine Maintenance Ground Run-Up Enclosure (Land Acquisition)] Acquire Snow Removal Equipment, Install Runway Vertical/Visual Guidance System - 06/24 Acquire Land For Approaches, Remove Obstructions
Construct Deicing Containment Facility [Innovative Glycol Treatment and Water Quality Improvement Program] Noise Mitigation Measures for Residences within 75 DNL [Home Surveys and Sample Home Procurements] Construct Taxiway [Design]
Conduct Environmental Study [Environmental Assessment for 5 year Master Plan projects] Acquire Land For Approaches
Remove Obstructions [Phase II-Tree Removal]
Construct Snow Removal Equipment Building
Rehabilitate Taxiway
Construct Snow Removal Equipment Building
Improve Runway Safety Area [Phase 2] - 07/25
Acquire Aircraft Rescue & Fire Fighting Vehicle, Conduct Miscellaneous Study [Wildlife], Security Enhancements [Design] Improve Runway Safety Area [Construction] - 03/21
Rehabilitate Runway [Design] - 03/21
Construct Taxiway [Construct portion of parallel taxiway and apron]
Acquire Land For Approaches
Remove Obstructions [Study]
Construct Apron
Rehabilitate Taxiway Lighting
Acquire Snow Removal Equipment [Front End Loader]
Rehabilitate Runway Lighting [Engineering Only] - 07/25
Selection Criteria Year: 2006
Page 16 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq Level Number
EA NYC NY Elmira/Corning Regional P 044
045
Floyd Bennett Memorial GA 033
034
035
Genesee County R 020
Greater Binghamton/Edwin A Link Field P 046
Greater Rochester International P 056
Griffiss Airpark GA 007
012
013
Hamilton Municipal GA 010
011
012
Hornell Municipal GA 016
Ithaca Tompkins Regional P 045
John F Kennedy International P 136
144
145
146
147
148
149
AIP Federal Funds
997,054
3,152,351
1,928,500
168,150
113,981
669,750
4,477,458
3,073,198
5,530,950
2,056,750
869,250
46,074
43,783
34,200
338,757
555,750
472,608
1,660,735
985,570
440,310
4,365,000
849,600
1,958,962
Brief Description Of Work
Improve Access Road [Design], Improve Terminal Building, Rehabilitate Runway[Design] - 06/24Rehabilitate Runway - 10/28
Improve Runway Safety Area [RW 1-Construction] - 01/19
Improve Runway Safety Area [(Design Only)] - 12/30, Rehabilitate Runway[(Design)] - 12/30Construct Snow Removal Equipment Building [Design]
Rehabilitate Runway [(Construction)] - 10/28
Improve Access Road [Airport Entrance Road Improvements], Improve RunwaySafety Area [Runway 10-28 RSA Improvements] - 10/28Rehabilitate Apron [Phase 1], Rehabilitate Apron [Phase 2]
Install Weather Reporting Equipment [Relocate ASOS from UCA to RME],Rehabilitate Building [Control Tower (Bldg. 504) Construction], Rehabilitate Building[Hangar/Offices(Bldg. 100) - Phase I Construction], Rehabilitate Snow RemovalEquipment Building [(Bldg. 220) Construction]Improve Building [Roof Replacement-Bldg. 100; Modifications to Bldg. 220-NewDoors; Demolition of Building 150]Acquire Aircraft Rescue & Fire Fighting Vehicle
Remove Obstructions [Obstruction Study]
Acquire Land For Approaches [Runway 35-Phase II]
Install Weather Reporting Equipment [Installation of AWOS (Design Only)]
Rehabilitate Taxiway, Update Airport Master Plan Study
Acquire Snow Removal Equipment
Noise Mitigation Measures for Public Buildings [Soundproofing of Lawrence SchoolNo.2, Inwood, N.Y. - Phase II]Rehabilitate Runway Lighting [Rehabilitate Runway 4R Pier Structure for ApproachLighting System - Phase I] - 04R/22LSecurity Enhancements [Phase II]
Noise Mitigation Measures for Public Buildings [Soundproofing of PS 195 Q - PhaseV $440,310]Improve Access Road
Improve Runway Safety Area - 13R/31L
Noise Mitigation Measures for Public Buildings [Noise Compatibility Project - SchoolSoundproofing Program - Soundproofing IH 198Q, Averne, - Phase V]
Selection Criteria Year: 2006
Page 17 of 93
Grants Awarded by FY FAA - Office Of Airports
FY 2006
Region ADO State Worksite Service Grant Seq Level Number
EA NYC NY Joseph Y Resnick GA 019
020
021
Kingston-Ulster R 014
La Guardia P 108
110
114
116
117
118
119
Lake Placid GA 024
025
026
Le Roy R 015
016
Long Island MacArthur P 066
067
069
070
Lt Warren Eaton GA 022
Malone-Dufort GA 018
019
Massena International-Richards Field CS 033
035
AIP FederalFunds
156,418
310,163
94,525
416,352
885,716
907,906
4,525,524
21,819,237
1,026,689
2,509,217
3,700,000
736,963
21,850
76,950
99,092
107,472
501,931
405,608
517,684
4,276,922
36,100
459,800
29,450
190,000
650,000
Report Date 03/13/2007
Brief Description Of Work
Install Runway Vertical/Visual Guidance System [REILS and PAPIS(incl.Obstructions Removal) - Design and Construction] - 04/22Construct Snow Removal Equipment Building [Design and Construction]
Construct Taxiway [Partial Parallel Taxiway - Design]
Install Perimeter Fencing
Noise Mitigation Measures for Public Buildings [Soundproofing School No.5 Bronx]
Noise Mitigation Measures for Public Buildings [Soundproofing PS146 Bronx-PhaseVII]Noise Mitigation Measures for Public Buildings [Soundproofing of St. AnselmSchool, Bronx - Phase III]Noise Mitigation Measures for Public Buildings [Soundproofing of John Bowne Sr.High School]Rehabilitate Runway [Runway Decks 13/31 and 04/22- Phase V] - 13/31
Improve Access Road [East End Roadway Improvements - Phase II]
Improve Access Road [Rehabilitate Grand Central Parkway Flyover]
Expand Apron [Construction], Rehabilitate Apron [Construction]
Remove Obstructions [Design R/W 14-32 Obstruction Removal (On-Airport)]
Improve Terminal Building [Renovation & Expansion - Phase I], Improve TerminalBuilding [Renovation & Expansion - Phase II]Acquire Land For Approaches
Conduct Environmental Study
Security Enhancements [Phase II]
Acquire Snow Removal Equipment
Install Guidance Signs [Replace], Install Miscellaneous NAVAIDS [Install Two WindCones]Construct Taxiway [Taxiway "D" Parallel to R/W 6/24 - Phase I]
Extend Runway [Design] - 01/19
Construct Snow Removal Equipment Building [Snow Removal Equipment StorageBuilding]Construct Taxiway [T-hangar Taxilane (Design)]
Update Airport Master Plan Study [Master Plan Update & Obstruction Study]
Rehabilitate Apron [Terminal Apron (Construction)]
Selection Criteria Year: 2006
Page 18 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
EA NYC NY 036 266,000 Construct Terminal Building [Demolish Old Terminal Building (Design Only)], Install Miscellaneous NAVAIDS [Relocate FAA Facilities]
037 260,000 Remove Obstructions [Runway 23 Phase I (Easements & Design)]
038 89,965 Rehabilitate Taxiway [Taxiway "D"]
Montauk R 009 239,198 Rehabilitate Runway [Runway Surface Rehabilitation, Markings, Threshold Relocation and Wind Cone Incstallation] - 06/24
Niagara Falls International R 026 382,992 Remove Obstructions [Design/Easements/Construction-Phase 1]
Ogdensburg International GA 027 750,500 Construct Terminal Building [(Construction)]
028 380,000 Install Airport Beacons [Relocate Airfield Equipment & Airport Beacon (Design)], Install Perimeter Fencing [Perimeter Fencing Replacement], Rehabilitate Runway [Runway Crack Repair] - 09/27
Oneonta Municipal GA 011 105,580 Construct Taxiway [Partial Parallel T/W Connecting R/W 6 End with Terminal Apron; Partial Relocation and Expansion of the Terminal Apron; and Relocation/Realignment
Orange County GA 032 162,921of the Airport Entrance Road - Eng. Design Only] Acquire Snow Removal Equipment [Plow]
Penn Yan GA 021 212,990 Acquire Land For Approaches, Acquire Land for Development
Perry-Warsaw GA 020 665,000 Remove Obstructions [Construction]
Plattsburgh International GA 014 3,275,000 Construct Building [FBO Facility], Construct Building [GA Hangars/Shelters - Phase I], Construct Fuel Farm [MAP] [Fuel Facility], Construct Utilities [MAP] [Proprietary
Potsdam Municipal/Damon Field/ GA 020 78,850Fire Loop] Construct Apron [Apron & Taxilane - Phase II & III (Design Only)]
Randall R 021 129,510 Construct Snow Removal Equipment Building
Republic R 031 450,000 Construct Taxiway [Relocate Taxiway B - Engineering Design Only]
Saratoga County GA 022 894,020 Remove Obstructions [Off-Airport Obstruction Removal]
Schenectady County R 035 66,245 Improve Airport Drainage [EA & Preliminary Design]
036 5,294,350 Rehabilitate Taxiway [Taxiways A, B & D (Construction)]
037 332,500 Construct Service Road [ARFF Access Road]
Schroon Lake GA 006 250,439 Construct Apron [Aircraft Parking Aprons]
Sky Acres R 015 199,610 Install Perimeter Fencing, Rehabilitate Apron [Rejuvenate Itinerant Aircraft Parking
State of New York 006 300,000
Apron - Design and Construction], Rehabilitate Taxiway [Reconstruct T/W "G" (180 L.F. x 25 L.F.) incl. markings] Conduct State System Plan Study
Stewart International P 040 767,341 Construct Sand and Chemical Storage Building [Phase II-Construction]
Selection Criteria Year: 2006
Page 19 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
EA NYC NY
Sullivan County International
Syracuse Hancock International
Syracuse Suburban
Ticonderoga Municipal
Tri-Cities
Watertown International
Wellsville Municipal Airport,Tarantine Field
Westchester County
EA WAS DC
ADO Total:
State Total:
Selection Criteria
Washington Dulles International
Washington Metropolitan Area
Year: 2006
FY 2006
Service Grant Seq Level Number
048
049
050
051
052
GA 021
P 075
090
091
092
093
094
R 006
GA 014
GA 012
CS 024
GA 018
P 073
076
077
121 Grants
147 Grants
P 035
005
AIP Federal Funds
1,696,034
305,294
134,899
140,125
310,000
300,000
144,400
5,327,716
475,000
6,341,250
636,500
5,310,500
40,046
79,294
150,000
143,950
45,600
806,494
260,775
263,476
149,291,104
200,457,438
36,913,573
301,713
Report Date 03/13/2007
Brief Description Of Work
Improve Runway Safety Area [Construction] - 16/34
Acquire Snow Removal Equipment
Rehabilitate Runway Lighting [TDZ Lighting System, PAPI's and Two Wind Cones Engineering Only] - 09/27Rehabilitate Taxiway [Taxiway "G" Design]
Conduct Environmental Study [Relocation of Tower Hill - Phase I - PreliminaryDesign for Environmental Assessment], Widen Taxiway [Taxiway "C" Object FreeArea Improvements - Engineering Design Only]Construct Snow Removal Equipment Building [Construction]
Remove Obstructions [Obstruction Study]
Rehabilitate Runway [Runway 10-28 Overlay ( Phase II)] - 10/28
Security Enhancements
Noise Mitigation Measures for Public Buildings [School Sound Insulation - St. Roseof Lima and Nate Perry Elementary]Improve Runway Safety Area [R/W 33 Safety Area Improvements] - 15/33
Rehabilitate Apron [General Aviation Apron (Construction)], Rehabilitate Apron[General Aviation Apron (Construction)], Rehabilitate Taxiway [Taxiway's Y & N(Construction)], Rehabilitate Taxiway [Taxiway's Y & N (Construction)]Construct Runway [Archeological Study- Phase 1B] - Plan-1
Rehabilitate Apron [Apron Sealcoating], Rehabilitate Taxiway [Crack Sealing onTaxiway]Update Airport Master Plan Study
Acquire Snow Removal Equipment
Remove Obstructions [Study]
Acquire Aircraft Rescue & Fire Fighting Vehicle [Replacement]
Rehabilitate Taxiway [T/W "A" - Design]
Install Emergency Generator [Acquire and Install Electrical Emergency Generator]
Construct Runway [1/11] - Plan-1
Update Metropolitan System Plan Study [Ground Access Element Update], Update
Page 20 of 93
Grants Awarded by FY FAA - Office Of Airports
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Level Number Funds
EA WAS DC
State Total:
EA WAS MD Baltimore/Washington International Thurgood Marshal
P
Bay Bridge
Carroll County Regional/Jack B Poage Field
GA
R
Easton/Newnam Field GA
Frederick Municipal R
Garrett County GA
Greater Cumberland Regional GA
Hagerstown Regional-Richard A Henson Field P
Montgomery County Airpark
Ocean City Municipal
Salisbury-Ocean City Wicomico Regional
R
GA
P
EA WAS
State Total:
VA
State of Maryland
Accomack County GA
Selection Criteria Year: 2006
005
2 Grants
077
016
023
028
029
030
026
027
010
014
035
036
037
013
016
029
031
032
033
001
20 Grants
011
37,215,286
14,012,849
398,050
136,333
262,390
300,485
753,255
29,703
150,000
5,715,510
377,767
6,000,000
2,391,289
289,085
521,691
129,627
2,147,739
456,922
6,681,660
446,372
490,476
41,691,203
272,936
Report Date 03/13/2007
Brief Description Of Work
Metropolitan System Plan Study [Update Ground Access Forecast]
Rehabilitate Apron [piers d & e construction phase 1], Rehabilitate Apron [piers d &e construction phase 2], Rehabilitate Taxiway [taxiways b, n, r, a, p constructionphase 1]Extend Taxiway [Final Design]
Install Miscellaneous NAVAIDS [4 Box PAPI]
Rehabilitate Runway [Design Only] - 04/22
Remove Obstructions [Acquire Land and Design, Rwy 4,22 & 33]
Conduct Environmental Study
Extend Runway [acquire land easement parcel a43 rw 5 approach (appraisalonly)], Extend Runway [acquire land easement parcel a44 rw 5 approach(appraisal only)], Extend Runway [acquire land easement parcel a45 rw 5approach (appraisal only)]Acquire Snow Removal Equipment
Extend Runway [construction phase 2] - 08/26
Rehabilitate Runway [acquire land (appraisal only)]
Construct Runway Safety Area [construction phase 4] - 09/27
Rehabilitate Apron [phase 2 construction]
Construct Aircraft Rescue & Fire Fighting Building [design only]
Rehabilitate Taxiway Lighting [phase 1 relocate vault]
Install Perimeter Fencing, Rehabilitate Apron [Design Only]
Rehabilitate Runway [Env. Mitigation for Runway Rehab.] - 14/32
Improve Runway Safety Area [Design] - 05/23
Rehabilitate Runway [Rehab. Runway, Phase 2 Construction] - 14/32
Remove Obstructions [Construction]
Conduct State System Plan Study
Construct Fuel Farm
Page 21 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
EA WAS VA Brookneal/Campbell County GA 002 522,081 Rehabilitate Runway [Construction] - 06/24
Charlottesville-Albemarle P 036 4,421,551 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Runway Safety Area
Chesapeake Regional GA 011 794,590[Construction, Overall Phase V] - 03/21 Improve Runway Safety Area [Construction] - 05/23
012 184,300 Conduct Environmental Study
Chesterfield County R 018 376,162 Rehabilitate Runway [RW 15-33 and Associated Parallel TW (Design)] - 15/33
Danville Regional GA 022 997,500 Acquire Land For Approaches [Runway 20 RPZ, Acquire Land and Relocate Business]
Dinwiddie County GA 016 449,983 Construct Building [Construct T Hangars]
Emporia-Greensville Regional GA 007 432,250 Construct Taxiway [Partial Parallel Twy (1000' North End) Construction]
Franklin Municipal-John Beverly Rose GA 010 139,891 Rehabilitate Runway [Design] - 09/27
Hanover County Municipal GA 015 122,060 Construct Taxiway [T-hangar taxiway (design only)]
018 327,940 Construct Taxiway [T-hangar taxiway (construction)]
Lee County GA 002 300,000 Construct Fuel Farm [Design/Construction (multi-year)]
Leesburg Executive R 031 309,700 Construct Apron, Install Perimeter Fencing
Louisa County/Freeman Field GA 013 53,416 Acquire Land for Development
Lynchburg Regional/Preston Glenn Field P 027 388,426 Update Airport Master Plan Study
029 8,787,486 Extend Runway [Phase 4, Construction] - 04/22
Manassas Regional/Harry P. Davis Field R 025 2,927,064 Rehabilitate Apron
026 477,821 Extend Runway [Phase 1: Environmental] - 16L/34R
Mecklenburg-Brunswick Regional GA 009 383,813 Construct Taxiway [Partial Parallel Twy - PH I EW (Construction)]
Middle Peninsula Regional GA 004 285,000 Rehabilitate Runway [Phase 1, Design Only] - 09/27
New 009 4,207,000 Construct New Airport [Airfield Paving, Lighting, Beacon]
New Kent County GA 009 300,000 Construct Building [T-hangar]
Newport News/Williamsburg International P 033 1,505,628 Improve Runway Safety Area - 07/25
Norfolk International P 051 419,597 Install Guidance Signs
Orange County GA
052
009
108,150
2,015,697
Acquire Aircraft Rescue & Fire Fighting Vehicle [Replace Rapid Intervention ARFF Vehicle] Rehabilitate Runway - 07/25
Richmond International P 044 1,660,000 Rehabilitate Taxiway [Taxiway 'L' (construction)]
Roanoke Regional/Woodrum Field P 040 2,505,964 Rehabilitate Taxiway [A&G (Construction/Demo Building 2 & 3), Overall PHIV]
Selection Criteria Year: 2006
Page 22 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
EA WAS VA Shenandoah Valley Regional
Stafford Regional
Virginia Highlands
Virginia Tech/Montgomery Executive
Warrenton-Fauquier
William M Tuck
Winchester Regional
CS
R
GA
GA
R
GA
GA
027
016
023
012
012
010
020
169,634
1,324,155
115,410
5,032,917
836,000
450,000
228,508
Acquire Snow Removal Equipment, Rehabilitate Runway Lighting [Rehab. Airfield Lighting (Design)] - 05/23 Construct Apron
Acquire Land For Approaches [RPZ Land Acquisition Services (Wright Equip)]
Acquire Land For Approaches [Acquire Land for RPZ]
Acquire Land for Development
Construct Building [T-hangar Building], Light Obstructions
Acquire Land For Approaches
State Total: 36 Grants 43,832,630
ADO Total: 58 Grants 122,739,119
Region Total: 521 Grants 485,558,552
Report Total: 2059 Grants 3,539,103,886
GL BIS ND Barnes County Municipal
Beach
Bismarck Municipal
Bottineau Municipal
Bowman Municipal
Cando Municipal
Carrington Municipal
Casselton Robert Miller Regional
Cooperstown Municipal
Crosby Municipal
Devils Lake Municipal
Edgeley Municipal
GA
GA
P
GA
GA
GA
GA
GA
GA
GA
CS
GA
007
005
036
007
007
007
006
013
005
005
022
023
005
85,385
150,501
2,053,353
152,375
266,000
25,031
300,200
296,161
111,018
25,465
830,998
115,214
27,427
Construct Taxiway
Improve Access Road, Improve Fuel Farm, Rehabilitate Runway - 12/30, Update Airport Master Plan Study Rehabilitate Taxiway
Acquire Snow Removal Equipment, Construct Building
Conduct Environmental Study, Install Weather Reporting Equipment, Rehabilitate Runway - 11/29 Construct Snow Removal Equipment Building, Rehabilitate Runway - 16/34, Update Airport Master Plan Study Construct Building, Rehabilitate Runway - 13/31
Construct Fuel Farm, Construct Taxiway, Construct Terminal Building
Construct Building, Construct Fuel Farm, Rehabilitate Apron, Update Airport Master Plan Study Construct Terminal Building, Install Runway Lighting - 03/21
Construct Aircraft Rescue & Fire Fighting Building, Construct Snow Removal Equipment Building, Rehabilitate Apron Extend Runway - 03/21
Improve Snow Removal Equipment Building, Install Perimeter Fencing, Rehabilitate
Selection Criteria Year: 2006
Page 23 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
GL BIS ND
Garrison Municipal
Glen Ullin Regional
Grand Forks International
Gwinner-Roger Melroe Field
Hamry Field
Harry Stern
Harvey Municipal
Hector International
Hettinger Municipal
Hillsboro Municipal
Hutson Field
International Peace Garden
Jamestown Regional
Kenmare Municipal
LaMoure Rott Municipal
Linton Municipal
Lisbon Municipal
Mandan Municipal
Mercer County Regional
Mohall Municipal
Mott Municipal
Northwood Municipal-Vince Field
FY 2006
Service Level
Grant Seq Number
GA
005
005
GA
P
006
030
GA
GA
005
007
GA
GA
010
003
P
GA
GA
GA
GA
CS
031
008
009
010
005
003
025
GA
GA
GA
006
003
006
GA 003
GA
GA
GA
GA
010
005
004
004
GA 007
AIP Federal Funds
206,713
218,500
1,822,727
60,800
101,868
273,628
635,380
1,702,683
408,964
187,280
325,000
287,418
597,296
1,845,850
146,249
107,846
89,334
1,538,220
1,111,500
86,643
103,900
93,486
104,916
Report Date 03/13/2007
Brief Description Of Work
Runway - 14/32, Update Airport Master Plan Study
Construct Building, Install Runway Vertical/Visual Guidance System - 13/31,Rehabilitate Runway - 13/31Construct Building, Remove Obstructions
Acquire Snow Removal Equipment, Environmental Mitigation, SecurityEnhancements, Update Airport Master Plan Study [Phase 2]Conduct Airport Master Plan Study, Rehabilitate Runway - 16/34
Construct Fuel Farm, Improve Snow Removal Equipment Building, RehabilitateRunway - 12/30Conduct Miscellaneous Study, Expand Building
Install Miscellaneous NAVAIDS, Rehabilitate Apron, Rehabilitate Runway - 11/29,Rehabilitate TaxiwayRehabilitate Apron, Rehabilitate Taxiway
Construct Building
Conduct Airport Master Plan Study, Construct Apron
Construct Building
Construct Building, Rehabilitate Runway - 17/35
Rehabilitate Runway - 10/28, Remove Obstructions
Acquire Land For Approaches, Acquire Safety Equipment, Construct AircraftRescue & Fire Fighting Building, Construct Snow Removal Equipment BuildingConstruct Snow Removal Equipment Building, Rehabilitate Runway - 08/26
Acquire Snow Removal Equipment, Rehabilitate Runway - 16/34
Improve Snow Removal Equipment Building, Install Miscellaneous NAVAIDS, InstallRunway Vertical/Visual Guidance System - 09/27, Rehabilitate Runway - 09/27,Update Miscellaneous StudyAcquire Land For Approaches, Extend Runway - 14/32, Rehabilitate Runway 14/32, Remove ObstructionsConstruct Taxiway, Rehabilitate Apron, Rehabilitate Taxiway
Rehabilitate Runway - 14/32, Update Airport Master Plan Study
Conduct Environmental Study, Rehabilitate Runway - 13/31
Acquire Snow Removal Equipment, Construct Terminal Building, Extend Runway 09/27, Rehabilitate Runway - 09/27Construct Taxiway, Rehabilitate Runway - 08/26
Selection Criteria Year: 2006
Page 24 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
GL BIS ND Oakes Municipal GA 007 95,320 Acquire Land For Approaches, Rehabilitate Runway - 12/30
Park River - W C Skjerven Field GA 004 168,528 Acquire Snow Removal Equipment, Rehabilitate Apron, Update Miscellaneous Study
Parshall-Hankins GA 004 229,396 Construct Fuel Farm, Construct Terminal Building, Rehabilitate Runway - 17/35
Robertson Field GA 004 249,735 Construct Snow Removal Equipment Building
Rolla Municipal GA 005 295,015 Acquire Snow Removal Equipment, Construct Fuel Farm, Rehabilitate Runway 14/32
Rugby Municipal GA 007 139,645 Construct Fuel Farm, Rehabilitate Runway - 12/30
Sloulin Field International CS 025 904,310 Acquire Snow Removal Equipment, Conduct Environmental Study, Construct Snow
Stanley Municipal GA 005 143,294Removal Equipment Building, Install Miscellaneous NAVAIDS Construct Building, Construct Fuel Farm, Construct Taxiway, Rehabilitate Airport Beacons, Rehabilitate Runway - 09/27, Update Airport Master Plan Study
State of North Dakota 005 220,000 Update Miscellaneous Study
Washburn Municipal GA 006 93,765 Conduct Environmental Study
007 73,040 Update Airport Master Plan Study
Watford City Municipal GA 007 119,224 Construct Fuel Farm, Improve Building, Install Runway Vertical/Visual Guidance System - 12/30, Rehabilitate Runway - 12/30
State Total: 48 Grants 19,226,601
GL BIS SD Aberdeen Regional P 026 2,156,393 Acquire Snow Removal Equipment, Conduct Airport Master Plan Study, Construct
Belle Fourche Municipal GA 007 73,625Snow Removal Equipment Building, Rehabilitate Taxiway, Security Enhancements Rehabilitate Apron, Rehabilitate Runway - 14/32, Rehabilitate Taxiway
Bison Municipal GA 005 1,638,750 Install Runway Lighting - 11/29, Rehabilitate Apron, Rehabilitate Runway - 11/29, Rehabilitate Taxiway
Bob Wiley Field GA 007 90,250 Acquire Land For Approaches, Construct Building [Plans & specs]
Britton Municipal GA 006 46,550 Rehabilitate Access Road [Plans and Specifications], Rehabilitate Apron [Plans and
Brookings Regional GA 018 340,000specifications] Conduct Environmental Study [Environmental Assessment (Phase 1 - Site selection/Alternatives)], Rehabilitate Taxiway Lighting
019 650,000 Rehabilitate Runway - 12/30
Cheyenne Eagle Butte GA 004 38,950 Construct Building [Plans and specifications]
Clark County GA 004 31,350 Construct Taxiway
Faulkton Municipal GA 004 679,250 Construct Apron, Construct Taxiway, Install Perimeter Fencing
Gettysburg Municipal GA 006 213,750 Install Perimeter Fencing
Selection Criteria Year: 2006
Page 25 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
GL BIS SD Gregory Municipal, Flynn Field GA 005 128,250 Construct Snow Removal Equipment Building
Harding County GA 003 59,850 Rehabilitate Runway [design] - 12/30
Harold Davidson Field GA 005 180,500 Construct Fuel Farm, Install Weather Reporting Equipment, Rehabilitate Runway [Design] - 12/30
Hoven Municipal GA 004 223,250 Construct Terminal Building, Install Miscellaneous NAVAIDS, Install Runway Lighting - 13/31
Huron Regional GA 022 180,000 Acquire Safety Equipment, Expand Terminal Building
Joe Foss Field P 035 2,122,995 Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate Runway Lighting [Plans and specifications] - 03/21, Rehabilitate Taxiway, Update Airport Master Plan Study
Lemmon Municipal GA 007 361,000 Construct Runway - Plan-1
Milbank Municipal GA 008 123,500 Acquire Snow Removal Equipment, Construct Fuel Farm, Install Miscellaneous
Miller Municipal GA 004 166,250NAVAIDS, Install Weather Reporting Equipment Construct Snow Removal Equipment Building, Rehabilitate Parking Lot
Mission Sioux GA 006 85,500 Construct Snow Removal Equipment Building
Mitchell Municipal GA 021 570,000 Rehabilitate Taxiway
Mobridge Municipal GA 007 31,350 Construct Fuel Farm
Murdo Municipal GA 004 43,700 Rehabilitate Runway [Plans and specifications] - 14/32
New 001 121,490 Construct New Airport [Environmental Assessment]
Onida Municipal GA 006 1,710,000 Extend Runway [Construction] - 13/31, Extend Runway [Relocate Power Line] -
Parkston Municipal GA 004 37,30013/31 Construct Snow Removal Equipment Building
Philip GA 004 522,500 Improve Access Road, Install Perimeter Fencing, Rehabilitate Apron
Pierre Regional P 021 242,915 Acquire Snow Removal Equipment [snow plow], Install Runway Vertical/Visual
Pine Ridge GA 008 66,500Guidance System - 07/25, Update Airport Master Plan Study Construct Snow Removal Equipment Building
Rapid City Regional P 033 304,000 Update Airport Master Plan Study
Redfield Municipal GA 004 75,050 Conduct Airport Master Plan Study
Sisseton Municipal GA 006 152,000 Construct Snow Removal Equipment Building
State of South Dakota 004 123,500 Update State System Plan Study
The Sigurd Anderson GA 003 76,000 Construct Snow Removal Equipment Building
Various Locations in South Dakota 010 237,500 Acquire Snow Removal Equipment (Marv Skie-Lincoln County; Parkston Municipal; The Sigurd Anderson)
Selection Criteria Year: 2006
Page 26 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
GL
GL
BIS
CHI
ADO Total:
State Total:
SD
IL
Wagner Municipal
Watertown Regional
Wilder
Abraham Lincoln Capital
Central IL Regional Airport at Bloomington-Normal
Chicago Midway International
Chicago O'Hare International
Chicago/Rockford International
City of DesPlaines
Decatur
Greater Peoria Regional
FY 2006
Service Level
Grant Seq Number
GA
CS
GA
004
018
005
39 Grants
87 Grants
P
P
044
045
046
P
P
P
P
P
047
066
067
068
069
079
080
081
082
083
084
085
087
045
046
001
029
042
AIP Federal Funds
361,000
7,520,142
332,500
22,117,410
41,344,011
2,498,900
4,872,200
745,750
2,371,783
15,000,000
12,000,000
6,134,296
250,000
10,604,456
2,847,324
1,900,000
5,000,000
4,500,000
250,000
5,963,551
29,300,000
2,091,697
2,000,000
750,000
2,018,975
6,249,000
Report Date 03/13/2007
Brief Description Of Work
Construct Building, Construct Fuel Farm
Construct Taxiway
Construct Snow Removal Equipment Building, Install Runway Lighting [Install Lights] - 15/33
Modify Service Road, Widen Taxiway
Widen Taxiway
Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Friction Measuring Equipment, Construct Aircraft Rescue & Fire Fighting Building, Update Airport Master Plan Study Acquire Safety Equipment, Improve Terminal Building
Improve Runway Safety Area - 04R/22L, Improve Runway Safety Area - 13C/31C
Construct Apron
Construct Terminal Building
Noise Mitigation Measures for Public Buildings
Improve Runway Safety Area - 04R/22L, Rehabilitate Runway - 04R/22L
Rehabilitate Taxiway
Noise Mitigation Measures for Public Buildings [St. Andrews School - Construction]
Noise Mitigation Measures for Public Buildings
Noise Mitigation Measures for Public Buildings [Stevenson - Melrose Park]
Noise Mitigation Measures for Public Buildings
Noise Mitigation Measures for Residences within 65 - 69 DNL
Construct Runway [Construct New Runway] - 09L/27R
Expand Terminal Building, Rehabilitate Apron, Rehabilitate Taxiway
Extend Runway - 07/25
Conduct Noise Compatibility Plan Study
Widen Taxiway
Extend Taxiway [Extend Taxiway A & D], Extend Taxiway
Selection Criteria Year: 2006
Page 27 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL CHI IL Illinois State Block Grant Program 062 18,120,221 Non primary development projects in state block grant program - RL
063 4,653,030 Non primary development projects in state block grant program - RL
064 2,073,500 Non primary development projects in state block grant program - RL
065 7,850,000 Non primary development projects in state block grant program - RL
Quad City International P 055 430,300 Extend Taxiway
056 2,900,971 Extend Runway - 05/23, Rehabilitate Runway - 05/23
057 1,166,300 Rehabilitate Runway - 13/31, Rehabilitate Runway - 13/31
058 1,328,720 Acquire Safety Equipment
059 637,600 Improve Runway Safety Area - 13/31
Quincy Regional-Baldwin Field CS 035 1,035,400 Improve Runway Safety Area - 13/31, Rehabilitate Taxiway
Scott AFB/Midamerica CS 024 479,750 Update Airport Master Plan Study
State of Illinois 004 50,000 Update State System Plan Study
University of Illinois-Willard P 023 1,153,300 Improve Terminal Building, Install Weather Reporting Equipment, Rehabilitate Apron [GA], Rehabilitate Apron [T-Hangar], Rehabilitate Runway [(Per Part 139 Threshold
Williamson County Regional P 024 869,390Marking Requirement)] - 14L/32R Acquire Land For Approaches, Remove Obstructions
State Total: 35 Grants 160,096,414
GL CHI IN Anderson Municipal-Darlington Field GA 018 1,378,104 Construct Taxiway
Arens Field GA 005 1,287,000 Rehabilitate Runway - 09/27
Columbus Municipal GA 017 150,000 Acquire Aircraft Rescue & Fire Fighting Vehicle
018 2,072,112 Rehabilitate Apron [2006], Rehabilitate Apron [2007]
Crawfordsville Municipal GA 004 73,435 Rehabilitate Apron
Daviess County GA 009 303,585 Construct Building, Construct Taxiway
De Kalb County GA 013 150,000 Environmental Mitigation
Delaware County - Johnson Field GA 015 1,386,847 Rehabilitate Taxiway
Delphi Municipal GA 007 227,289 Improve Runway Safety Area - 18/36
Elkhart Municipal GA 017 400,000 Widen Taxiway
Evansville Regional P 041 1,974,289 Extend Taxiway
Fort Wayne International P 047 3,316,528 Rehabilitate Runway - 05/23, Rehabilitate Runway - 14/32, Rehabilitate Runway
Selection Criteria Year: 2006
Page 28 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL CHI IN 047 14/32
Freeman Municipal GA 008 566,666 Construct Terminal Building
French Lick Municipal GA 005 551,167 Construct Taxiway, Expand Apron
Gary/Chicago International P 020 6,000,000 Extend Runway - 12/30
Greenwood Municipal GA 020 245,039 Rehabilitate Taxiway
Indianapolis Executive R 013 1,808,000 Extend Taxiway
Indianapolis International P 100 15,000,000 Construct Apron, Construct Service Road, Construct Taxiway, Improve Airport Drainage [Phase 2], Remove Obstructions [Relocate ATCT]
101 6,422,275 Acquire Snow Removal Equipment, Construct Aircraft Rescue & Fire Fighting Building, Install Airfield Guidance Signs, Security Enhancements
Jasper County GA 002 1,225,441 Construct Taxiway
Kendallville Municipal GA 012 613,700 Expand Apron, Rehabilitate Apron
Kokomo Municipal GA 013 134,900 Extend Runway [Phase 1 environmental assessment] - 05/23
Madison Municipal GA 009 570,950 Extend Runway - 03/21
010 1,086,674 Extend Runway - 03/21
Marion Municipal GA 011 102,600 Rehabilitate Runway - 15/33, Rehabilitate Runway - 15/33
Mettel Field GA 010 1,480,717 Construct Taxiway
Monroe County GA 024 717,687 Rehabilitate Taxiway
North Vernon
Paoli Municipal
GA
GA
007
005
150,000
57,000
Install Runway Lighting - 15/33, Install Taxiway Lighting, Update Airport Master Plan Study Construct Snow Removal Equipment Building, Install Runway Vertical/Visual
Peru Municipal GA 007 82,636Guidance System - 02/20, Remove Obstructions Update Airport Master Plan Study
Purdue University GA 027 239,435 Acquire Friction Measuring Equipment, Install Runway Vertical/Visual Guidance System - 05/23, Light Obstructions, Rehabilitate Runway Lighting - 10/28
Putnam County GA 009 791,648 Construct Taxiway
Randolph County GA 007 114,361 Construct Runway [Phase 1, Land] - 07/25
Richmond Municipal GA 008 1,399,056 Rehabilitate Runway - 06/24
Salem Municipal GA 008 298,300 Install Runway Vertical/Visual Guidance System - 10/28, Rehabilitate Apron, Remove Obstructions
Shelbyville Municipal GA 016 456,635 Expand Apron
South Bend Regional P 033 2,736,896 Construct Apron, Extend Runway - 18/36
Selection Criteria Year: 2006
Page 29 of 93
FAA - Office Of Airports
Region ADO State Worksite
GL CHI IN Starke County
Sullivan County
Terre Haute International-Hulman Field
ADO Total:
State Total:
Tri-State Steuben County
Wabash Municipal
White County
GL DET MI Alpena County Regional
Bishop International
Capital City
Charlevoix Municipal
Cherry Capital
Chippewa County International
Delta County
Detroit Metropolitan Wayne County
Gerald R. Ford International
Houghton County Memorial
Grants Awarded by FY
FY 2006
Service Level
Grant Seq Number
AIP Federal Funds
GA
GA
GA
GA
GA
GA
007
007
030
031
008
007
006
176,700
39,900
867,201
687,671
128,250
355,494
267,516
44 Grants 58,093,704
79 Grants 218,190,118
CS
P
P
P
P
011
040
041
039
008
032
162,000
346,750
213,091
1,615,000
23,282
3,621,166
P 019 1,325,250
P
020
027
305,900
1,843,000
P
P
P
076
077
078
079
037
038
024
9,750,000
18,581,601
11,868,906
120,968
1,406,000
247,000
180,500
Report Date 03/13/2007
Brief Description Of Work
Install Weather Reporting Equipment
Construct Building
Acquire Safety Equipment
Acquire Safety Equipment [fence 10']
Update Airport Master Plan Study
Install Miscellaneous NAVAIDS, Rehabilitate Runway Lighting - 09/27
Acquire Land For Approaches
Improve Airport Miscellaneous Improvements, Install Airfield Guidance Signs
Expand Apron
Install Airfield Guidance Signs, Light Obstructions, Remove Obstructions
Extend Runway - 10R/28L
Update Airport Master Plan Study
Construct Snow Removal Equipment Building [2006], Construct Snow Removal Equipment Building [2007] Install Miscellaneous NAVAIDS, Install Taxiway Lighting [2007], Install Taxiway Lighting [MITL Taxiways A, B, C and D], Rehabilitate Runway - 16/34, Rehabilitate Terminal Building Acquire Snow Removal Equipment
Conduct Environmental Study, Environmental Mitigation, Rehabilitate Runway 09/27, Rehabilitate Runway - 09/27, Update Airport Master Plan Study Noise Mitigation Measures for Residences within 65 - 69 DNL
Construct Apron, Construct Runway - 04L/22R, Environmental Mitigation
Rehabilitate Runway - 03R/21L, Rehabilitate Taxiway
Noise Mitigation Measures for Residences within 65 - 69 DNL
Construct Service Road, Rehabilitate Apron
Conduct Miscellaneous Study, Construct Service Road
Expand Terminal Building, Update Airport Master Plan Study
Selection Criteria Year: 2006
Page 30 of 93
Grants Awarded by FY FAA - Office Of Airports
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
GL DET MI 025 485,000
MBS International
Michigan State Block Grant Program
Muskegon County
033
034
045
046
047
048
049
027
P
P
570,000
960,000
20,240,870
5,268,000
2,850,000
4,400,000
850,000
5,633,461
Pellston Regional Airport of Emmet County 026
027
P 438,900
988,000
Sawyer International 019
020
P 2,055,000
480,000
Willow Run
021
025
026
R
256,500
500,000
7,501,639
State Total: 32 Grants 105,087,784
GL DET OH Akron Fulton International 013GA 223,250
Akron-Canton Regional
Alexander Salamon
Ashland County
Barnesville-Bradfield
042
043
044
005
007
005
P
GA
GA
GA
3,602,661
5,000,000
5,000,000
59,364
159,671
183,329
Report Date 03/13/2007
Brief Description Of Work
Acquire Snow Removal Equipment [2006], Acquire Snow Removal Equipment [2007], Environmental Mitigation [2006], Environmental Mitigation [2007] Conduct Miscellaneous Study
Acquire Aircraft Rescue & Fire Fighting Vehicle
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Improve Runway Safety Area [2006] - 14/32, Improve Runway Safety Area [2007] - 14/32 Acquire Snow Removal Equipment
Construct Access Road, Improve Airport Miscellaneous Improvements, Improve Airport Miscellaneous Improvements Improve Building
Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Building, Improve Runway Safety Area - 01/19, Install Weather Reporting Equipment, Rehabilitate Runway - 01/19 Update Airport Master Plan Study
Conduct Noise Compatibility Plan Study
Construct Taxiway, Improve Runway Safety Area [fence] - 05L/23R, Improve Runway Safety Area - 05L/23R, Improve Runway Safety Area - 05R/23L
Improve Snow Removal Equipment Building [Final construction], Remove Obstructions [Replace hazard poles Runway 07 and 25 approaches] Improve Terminal Building [Construct Phase IV]
Construct Deicing Containment Facility
Extend Runway - 05/23
Acquire Land For Approaches, Acquire Snow Removal Equipment
Acquire Land For Approaches, Rehabilitate Taxiway, Remove Obstructions
Acquire Snow Removal Equipment [Truck and Plow], Rehabilitate Apron
Selection Criteria Year: 2006
Page 31 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
GL DET OH Bellefontaine Regional GA 007 450,000 Construct Building [2006], Construct Building [2007]
Bolton Field R 015 160,734 Acquire Equipment, Install Weather Reporting Equipment, Rehabilitate Apron [design
016 237,500(Phase 1)], Rehabilitate Apron Install Perimeter Fencing
Butler County Regional R 017 880,185 Acquire Land For Approaches, Construct Taxiway [2006], Construct Taxiway [2007], Rehabilitate Apron, Remove Obstructions
Cambridge Municipal GA 005 346,115 Improve Runway Safety Area [2007] - 04/22, Improve Runway Safety Area - 04/22
Carl R Keller Field GA 022 1,316,460 Acquire Snow Removal Equipment, Rehabilitate Runway - 09/27
Cincinnati West GA 005 226,297 Acquire Land For Approaches
Cleveland-Hopkins International P 078 17,915,358 Construct Runway - 06L/24R, Extend Runway [Phase 1] - 06R/24L, Extend Runway [Phase 2] - 06R/24L
079 2,660,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
080 2,951,418 Improve Runway Safety Area - 10/28
Clinton Field GA 004 209,600 Acquire Miscellaneous Land, Conduct Environmental Study, Rehabilitate Taxiway, Remove Obstructions
Columbiana County GA 008 182,684 Acquire Snow Removal Equipment, Rehabilitate Runway Lighting - 07/25
Cuyahoga County R 016 615,000 Acquire Land For Approaches [2006], Acquire Land For Approaches [2007]
017 151,344 Acquire Land For Approaches
Darke County GA 003 74,253 Improve Airport Drainage
Defiance Memorial GA 005 171,689 Construct Utilities, Install Runway Lighting - 12/30
Fairfield County GA 014 167,687 Conduct Airport Master Plan Study, Construct Taxiway
Fayette County GA 004 517,109 Construct Apron, Construct Apron, Construct Parking Lot, Construct Terminal Building, Remove Obstructions
Findlay GA 016 1,372,761 Acquire Snow Removal Equipment [2006], Construct Taxiway, Expand Apron, Extend Taxiway, Improve Runway Safety Area - 07/25, Install Airfield Guidance Signs, Install Perimeter Fencing, Install Taxiway Lighting, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting
Fostoria Metropolitan GA 006 147,200 Rehabilitate Taxiway Lighting
Fulton County GA 005 97,361 Acquire Land For Approaches, Rehabilitate Apron
Galion Municipal
Gallia-Meigs Regional
GA
GA
006
005
146,300
384,134
Conduct Airport Master Plan Study, Rehabilitate Apron, Rehabilitate Runway 05/23, Remove Obstructions Acquire Snow Removal Equipment, Install Runway Lighting - 05/23, Install Runway Vertical/Visual Guidance System - 05/23
Selection Criteria Year: 2006
Page 32 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
Brief Description Of Work
Improve Airport Drainage [2006], Improve Airport Drainage [2007]
Strengthen Taxiway [North End B & C]
Extend Taxiway [(2006)], Extend Taxiway [(2007)]
Acquire Land For Approaches [2006], Acquire Land For Approaches [2007],Remove ObstructionsExpand Apron, Install Miscellaneous NAVAIDS
Install Perimeter Fencing, Rehabilitate Runway - 13/31, Rehabilitate RunwayLighting - 13/31Construct Terminal Building, Update Airport Master Plan Study
Install Perimeter Fencing
Acquire Miscellaneous Land, Rehabilitate Runway - 09/27, Rehabilitate Taxiway
Acquire Snow Removal Equipment
Update Airport Master Plan Study
Acquire Land For Approaches, Acquire Land for Development, Extend Runway 01/19Security Enhancements
Acquire Land for Noise Compatibility within 70 - 74 DNL
Acquire Interactive Training System, Conduct Environmental Study, RehabilitateApron, Rehabilitate Taxiway, Update Airport Master Plan StudyImprove Runway Safety Area - 06R/24L, Rehabilitate Apron, Rehabilitate Taxiway
Construct Terminal Building, Environmental Mitigation
Acquire Land For Approaches, Acquire Miscellaneous Land [Grant 0406]
Acquire Miscellaneous Land [Grant 0506], Update Airport Master Plan Study
Acquire Land For Approaches, Extend Runway [2006] - 10/28, Extend Runway[2007] - 10/28Acquire Miscellaneous Land, Extend Runway - 08/26
Acquire Easement For Approaches, Acquire Land For Approaches, Acquire LandFor Approaches, Acquire Land for Development, Conduct Miscellaneous Study,Rehabilitate TaxiwayConstruct Apron, Extend Runway - 09/27, Update Airport Master Plan Study
Construct Taxiway, Improve Airport Miscellaneous Improvements, Update AirportMaster Plan StudyImprove Airport Drainage
FY 2006
Worksite Service Level
Grant Seq Number
AIP Federal Funds
Geauga County
Greater Portsmouth Regional
Greene County-Lewis A. Jackson Regional
GA
GA
GA
010
009
010
300,000
131,348
213,164
Region ADO State
GL DET OH
Grimes Field GA 013 346,290
Hardin County GA 004 165,228
Harrison County GA 005 184,523
Henry County GA 005 57,000
Highland County GA 006 36,767
Holmes County GA 005 41,645
Hook Field Municipal GA 008 42,750
009 95,000
James A Rhodes GA 005 657,075
James M Cox Dayton International P 054 350,000
055 498,750
056 680,000
057 5,061,899
Jefferson County Airpark GA 012 57,000
Kelleys Island Land Field GA 004 495,000
005 199,975
Knox County GA 009 1,093,096
Lakefield GA 009 69,500
Lebanon-Warren County GA 005 515,375
Lima Allen County GA 009 147,358
Lorain County Regional R 017 150,591
Madison County GA 010 216,541
Selection Criteria Year: 2006
Page 33 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
GL DET OH Mansfield Lahm Regional GA 020 50,000 Conduct Miscellaneous Study
021 1,513,910 Improve Airport Drainage, Rehabilitate Runway - 14/32
Marion Municipal GA 017 300,000 Acquire Land For Approaches, Construct Taxiway, Improve Airport Drainage, Improve Runway Safety Area [2006] - 07/25, Improve Runway Safety Area [2007]
Medina Municipal R 008 168,677- 07/25 Improve Airport Drainage, Remove Obstructions
Metcalf Field
Miami University
R
GA
018
004
1,050,000
146,530
Rehabilitate Runway - 04/22, Rehabilitate Taxiway [2006], Rehabilitate Taxiway [2007] Install Runway Vertical/Visual Guidance System - 05/23
Middle Bass Island GA 013 191,675 Improve Airport Drainage, Rehabilitate Apron, Rehabilitate Runway - 10/28, Rehabilitate Taxiway
Monroe County GA 006 263,795 Acquire Land For Approaches, Rehabilitate Runway - 07/25
Neil Armstrong GA 009 150,000 Install Taxiway Lighting, Rehabilitate Taxiway
Newark-Heath GA 018 132,700 Conduct Airport Master Plan Study, Construct Taxiway, Rehabilitate Runway 09/27, Rehabilitate Runway - 09/27
North Bass Island GA 009 37,100 Rehabilitate Apron, Rehabilitate Runway - 17/35
Norwalk-Huron County GA 006 138,700 Construct Building, Install Airport Beacons, Rehabilitate Runway - 10/28,
Ohio State University R 020 225,000Rehabilitate Runway Lighting - 10/28 Acquire Safety Equipment [GATES/FENCE]
021 2,045,000 Install Miscellaneous NAVAIDS, Rehabilitate Taxiway
Ohio University Snyder Field GA 011 813,725 Construct Snow Removal Equipment Building, Improve Airport Drainage, Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 07/25, Install Weather Reporting Equipment
Perry County GA 005 300,000 Acquire Land for Development, Improve Runway Safety Area [2006] - 08/26, Improve Runway Safety Area [2007] - 08/26, Rehabilitate Runway [2006] - 08/26, Rehabilitate Runway [2007] - 08/26
Pike County GA 004 173,543 Install Runway Vertical/Visual Guidance System [[2006]] - 07/25, Install Runway Vertical/Visual Guidance System [[2007]] - 07/25
Port Bucyrus-Crawford County GA 003 181,388 Install Weather Reporting Equipment
Port Columbus International P 061 1,471,871 Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate Taxiway
062 59,680 Install Noise Monitoring System
063 7,000,000 Construct Apron, Construct Taxiway, Extend Taxiway
Portage County GA 018 150,000 Install Perimeter Fencing, Install Weather Reporting Equipment
Selection Criteria Year: 2006
Page 34 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL DET OH Put-in-Bay GA 012 1,040,926 Construct Utilities, Improve Terminal Building, Install Guidance Signs, Remove Obstructions
Richard Downing GA 012 119,320 Conduct Environmental Study, Improve Airport Miscellaneous Improvements, Install Perimeter Fencing
Rickenbacker International P 033 1,060,039 Rehabilitate Apron, Rehabilitate Runway - 05R/23L, Update Miscellaneous Study
034 4,685,832 Construct Building, Construct Fuel Farm [MAP]
Sandusky County Regional GA 014 178,695 Conduct Miscellaneous Study, Update Airport Master Plan Study
Sidney Municipal GA 009 61,099 Conduct Airport Master Plan Study, Conduct Environmental Study, Install Miscellaneous NAVAIDS, Rehabilitate Apron, Remove Obstructions
Springfield-Beckley Municipal GA 015 213,000 Acquire Safety Equipment
016 313,500 Acquire Safety Equipment, Expand Apron, Rehabilitate Apron
State of Ohio 003 50,000 Conduct Miscellaneous Study
Toledo Express P 060 100,000 Conduct Miscellaneous Study
061 861,735 Construct Deicing Containment Facility
Union County GA 014 175,395 Construct Building, Environmental Mitigation, Environmental Mitigation
Van Wert County GA 008 236,028 Rehabilitate Apron
Vinton County GA 004 147,930 Acquire Land for Development [reimbursement], Construct Taxiway, Expand Terminal Building, Improve Runway Safety Area - 09/27, Rehabilitate Apron, Rehabilitate Runway - 09/27, Remove Obstructions
Wadsworth Municipal GA 008 38,000 Install Runway Lighting - 02/20
Wayne County GA 014 399,460 Construct Terminal Building [2006], Construct Terminal Building [2007]
015 132,400 Construct Terminal Building
Wood County GA 016 167,945 Conduct Environmental Study, Construct Building
Youngstown-Warren Regional GA 033 591,477 Acquire Safety Equipment, Conduct Miscellaneous Study, Install Guidance Signs, Rehabilitate Runway Lighting - 05/23, Remove Obstructions
Zanesville Municipal GA 008 138,500 Rehabilitate Apron
State Total: 97 Grants 84,689,914
ADO Total: 129 Grants 189,777,698
GL MSP MN Airlake R 007 158,081 Rehabilitate Taxiway
Aitkin Municipal-Steve Kurtz Field GA 006 30,663 Acquire Land For Approaches
Selection Criteria Year: 2006
Page 35 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
GL MSP MN Albert Lea Municipal GA 004 471,200 Acquire Land for Development
Austin Municipal GA 009 1,351,660 Rehabilitate Runway - 18/36
Bemidji Regional P 016 5,000,000 Acquire Land For Approaches, Improve Runway Safety Area - 07/25, Rehabilitate Runway [2007] - 07/25
Brainerd Lakes Regional P 027 1,769,182 Acquire Safety Equipment, Acquire Snow Removal Equipment [2007], Acquire Snow Removal Equipment, Rehabilitate Apron, Rehabilitate Runway Lighting
Cambridge Municipal GA 005 156,47905/23, Rehabilitate Taxiway [2007], Rehabilitate Taxiway Construct Taxiway, Improve Airport Drainage
Chandler Field GA 006 99,750 Rehabilitate Runway [Crackfill Runway (not a triggering project)] - 04/22, Update
007 57,000Airport Master Plan Study Conduct Airport Master Plan Study
Chisholm-Hibbing CS 022 1,847,546 Construct Snow Removal Equipment Building, Install Airfield Guidance Signs
Cloquet Carlton County GA 006 88,883 Rehabilitate Runway [2007] - 17/35, Rehabilitate Runway - 17/35
Crookston Municipal Kirkwood Field GA 006 217,766 Rehabilitate Access Road, Rehabilitate Parking Lot
Detroit Lakes-Wething Field GA 004 99,697 Acquire Snow Removal Equipment
Dodge Center GA 003 406,600 Construct Taxiway
Duluth International P 041 6,318,751 Conduct Miscellaneous Study, Environmental Mitigation, Rehabilitate Runway [Phase 3 (center section) shoulders, drainage, signs, repair pavement] - 09/27, Rehabilitate Runway [Related to Runway 9/27 Rehab Project] - 03/21, Rehabilitate
042 1,519,373Terminal Building Expand Terminal Building [2007], Expand Terminal Building
Elbow Lake Municipal - Pride of the Prairie GA 004 1,453,500 Construct Runway - 14/32
Ely Municipal GA 008 53,200 Acquire Snow Removal Equipment
Fairmont Municipal GA 007 158,650 Acquire Snow Removal Equipment [2007], Acquire Snow Removal Equipment, Conduct Airport Master Plan Study
Fergus Falls Municipal-Einar Mickelson Field GA 006 114,000 Update Airport Master Plan Study
Fillmore County GA 005 383,800 Rehabilitate Runway - 10/28
Fosston Municipal
Glenwood Municipal
GA
GA
002
003
291,662
68,400
Acquire Snow Removal Equipment, Construct Service Road [rehabilitate], Improve Access Road, Rehabilitate Parking Lot, Update Airport Master Plan Study Acquire Snow Removal Equipment
Grand Marais/Cook County GA 008 47,298 Rehabilitate Apron, Rehabilitate Taxiway
Grand Rapids/Itasca County Airport-Gordon GA 012 513,849 Acquire Snow Removal Equipment, Improve Snow Removal Equipment Building, Newstrom Field Install Miscellaneous NAVAIDS
Selection Criteria Year: 2006
Page 36 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
GL MSP MN Hawley Municipal
Hector Municipal
Houston County
Hutchinson Municipal-Butler Field
Jackson Municipal
Lac qui Parle County
Lake Elmo
Le Sueur Municipal
Mahnomen County
Minneapolis-St Paul International/Wold-Chamberlain/
Montevideo-Chippewa County
Moorhead Municipal
Mora Municipal
Morris Municipal
New Ulm Municipal
Orr Regional
Ortonville Municipal-Martinson Field
Owatonna Degner Regional
Park Rapids Municipal-Konshok Field
Pine River Regional
Quentin Aanenson Field
Red Wing Regional
FY 2006
Service Grant SeqLevel Number
GA 003
GA 003
GA 002
GA 006
GA 005
GA 004
R 004
GA 003
GA 005
P 083
084
085
086
GA 005
GA 002
GA 005
GA 002
GA 006
GA 003
GA 004
GA 010
GA 007
GA 002
GA 003
GA 007
AIP FederalFunds
325,890
168,625
419,900
302,100
59,850
129,200
71,335
85,917
305,420
7,500,000
3,627,395
5,764,354
956,057
114,000
247,000
420,275
413,250
116,565
27,122
403,750
168,245
26,600
152,457
51,528
180,500
Report Date 03/13/2007
Brief Description Of Work
Acquire Snow Removal Equipment, Install Runway Lighting - 16/34, Install RunwayVertical/Visual Guidance System [2007] - 16/34, Install Runway Vertical/VisualGuidance System - 16/34Acquire Snow Removal Equipment, Construct Snow Removal Equipment Building
Acquire Land for Development, Conduct Miscellaneous Study, Construct Fuel Farm,Construct Terminal BuildingConstruct Building [Hangar]
Construct Terminal Building [design]
Construct Snow Removal Equipment Building
Rehabilitate Taxiway
Improve Fuel Farm, Update Airport Master Plan Study
Acquire Land For Approaches, Construct Runway - Plan-1
Construct Runway - Plan-1
Noise Mitigation Measures for Residences within 65 - 69 DNL [530 Units of multifamily housing in this phase.]Extend Taxiway, Rehabilitate Taxiway
Rehabilitate Apron [2007], Rehabilitate Apron
Install Perimeter Fencing, Rehabilitate Access Road, Rehabilitate Parking Lot
Acquire Snow Removal Equipment, Construct Taxiway [Construct hangar areataxilane], Construct Terminal BuildingConstruct Runway [Land] - Plan-1, Extend Runway [Land] - 17/35
Construct Building, Improve Fuel Farm, Rehabilitate Runway - 14/32
Construct Runway [EA] - 04/22
Acquire Snow Removal Equipment, Install Airfield Guidance Signs
Rehabilitate Apron, Rehabilitate Runway [Overlay Rwy 16/34] - 16/34, RehabilitateTaxiway [Overlay connecting twy]Construct Runway - Plan-1
Acquire Snow Removal Equipment, Update Airport Master Plan Study
Acquire Snow Removal Equipment, Construct Fuel Farm, Rehabilitate Apron,Rehabilitate Runway - 16/34Construct Runway - 17/35
Expand Apron, Update Airport Master Plan Study
Selection Criteria Year: 2006
Page 37 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL MSP MN Redwood Falls Municipal GA 005 33,250 Update Airport Master Plan Study [Update Airport Layout Plan]
Richard B Helgeson GA 005 314,492 Construct Service Road, Construct Taxiway
Rochester International P 022 1,223,600 Acquire Safety Equipment
023 2,647,137 Expand Snow Removal Equipment Building
Roseau Municipal/Rudy Billberg Field GA 004 497,415 Improve Airport Drainage, Rehabilitate Runway - 16/34, Rehabilitate Taxiway
Silver Bay Municipal GA 003 221,682 Rehabilitate Taxiway
Sky Harbor GA 004 466,848 Acquire Snow Removal Equipment, Conduct Environmental Study, Rehabilitate Runway - 14/32, Rehabilitate Seaplane Base
South St Paul Municipal-Richard E Fleming Field R 010 1,765,385 Acquire Land for Development, Construct Service Road, Construct Taxiway, Install Perimeter Fencing, Rehabilitate Taxiway
Southwest Minnesota Regional Marshall/Ryan Field
GA 007 4,926,026 Extend Runway [Extend runway to 7200' - Phase 2] - 12/30
St James Municipal GA 005 62,700 Conduct Airport Master Plan Study, Rehabilitate Runway - 15/33
St Paul Downtown Holman Field R 014 2,716,698 Improve Runway Safety Area - 13/31, Improve Runway Safety Area - 14/32
015 1,305,867 Improve Airport Drainage [Compensatory Excavation]
St. Cloud Regional P 017 67,070 Acquire Land for Development [environmental assessment]
Todd Field GA 004 89,544 Improve Airport Miscellaneous Improvements, Install Perimeter Fencing
Tower Municipal GA 002 97,371 Rehabilitate Apron, Rehabilitate Runway - 08/26, Rehabilitate Taxiway, Remove Obstructions, Update Airport Master Plan Study
Tracy Municipal GA 005 86,450 Install Perimeter Fencing, Rehabilitate Runway - 11/29, Rehabilitate Taxiway
Warroad International-Swede Carlson Field GA 007 213,906 Construct Snow Removal Equipment Building
Wheaton Municipal GA 003 28,500 Rehabilitate Runway - 16/34
Willmar Municipal 007 88,625 Expand Apron
Winsted Municipal GA 001 166,089 Extend Taxiway, Improve Access Road, Rehabilitate Parking Lot, Update Airport Master Plan Study
Worthington Municipal GA 007 1,882,045 Rehabilitate Taxiway [2007], Rehabilitate Taxiway
State Total: 71 Grants 63,615,025
GL MSP WI Austin Straubel International P 035 2,436,235 Acquire Land For Approaches, Improve Runway Safety Area - 18/36
Central Wisconsin P 035 806,075 Conduct Airport Master Plan Study, Rehabilitate Runway - 17/35
Chippewa Valley Regional P 026 760,000 Conduct Miscellaneous Study, Rehabilitate Apron
Selection Criteria Year: 2006
Page 38 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
GL MSP WI Dane County Regional-Truax Field
General Mitchell International
La Crosse Municipal
Outagamie County Regional
Rhinelander-Oneida County
Wisconsin State Block Grant Program
State Total:
ADO Total:
Region Total:
Report Total:
NE ANE CT Bradley International
Danielson
Groton-New London
Hartford-Brainard
Igor I Sikorsky Memorial
Robertson Field
State of Connecticut
Tweed-New Haven
FY 2006
Service Level
Grant Seq Number
P
P
P
P
038
039
050
051
029
030
P 024
024
025
026
027
14 Grants
85 Grants
901 Grants
2059 Grants
P 041
042
044
GA 007
GA 021
022
R 012
GA 022
R 001
002
P 030
AIP Federal Funds
4,530,280
3,950,000
4,127,711
1,871,358
1,423,126
1,586,500
3,662,516
16,624,280
4,500,000
7,800,000
7,459,186
61,537,267
125,152,292
574,464,119
3,539,103,886
2,553,269
42,000
800,000
1,180,271
315,776
287,289
1,436,315
359,480
112,575
162,865
1,894,102
Report Date 03/13/2007
Brief Description Of Work
Acquire Safety Equipment, Expand Apron [expand terminal apron north phase 1]
Acquire Safety Equipment
Construct Taxiway, Rehabilitate Apron
Rehabilitate Apron [2007], Rehabilitate Apron, Rehabilitate Service Road
Extend Taxiway
Acquire Land for Development, Acquire Snow Removal Equipment, Construct Taxiway [environmental assessment] Construct Apron, Construct Taxiway, Extend Runway - 15/33, Rehabilitate Runway - 15/33 Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Rehabilitate Taxiway
Conduct Miscellaneous Study
Noise Mitigation Measures for Residences within 65 - 69 DNL [plan]
Construct Apron
Construct Runway Safety Area [design/permits] - 05/23
Improve Airport Drainage
Rehabilitate Apron
Rehabilitate Runway - 06/24
Conduct Airport Master Plan Study
Update State System Plan Study
Rehabilitate Apron
Selection Criteria Year: 2006
Page 39 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
NE ANE CT
State Total:
NE ANE MA Barnes Municipal
Beverly Municipal
Chatham Municipal
Gardner Municipal
General Edward Lawrence Logan International
Lawrence Municipal
Mansfield Municipal
Nantucket Memorial
New Bedford Regional
Norwood Memorial
Orange Municipal
Pittsfield Municipal
Plymouth Municipal
Provincetown Municipal
Taunton Municipal
Westover ARB/Metropolitan
Worcester Regional
FY 2006
Service Grant Seq Level Number
031
12 Grants
GA 024
025
R 024
025
GA 015
016
GA 009
P 089
090
R 023
GA 017
018
P 042
P 032
033
034
R 027
GA 013
GA 019
020
GA 033
P 020
GA 015
GA 013
014
GA 034
AIP Federal Funds
577,328
9,721,270
719,150
185,250
276,450
2,924,100
110,675
1,233,100
188,100
13,610,000
4,263,335
699,352
82,498
398,440
514,827
477,517
207,100
90,250
953,800
91,200
3,650,850
105,450
847,400
656,925
1,255,900
2,500,000
492,084
83,600
Report Date 03/13/2007
Brief Description Of Work
Acquire Aircraft Rescue & Fire Fighting Vehicle
Rehabilitate Runway Lighting - 02/20
Conduct Noise Compatibility Plan Study
Rehabilitate Runway [Phase I - Design] - 09/27
Extend Runway - 16/34, Extend Taxiway, Improve Runway Safety Area - 16/34
Conduct Environmental Study [Phase I]
Rehabilitate Apron
Update Airport Master Plan Study
Construct Runway - Plan-1
Conduct Noise Compatibility Plan Study
Remove Obstructions
Acquire Snow Removal Equipment
Construct Taxiway [Phase II], Remove Obstructions
Construct Terminal Building [Phase II]
Conduct Environmental Study
Rehabilitate Runway Lighting - 05/23
Update Airport Master Plan Study [ALP Update]
Rehabilitate Apron [taxilane], Rehabilitate Apron
Update Airport Master Plan Study
Extend Runway [(Phase I) (Land Acquisition)] - 08/26
Install Miscellaneous NAVAIDS
Rehabilitate Taxiway
Conduct Environmental Study [(Phase I)]
Mark Obstructions, Rehabilitate Apron
Acquire Land for Noise Compatibility within 70 - 74 DNL
Rehabilitate Apron
Improve Terminal Building
Selection Criteria Year: 2006
Page 40 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
Region ADO State Worksite
State Total:
NE ANE ME Auburn/Lewiston Municipal
Augusta State
Bangor International
Belfast Municipal
Biddeford Municipal
Caribou Municipal
Central Maine Airport of Norridgewock
Dewitt Field,Old Town Municipal
Eastern Slopes Regional
Hancock County-Bar Harbor
Houlton International
Knox County Regional
Millinocket Municipal
Northern Aroostook Regional
Pittsfield Municipal
Portland International Jetport
Sanford Regional
State of Maine
Steven A. Bean Municipal
Waterville Robert Lafleur
Wiscasset
State Total:
Selection Criteria Year: 2006
FY 2006
Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
26 Grants 36,617,353
014R 155,610 Conduct Environmental Study
014CS 549,575 Rehabilitate Taxiway
043P 2,584,251 Construct Access Road, Improve Airport Drainage, Rehabilitate Apron [(Design)]
007GA 456,000 Expand Apron, Expand Apron
006GA 178,600 Remove Obstructions
010GA 80,121 Rehabilitate Apron
010GA 144,400 Rehabilitate Runway - 15/33
005GA 500,863 Improve Runway Safety Area - 12/30
011GA 85,500 Remove Obstructions
021P 404,463 Acquire Land For Approaches
022 1,681,168 Improve Runway Safety Area [runway 4-22] - 17/35, Improve Terminal Building, Rehabilitate Runway - 17/35, Strengthen Apron
010GA 992,750 Rehabilitate Apron, Rehabilitate Apron
021P 261,250 Construct Taxiway [PH I Design/Permitting]
008GA 157,867 Improve Building
008GA 1,002,250 Remove Obstructions [Phase I]
009 375,250 Acquire Snow Removal Equipment
007GA 113,810 Conduct Miscellaneous Study
059P 523,726 Acquire Interactive Training System, Improve Utilities, Install Noise Monitoring System [flight track system], Noise Mitigation Measures
019R 2,110,380 Rehabilitate Apron
020 619,864 Acquire Land for Development [Modern Continental], Acquire Land for Development
005 262,571 Update State System Plan Study
006 316,150 Rehabilitate Runway
009GA 313,500 Improve Access Road
014GA 1,676,750 Rehabilitate Taxiway
011GA 435,024 Extend Taxiway
25 Grants 15,981,693
Page 41 of 93
FAA - Office Of Airports
Region ADO State Worksite
NE ANE NH Boire Field
Concord Municipal
Dillant-Hopkins
Laconia Municipal
Lebanon Municipal
Manchester
Mount Washington Regional
Pease International Tradeport
Skyhaven
State Total:
NE ANE RI Block Island State
Newport State
North Central State
Quonset State
Theodore Francis Green State
Westerly State
State Total:
Selection Criteria Year: 2006
Grants Awarded by FY Report Date 03/13/2007
FY 2006
Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
027R 256,500 Acquire Snow Removal Equipment
019GA 650,000 Acquire Easement For Approaches [Phase II]
021GA 782,985 Rehabilitate Apron
016GA 7,732,416 Construct Taxiway, Rehabilitate Runway - 08/26
031P 2,945,000 Construct Apron
060P 4,500,000 Rehabilitate Runway - 17/35
061 2,500,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
062 9,660,646 Rehabilitate Runway [Phase I] - 06/24, Rehabilitate Runway [Runway Safety Areas] - 06/24
063 715,000 Construct Sand and Chemical Storage Building
064 4,873,350 Noise Mitigation Measures for Residences within 65 - 69 DNL
015GA 157,422 Construct Taxiway [PH I (Design/Permitting)], Rehabilitate Apron
031P 131,955 Update Airport Master Plan Study
033 791,160 Noise Mitigation Measures for Residences within 65 - 69 DNL
020GA 123,321 Extend Taxiway [Design and Permitting]
14 Grants 35,819,755
011CS 3,484,483 Extend Taxiway, Rehabilitate Runway - 10/28
012 182,157 Construct Terminal Building
014GA 280,419 Update Airport Master Plan Study
016R 2,730,215 Rehabilitate Runway [Phase II] - 05/23
013R 533,210 Improve Airport Erosion Control
072P 98,639 Remove Obstructions
075 1,552,368 Rehabilitate Taxiway
076 15,000,000 Acquire Land for Noise Compatibility within 70 - 74 DNL
077 643,160 Construct Terminal Building
078 1,076,756 Conduct Environmental Study
016CS 72,477 Remove Obstructions
11 Grants 25,653,884
Page 42 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
NE ANE VT Burlington International
Fair Haven Municipal
Franklin County State
Rutland State
State of Vermont
Various Locations in Vermont
Report Total:
Region Total:
ADO Total:
State Total:
NM DEN CO Aspen-Pitkin County/Sardy Field
Blake Field
Centennial
Central Colorado Regional
City of Colorado Springs Municipal
Selection Criteria Year: 2006
FY 2006
Service Level
Grant Seq Number
P 060
062
GA
GA
063
064
065
003
005
CS 023
024
025
003
002
003
13 Grants
101 Grants
1002 Grants
2059 Grants
P 033
GA 006
R 030
031
032
GA 010
P 041
AIP Federal Funds
148,200
2,435,800
401,641
1,500,240
138,700
145,635
130,236
199,107
565,226
411,331
131,575
414,076
173,420
6,795,187
130,589,142
130,589,142
3,539,103,886
11,000,000
450,000
4,550,000
305,000
1,500,000
306,838
15,286,040
Report Date 03/13/2007
Brief Description Of Work
Conduct Noise Compatibility Plan Study
Construct Apron [PH II South End Development], Construct Apron [PH II South End Development], Construct Taxiway [Phase I - South End Development] Environmental Mitigation
Acquire Land for Noise Compatibility within 65 - 69 DNL
Rehabilitate Runway - 15/33
Conduct Environmental Study
Construct Runway Safety Area - 01/19, Install Runway Vertical/Visual Guidance System - 01/19 Groove Runway [sensors] - 01/19
Construct Apron
Construct Snow Removal Equipment Building
Update Miscellaneous Study
Acquire Snow Removal Equipment (Hartness State (Springfield); Morrisville-Stowe State; Rutland State; William H. Morse State) Rehabilitate Runway (Hartness State (Springfield) - 11/29; Middlebury State 01/19; Rutland State - 01/19), Rehabilitate Runway Lighting (William H. Morse State - 13/31)
Rehabilitate Runway - 15/33
Construct Taxiway [Partial Parallel Taxiway]
Rehabilitate Runway - 17L/35R
Conduct Noise Compatibility Plan Study, Update Airport Master Plan Study
Rehabilitate Taxiway
Expand Apron, Rehabilitate Apron
Rehabilitate Runway [Phase 3] - 17L/35R, Rehabilitate Taxiway [E1, E7 & E8]
Page 43 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM DEN CO Cortez Municipal CS 022 300,000 Expand Snow Removal Equipment Building
Craig-Moffat GA 006 625,166 Rehabilitate Apron
Denver International P 039 3,450,000 Construct Deicing Containment Facility [Phase 4]
040 1,250,000 Conduct Miscellaneous Study [Pavement Survey]
041 2,390,213 Improve Airport Drainage, Rehabilitate Runway - 16L/34R, Rehabilitate Taxiway
042 4,500,000 Rehabilitate Taxiway
Durango-La Plata County P 031 103,618 Conduct Environmental Study [(Phase 2)], Environmental Mitigation
032 1,160,606 Construct Taxiway [Extend Parallel Taxiway A - South (Design)]
Eagle County Regional P 039 4,061,500 Extend Runway [Phase IV (Site Preparation)] - 07/25
Fort Collins-Loveland Municipal P 020 4,627,500 Rehabilitate Taxiway, Security Enhancements
Front Range R 030 163,977 Rehabilitate Taxiway
Garfield County Regional GA 015 362,000 Improve Runway Safety Area [Phase 2: Planning Support & Wetlands Permit]
Gunnison-Crested Butte Regional P 039 4,028,57008/26 Rehabilitate Taxiway
Holyoke GA 005 480,362 Rehabilitate Apron
Hopkins Field GA 003 550,812 Install Airfield Guidance Signs, Rehabilitate Apron, Rehabilitate Taxiway
Jeffco R 038 3,500,000 Construct Taxiway [Phase 3: Relocate Taxiway A]
039 1,050,000 Rehabilitate Apron
040 2,500,000 Construct Apron
Kit Carson County GA 008 3,045,056 Rehabilitate Runway - 15/33
Mc Elroy Airfield GA 006 413,982 Expand Apron
Meadow Lake R 012 350,000 Acquire Land For Approaches [Parcels 1H, 9F, 9G and 11B]
013 100,000 Update Airport Master Plan Study
Monte Vista Municipal GA 006 542,000 Rehabilitate Apron, Rehabilitate Taxiway
Montrose Regional P 033 3,513,459 Construct Taxiway
Rangely GA 007 2,013,702 Rehabilitate Runway [Phase 2 (Construction)] - 06/24
State of Colorado 005 235,740 Update State System Plan Study
Steamboat Springs/Bob Adams Field GA 015 150,000 Conduct Airport Master Plan Study
Sterling Municipal GA 009 322,938 Acquire Land For Approaches
Stevens Field GA 016 227,500 Construct Taxiway [-Parcels 15 (6.9 acres) -Parcel 17 (6.2 Acres)]
Selection Criteria Year: 2006
Page 44 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM DEN CO 017 80,000 Conduct Airport Master Plan Study
Telluride Regional P 021 4,088,933 Improve Runway Safety Area [(Design Only)] - 09/27
Walker Field P 031 1,390,328 Acquire Snow Removal Equipment, Construct Apron [(Phase I)]
032 200,000 Update Airport Master Plan Study [Airport Layout Plan]
State Total: 40 Grants 85,175,840
NM DEN UT Brigham City GA 017 8,000,000 Improve Runway Safety Area [Construction, Phase II (Rehabilitate/Strengthen Runway, SA Grading C/D II)] - 16/34
Cal Black Memorial GA 010 155,455 Install Miscellaneous NAVAIDS, Rehabilitate Runway - 01/19
Canyonlands Field CS 017 2,800,000 Improve Runway Safety Area [Construction, Sch I] - 03/21
Carbon County GA 012 195,121 Construct Taxiway [Design Only]
Cedar City Regional CS 018 568,723 Acquire Aircraft Rescue & Fire Fighting Vehicle [Index B]
Duchesne Municipal GA 004 158,688 Install Runway Vertical/Visual Guidance System - 17/35, Rehabilitate Runway Lighting [Phase II, Electrical Vault] - 17/35
Escalante Municipal
Green River Municipal
GA
GA
004
007
367,820
513,250
Acquire Easement For Approaches [(Easements E1-E4)], Acquire Land For Approaches [(Parcels 13-26)] Construct Taxiway [Construction, (Phase I)]
Heber City Municipal - Russ McDonald Field GA 019 884,309 Construct Taxiway
020 2,200,000 Construct Taxiway
Logan-Cache GA 017 706,168 Construct Taxiway
Milford Municipal/Ben and Judy Briscoe Field GA 009 303,811 Install Runway Lighting - 16/34
Monticello Municipal Airport 001 360,000 Construct New Airport [Acquire Land]
Nephi Municipal GA 009 1,823,848 Construct Runway [(Phase V, Construct North Partial Parallel Taxiway)] - 16/34
New 006 1,157,437 Conduct Miscellaneous Study
007 17,202,476 Construct New Airport [Acquire Land]
Ogden-Hinckley R 029 127,575 Update Airport Master Plan Study
Provo Municipal GA 025 582,103 Extend Taxiway [Construction, Phase II]
026 1,525,100 Rehabilitate Apron
Richfield Municipal GA 008 125,000 Acquire Land For Approaches
Salt Lake City International P 082 3,193,192 Rehabilitate Taxiway
083 787,097 Rehabilitate Taxiway [(Centerline Light Trench Rehabilitation)]
Selection Criteria Year: 2006
Page 45 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM DEN UT Salt Lake City Municipal 2 R 012 1,502,332 Rehabilitate Apron
Spanish Fork-Springville GA 014 54,577 Acquire Land For Approaches
State of Utah 005 130,000 Update State System Plan Study
Vernal GA 020 131,848 Acquire Miscellaneous Land [(A portion of Parcel 37, 1.65 Acres )], Construct Service Road
021 518,850 Acquire Miscellaneous Land [Parcel 29]
State Total: 27 Grants 46,074,780
NM DEN WY Cheyenne Regional/Jerry Olson Field P 037 1,226,057 Conduct Miscellaneous Study, Construct Apron
Converse County GA 016 150,000 Rehabilitate Runway [(Design Only)] - 11/29
Gillette-Campbell County P 027 828,000 Conduct Miscellaneous Study, Construct Access Road, Update Airport Master Plan Study
028 585,000 Acquire Aircraft Rescue & Fire Fighting Vehicle
Hulett Municipal GA 010 1,784,663 Construct Taxiway
Hunt Field GA 010 614,993 Acquire Land For Approaches [Tract R (4.2 acres)]
Jackson Hole P 036 1,463,058 Construct Building [(Tower Reimbursement)], Rehabilitate Taxiway [(Design Only)]
Laramie Regional P 023 160,000 Rehabilitate Apron [Design]
Lusk Municipal GA 007 536,913 Construct Building, Install Runway Vertical/Visual Guidance System - 10/28, Install Weather Reporting Equipment
Mondell Field GA 010 533,266 Rehabilitate Apron, Rehabilitate Taxiway
Natrona County International P 043 2,600,616 Rehabilitate Taxiway
North Big Horn County GA 008 592,849 Rehabilitate Runway - 09/27
Pine Bluffs Municipal GA 006 273,748 Rehabilitate Runway - 08/26
Ralph Wenz Field GA 013 375,000 Extend Runway [Design Only] - 11/29
Rawlins Municipal/Harvey Field GA 011 158,023 Acquire Snow Removal Equipment
Riverton Regional P 025 1,000,000 Rehabilitate Runway [Design Only (Phase II)] - 10/28
Rock Springs-Sweetwater County P 021 1,351,465 Acquire Safety Equipment, Rehabilitate Access Road, Rehabilitate Parking Lot
Sheridan County P 029 96,636 Rehabilitate Taxiway
030 123,000 Conduct Miscellaneous Study, Improve Runway Safety Area - 14/32
Shively Field GA 019 304,600 Rehabilitate Taxiway
South Big Horn County GA 012 165,000 Improve Runway Safety Area [Acquire Land] - 15/33
Selection Criteria Year: 2006
Page 46 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
NM DEN WY Worland Municipal GA 016 2,548,961 Construct Runway [Construction, Sch II] - 10/28
Yellowstone Regional P 020 662,524 Construct Terminal Building [Design (Phase I), Site Utilities/Drainage], Modify Terminal Building
State Total: 23 Grants 18,134,372
ADO Total: 90 Grants 149,384,992
NM HLN MT Baker Municipal GA 010 140,453 Acquire Snow Removal Equipment
Bert Mooney P 034 451,422 Conduct Miscellaneous Study [Pavement Condition Index (PCI) Survey], Construct Apron [general aviation], Construct Taxiway [hangar access]
035 415,824 Update Airport Master Plan Study
Big Sandy GA 003 250,000 Acquire Snow Removal Equipment, Conduct Environmental Study [Cultural Resource Survey], Construct Snow Removal Equipment Building
Billings Logan International P 030 3,760,566 Improve Service Road [runway incursion prevention road], Rehabilitate Apron [Phase 2], Rehabilitate Runway [,including runway and taxiway edge lights]
031 1,204,74210R/28L Acquire Aircraft Rescue & Fire Fighting Vehicle [two replacement vehicles]
Bowman Field GA 008 97,644 Rehabilitate Runway [including runway 16/34, taxiways, and apron (maintenance)] - 04/22
Choteau GA 005 177,502 Construct Fuel Farm
Circle Town County GA 003 612,000 Acquire Land For Approaches [Tract 7], Rehabilitate Runway [Phase 1 - grading
Cut Bank Municipal GA 007 342,000and drainage] - 12/30 Acquire Snow Removal Equipment, Rehabilitate Runway [and 5/23 (Phase 1 Design
Dawson Community GA 007 294,310and Testing)] - 13/31 Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Acquire Snow Removal Equipment, Improve Aircraft Rescue & Fire Fighting Building, Rehabilitate Runway
Deer Lodge-City-County GA 006 920,055[Phase I - design] - 12/30 Extend Runway [Phase II - paving and lighting] - 12/30, Rehabilitate Apron,
Edgar G Obie GA 008 1,164,610Rehabilitate Runway - 12/30, Rehabilitate Runway Lighting - 12/30 Rehabilitate Runway [including partial parallel taxiway and apron (Phase III -
Ekalaka GA 004 162,395paving)] - 08/26 Install Miscellaneous NAVAIDS [relocate lighted windcone and segmented circle],
Ennis - Big Sky GA 008 174,836Install Weather Reporting Equipment Acquire Snow Removal Equipment, Install Weather Reporting Equipment
Fort Benton GA 005 83,125 Acquire Snow Removal Equipment
Selection Criteria Year: 2006
Page 47 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM HLN MT Frank Wiley Field GA 008 284,090 Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Miscellaneous NAVAIDS [supplemental windcones on runways 4 and 12], Install Runway Vertical/Visual Guidance System [runway end identifier lights (REILs) on runways 12 and 22] 04/22
Gallatin Field P 031 552,000 Acquire Land For Approaches
Glacier Park International P 032 893,709 Acquire Land For Approaches, Acquire Snow Removal Equipment, Update Airport Master Plan Study
Great Falls International P 035 8,587,138 Install Instrument Approach Aid - 03/21
Helena Regional P 032 459,401 Modify Access Road [construct turning lane], Modify Terminal Building [acquire
L M Clayton GA 005 374,737passenger loading bridge] Expand Terminal Building, Install Airfield Guidance Signs [distance remaining signs], Install Runway Vertical/Visual Guidance System [runway end identifier lights runway 29] - 11/29
Lewistown Municipal GA 010 510,000 Construct Taxiway, Improve Snow Removal Equipment Building, Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Taxiway
Libby GA 006 150,000 Acquire Snow Removal Equipment, Install Weather Reporting Equipment
Liberty County GA 004 170,000 Acquire Snow Removal Equipment, Conduct Environmental Study [Cultural
Missoula International P 040 3,309,845Resource Survey], Construct Snow Removal Equipment Building Expand Aircraft Rescue & Fire Fighting Building, Improve Airport Miscellaneous Improvements [grade object free area/runway safety area transition], Rehabilitate
New 002 373,160Apron, Remove Obstructions Construct New Airport [Phase II - Acquire Land and Design Engineering]
Plains GA 005 2,700,000 Construct Apron, Construct Runway [Phase II - including grading, paving, runway and taxiway lighting, signs, windcone, segmented circle, and PAPI] - 12/30,
Ravalli County GA 007 170,433Construct Taxiway, Install Perimeter Fencing, Install Weather Reporting Equipment Acquire Snow Removal Equipment
Roundup GA 006 126,000 Install Weather Reporting Equipment
Shelby GA 008 164,000 Acquire Snow Removal Equipment
Sidney-Richland Municipal P 014 1,543,457 Rehabilitate Apron [terminal and general aviation]
State of Montana 005 127,479 Conduct State System Plan Study
Stevensville GA 005 493,884 Acquire Snow Removal Equipment, Construct Snow Removal Equipment Building, Update Airport Master Plan Study
Tillitt Field GA 005 182,616 Acquire Snow Removal Equipment, Install Miscellaneous NAVAIDS
Townsend GA 006 109,075 Acquire Land For Approaches
Selection Criteria Year: 2006
Page 48 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM HLN MT Twin Bridges GA 007 380,099 Extend Runway [Phase I - Relocate County Road] - 17/35, Install Weather Reporting Equipment
Wheatland County at Harlowton GA 003 167,000 Install Weather Reporting Equipment, Rehabilitate Runway [taxiways, and apron (maintenance)] - 08/26, Update Airport Master Plan Study
Wokal Field/Glasgow International
Yellowstone
GA
CS
011
006
436,000
195,000
Acquire Aircraft Rescue & Fire Fighting Vehicle, Groove Runway - 08/26, Rehabilitate Runway [and taxiway (maintenance)] - 12/30 Acquire Aircraft Rescue & Fire Fighting Vehicle
State Total: 40 Grants 32,710,607
ADO Total: 40 Grants 32,710,607
NM SEA ID Arco-Butte County GA 007 150,000 Acquire Snow Removal Equipment
Bear Lake County GA 004 140,000 Construct Building
Boise Air Terminal/Gowen Field P 043 481,417 Update Airport Master Plan Study
046 1,000,000 Security Enhancements
047 4,291,561 Construct Apron, Construct Heliport/Helipad, Expand Terminal Building [Loading bridges Gates 11,14,&20(construction only) & extend passenger walkway (Phase
Boundary County GA 005 200,0004)] Install Perimeter Fencing, Rehabilitate Apron [Phase 1 (design)]
Burley Municipal GA 005 190,000 Conduct Airport Master Plan Study, Conduct Miscellaneous Study
Caldwell Industrial R 016 495,000 Rehabilitate Runway - 12/30
Coeur d'Alene Air Terminal GA 026 1,876,210 Construct Apron
Driggs-Reed Memorial GA 006 95,000 Acquire Snow Removal Equipment, Rehabilitate Runway - 03/21
Gooding Municipal GA 003 150,000 Acquire Land For Approaches, Construct Taxiway, Remove Obstructions
Idaho Falls Regional P 027 5,391,619 Expand Apron [Expand south general aviation apron, including revise ALP (Phase
Jerome County GA 006 150,0003)], Install Runway Vertical/Visual Guidance System - 17/35 Acquire Land For Approaches, Rehabilitate Taxiway
Joslin Field - Magic Valley Regional P 025 592,876 Improve Access Road, Rehabilitate Parking Lot, Rehabilitate Taxiway
Lemhi County GA 009 305,004 Construct Taxiway, Install Perimeter Fencing
Lewiston-Nez Perce County P 023 2,000,000 Conduct Miscellaneous Study, Construct Taxiway, Rehabilitate Taxiway [B, C, D & E, (Phase 2)], Remove Obstructions
McCall Municipal GA 010 229,135 Update Airport Master Plan Study
011 215,051 Acquire Snow Removal Equipment, Install Perimeter Fencing, Rehabilitate Runway
Selection Criteria Year: 2006
Page 49 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM SEA ID 011 16/34, Rehabilitate Taxiway
McCarley Field GA 006 638,458 Install Perimeter Fencing, Rehabilitate Apron
Nampa Municipal GA 017 926,000 Rehabilitate Apron
Orofino Municipal GA 001 100,000 Construct Taxiway, Install Perimeter Fencing, Rehabilitate Runway - 09/27
Pocatello Regional P 025 1,000,000 Acquire Snow Removal Equipment, Construct Aircraft Rescue & Fire Fighting Building [Phase 3], Expand Terminal Building [Phase 1 (design)], Rehabilitate Parking
Sandpoint GA 011 287,726Lot, Rehabilitate Runway Lighting - 17/35 Install Instrument Approach Aid - 01/19, Install Weather Reporting Equipment
Shoshone County GA 001 115,000 Rehabilitate Runway - 07/25
State Total: 24 Grants 21,020,057
NM SEA OR Albany Municipal GA 008 150,000 Construct Taxiway, Rehabilitate Taxiway
Baker City Municipal GA 007 464,718 Construct Building, Construct Taxiway, Rehabilitate Taxiway
Bend Municipal GA 013 3,534,605 Construct Runway - 16/34
Boardman GA 003 150,000 Construct Taxiway
Brookings GA 004 300,000 Conduct Miscellaneous Study, Construct Taxiway, Remove Obstructions
Eastern Oregon Regional at Pendleton CS 017 650,000 Acquire Friction Measuring Equipment, Acquire Safety Equipment [proximity suits], Install Runway Vertical/Visual Guidance System - 07/25, Rehabilitate Runway 11/29, Rehabilitate Runway - 11/29, Rehabilitate Taxiway [including pavement
Florence Municipal GA 008 275,000maintenance plan] Install Perimeter Fencing [Wildlife fence], Rehabilitate Runway - 15/33, Update
Gold Beach Municipal GA 006 1,200,000Airport Master Plan Study Install Miscellaneous NAVAIDS, Rehabilitate Runway [Phase 2] - 16/34
Grants Pass GA 004 125,000 Construct Taxiway
Hermiston Municipal GA 004 146,660 Rehabilitate Runway [Phase I design] - 04/22
Klamath Falls P 022 1,000,000 Environmental Mitigation
La Grande/Union County GA 010 1,318,544 Rehabilitate Runway - 16/34, Rehabilitate Taxiway
Lake County GA 004 130,000 Rehabilitate Apron [Phase 1 - Design only], Rehabilitate Runway - 16/34
Lexington GA 004 584,520 Construct Taxiway, Improve Runway Safety Area - 08/26, Install Miscellaneous
Mahlon Sweet Field P 036 1,206,221NAVAIDS, Rehabilitate Apron Construct Runway - 16L/34R, Rehabilitate Apron, Security Enhancements
038 3,062,268 Improve Terminal Building, Improve Terminal Building
Selection Criteria Year: 2006
Page 50 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
NM SEA OR Newport Municipal
Ontario Municipal
Portland International
Portland-Hillsboro
Portland-Mulino
Roberts Field
Rogue Valley International - Medford
Scappoose Industrial Airpark
Southwest Oregon Regional
State of Oregon
Various Locations in Oregon
State Total:
NM SEA WA Anacortes
Arlington Municipal
Bellingham International
Boeing Field/King County International
Bremerton National
FY 2006
Service Level
Grant Seq Number
GA
GA
P
R
GA
P
P
GA
P
014
006
053
054
055
019
010
026
028
014
023
024
005
021
30 Grants
CS
GA
P
013
014
015
036
P
GA
032
033
018
AIP Federal Funds
405,000
111,765
992,915
3,510,502
4,995,000
650,000
132,350
900,000
2,115,859
295,000
2,464,032
4,500,000
90,725
504,000
35,964,684
702,627
226,353
83,602
997,500
560,000
21,039,132
147,205
Report Date 03/13/2007
Brief Description Of Work
Construct Building [(Phase 2)]
Update Airport Master Plan Study
Install Noise Monitoring System
Install Runway Lighting - 10L/28R, Rehabilitate Taxiway
Rehabilitate Taxiway [Phase 2]
Rehabilitate Service Road, Rehabilitate Taxiway
Update Airport Master Plan Study
Expand Terminal Building [Phase 3 final design]
Construct Terminal Building [Phase 3]
Acquire Land for Development [Ross Property]
Construct Apron [2007], Construct Apron, Construct Taxiway, Construct TerminalBuilding [2007], Construct Terminal BuildingRehabilitate Runway - 04/22
Update State System Plan Study
Improve Runway Safety Area (Cottage Grove State - 15/33; Lebanon State 16/34), Install Miscellaneous NAVAIDS (Bandon State; Lebanon State), RehabilitateApron (Chiloquin State), Rehabilitate Runway (Ashland Municipal-Sumner ParkerField - 12/30; Bandon State - 16/34; Christmas Valley - 07/25; Cottage Grove State 15/33; Hobby Field - 15/33), Rehabilitate Taxiway (Ashland Municipal-SumnerParker Field; Bandon State)
Remove Obstructions
Remove Obstructions [Phase 1]
Construct Apron, Rehabilitate Taxiway, Strengthen Taxiway
Acquire Land for Development, Construct Aircraft Rescue & Fire Fighting Building,Expand Apron, Modify Terminal Building, Rehabilitate Apron [Terminal apron designonly], Rehabilitate Runway - 16/34, Update Airport Master Plan StudyConduct Miscellaneous Study [Phase 2]
Rehabilitate Runway [Phase 2] - 13R/31L, Rehabilitate Runway - 13R/31L
Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System 01/19
Selection Criteria Year: 2006
Page 51 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
NM SEA WA Chehalis-Centralia GA 008 817,557 Construct Taxiway [t-hangar taxilanes], Install Weather Reporting Equipment [AWOS], Rehabilitate Taxiway
Cle Elum Municipal GA 001 120,780 Construct Runway [including environmental assessment and design (Phase 1)] 07/25
Deer Park
Ephrata Municipal
GA
GA
015
007
140,074
298,846
Construct Apron, Construct Taxiway, Install Miscellaneous NAVAIDS, Rehabilitate Runway - 16/34, Rehabilitate Taxiway Construct Runway - Plan-1, Construct Taxiway
Felts Field R 018 404,853 Construct Taxiway
Grant County International CS 031 500,000 Rehabilitate Taxiway
Kelso-Longview GA 011 119,028 Construct Taxiway [Ph 1 Construct Taxilanes], Install Perimeter Fencing
Orcas Island CS 006 164,731 Install Miscellaneous NAVAIDS, Rehabilitate Airport Beacons, Update Airport
Othello Municipal GA 003 480,225Master Plan Study Install Perimeter Fencing [partial], Install Runway Lighting [pilot controlled lighting] 07/25, Rehabilitate Taxiway, Remove Obstructions [remove Runway 7-25 line of sight obstruction]
Pierce County - Thun Field GA 010 2,419,163 Construct Taxiway, Install Weather Reporting Equipment, Remove Obstructions [West side trees]
Port of Whitman Business Air Center
Prosser
GA
GA
003
009
127,000
151,789
Construct Taxiway [Design/environmental only (Phase 1)], Improve Runway Safety Area - 07/25 Extend Runway [including environmental (Phase 1)] - 07/25, Update Airport Master
Pullman/Moscow Regional P 027 132,649Plan Study Construct Apron
Renton Municipal R 016 150,000 Install Perimeter Fencing
Richland GA 015 149,426 Rehabilitate Runway - 07/25
Rosalia Municipal GA 001 80,000 Rehabilitate Runway [Preliminary Design] - 02/20
Seattle-Tacoma International P 097 21,341,160 Construct Runway [Phase 11] - Plan-1
098 10,800,000 Improve Runway Safety Area [Runway 16L safety area Phase 5] - 16R/34L
099 3,054,000 Noise Mitigation Measures for Public Buildings
100 8,927,085 Noise Mitigation Measures for Residences within 70 - 74 DNL
101 7,000,000 Install Runway Vertical/Visual Guidance System [Approach lighting 16X (ALSF)] Plan-1
Skagit Regional GA 013 313,428 Acquire Land For Approaches [Parcel 9 (Van Pelt)]
014 2,061,575 Acquire Land For Approaches [Parcel 10 (Bouslog) Phase 1]
Selection Criteria Year: 2006
Page 52 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
NM SEA WA Snohomish County (Paine Field)
Spokane International
State of Washington
Tri-Cities
Various Locations in Washington
Walla Walla Regional
William R Fairchild International
Yakima Air Terminal/McAllister Field
State Total:
ADO Total:
Region Total:
Report Total:
SO ATL GA Augusta Regional at Bush Field
Brunswick Golden Isles
Cherokee County
Cobb County-McCollum Field
Columbus Metropolitan
FY 2006
Service Level
Grant Seq Number
R
P
P
041
036
005
006
029
007
008
P 022
P
P
023
026
40 Grants
94 Grants
1226 Grants
2059 Grants
P 029
P 023
024
GA 009
010
R 022
023
P 028
029
AIP Federal Funds
3,500,000
1,010,101
900,000
175,685
364,095
493,454
135,526
1,118,095
851,280
215,672
92,273,696
149,258,437
331,354,036
3,539,103,886
4,186,443
666,788
984,405
1,475,000
250,000
523,450
1,486,000
525,000
611,145
Report Date 03/13/2007
Brief Description Of Work
Construct Taxiway [K Phase 1]
Construct Taxiway, Rehabilitate Apron
Conduct State System Plan Study
Conduct State System Plan Study
Install Guidance Signs, Rehabilitate Apron
Install Miscellaneous NAVAIDS (Sanderson Field), Rehabilitate Apron (SandersonField), Rehabilitate Runway (Anderson Field - 07/25; Grand Coulee Dam - 03/21)Update Airport Master Plan Study (Ione Municipal; Methow Valley State; VashonMunicipal)Acquire Aircraft Rescue & Fire Fighting Safety Equipment [oxygen tanks], AcquireLand For Approaches [Runway 20 Fraizer parcel]Construct Taxiway, Install Guidance Signs, Update Airport Master Plan Study
Conduct Miscellaneous Study, Construct Taxiway
Expand Terminal Building [Construction]
Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF Vehicle]
Construct Taxiway [Design/Construct], Improve Runway Safety Area - 07/25,Rehabilitate Apron [Construction], Rehabilitate Runway - 07/25, RehabilitateRunway Lighting [Design] - 07/25Extend Taxiway
Acquire Land for Development [land acquisition]
Rehabilitate Taxiway [A, A1, A2, A3,A4, A5]
Acquire Land for Development [aeron development]
Improve Runway Safety Area [Phase 2 - Relocate localizer] - 06/24
Construct Aircraft Rescue & Fire Fighting Building [Phase 2 - Design Only], SecurityEnhancements [Security Access Control System - Phase 3]
Selection Criteria Year: 2006
Page 53 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite
SO ATL GA Dekalb-Peachtree
Fulton County Airport-Brown Field
Gwinnett County - Briscoe Field
Hartsfield - Jackson Atlanta International
Lee Gilmer Memorial
Malcolm McKinnon
Middle Georgia Regional
Paulding County (New)
Peachtree City-Falcon Field
Peachtree City-Falcon Field
Roosevelt Memorial
Savannah/Hilton Head International
Southwest Georgia Regional
State of Georgia
Toccoa - R G LeTourneau Field
Valdosta Regional
Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
R 032 3,113,150 Rehabilitate Runway - 02R/20L, Rehabilitate Taxiway [TY A&E across 16/34 concrete/ asphalt combo], Rehabilitate Taxiway [taxiway B (north) & Ty D (asphalt)], Rehabilitate Taxiway [tys A & J]
R 020 82,650 Install Perimeter Fencing
R 026 121,445 Update Airport Master Plan Study
P 071 13,000,000 Extend Runway - 10/28
072 6,368,300 Construct Runway - Plan-1
073 7,000,000 Construct Taxiway [8R end around taxiway]
074 10,665,924 Construct Runway [runway paving and lighting] - Plan-1, Improve Runway Safety Area [9L end improvement] - 09L/27R, Improve Runway Safety Area [9R end] 09R/27L, Improve Runway Safety Area - 08L/26R
075 3,934,750 Rehabilitate Runway - 08R/26L
R 012 280,500 Construct Taxiway [phase II (supplemental to MY grant - 05, 06, 07)]
GA 014 250,000 Rehabilitate Apron [Design]
P 021 137,671 Install Miscellaneous NAVAIDS [Wind Cone and Segmented Circle], Rehabilitate Runway [Rehabilitate Runway 5/23 & 13/31 Marking] - 05/23
022 1,029,455 Improve Airport Drainage [Construction Phase I], Improve Airport Miscellaneous Improvements [EQUIPMENT FOR PILOT CONTROLLED LIGHTING], Install Emergency Generator [Install 200 KW Emergency Generator]
003 8,809,627 Construct New Airport [Grading and drainage]
GA 018 2,000,000 Improve Runway Safety Area [Acquire land for RSA improvement] - 13/31
019 500,000 Acquire Land for Development [Hunting Prop Acq Phase 1]
R 017 400,551 Conduct Environmental Study [EA for hangar areas B & C], Construct Taxiway [Phase 1 - Design]
GA 005 121,470 Install Miscellaneous NAVAIDS [Wind Cone], Rehabilitate Airport Beacons, Rehabilitate Runway Lighting [Replace MIRL and MITL] - 17/35
P 041 680,932 Improve Runway Safety Area [Relocate Localizer] - 18/36
P 026 3,463,483 Widen Taxiway [Construction - Phase I of II]
002 500,000 Update State System Plan Study
GA 011 135,500 Construct Taxiway [construct t-hangar taxiway (design only)], Rehabilitate Apron, Update Airport Master Plan Study [Update ALP]
P 022 461,299 Expand Apron [Commercial Ramp Expan - Design], Groove Runway - 17/35, Rehabilitate Taxiway [Design], Update Airport Master Plan Study [Master Plan Update]
Selection Criteria Year: 2006
Page 54 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite
SO ATL GA Various Locations in Georgia
Washington-Wilkes County
Winder-Barrow
Wright AAF (Fort Stewart)
State Total:
SO ATL NC Albert J Ellis
Asheville Regional
Service Grant Seq AIP Federal Level Number Funds
006 16,302,082
GA 004 204,000
GA 015 350,000
GA 003 250,000
35 Grants 90,871,020
P 026 174,800
P 031 1,093,870
Brief Description Of Work
Acquire Land For Approaches (Gilmer County; Thomasville Regional; TurnerCounty; Wrens Memorial), Acquire Land for Development (Newnan CowetaCounty; Perry-Houston County), Acquire Miscellaneous Land (Blairsville), ConductEnvironmental Study (Homerville), Construct Apron (Cartersville; Dawson Municipal;Kaolin Field), Construct Building (Bacon County; Crisp County-Cordele; SoutherField; Thomaston-Upson County; Thomson-McDuffie County; Waycross-WareCounty), Construct Fuel Farm (Gilmer County), Construct Runway (Cochran - Plan1), Construct Taxiway (Burke County; Dalton Municipal; Donalsonville Municipal;Elbert County-Patz Field; Habersham County; Swinton Smith Field at ReidsvilleMunicipal; Sylvester; Vidalia Regional; W H 'Bud' Barron), Environmental Mitigation(Cook County), Expand Apron (Clayton County - Tara Field; Pickens County; Tom B.David Field), Extend Runway (Berrien County - 10/28; Brantley County - 01/19;Franklin County - 08/26; Greene County Regional - 06/24; Hazlehurst - 14/32;Jackson County - 16/34; La Grange-Callaway - 13/31; Madison Municipal - 14/32;Metter Municipal - 10/28; Moultrie Municipal - 04/22; Polk County Airport- CorneliusMoore Field - 10/28; Quitman Brooks County - 09/27), Extend Runway Safety Area(Telfair-Wheeler - 03/21), Improve Runway Safety Area (Claxton-Evans County 09/27), Install Perimeter Fencing (Bacon County; Baxley Municipal; Butler Municipal;Claxton-Evans County; Douglas Municipal; Emanuel County; Heart of GeorgiaRegional; Henry Tift Myers; Homerville; Louisville Municipal; Moultrie Municipal;Plantation Airpark; Polk County Airport- Cornelius Moore Field; Richard B Russell;West Georgia Regional - O V Gray Field), Rehabilitate Apron (Baldwin County),Rehabilitate Runway (Cairo-Grady County - 12/30; Dr. C P Savage Sr. - 18/36;Harris County - 09/27; Jekyll Island - 18/36; Jesup-Wayne County; Millen - 17/35),Rehabilitate Taxiway (Decatur County Industrial Air Park; Harris County; Richard BRussell; Statesboro-Bulloch County), Remove Obstructions (Camilla-MitchellCounty; Covington Municipal; Monroe-Walton County), Update Airport Master PlanStudy (Cuthbert-Randolph; Statesboro-Bulloch County)Construct Taxiway [partial parallel taxiway east]
Acquire Land For Approaches
Construct Apron [Terminal Apron Design & Construct]
Rehabilitate Runway [Design] - 05/23, Security Enhancements
Acquire Aircraft Rescue & Fire Fighting Vehicle, Modify Terminal Building
Selection Criteria Year: 2006
Page 55 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO ATL NC Charlotte/Douglas International P 054 9,506,664 Construct Aircraft Rescue & Fire Fighting Building, Construct Runway [Phase VII, Master Plan Land Acquisition] - 18L/36R
Craven County Regional P 026 922,169 Acquire Land For Approaches [Runway 13-31 Runway Protection Zone], Extend Taxiway [Taxiway L], Improve Airport Drainage [design & permitting], Rehabilitate
Fayetteville Regional/Grannis Field P 031 1,127,409Runway - 04/22 Construct Aircraft Rescue & Fire Fighting Training Facility [training facility]
Hickory Regional GA 021 286,826 Conduct Miscellaneous Study [Pavement Study (Taxiway A and B)], Install
North Carolina State Block Grant Program 031 18,819,968Guidance Signs Non primary development projects in state block grant program - GA
Piedmont Triad International P 047 12,237,916 Construct Runway [Construct Runway 5L-23R and associated taxiways; Construct connector taxiway "F"; Extend taxiway "K"; Acquire Land, Phase V] Plan-1
048 1,560,500 Acquire Aircraft Rescue & Fire Fighting Vehicle, Improve Runway Safety Area [Environmental Assesment] - 05/23, Rehabilitate Apron [South Cargo Apron, Phase II]
049 1,026,734 Improve Runway Safety Area - 14/32
050 3,402,154 Acquire Land for Noise Compatibility within 65 - 69 DNL
Wilmington International P 036
037
3,000,000
7,526,342
Improve Runway Safety Area [Phase VI (Install Runway 6/24 Instrument Landing System)] - 17/35 Expand Apron, Rehabilitate Runway - 06/24, Rehabilitate Taxiway
State Total: 13 Grants 60,685,352
SO ATL SC Aiken Municipal GA 010 644,332 Rehabilitate Apron [Construction]
Allendale County GA 010 168,033 Install Taxiway Lighting
Berkeley County GA 014 83,410 Extend Taxiway [Design and Environmental Mitigation]
Charleston AFB/International P 027 201,313 Improve Access Road [Design]
Columbia Metropolitan P 030 3,425,571 Rehabilitate Apron [Design and Construction], Rehabilitate Taxiway
031 366,700 Rehabilitate Taxiway [Taxiway U Rehab - Phase III]
Columbia Owens Downtown R 009 150,000 Construct Terminal Building [Phase III, Construction]
Corporate GA 008 236,550 Construct Fuel Farm
Darlington County Jetport GA 007 92,245 Expand Apron [Design], Rehabilitate Runway - 05/23
Donaldson Center GA 015 42,989 Update Airport Master Plan Study
Grand Strand GA 012 152,383 Remove Obstructions [Phase I]
Selection Criteria Year: 2006
Page 56 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO ATL SC Greenville Downtown GA 014 800,738 Rehabilitate Apron
Greenville Spartanburg International P 038 3,344,078 Conduct Environmental Study [Storm Water Pollution Prevention Phase], Construct Access Road [Interstate-85 Interchange, Phase III (final phase)], Rehabilitate Aircraft Rescue & Fire Fighting Building [fuel storage rehabilitation], Rehabilitate Apron [Air carrier apron], Rehabilitate Runway Lighting [Airfield Electrical Vault Regulator Replacement and Generator Upgrade] - 04/22, Rehabilitate Terminal Building [Roof Replacement (20,241 square feet)]
Greenwood County GA 008 39,511 Construct Building
Hartsville Regional GA 009 118,152 Install Perimeter Fencing [Phase 1]
Hilton Head P 026 305,643 Acquire Land for Development [Phase 4 through 8], Conduct Environmental Study [Stormwater Pollution Prevention Plans], Conduct Miscellaneous Study [Wildlife
Lancaster County-Mc Whirter Field GA 010 763,860Assessment Study] Rehabilitate Apron [Design and Construction]
Lee County GA 004 184,557 Extend Runway - 05/23
Lowcountry Regional GA 008 142,073 Construct Taxiway [Design, Surveying, Testing]
Marlboro County Jetport - H.E. Avent Field GA 007 178,954 Construct Taxiway [Taxiway Design (To Hangars)], Install Taxiway Lighting, Remove Obstructions
Myrtle Beach International P 036 3,703,190 Construct Terminal Building [Design + Construction]
037 4,000,000 Construct Apron [Terminal Apron and Taxiway]
Newberry County GA 004 609,701 Construct Runway [Design (Runway and Stub Connectors) and Land Acquisition (Approximately 32 acres)] - 4/22
Ridgeland GA 005 169,100 Improve Runway Safety Area [Environmental Assessment for Runway Safety Area Imrpovements and Obstruction Removal] - 03/21, Rehabilitate Runway [Design] - 03/21
Santee Cooper Regional GA 004 60,000 Update Airport Master Plan Study [ALP Update]
Spartanburg Downtown Memorial GA 012 877,729 Install Perimeter Fencing, Remove Obstructions
State of South Carolina 004 350,000 Conduct State System Plan Study
Summerville GA 010 756,932 Rehabilitate Runway - 06/24
Sumter GA 010 150,000 Construct Taxiway [Design Only], Improve Runway Safety Area [Conduct RSA Grading Study] - 05/23, Remove Obstructions [Conduct Obstruction Study]
Twin City GA 001 333,310 Acquire Land For Approaches [Acquire Land in RPZ and remove obstructions, Phase I and II]
Various Locations in South Carolina 009 732,411 Acquire Aircraft Rescue & Fire Fighting Vehicle
010 100,000 Install Weather Reporting Equipment
Selection Criteria Year: 2006
Page 57 of 93
Grants Awarded by FY FAA - Office Of Airports
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
SO ATL SC Williamsburg Regional 008GA 870,836
Woodward Field 014GA 80,000
State Total: 34 Grants 24,234,301
ADO Total: 82 Grants 175,790,673
SO JAN AL Andalusia-Opp 010GA 150,000
Anniston Metropolitan 021GA 1,050,000
Auburn-Opelika Robert G. Pitts 018GA 831,704
019 716,100
Bay Minette Municipal 006GA 497,145
Bibb County 003GA 147,673
Birmingham International 062P 9,500,000
063 4,200,000
Blackwell Field 007GA 2,701,649
Brewton Municipal 004GA 113,522
Camden Municipal 001GA 30,789
Carl Folsom 002GA 147,305
Dauphin Island 001GA 200,000
002 602,326
Dothan Regional 026P 1,091,550
Enterprise Municipal 013GA 342,576
Folsom Field 014GA 42,750
Report Date 03/13/2007
Brief Description Of Work
Construct Taxiway [Multiyear], Construct Taxiway [Partial Parallel for Runway14/32 and to Hangar Development]Construct Taxiway [Extend Parallel Taxiway - Phase I (Design Only)]
Construct Building [Construct 60' x 60' box hangar], Construct Fuel Farm [100 LLfuel system.]Extend Runway Safety Area - 23
Construct Apron, Construct Taxiway [Phase 1]
Construct Apron [Phase 2 (site prep)]
Construct Building [Phase -2 Construct Hangar Unit], Construct Taxiway [Constructaccess taxiways to T-hangars]Acquire Land For Approaches
Acquire Land for Noise Compatibility within 65 - 69 DNL
Security Enhancements
Construct Taxiway [Light and signage for taxiway], Extend Runway [Pave andlight] - 12/30, Rehabilitate Runway [Overlay old section of runway] - 12/30Improve Terminal Building [Improve terminal Bldg (600 SF, ADA restroom, etc)],Install Weather Reporting EquipmentRehabilitate Runway Lighting - 18/36, Remove Obstructions [Clearing of 20:1approaches.], Update Airport Master Plan StudyAcquire Land For Approaches [Conduct Environmental Site Assessment andsurvey for Runway 1/19 Protection Zone Phase 2 (tracts 4 and 5)], RemoveObstructionsRehabilitate Runway [Design for repair and replace bulkhead around runway.Hurricane damage.] - 12/30Rehabilitate Runway [Construct repairs of bulkhead damaged by hurricane Katrina]- 12/30 Improve Runway Safety Area [Acquire Land (move RPZ south for RW36 extension)] - 18/36, Improve Runway Safety Area [Plans & Specifications for extend, mark and light RW36 and parallel taxiway and rehab runway.] - 18/36 Install Perimeter Fencing [Perimeter Fence]
Conduct Miscellaneous Study
Selection Criteria Year: 2006
Page 58 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
SO JAN AL Franklin Field GA 002 496,596 Rehabilitate Apron, Rehabilitate Runway - 14/32
Gadsden Municipal GA 007 600,000 Conduct Airport Master Plan Study, Install Runway Vertical/Visual Guidance
Geneva Municipal GA 002 262,983System - 06/24, Rehabilitate Taxiway Acquire Land For Approaches [Tract 4]
George Downer GA 004 403,413 Acquire Land For Approaches
Gragg-Wade Field GA 004 920,355 Acquire Land For Approaches
Guntersville Municipal - Joe Starnes Field GA 009 300,000 Acquire Land for Development
Huntsville International-Carl T Jones Field P 048 2,038,000 Construct Taxiway, Security Enhancements
049 3,824,325 Acquire Equipment, Expand Terminal Building, Install Runway Vertical/Visual Guidance System - 18R/36L, Rehabilitate Apron, Rehabilitate Runway - 18L/36R,
050 5,000,000Rehabilitate Runway - 18L/36R, Security Enhancements Acquire Land for Development
Isbell Field GA 013 118,423 Install Perimeter Fencing, Install Runway Vertical/Visual Guidance System - 04/22
Lanett Municipal GA 003 542,203 Rehabilitate Runway - 08/26
Lawrence County GA 005 45,600 Conduct Airport Master Plan Study [update ALP, update ACIP], Rehabilitate Apron
MacCrenshaw Memorial GA 006 485,133 Construct Building [Access Taxiway for 8-Unit T-hangar], Construct Building [Construct 8-Unit T-Hangar]
Madison County Executive GA 018 1,260,000 Construct Apron, Construct Building
Marion County-Rankin Fite GA 006 749,416 Construct Terminal Building
Merkel Field Sylacauga Municipal GA 012 553,913 Improve Runway Safety Area
Middleton Field GA 004 397,575 Extend Runway [Acquire Tract 1, land for Runway 01 extension and protection zone.] - 01/19, Extend Runway [Acquire Tract 2, runway visibility zone for extended runway.] - 01/19
Mobile Downtown R 017 23,603 Install Perimeter Fencing [repair fence damaged by Katrina.]
Mobile Regional P 037 115,719 Rehabilitate Access Road [Replace damaged roadway signage.]
038 2,382,780 Acquire Land for Development [Phase 2, South RPZ], Construct Service Road [Phase 2 of infield service road (design only)], Rehabilitate Terminal Building [Phase 1 Lightning protection, Install air handlers, Replace check-in baggage conveyors, Install terminal seating, Design exit stairwell relocation.], Security Enhancements
039 1,622,400
[Security Improvement at culvert; security vehicles], Update Airport Master Plan Study [Update ALP] Acquire Land for Noise Compatibility within 65 - 69 DNL [Phase 1 of acquire easements], Acquire Land for Noise Compatibility within 65 - 69 DNL
Selection Criteria Year: 2006
Page 59 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
SO JAN AL Montgomery Regional (Dannelly Field)
Moton Field Municipal
New
North Pickens
Northwest Alabama Regional
Pryor Field Regional
Richard Arthur Field
Roanoke Municipal
Rountree Field
Scottsboro Municipal-Word Field
St Clair County
St Elmo
Talladega Municipal
The Albertville Municipal-Thomas J Brumlik Field
Thomas C Russell Field
Tuscaloosa Regional
Weedon Field
State Total:
SO JAN MS Ackerman Choctaw County
Belzoni Municipal
Bobby L Chain Municipal
Booneville/Baldwyn
Bruce Campbell Field
C. A. Moore
Calhoun County
FY 2006
Service Level
Grant Seq Number
P 036
GA
GA
CS
GA
GA
GA
GA
GA
R
GA
GA
GA
GA
GA
GA
009
004
002
021
013
005
002
004
010
007
005
013
016
008
020
013
55 Grants
GA 003
GA
GA
GA
GA
GA
GA
006
013
014
007
014
006
007
004
AIP Federal Funds
417,025
41,150
1,195,227
319,428
788,900
203,675
308,236
103,356
187,679
346,054
655,500
8,400
799,508
118,340
385,337
570,567
166,468
51,122,376
242,687
157,142
148,000
300,000
1,010,193
971,145
223,256
5,995
438,698
Report Date 03/13/2007
Brief Description Of Work
Expand Apron, Rehabilitate Runway - 03/21, Rehabilitate Runway Lighting - 10/28, Update Miscellaneous Study Conduct Environmental Study [Phase 2 Environmental Study], Construct Fuel Farm
Construct Runway, Install Runway Lighting
Rehabilitate Runway Lighting - 01/19
Rehabilitate Taxiway
Improve Runway Safety Area - 18/36
Construct Building
Acquire Land For Approaches
Acquire Land For Approaches
Construct Building
Expand Apron
Install Miscellaneous NAVAIDS [Replace damaged windcone]
Extend Runway, Extend Taxiway
Install Perimeter Fencing
Acquire Land For Approaches, Construct Taxiway
Acquire Aircraft Rescue & Fire Fighting Vehicle
Install Perimeter Fencing
Improve Access Road, Improve Runway Safety Area - 01/19, Install Perimeter Fencing Rehabilitate Runway - 03/21
Rehabilitate Building [Repair buildings damaged by Hurricane Katrina.]
Construct Building
Extend Runway, Improve Access Road
Construct Apron
Acquire Land For Approaches, Install Perimeter Fencing
Install Miscellaneous NAVAIDS
Construct Building, Construct Taxiway, Improve Runway Safety Area - 15/33
Selection Criteria Year: 2006
Page 60 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO JAN MS Clarke County GA 005 91,056 Expand Apron
Columbia-Marion County GA 004 473,715 Install Miscellaneous NAVAIDS, Install Perimeter Fencing, Rehabilitate Access Road, Rehabilitate Airport Beacons, Rehabilitate Apron, Rehabilitate Runway 05/23, Rehabilitate Taxiway, Remove Obstructions
Columbus-Lowndes County GA 009 220,658 Rehabilitate Taxiway Lighting
Copiah County GA 004 309,187 Construct Taxiway, Expand Apron
Dean Griffin Memorial GA 007 496,368 Construct Building [Replace T-hangar unit destroyed by Hurricane Katrina]
008 273,667 Construct Building, Remove Obstructions
Fletcher Field GA 012 135,318 Acquire Land for Development
G. V. Montgomery GA 003 455,127 Improve Runway Safety Area [Acquire land for south safety area.] - 16/34,
George M Bryan GA 011 1,034,090
Improve Runway Safety Area [Grade safety area to meet standard.] - 16/34, Rehabilitate Apron, Rehabilitate Runway, Rehabilitate Taxiway Extend Taxiway, Rehabilitate Taxiway
Golden Triangle Regional P 037 754,953 Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Acquire Equipment, Acquire Handicap Passenger Lift Device, Modify Terminal Building, Rehabilitate
038 767,600Access Road, Rehabilitate Apron, Rehabilitate Taxiway, Security Enhancements Acquire Land for Development
Greenwood-Leflore GA 011 608,143 Extend Taxiway, Install Taxiway Lighting
Grenada Municipal GA 006 130,000 Improve Runway Safety Area - 13/31
Gulfport-Biloxi International P 055 4,650,000 Construct Building [Develop plans and specifications for GA area work.], Construct Building [Develop plans and specifications for cargo facility construction.], Construct Building [Develop plans and specifications for public areas of rental car facility.], Rehabilitate Runway Lighting [Develop plans & specs for airside repair
056 2,569,199
and rehabilitation work.] - 14/32, Rehabilitate Terminal Building [Develop plans and specifications for terminal area repair and rehabilitation.] Rehabilitate Terminal Building [Phase 1 of terminal area drainage.], Rehabilitate
057 4,750,000Terminal Building [Terminal Area Lighting] Acquire Easement for Noise Compatibility within 65 - 69 DNL [Phase 2 of acquire easements], Noise Mitigation Measures for Residences within 65 - 69 DNL [Sound insulation Phase 2]
058 6,009,700 Conduct Miscellaneous Study [Conduct underground drainage study.], Conduct Miscellaneous Study [Terminal Apron & Gate Study], Expand Terminal Building [Terminal Expansion - (Expansion Design and Install Gate 3 Jet Bridge)], Widen Taxiway [Phase 1 of widen and overlay taxiway C.]
059 63,069,758 Construct Building [Construction phase for air cargo facility replacement.],
Selection Criteria Year: 2006
Page 61 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO JAN MS 059 Construct Building [Construction phase for general aviation area work.], Construct Building [Construction phase for public areas of rental car facility.], Improve Terminal Building, Install Guidance Signs [Replace damaged guidnace signs], Rehabilitate Apron, Rehabilitate Terminal Building [Construction phase of terminal
Hardy-Anders Field Natchez-Adams County GA 016 105,512
area repair and rehabilitation.], Rehabilitate Terminal Building [Phase 2 of terminal area drainage], Remove Obstructions [demolition] Acquire Equipment, Install Miscellaneous NAVAIDS, Update Airport Master Plan
Hattiesburg-Laurel Regional P 026 191,755Study Rehabilitate Building [Repair hangars damaged by Hurricane Katrina], Rehabilitate
027 602,300Terminal Building [Repair Hurricane damage not covered by insurance.] Construct Access Road [Phase II], Improve Terminal Building [Payoff sewage
Hesler-Noble Field GA 003 600,000treatment plant], Improve Terminal Building [Terminal Building Renovation - Phase II] Rehabilitate Terminal Building
Holly Springs-Marshall County GA 008 153,275 Remove Obstructions
Houston Municipal GA 007 169,962 Improve Terminal Building, Install Runway Vertical/Visual Guidance System - 03/21
Indianola Municipal GA 008 142,623 Improve Airport Drainage [Drainage improvements]
Iuka GA 004 510,292 Widen Runway - 18/36
Jackson-Evers International P 038 700,000 Security Enhancements
John Bell Williams GA 011 3,213,355 Extend Runway [Extend Taxiway A] - 12/30, Extend Runway [Install MIRL, REILs, &
Key Field P 021 1,454,493
PAPIs] - 12/30, Extend Runway [Install MITL on Taxiway A] - 12/30, Extend Runway [Site Prep Ph 2, Pave Ph 1] - 12/30, Install Weather Reporting Equipment Acquire Emergency Generator, Conduct Miscellaneous Study, Install Guidance Signs, Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Taxiway, Security Enhancements, Update Airport Master Plan Study
Kosciusko-Attala County GA 005 236,922 Improve Runway Safety Area - 14/32
Macon Municipal GA 005 43,700 Install Runway Vertical/Visual Guidance System
Magee Municipal GA 005 17,100 Install Perimeter Fencing
McCharen Field GA 007 382,996 Improve Building, Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate
McComb/Pike County/John E Lewis Field GA 012 94,658Taxiway Construct Taxiway [Phase 1 - Design Only], Expand Apron [Design Only]
Mid Delta Regional P 023 2,983,737 Extend Taxiway [Phase 2], Improve Runway Safety Area [Phase 1] - 18L/36R
Monroe County GA 010 301,754 Construct Building
New Albany-Union County GA 008 183,630 Construct Building, Construct Taxiway
Okolona Municipal-Richard Stovall Field GA 007 154,628 Improve Access Road
Selection Criteria Year: 2006
Page 62 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO JAN MS Olive Branch R 015 500,000 Install Taxiway Lighting, Rehabilitate Runway - 18/36
Paul Pittman Memorial GA 007 227,647 Rehabilitate Airport Beacons, Rehabilitate Runway - 18/36, Remove Obstructions
Picayune Municipal GA 013 78,075 Install Miscellaneous NAVAIDS [Install miscellaneous NAVAID's damaged by Hurricane Katrina]
Poplarville-Pearl River County GA 006 152,950 Install Perimeter Fencing, Rehabilitate Runway Lighting - 16/34
Richton-Perry County GA 006 12,594 Install Perimeter Fencing [Replace damaged fence], Rehabilitate Runway Lighting
Roscoe Turner GA 015 210,553[Repair damage to the lighting system] - 18/36 Construct Building
Ruleville-Drew
Stennis International
GA
R
007
020
159,751
1,408,758
Install Runway Lighting [Rehab runway lighting, instrument approach aids, and miscellaneous lighting improvements] Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Acquire Emergency
021 1,260,000Generator, Construct Aircraft Rescue & Fire Fighting Building, Install Apron Lighting Install Miscellaneous NAVAIDS [Replace windcones, rehab rotating beacon, etc.], Install Perimeter Fencing, Install Weather Reporting Equipment, Rehabilitate Runway Lighting [Replace runway lights] - 18/36, Rehabilitate Taxiway Lighting [Replace TW
Thigpen Field GA 005 561,925A,B,C,D lighting system], Rehabilitate Taxiway Lighting [Replace taxiway signage] Rehabilitate Runway
Tishomingo County GA 007 146,683 Acquire Land for Development, Improve Access Road
Trent Lott International GA 020 207,921 Acquire Equipment [Replace terminal parking lot light destroyed by Hurricane Katrina.], Install Miscellaneous NAVAIDS [Replace damaged windcone], Rehabilitate Building [Repair hangars damaged by Katrina], Rehabilitate Building [Repair hurricane damage to new Air Traffic Control Tower], Rehabilitate Terminal Building
021 150,000[Repair Hurricane Katrina damage.] Construct Apron [Wetlands Mitigation for apron development], Update Airport
Tunica Municipal GA 008 499,184Master Plan Study [Update airport layout plan] Acquire Aircraft Rescue & Fire Fighting Vehicle
Waynesboro Municipal GA 004 42,750 Construct Building [Design for Hangars, Phase 1], Construct Fuel Farm [Engineering for Fuel Farm], Construct Terminal Building [Design for new terminal]
Winona-Montgomery County GA 005 202,415 Install Perimeter Fencing
Yazoo County GA 007 342,368 Install Perimeter Fencing, Rehabilitate Runway
State Total: 64 Grants 108,701,921
ADO Total: 119 Grants 159,824,297
SO MEM KY Ashland Regional GA 007 49,039 Update Airport Master Plan Study
Selection Criteria Year: 2006
Page 63 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO MEM KY Barkley Regional P 028 692,231 Improve Runway Safety Area - 04/22
029 740,871 Rehabilitate Apron
Big Sandy Regional GA 008 237,556 Install Perimeter Fencing
Blue Grass P 038 3,487,026 Expand Terminal Building [Expand Number of Gates on Concourse B]
039 6,550,300 Rehabilitate Runway, Widen Taxiway [Phase 2 of Taxiway Widening and Rehabilitation]
Bowling Green-Warren County Regional GA 018 1,168,309 Construct Runway Safety Area [Land Acquisition] - 03/21
Bowman Field R 016 1,709,449 Construct Taxiway
Breckinridge County GA 002 25,000 Acquire Land for Development, Improve Runway Safety Area - 09/27
Cincinnati/Northern Kentucky International P 052 19,314,459 Construct Runway [FY 2006 Scheduled Payment]
053 5,644,650 Noise Mitigation Measures for Public Buildings
054 6,000,000 Construct Runway [FY 2006 Additional Payment]
Cynthiana-Harrison County GA 004 140,236 Construct Fuel Farm
Fleming-Mason GA 011 600,000 Construct Building [Construct T-Hangars], Construct Building [Construct T-
Fulton GA 003 25,175Hangars], Construct Building Construct Terminal Building
Glasgow Municipal GA 014 67,350 Improve Runway Safety Area - 07/25
Henderson City-County GA 016 25,153 Expand Apron
Hopkinsville-Christian County GA 012 50,350 Construct Building
Kentucky Dam State Park GA 005 101,099 Extend Runway Safety Area - 09/27, Remove Obstructions
Kyle-Oakley Field GA 015 293,726 Construct Building [Terminal Building]
Lebanon-Springfield GA 006 117,154 Install Weather Reporting Equipment
London-Corbin Airport-Magee Field GA 014 220,000 Construct Building, Install Runway Vertical/Visual Guidance System - 06/24
Louisville International-Standiford Field P 077 9,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
078 10,419,971 Acquire Safety Equipment, Acquire Snow Removal Equipment, Conduct Miscellaneous Study, Construct Building, Construct Taxiway, Improve Airport Miscellaneous Improvements, Improve Airport Miscellaneous Improvements
Madison GA 009 165,923 Install Weather Reporting Equipment
Madisonville Municipal GA 013 100,482 Acquire Emergency Generator
Marion-Crittenden County GA 006 300,000 Construct Building
Mayfield Graves County GA 008 303,054 Construct Building
Selection Criteria Year: 2006
Page 64 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO MEM KY McCreary County GA 005 151,237 Install Miscellaneous NAVAIDS, Install Runway Lighting - 04/22
Middlesboro-Bell County GA 008 150,000 Expand Apron, Improve Airport Drainage, Install Perimeter Fencing
Morehead - Roean County 001 3,628,955 Construct New Airport
002 1,183,225 Construct New Airport [Completion to 5,500 feet]
Muhlenberg County GA 003 25,000 Acquire Land For Approaches [Phase 1 preliminary cost including appraisals.]
New 006 4,720,578 Construct New Airport
Ohio County GA 005 138,476 Construct Building
Owensboro-Daviess County CS 033 500,052 Extend Runway - 18/36
034 2,265,000 Extend Runway - 18/36
Pike County-Hatcher Field GA 008 429,464 Install Perimeter Fencing, Install Perimeter Fencing
Samuels Field GA 009 375,363 Construct Building [Multi-Year Grant]
Somerset-Pulaski County-J.T. Wilson Field GA 014 2,497,518 Conduct Environmental Study, Construct Taxiway
Stuart Powell Field GA 012 93,222 Install Miscellaneous NAVAIDS, Install Perimeter Fencing, Update Airport Master Plan Study
Sturgis Municipal GA 007 283,292 Construct Fuel Farm
Taylor County GA 011 476,028 Construct Building
Tompkinsville-Monroe County GA 003 300,000 Construct Building
Tucker-Guthrie Memorial GA 005 400,000 Construct Building
Wendell H Ford GA 010 43,383 Update Airport Master Plan Study
Williamsburg-Whitley County GA 009 73,218 Construct Utilities
State Total: 47 Grants 85,282,574
SO MEM TN Lovell Field P 038 2,099,900 Install Runway Vertical/Visual Guidance System - Plan-1, Rehabilitate Runway [Rehab RW 15-33 (associated Taxiway D from RW 2-20 to RW 33 threshold)]
039 1,339,526
15/33, Rehabilitate Runway [Rehab RW 15-33 from RW 2-20 to threshold of RW 33 (Phase 3)] - 15/33 Construct Apron [Design Portion of West GA Development], Rehabilitate Taxiway,
040 478,098Update Airport Master Plan Study Construct Apron
McGhee Tyson P 051 2,620,575 Construct Apron [Discretionary grant to fund unfunded portion of West GA Apron Project in multi-year AIP #50]
Selection Criteria Year: 2006
Page 65 of 93
Grants Awarded by FY FAA - Office Of Airports
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
SO MEM TN McKellar-Sipes Regional 017CS 862,800
Memphis International 068P 5,878,000
069 20,366,583
070 18,291,890
Nashville International 077P 5,434,850
078 4,079,151
079 1,306,513
Tennessee State Block Grant Program 026 14,031,106
Tri-Cities Regional TN/VA 043P 1,523,040
044 948,771
State Total: 14 Grants 79,260,803
ADO Total: 61 Grants 164,543,377
SO ORL FL Airglades 003GA 1,993,215
Albert Whitted 014R 178,600
015 786,550
Apalachicola Municipal 003GA 856,617
Avon Park Executive 013GA 1,488,538
Bartow Municipal 021GA 1,170,804
Bob Sikes 018GA 449,093
Boca Raton 010R 3,053,000
Cecil Field 008R 1,945,712
009 1,443,251
Charlotte County 021GA 198,274
Craig Municipal 017R 150,000
Report Date 03/13/2007
Brief Description Of Work
Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Service Road
Rehabilitate Runway [FY 2006 Scheduled Payment]
Acquire Snow Removal Equipment, Construct Taxiway [TWY Victor Reim.], ImproveService Road, Improve Terminal Building [Phase 1- Design Intermodal Facility],Rehabilitate Taxiway [TWY November Rehabilitation], Widen TaxiwayImprove Access Road, Improve Access Road
Extend Runway Safety Area - 02L/20R, Extend Runway Safety Area - 02R/20L
Acquire Snow Removal Equipment, Rehabilitate Runway Lighting - 02L/20R,Rehabilitate TaxiwayRehabilitate Taxiway
Non primary development projects in state block grant program
Acquire Land For Approaches [RW 27 RPZ (31.93 acres)]
Acquire Land For Approaches, Improve Runway Safety Area - 05/23, RehabilitateTerminal Building, Security Enhancements
Improve Runway Safety Area [Phase 2, construction] - 13/31
Construct Heliport/Helipad
Construct Apron
Rehabilitate Runway - 13/31
Rehabilitate Runway [Rehab RW 9/27 Lighting] - 09/27, Rehabilitate Runway[Rehabilitate Runway 9/27, Phase 2, Construction] - 09/27Expand Apron
Rehabilitate Runway [(Phase 2 Design)] - 17/35, Update Airport Master Plan Study
Install Guidance Signs, Noise Mitigation Measures for Residences within 65 - 69DNL [Residential Sound Installation]Construct Building [Rehabilitate Hangar 67 (Roof)]
Install Perimeter Fencing [(Rehabilitate Perimeter Fencing)], Rehabilitate Building [FireMain], Rehabilitate TaxiwayAcquire Safety Equipment
Conduct Airport Master Plan Study [Layout Plan Update]
Selection Criteria Year: 2006
Page 66 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite
SO ORL FL Cross City
Crystal River
Daytona Beach International
Defuniak Springs
Destin-Fort Walton Beach
Eglin AFB
Executive
Fernandina Beach Municipal
Fort Lauderdale Executive
Fort Lauderdale/Hollywood International
Gainesville Regional
Hilliard Airpark
Immokalee
Inverness
Jacksonville International
Key West International
Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GA 005 329,153 Construct Taxiway [Construct T-Hangar Taxilanes, Phase 1], Update Airport Master Plan Study
GA 003 38,000 Conduct Environmental Study
P 049 2,375,000 Install Instrument Approach Aid [Instument Landing System] - 07L/25R
GA 003 41,057 Rehabilitate Runway [Runway Rehab Design] - 09/27, Update Airport Master Plan Study
GA 013 453,394 Install Apron Lighting
P 017 3,451,736 Expand Apron [Expand Terminal Apron]
R 023 780,592 Improve Airport Drainage [Ph2 Stormwater Facility], Install Guidance Signs, Rehabilitate Runway Lighting - 13/31
R 016 140,125 Construct Taxiway [Taxiway E, design only], Improve Airport Drainage [Taxiway A, design only], Rehabilitate Taxiway [Taxiway B, design only]
R 022 174,420 Install Airfield Guidance Signs [Rehabilitate - Reimbursement], Install Perimeter Fencing [Rehabilitate - Reimbursement], Rehabilitate Runway Lighting [Runway 8/26] - 08/26
023 2,180,915 Improve Runway Safety Area - 13/31, Rehabilitate Runway - 13/31
P 050 1,952,704 Conduct Environmental Study
051 6,297,917 Acquire Friction Measuring Equipment, Construct Taxiway [Design High Speed Exit Taxiways], Improve Airport Drainage, Rehabilitate Apron [Terminal 2,3,and 4], Rehabilitate Taxiway [D, T5, T8, and B East]
052 1,050,000 Update Airport Master Plan Study [and Airport Layout Plan]
P 023 2,828,500 Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate Taxiway Lighting
GA 002 80,750 Rehabilitate Runway - 18/36, Rehabilitate Runway Lighting - 18/36
GA 003 149,435 Conduct Airport Master Plan Study [Update MP/ALP]
004 750,039 Construct Taxiway [partial parallel Taxiway C, including medium intensity taxiway lights and signage]
GA 002 356,411 Conduct Airport Master Plan Study [Master Plan/ALP Update], Install Perimeter Fencing [Perimeter Fencing (19,200 L.F.)]
P 041 8,597,150 Construct Apron [Construct Air Carrier Apron, Phase 2 (60,890 SY)]
P 028 3,666,219 Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Emergency Generator, Acquire Equipment, Construct Terminal Building, Install Perimeter Fencing, Rehabilitate Airport Beacons
029 3,234,614 Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise Mitigation]
030 684,207 Install Perimeter Fencing, Rehabilitate Runway Lighting - 09/27, Rehabilitate Terminal
Selection Criteria Year: 2006
Page 67 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
SO ORL FL 030 Building
Keystone Airpark GA 016 150,000 Install Perimeter Fencing
Kissimmee Gateway R 028 607,888 Rehabilitate Taxiway [Taxiway C], Widen Taxiway [B]
Lake City Municipal GA 016 142,636 Install Perimeter Fencing, Rehabilitate Runway [Runways 10/28 and 5/23] - 10/28
Lake Wales Municipal GA 008 47,025 Rehabilitate Runway Lighting - 06/24
Leesburg Regional GA 014 675,435 Extend Runway [(Design)] - 13/31
Marco Island GA 002 105,308 Update Airport Master Plan Study
003 414,475 Expand Apron [Design - PH1], Expand Apron [Land Acquisition - PH2]
Marianna Municipal GA 006 138,349 Rehabilitate Apron [(Terminal)]
Melbourne International P 030 4,184,012 Construct Apron, Construct Service Road [Construct Service Road (Other)], Install
Merritt Island GA 015 196,175Taxiway Lighting, Rehabilitate Taxiway [Rehabilitate Taxiway Q] Conduct Airport Master Plan Study [airport master plan and airport layout plan
Miami International P 052 7,550,000update] Construct Runway [Construct Runway 8/26 (now Runway 8L/26R)] - Plan-1
053 8,720,307 Rehabilitate Apron
Naples Municipal CS 024 1,444,230 Acquire Emergency Generator, Install Airport Beacons, Install Miscellaneous NAVAIDS [Acquire and Install Omnidirectional Approach Lighting System (ODALS)],
025 2,727,993Install Perimeter Fencing, Rehabilitate Terminal Building [Roofing] Construct Service Road [Emergency Road Around Runway 23, Design and Construct], Construct Taxiway [Realign Taxiway B/apron expansion, Design Phase 1 (including topo survey)], Construct Taxiway [South Quadrant Taxiways]
Okeechobee County GA 014 240,920 Acquire Emergency Generator [Acquire and Install Emergency Generators]
Orlando International P 092 5,620,000 Construct Runway - 17L/35R
093 2,000,000 Construct Taxiway [LOI 9 of 10]
094 4,466,203 Rehabilitate Terminal Building
Orlando Sanford International P 050 7,869,732 Expand Apron [east terminal apron (design and construction)], Expand Terminal Building, Rehabilitate Runway Lighting - 18/36
051 2,705,182 Acquire Easement for Noise Compatibility within 65 - 69 DNL [effects 30 homes/75 persons]
052 1,817,350 Extend Runway [Land Acquisition] - 09R/27L
Ormond Beach Municipal R 011 121,744 Construct Heliport/Helipad [design phase], Install Runway Vertical/Visual Guidance System [REILS - Runway 8, 26, 35, Design] - 08/26, Rehabilitate Runway [RW 17/35 Rehab PH1 (Pre-Design)] - 17/35, Update Airport Master Plan Study
Selection Criteria Year: 2006
Page 68 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO ORL FL Page Field GA 014 3,000,000 Construct Taxiway [(Taxiway D)], Extend Taxiway [(Taxiway C)]
Palatka Municipal - Lt. Kay Larkin Field GA 014 1,140,680 Improve Airport Drainage, Install Airfield Guidance Signs [Install Airfield Guidance
Palm Beach County Park R 006 171,399Signs], Install Runway Lighting - 17/35, Install Taxiway Lighting Install Weather Reporting Equipment
Palm Beach International P 045 3,266,542 Improve Terminal Building [skylight damaged from Hurrican Wilma, fall 2005], Improve Terminal Building [wall panels, Concourse CB, damaged from Hurricane
046 2,827,967Wilma, fall 2005], Improve Terminal Building Conduct Miscellaneous Study [Benefit-Cost-Analysis], Extend Runway [Extend Runway - PH1 (EIS)] - 09R/27L, Update Miscellaneous Study [Stormwater Master
Panama City-Bay County International P 037 906,303Plan] Conduct Environmental Study [Phase 6]
Peter Prince Field GA 009 201,902 Install Miscellaneous NAVAIDS [segmented circle and wind cone], Install Runway Vertical/Visual Guidance System [runway end identification lights] - 18/36,
Quincy Municipal GA 003 86,166Rehabilitate Runway [mark] - 18/36 Extend Runway [Conduct EA] - 14/32
Sarasota/Bradenton International P 039 570,000 Update Airport Master Plan Study
040 7,965,566 Rehabilitate Runway - 14/32, Rehabilitate Service Road [relocate and widen
Southwest Florida International P 039 4,000,000perimeter road] Construct Apron
Space Coast Regional GA
040
018
2,291,049
999,960
Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Apron, Construct Terminal Building [Construct New Terminal Building] Rehabilitate Apron [Rehabilitate Apron]
St Augustine R 021 4,407,868 Construct Apron [Construct Apron], Construct Taxiway
St Lucie County International GA 026 48,450 Conduct Airport Master Plan Study [update]
027 6,539,438 Construct Runway - 09/27, Construct Taxiway [Parallel], Install Perimeter Fencing
Suwannee County GA 006 760,000 Rehabilitate Runway [Rehabilitate Runway 7/25] - 07/25
Tallahassee Regional P 031 1,417,432 Security Enhancements
Tampa International P 046 3,127,614 Construct Taxiway [Construct High Speed Taxiway (Phase 2 Design and Construct) and Extend Taxiway A (Phase 2 Design and Construct)], Rehabilitate Taxiway [W, Phase 2 (from Runway 26L to Taxiway J Connector)]
047 4,500,000 Construct Taxiway [Construct New Taxiway D between Runway 9-27 and Taxiway J (Phase II - Construction)], Construct Taxiway [Relocate Taxiway E.
The Florida Keys Marathon GA 022 1,397,799 between Runway 9-27 and Taxiway J (Phase II - Construction)] Acquire Emergency Generator [Replace], Construct Apron [East General Aviation
Selection Criteria Year: 2006
Page 69 of 93
FAA - Office Of Airports
Region ADO State Worksite
SO ORL FL
Vandenberg
Venice Municipal
Wauchula Municipal
Williston Municipal
Witham Field
SO ORL
State Total:
PR Antonio Rivera Rodriguez
Eugenio Maria De Hostos
Luis Munoz Marin International
Mercedita
Rafael Hernandez
SO ORL
State Total:
State Total:
VI Cyril E King
Henry E Rohlsen
Grants Awarded by FY
FY 2006
Service Level
Grant Seq Number
AIP Federal Funds
022
R
R
GA
GA
GA
023
028
011
007
008
011
012
889,000
1,540,530
3,650,322
184,906
86,140
5,000,000
150,000
84 Grants 166,397,989
P 015 347,200
P
P
013
042
781,970
8,880,827
CS
P
015
019
1,220,966
165,460
5 Grants 11,396,423
P
P
2 Grants
025
028
1,521,221
1,091,550
429,671
Report Date 03/13/2007
Brief Description Of Work
(1667 square yards)], Improve Building [Improve Electrical Vault], Install PerimeterFencing [Replace], Rehabilitate Apron [West General Aviation (400 square yards)]Install Perimeter Fencing, Rehabilitate Runway Lighting - 07/25, Rehabilitate TerminalBuildingInstall Airfield Guidance Signs, Rehabilitate Apron [overlay General Aviation ApronA and B]Rehabilitate Runway - 13/31
Construct Taxiway [T-Hangar Taxilane]
Update Airport Master Plan Study [and Terminal Area Plan]
Acquire Land for Noise Compatibility within 65 - 69 DNL [Land Acquisition in the 65DNL]Conduct Miscellaneous Study [Conduct Runway 12/30 Runway ProtectionZone/Runway Safety Area Study], Conduct Miscellaneous Study [airport propertymap and evaluate Runway 12/30 runway safety area and runway protection zonealternatives]
Improve Runway Safety Area - 09/27, Install Emergency Generator, InstallGuidance Signs, Install Runway Vertical/Visual Guidance System [PAPI on Runway9] - 09/27, Rehabilitate Taxiway [A Portion - 500 ft. x 35 ft.]Improve Runway Safety Area - 09/27
Conduct Miscellaneous Study [utility master plan, Phase III], Rehabilitate RunwayLighting [Reconstruct Runway 8/26 Lights (HIRL)(includes new electrical vault)] 08/26, Security EnhancementsImprove Runway Safety Area - 12/30, Install Emergency Generator
Improve Runway Safety Area [8 end only] - 08/26, Install Airfield Guidance Signs[All reimbursement and force account]
Improve Terminal Building [install new baggage claim conveyor], SecurityEnhancementsSecurity Enhancements
Selection Criteria Year: 2006
Page 70 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
ADO Total:
Report Total:
Region Total:
91 Grants
1579 Grants
2059 Grants
179,315,633
3,539,103,886
679,473,980
SW AROK AR Adams Field P 061 585,002 Acquire Aircraft Rescue & Fire Fighting Vehicle [Replace ARFF Vehicle No. 2]
062 3,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
063 1,476,084 Extend Runway [Phase III, Extend Runway 18 Design] - 18/36, Improve Airport Drainage [West of RW 4R/22L], Rehabilitate Apron [Replace Approximately 30
Almyra Municipal GA 003 385,961Concrete Slabs] Rehabilitate Apron
Bentonville Municipal/Louise M Thaden Field
Billy Free Municipal
GA
GA
006
003
665,691
160,455
Acquire Safety Equipment [Install perimter fence (barbed wire)], Construct Taxiway [Construct west side GA access taxiway] Acquire Land For Approaches, Construct Taxiway [Phase 1-Acquire Land and
Boone County CS 015 1,362,526Design Only] Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate Apron [Phase 1 GA Apron Rehab], Rehabilitate Runway Lighting [Rehabilitate RWY LGTG is requirement of 139 Inspection] - 18/36
Calico Rock-Izard County GA 003 54,898 Construct Taxiway [Phase 1 - Design Only]
Carlisle Municipal GA 006 315,843 Improve Runway Safety Area - 18/36, Rehabilitate Taxiway
Carroll County GA 007 243,163 Conduct Airport Master Plan Study [AMP Update & Approach Procedure Survey], Rehabilitate Apron [Rehabilitate hangar apron]
Clarendon Municipal GA 002 73,162 Construct Runway [Phase 1 - Land Acquisition] - Plan-1
Clarksville Municipal GA 006 234,128 Construct Apron
Clinton Municipal GA 005 41,305 Widen Runway [Design only 2006] - 13/31, Widen Taxiway [Design only 2006]
Corning Municipal GA 010 149,808 Construct Apron
De Witt Municipal GA 003 481,470 Construct Apron
Drake Field GA 035 278,456 Construct Apron [Phase II: Construct West Side GA Apron]
Frank Federer Memorial GA 002 367,740 Conduct Airport Master Plan Study, Extend Taxiway
Grider Field GA 009 267,086 Construct Taxiway
H L Hopkins-Fordyce Municipal GA 003 622,275 Rehabilitate Runway [Phase II - Overlay and Widen Runway to 60', Relocate Runway Lights and Construct Turn Arounds] - 04/22
J Lynn Helms Sevier County GA 006 140,917 Rehabilitate Runway - 08/26, Update Airport Master Plan Study
Selection Criteria Year: 2006
Page 71 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SW AROK AR Jonesboro Municipal CS 014 1,458,322 Rehabilitate Runway Lighting - 05/23
Magnolia Municipal GA 008 892,907 Extend Runway [400' x 100', Extend Parallel Taxiway & Relocate Utilities] - 18/36
Malvern Municipal GA 001 141,170 Remove Obstructions [Acquire Land for Obstruction Relocation]
Manila Municipal GA 005 244,854 Rehabilitate Runway Lighting [Includes REILS and MITL] - 18/36
Marianna/Lee County-Steve Edwards Field GA 002 532,748 Extend Taxiway
Marked Tree Municipal GA 004 205,345 Rehabilitate Apron
Mena Intermountain Municipal GA 013 107,697 Conduct Miscellaneous Study [Study Runway Pavement Geometry in Vicinity of the Intersection of RW 9 and RW 35], Rehabilitate Runway [Remark Runway 9/27] -
Monticello Municipal/Ellis Field GA 008 231,80709/27 Install Airfield Guidance Signs [Hold Signs], Rehabilitate Runway [Seal Runway
New Saline County 001 1,315,175
3/21 and Remark] - 03/21, Update Miscellaneous Study [ALP With Action Plan Narrative] Construct New Airport [Phase 5- access road and terminal area improvements]
North Little Rock Municipal R 018 234,095 Construct Taxiway [Phase II - RW 5]
Northwest Arkansas Regional P 026 745,373 Acquire Aircraft Rescue & Fire Fighting Vehicle
027 244,542 Conduct Miscellaneous Study
Ozark Regional GA 011 297,582 Extend Runway [Land Acquisition] - 05/23
Rogers Municipal-Carter Field GA 023 4,593,485 Construct Taxiway [Phase III]
Searcy Municipal GA 014 601,848 Expand Apron, Install Weather Reporting Equipment [FAA Reimbursable Agreement]
015 451,905 Install Weather Reporting Equipment [Install AWSS]
Sharp County Regional GA 004 27,871 Install Perimeter Fencing [Design Only]
Sheridan Municipal GA 002 518,071 Widen Runway [from 50' to 75' and relocate MIRL] - 01/19
Smith Field GA 008 98,647 Conduct Miscellaneous Study, Install Perimeter Fencing [Install perimeter fencing]
South Arkansas Regional at Goodwin Field GA 011 215,474 Acquire Aircraft Rescue & Fire Fighting Vehicle
012 2,000,000 Acquire Safety Equipment [Wildlife/Perimeter Fencing], Improve Runway Safety Area [Phase II - Relocate Localizer] - 04/22, Strengthen Runway [Phase II, 3" Overlay and Remark Runway] - 13/31
State of Arkansas 005 239,539 Update State System Plan Study
Stuttgart Municipal GA 012 1,773,053 Rehabilitate Taxiway
Texarkana Regional-Webb Field P 025 441,750 Construct Aircraft Rescue & Fire Fighting Building [Design Only]
Waldron Municipal GA 003 559,798 Widen Runway [Phase II - Construction] - 09/27
Selection Criteria Year: 2006
Page 72 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SW AROK AR Walnut Ridge Regional GA 009 332,500 Install Taxiway Lighting
Warren Municipal GA 002 674,996 Rehabilitate Runway Lighting - 03/21, Widen Runway - 03/21
West Memphis Municipal R 019 2,605,451 Rehabilitate Runway Lighting [Relocate Electrical Vault] - 17/35, Widen Taxiway [Widen Taxiway A, Phase 2]
Z M Jack Stell Field GA 003 148,480 Rehabilitate Taxiway [Repair local pavement failures and overlay Taxiway]
State Total: 49 Grants 32,840,455
SW AROK OK Ardmore Downtown Executive GA 007 150,000 Rehabilitate Runway [Phase 2 - HMAC Overlay of RW 17/35] - 17/35
Ardmore Municipal GA 010 881,388 Rehabilitate Runway [Rehabilitate RWY 17/35] - 17/35
Arrowhead GA 003 57,190 Improve Runway Safety Area [Improve Safety Area (Design Only)] - 15/33, Install Airport Beacons [Install Airport Beacon (Design Only)] - -, Install Miscellaneous NAVAIDS [Install Miscellaneous NAVAIDS (Design Only)], Rehabilitate Apron [Rehabilitate Apron (Design Only)] - -, Rehabilitate Runway [Rehabilitate runway
Bartlesville Municipal GA 007 1,767,000(DESIGN ONLY)] - 15/33 Improve Runway Safety Area [Extend RW 17 650 feet] - 17/35
Beaver Municipal GA 001 600,000 Extend Runway [Extend and widen runway.] - 17/35, Install Runway Lighting 17/35, Rehabilitate Runway - 17/35
Chickasha Municipal GA 005 230,034 Construct Taxiway, Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Taxiway
Christman Airfield GA 003 312,451 Construct Taxiway, Expand Apron, Improve Access Road
Claremore Regional GA 010 50,160 Construct Taxiway
Cleveland Municipal GA 004 169,100 Strengthen Apron - -, Strengthen Taxiway -
Clinton Regional GA 006 730,484 Rehabilitate Taxiway [Phase 1-relocate and widen Taxiways A.]
Clinton-Sherman GA 002 155,939 Rehabilitate Runway Lighting [Phase 2-rehab electrical vault equipment] - 17R/35L
Cordell Municipal GA 001 93,290 Rehabilitate Runway [Design] - 17/35
Cushing Municipal GA 008 161,500 Improve Access Road -
David Jay Perry GA 004 625,316 Construct Taxiway, Install Airport Beacons - -, Rehabilitate Runway - 17/35
Davis Field GA 006 436,782 Rehabilitate Taxiway Lighting
Eaker Field GA 005 719,872 Construct Taxiway [Relocate hangar, reconstruct terminal apron, and construct
El Reno Regional GA 007 245,416hangar access apron] Rehabilitate Apron [Seal Cracks, Seal Coat and Mark] - -, Rehabilitate Taxiway
Elk City Municipal GA 008 235,125 [Crack Seal, Asphalt Rejuvinate and Mark (parallel and connector TWs)] Acquire Miscellaneous Land [Phase 2 land reimbursement]
Selection Criteria Year: 2006
Page 73 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
SW AROK OK Enid Woodring Regional
Eufaula Municipal
Fountainhead Lodge Airpark
Frederick Municipal
Grove Municipal
Guthrie Municipal
Halliburton Field
Lake Murray State Park
Lawton-Fort Sill Regional
Lindsay Municipal
Madill Municipal
Miami Municipal
Mooreland Municipal
Okemah Municipal
Pauls Valley Municipal
Perry Municipal
Richard Lloyd Jones Jr
Robert S Kerr
Sallisaw Municipal
Scott Field
Shawnee Regional
Stan Stamper Municipal
State of Oklahoma
FY 2006
Service Grant SeqLevel Number
GA 018
GA 004
GA 004
GA 005
GA 011
GA 008
GA 007
GA 003
P 022
GA 002
GA 002
GA 011
GA 001
001
GA 005
GA 005
R 016
GA 008
GA 007
GA 002
GA 011
GA 007
006
AIP Federal Funds
2,902,660
355,560
29,165
289,931
235,600
150,000
74,994
23,180
864,500
230,392
93,100
185,250
600,000
405,696
428,907
19,746
3,009,866
806,590
300,000
578,689
100,000
721,620
179,011
Report Date 03/13/2007
Brief Description Of Work
Rehabilitate Runway - 17/35
Rehabilitate Runway - 17/35, Rehabilitate Taxiway
Install Airport Beacons [Install Airport Beacon (Design Only)], Install Runway Lighting [Install Runway Lighting (DESIGN ONLY)] - 18/36, Rehabilitate Runway [Displace threshold (Design Only)] - 18/36, Remove Obstructions [Remove Obstructions (Design Only)] - Improve Airport Drainage [Adjacent & Parallel to RW 12/30], Install Runway Vertical/Visual Guidance System - 17R/35L, Rehabilitate Apron Acquire Land for Development [57.75 acres on westside]
Install Perimeter Fencing
Construct Taxiway
Install Airport Beacons [Install Airport Beacons (Design Only)], Install Runway Lighting [Install runway lighting (Design Only)] - 14/32 Rehabilitate Apron
Rehabilitate Runway - 01/19, Widen Runway - 01/19
Install Perimeter Fencing [Phase 1 (Design-only)] - -, Rehabilitate Access Road [Phase 1 (Design-only)], Rehabilitate Runway [Phase 1 (Design-only)] - 18/36, Update Airport Master Plan Study Rehabilitate Apron [Reconstruct T-hangar Taxilanes]
Construct Taxiway, Rehabilitate Runway - 17/35, Widen Runway - 17/35
Construct New Airport
Extend Runway Safety Area [Extend Rwy 17 safety area (close road, grading & drainage).] - 17/35, Extend Runway Safety Area [Extend Rwy 17 safety area(acquire land).] - 17/35, Extend Runway Safety Area [Improve drainage and grade Rwy 12 safety area as part of Rwy 17 safety area impvts.] - 17/35 Improve Airport Drainage, Rehabilitate Taxiway
Improve Airport Drainage [Phase 1B,2,3 - Improve SE Airport Drainage]
Rehabilitate Runway - 18/36, Rehabilitate Taxiway [Rehabilitate Taxiway]
Rehabilitate Runway - 17/35
Construct Access Road, Rehabilitate Runway - 17/35
Rehabilitate Taxiway -
Install Perimeter Fencing
Update State System Plan Study
Selection Criteria Year: 2006
Page 74 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
SW AROK OK Stigler Regional GA 003 81,415 Update Airport Master Plan Study
Stroud Municipal GA 004 138,700 Improve Access Road
Tahlequah Municipal GA 006 698,085 Construct Taxiway [Relocate portion of TW A 240' from RW centerline and Construct Hangar Access Taxilanes]
007 1,928,500 Extend Runway [Extend RW 17 (1000'x75' & Associated Parallel TW)] - 17/35
Thomas Municipal GA 004 41,800 Widen Runway [Design only - Runway Widen] - 17/35
Tulsa International P 053 2,762,399 Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate Terminal Building [Replace Six Inbound Baggage Conveyor Systems]
057
058
7,000,000
4,132,805
Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise mitigation (continued)] Extend Runway [Extend Taxiway Echo (1200 feet from TW DD to TW F)] - 08/26
Vinita Municipal GA 005 93,570 Conduct Miscellaneous Study [to Develop CIP, ALP update, surveys, geotechnical testing, hazard zoning ordinance]
West Woodward GA 004 498,930 Rehabilitate Apron
005 1,077,040 Rehabilitate Taxiway
Wilburton Municipal GA 003 493,461 Rehabilitate Runway - 17/35
Wiley Post R 015 475,000 Install Taxiway Lighting, Rehabilitate Apron, Rehabilitate Runway - 17R/35L,
Will Rogers World P 053 5,734,200Rehabilitate Taxiway Acquire Snow Removal Equipment [2 Brooms Replace.], Improve Runway Safety
William R. Pogue Municipal GA 012 137,574Area [Construct Rwy 13/31 Safety Area Improvement.] - 13/31, Widen Taxiway Rehabilitate Taxiway [TW Alpha Crack Seal & Sealcoat]
State Total: 56 Grants 45,498,983
ADO Total: 105 Grants 78,339,438
SW LANM LA Abbeville Chris Crusta Memorial GA 012 165,277 Improve Runway Safety Area [Tree Removal (east side of runway) and Grading of Safety Area (Phase II)] - 15/33
Acadiana Regional GA 011 150,000 Install Perimeter Fencing, Update Airport Master Plan Study
Alexandria International P 032 5,197,025 Construct Terminal Building [Phase XI]
033 450,000 Rehabilitate Taxiway [1/2 of Taxiway E]
Allen Parish GA 008 970,303 Construct Taxiway
Baton Rouge Metropolitan, Ryan Field P 071 1,410,000 Extend Runway - 04L/22R, Improve Runway Safety Area [Acquisition of Hobgood Property.] - 04L/22R
Selection Criteria Year: 2006
Page 75 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
SW LANM LA 072 5,962,046 Expand Apron [Engineering and Phase I Construction], Improve Runway Safety Area [Acquisition of Conway Trucking ($1.677M); Design for Plank and Blount Road
C E 'Rusty' Williams GA 005 258,132Relocation ($869k)] - 04L/22R Improve Airport Drainage
Chennault International GA 005 129,434 Construct Building [Phase I - Engineering]
DeQuincy Industrial Airpark GA 011 519,175 Rehabilitate Runway - 15/33
False River Regional
George R Carr Memorial Air Field
GA
GA
012
013
738,629
862,125
Acquire Easement For Approaches, Acquire Land For Approaches, Construct Building [Two hangar complexs] Improve Runway Safety Area [1/3 Precast Piles and East Side Retaining Wall]
Harry P Williams Memorial GA 010 910,38718/36 Improve Airport Drainage [Phase I]
Homer Municipal GA 003 234,859 Rehabilitate Runway - 12/30
Houma-Terrebonne GA 021 2,994,800 Rehabilitate Taxiway [Phase II Construction], Rehabilitate Taxiway [TW B, E, and H]
Jena GA 002 731,874 Rehabilitate Runway - 17/35, Rehabilitate Taxiway [Rehabilitate Taxiway]
Jennings GA 010 438,671 Install Runway Lighting - 13/31, Update Airport Master Plan Study
John H Hooks Jr Memorial GA 009 423,954 Rehabilitate Apron
Jonesboro GA 003 280,857 Remove Obstructions
Jonesville GA 001 400,000 Rehabilitate Runway [$500K LA DOTD funds] - 06/24
Lafayette Regional P 031 3,222,750 Rehabilitate Taxiway [phase 2 of reconstruct Taxiway Bravo east of 4/22],
Lake Charles Regional P 031 1,000,000Rehabilitate Taxiway [phase 3 and last of reconstruct Taxiway Bravo east of 4/22] Construct Aircraft Rescue & Fire Fighting Building
032 1,600,000 Improve Airport Miscellaneous Improvements
Lakefront R 019 790,000 Improve Airport Drainage [Engineering], Improve Airport Erosion Control [Engineering], Rehabilitate Runway Lighting [Engineering] - 18L/36R, Security Enhancements [Engineering]
020 2,755,710 Improve Airport Drainage [Construction], Rehabilitate Runway Lighting [Construction] - 18L/36R, Security Enhancements [Construction]
021 9,640,990 Improve Airport Erosion Control [Construction]
Le Gros Memorial GA 005 511,629 Rehabilitate Runway Lighting - 04/22
Leesville GA 007 458,938 Rehabilitate Runway Lighting - 18/36
Louis Armstrong New Orleans International P 077 8,059,218 Security Enhancements
078 3,000,000 Improve Airport Miscellaneous Improvements
Selection Criteria Year: 2006
Page 76 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SW LANM LA Monroe Regional P 022 2,069,592 Rehabilitate Runway Lighting [Phase II Airfield Lighting Rehab.] - 14/32
023 3,865,702 Rehabilitate Runway - 04/22
New Orleans Regional Planning Commission 001 350,000 Conduct Metropolitan System Plan Study
Ruston Regional GA 012 80,897 Conduct Airport Master Plan Study
Shreveport Downtown R 014 146,530 Rehabilitate Taxiway [Taxiway F - Engineering only]
Shreveport Regional P 039 5,123,669 Expand Service Road [Expand Perimeter Road], Install Guidance Signs, Rehabilitate Runway Lighting - 05/23, Rehabilitate Taxiway [Taxiways B & C], Rehabilitate Taxiway Lighting [Taxiways B & E]
South Lafourche GA 008 672,750 Extend Runway [Phase II of Construction - Airfield Lighting and Vault] - 18/36
Southland Field GA 010 95,857 Rehabilitate Runway [sealcoat runway and taxiways] - 15/33
St John the Baptist Parish
St. Tammany Regional
GA
GA
012
005
511,737
375,250
Construct Taxiway [Phase II - Construction], Construct Taxiway [Phase II Construction] Extend Runway [Acquire Land (~70 Acres)] - 18/36
State of Louisiana 001 285,000 Conduct State System Plan Study
Union Parish GA 007 372,933 Construct Taxiway
Various Locations in Louisiana 004 4,380,000 Improve Airport Miscellaneous Improvements (Abbeville Chris Crusta Memorial; Acadiana Regional; Allen Parish; Beauregard Regional; Chennault International; Concordia Parish; DeQuincy Industrial Airpark; Esler Regional; George R Carr Memorial Air Field; Hammond Northshore Regional; Harry P Williams Memorial; Houma-Terrebonne; Le Gros Memorial; Leesville; Louisiana Regional; Natchitoches Regional; Slidell; South Lafourche; Southland Field; St John the Baptist Parish; St. Tammany Regional; The Red River; Vicksburg Tallulah Regional)
State Total: 43 Grants 72,596,700
SW LANM NM Alamogordo-White Sands Regional GA 013 372,597 Rehabilitate Apron
Albuquerque International Sunport P 031 10,453,996 Rehabilitate Apron
Alexander Municipal GA 007 611,647 Construct Runway [Engineering design and start site prep] - Plan-1
Artesia Municipal GA 008 122,614 Install Perimeter Fencing [complete perimeter fencing]
Carrizozo Municipal GA 002 914,360 Rehabilitate Runway - 06/24
Cavern City Air Terminal GA 016 405,775 Rehabilitate Taxiway [also called t-hanger taxiway]
Clovis Municipal GA 019 797,133 Acquire Aircraft Rescue & Fire Fighting Vehicle, Extend Runway [Environmental Assessment] - 04/22, Improve Runway Safety Area - 04/22
Selection Criteria Year: 2006
Page 77 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
SW LANM NM Deming Municipal GA 010 121,289 Extend Runway [engineering for runway extension] - 08/26
Dona Ana County at Santa Teresa GA 016 650,000 Extend Runway - 10/28, Rehabilitate Apron, Update Airport Master Plan Study
Double Eagle II R 012 1,900,000 Construct Apron, Construct Taxiway
Fort Sumner Municipal GA 006 118,959 Rehabilitate Runway [sealcoat and crack seal pavement] - 03/21
Four Corners Regional P 027 192,165 Rehabilitate Runway [Design Only] - 05/23, Rehabilitate Runway Lighting [Design Only] - 07/25
Gallup Municipal GA 019 123,643 Rehabilitate Taxiway [Design Only]
Grant County GA 006 827,709 Acquire Aircraft Rescue & Fire Fighting Vehicle [Part 139 requirement], Conduct
Grants-Milan Municipal GA 009 295,515Environmental Study, Rehabilitate Runway Lighting - 08/26 Acquire Snow Removal Equipment, Rehabilitate Runway [seal & Mark Pavement] 13/31
Hatch Municipal GA 002 665,000 Construct Taxiway
Jicarilla Apache Nation GA 008 132,285 Construct Fuel Farm [design only], Improve Access Road [Phase 1 design only],
Las Cruces International GA 018 847,505Improve Snow Removal Equipment Building [provide utilities to new building] Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Airfield Guidance Signs
Las Vegas Municipal GA 009 389,585 Install Runway Lighting - 02/20, Install Runway Vertical/Visual Guidance System 14/32
Lea County Regional GA 015 319,676 Improve Terminal Building
Lordsburg Municipal GA 006 106,229 Extend Runway [project revised to engineering only] - 12/30, Install Perimeter
Los Alamos GA 002 140,000Fencing Rehabilitate Runway Lighting - 09/27
Moriarty GA 007 337,955 Rehabilitate Runway - 08/26, Rehabilitate Taxiway
Portales Municipal GA 012 301,651 Conduct Environmental Study, Modify Access Road
Proposed - GA 004 1,554,263 Construct New Airport [Pave]
Roswell International Air Center CS 017 764,627 Acquire Aircraft Rescue & Fire Fighting Vehicle [ARFF 139 recommendation],
Santa Fe Municipal P 024 535,028Improve Terminal Building [Terminal ADA improvements Phase 1 design only] Acquire Aircraft Rescue & Fire Fighting Vehicle
State of New Mexico
Taos Regional GA
004
016
115,425
167,456
Conduct Airport Master Plan Study (Angel Fire; Aztec Municipal), Update Airport Master Plan Study (Las Cruces International) Install Perimeter Fencing, Install Runway Vertical/Visual Guidance System [Relocate
Truth Or Consequences Municipal GA 009 52,535 PLASI] - 04/22, Rehabilitate Taxiway Rehabilitate Apron [Design], Rehabilitate Taxiway [Phase I Design Only], Rehabilitate Taxiway [Phase I Design Only]
Selection Criteria Year: 2006
Page 78 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite
State Total:
ADO Total:
SW TEX TX Abilene Regional
Austin-Bergstrom International
Brownsville/South Padre Island International
Corpus Christi International
Dallas Love Field
Dallas/Fort Worth International
East Texas Regional
P
Service Level
30 Grants
73 Grants
030
Grant Seq Number
P
031
035
036
P
P
030
031
038
P
P
030
078
079
080
P 025
AIP FederalFunds
24,336,622
96,933,322
2,000,000
2,255,076
3,500,000
2,812,500
320,602
1,000,000
9,356,300
8,100,000
5,692,000
24,918,468
7,104,882
5,705,250
Brief Description Of Work
Improve Terminal Building [Phase 4, Construction], Improve Terminal Building [Phase 4, Construction], Rehabilitate Apron [Rehabilitate Air Carrier Apron, Area C, Phase I (Design)], Rehabilitate Apron [Rehabilitate Air Carrier, Area B, Phase I (Design)], Rehabilitate Apron [Rehabilitate General Aviation Apron/Taxilane, Area A, Phase I (Design)], Rehabilitate Apron [Rehabilitate General Aviation Apron/Taxilane, Area B, Phase I (Design)] Rehabilitate Apron [Rehabilitate Air Carrier Apron, Area A], Rehabilitate Runway Lighting [Rehabilitate Runway 17L/35R Lighting System, Phase I (Design)] - 17L/35R Acquire Land for Noise Compatibility within 65 - 69 DNL [Acquire Land]
Acquire Interactive Training System [Acquire Interactive Training System], Rehabilitate Runway Lighting [Rehabilitate Airfield Runway Lighting System] 17R/35L, Security Enhancements [Security System Upgrade, Phase 1 (Design)], Update Airport Master Plan Study [Update Airport Master Phasing Plan, Level 1] Conduct Noise Compatibility Plan Study
Construct Apron, Improve Airport Drainage [Improve airport drainage, Phase I], Rehabilitate Apron [Terminal ramp improvements], Rehabilitate Runway - 13R/31L Acquire Equipment [Acquire Runway Sweeper], Extend Runway [Extend Runway 13/31 (B/C Analysis)] - 13/31, Improve Airport Drainage [Improve Airport Drainage, Phase V, (Design)], Rehabilitate Apron [Rehabilitate Air Carrier Apron], Rehabilitate Apron [Rehabilitate West Apron, Phase I (Design)], Rehabilitate Apron [Rehabilitate West Apron, Phase II, (Construction)], Rehabilitate Runway [Runway 17/35's Shoulders and Blast Pads (Construction Only)] - 17/35, Rehabilitate Taxiway [Rehabilitate Taxiway B, Phase I, (Design)] Improve Airport Drainage [Phase 1, Design], Rehabilitate Apron, Security Enhancements Extend Runway [LOI Payment #7] - 17C/35C
Construct Taxiway [Construct Perimeter Taxiway - Phase 1 SE]
Improve Terminal Building [Rehabilitate or Replace Board Owned Jetbridges 2006], Rehabilitate Apron [Rehabilitate Aprons 2006 - Various locations], Rehabilitate Runway - 18R/36L, Rehabilitate Runway Lighting [Rehabilitate Airfield Lighting Phase 2] - 17C/35C, Rehabilitate Taxiway [Rehabilitate Taxiways - Various Locations] Construct Service Road [Engineering only.], Improve Airport Drainage, Rehabilitate
Selection Criteria Year: 2006
Page 79 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq Level Number
SW TEX TX 025
Easterwood Field P 023
024
El Paso International P 023
Ellington Field P 018
020
Fort Worth Alliance R 029
030
031
George Bush Intercontinental/Houston P 057
058
059
060
Kickapoo Downtown Airpark GA 007
Laredo International P 047
048
049
AIP Federal Funds
3,198,973
836,274
9,971,866
12,515,564
8,422,023
550,000
10,000,000
517,860
17,250,000
8,700,000
1,546,760
25,113
1,205,650
2,000,000
1,424,968
7,500,000
Brief Description Of Work
Runway - 17/35, Rehabilitate Taxiway [Rehabilitate Taxiways B, C, D, & E.]
Rehabilitate Runway [Rehab Runway 16-34] - 16/34
Expand Apron [Expand Terminal Apron, Phase 1]
Extend Runway [Conduct environmental assessment] - 08R/26L, RehabilitateRunway - 08R/26LRehabilitate Runway - 04/22, Rehabilitate Taxiway, Rehabilitate Taxiway Lighting
Rehabilitate Taxiway
Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire Aircraft Rescue & FireFighting Vehicle #2], Acquire Aircraft Rescue & Fire Fighting Vehicle [AcquireAircraft Rescue & Fire Fighting Vehicle #2]Extend Runway [Extend Runway - Phase 2] - 16L/34R
Conduct Noise Compatibility Plan Study [Custom Aircraft Profiles], Improve RunwaySafety Area [Construction- Precision Object Free Zone] - 16L/34R, Noise MitigationMeasures for Public Buildings [Testing and Analysis], Rehabilitate Runway [Design]- 16L/34R, Rehabilitate Runway Lighting [Install Runway End Identifier Lighting System] - 16L/34R Construct Runway - 08L/26R
Noise Mitigation Measures for Residences within 65 - 69 DNL, Noise Mitigation Measures for Residences within 70 - 74 DNL Acquire Aircraft Rescue & Fire Fighting Vehicle [Three Vehicles to replace existing units] VALE Vehicle [VALE]
Construct Apron [Construct holding apron for Taxiway A.], Construct Taxiway, Improve Airport Miscellaneous Improvements, Install Weather Reporting Equipment, Rehabilitate Apron [Engineering design only.], Rehabilitate Parking Lot, Rehabilitate Taxiway [Phase 2 of taxiway rehabilitation.] Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise mitigation in 65 DNL.] Acquire Interactive Training System, Improve Airport Miscellaneous Improvements [Rehabilitate airfield lighting.], Improve Runway Safety Area [Improve Runway 17R/35L safety area.] - 17R/35L, Rehabilitate Apron [Construct cargo pads on westside apron.], Rehabilitate Apron [Rehabilitate GA Apron engineering only (Phase 3).], Update Miscellaneous Study [Conduct benefit/cost analysis for Runway 17L/35R extension.] Construct Apron [Construct east air cargo apron.], Rehabilitate Apron [Rehabilitate
Selection Criteria Year: 2006
Page 80 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite
SW TEX TX
Lubbock Preston Smith International
Midland International
North Central Texas
Rick Husband Amarillo International
Robert Gray AAF
San Angelo Regional/Mathis Field
San Antonio International
Skylark Field
Southeast Texas Regional
State of Texas
Texas State Block Grant Program
Tyler Pounds Regional
Valley International
Victoria Regional
Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
049 GA Apron (Phase 2).]
P 029 371,308 Rehabilitate Apron [Rehabilitate General Aviation Ramp (East Side).]
P 043
001
2,446,834
932,106
Rehabilitate Runway [Construct Runway 16R/34L Shoulders] - 16R/34L, Rehabilitate Runway [Runway 10/28 Shoulders, Phase I (Design)] - 10/28, Security Enhancements [Modifications to Security System] Conduct Metropolitan System Plan Study
P
P
031
012
306,144
2,435,667
Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire 1500 gallon ARFF vehicle.] Acquire Equipment, Expand Apron, Update Airport Master Plan Study
P
P
024
051
4,700,000
5,000,000
Rehabilitate Apron [Rehabilitate Apron, Area A], Rehabilitate Apron [Rehabilitate Apron, Area B, Phase I (Design)], Rehabilitate Runway [Rehabilitate Runway 18/36, (Construction)] - 18/36 Noise Mitigation Measures for Residences within 65 - 69 DNL [Phase 2]
P
P
052
021
022
3,032,500
1,087,409
8,280,893
Construct Taxiway [RSAT taxiway:design only.], Expand Apron [Construct], Extend Taxiway [Extend Twy R: Engineering only.], Update Miscellaneous Study Construct Apron, Install Guidance Signs, Install Runway Vertical/Visual Guidance System - 01/19, Rehabilitate Airport Beacons, Rehabilitate Runway Lighting - 01/19, Rehabilitate Taxiway Lighting Rehabilitate Terminal Building
023
002
388,740
500,000
Acquire Aircraft Deicing Equipment, Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Acquire Emergency Generator, Acquire Safety Equipment, Construct Building Update State System Plan Study
036 21,440,544 Non primary development projects in state block grant program
037 20,514,755 Non primary development projects in state block grant program
040 10,587,750 Non primary development projects in state block grant program
P
P
043
020
040
4,880,600
3,629,573
3,243,474
Non primary development projects in state block grant program, Non primary development projects in state block grant program Construct Service Road [Construct east perimeter road (Phase 2).], Improve Runway Safety Area [RSA improvement study.] - 04/22, Improve Terminal Building [Acquire jet bridges], Rehabilitate Apron [Rehabilitate apron.] Rehabilitate Taxiway
P 019 818,105 Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Construct Taxiway, Improve Terminal Building, Rehabilitate Access Road [Airport Entrance Road]
Selection Criteria Year: 2006
Page 81 of 93
Grants Awarded by FY FAA - Office Of Airports
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
SW TEX TX Waco Regional P 023
William P Hobby P 028
029
031
State Total: 51 Grants
ADO Total: 51 Grants
Report Total:
Region Total: 1808 Grants
2059 Grants
WP HNL GU Guam International P 052
054
055
State Total: 3 Grants
WP HNL HI Hilo International
Honolulu International
P
P
024
025
086
087
088
089
Kahului
Kalaeloa (John Rodgers Field)
Kalaupapa
P
R
GA
042
043
010
004
AIP Federal Funds
4,079,550
1,121,305
5,283,749
18,835
263,529,970
263,529,970
438,802,730
3,539,103,886
5,000,000
1,400,000
3,093,137
9,493,137
985,000
1,000,000
1,875,000
637,500
472,204
10,000,000
702,093
474,101
3,816,667
2,375,000
Report Date 03/13/2007
Brief Description Of Work
Conduct Airport Master Plan Study [Update airport master plan.], Expand TerminalBuilding, Improve Runway Safety Area [Improve Runway 1/19 safety area.] 01/19, Improve Runway Safety Area [Runway 14/32 safety area improvements.Includes land acquisition.] - 14/32, Rehabilitate Runway [Design only.] - 14/32,Widen Taxiway [Design only.]Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire two vehicles]
Rehabilitate Runway - 17/35, Rehabilitate Taxiway
VALE Vehicle [VALE]
Noise Mitigation Measures for Residences within 65 - 69 DNL
Improve Terminal Building [Seismic Zone 4 Upgrade]
Extend Runway [Phase II] - 06L/24R
Improve Terminal Building [Upgrade PA System]
Install Perimeter Fencing
Improve Terminal Building [CM for AC Mod Ph II]
Improve Terminal Building
Acquire Aircraft Rescue & Fire Fighting Vehicle [1,500-gallon]
Improve Terminal Building [Sterile Corridor], Improve Terminal Building [SterileCorridor]Improve Runway Safety Area - 05/23
Acquire Aircraft Rescue & Fire Fighting Vehicle
Construct Building [Construct T-Hangars, Phase II]
Improve Runway Safety Area - 05/23, Rehabilitate Apron, Rehabilitate Runway 05/23
Selection Criteria Year: 2006
Page 82 of 93
FAA - Office Of Airports Grants Awarded by FY
Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
WP HNL HI Kona International at Keahole
Lanai
Lihue
Waimea-Kohala
P
P
P
GA
026
027
010
035
004
1,800,000
599,975
3,332,505
4,270,000
950,000
Conduct Noise Compatibility Plan Study, Update Airport Master Plan Study
Acquire Aircraft Rescue & Fire Fighting Vehicle
Construct Apron
Improve Service Road, Install Perimeter Fencing
Install Airfield Guidance Signs, Rehabilitate Runway Lighting - 04/22
State Total: 15 Grants 33,290,045
WP HNL MP Francisco C. Ada/Saipan International
Tinian International
P
P
055
056
019
8,490,413
2,000,000
1,860,432
Expand Terminal Building [Arrivals Building - Phase II], Expand Terminal Building [Arrivals Building - Phase II] Rehabilitate Taxiway [Ph IV]
Strengthen Taxiway [Ph II]
State Total: 3 Grants 12,350,845
WP HNL TT Babelthuap/Koror
Kosrae
Marshall Islands International
Yap International
GA
GA
GA
GA
005
006
007
007
006
008
5,000,000
250,000
1,500,000
750,000
13,000,000
1,000,000
Rehabilitate Runway [(Phase III)] - 09/27
Rehabilitate Apron [Phase I - Design only]
Construct Aircraft Rescue & Fire Fighting Building
Acquire Aircraft Rescue & Fire Fighting Vehicle
Rehabilitate Runway [Phase II] - 07/25
Rehabilitate Apron [Design only]
State Total: 6 Grants 21,500,000
ADO Total: 27 Grants 76,634,027
WP LAX AZ Avi Suquilla
Casa Grande Municipal
Chandler Municipal
Cibecue
Ernest A. Love Field
GA
GA
R
GA
CS
009
010
010
017
018
003
025
663,867
2,013,050
1,030,623
272,650
150,000
150,000
185,000
Install Perimeter Fencing
Construct Runway [Relocate Runway, Phase II] - 01/19
Construct Apron [West Apron, Phase II]
Conduct Noise Compatibility Plan Study
Construct Access Road [Perimeter Road]
Conduct Environmental Study
Update Airport Master Plan Study
Selection Criteria Year: 2006
Page 83 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
WP LAX AZ Falcon Field R 014 1,139,396 Improve Runway Safety Area - 04R/22L, Install Perimeter Fencing [Phase I]
015 170,000 Update Airport Master Plan Study
Flagstaff Pulliam P 028 218,500 Conduct Environmental Study
029 500,000 Construct Service Road [Phase II]
030 10,483,414 Extend Runway [Phase I] - 03/21
Gila Bend Municipal GA 011 242,471 Install Apron Lighting, Install Runway Vertical/Visual Guidance System - 04/22
Grand Canyon National Park P 020 1,765,877 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Apron [Holding Position], Improve Airport Drainage [Runway 03/21 Safety Area]
Grand Canyon West P 005 6,402,822 Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Construct Runway [Relocate Runway] - 17/35
006 1,808,310 Construct Runway - 17/35
H.A. Clark Memorial Field GA 019 150,000 Conduct Environmental Study [Land Acquisition]
Kingman GA 017 177,016 Conduct Miscellaneous Study, Install Runway Lighting - 17/35
018 47,500 Conduct Environmental Study
Laughlin/Bullhead International P 026 457,373 Expand Terminal Building, Rehabilitate Access Road, Rehabilitate Runway - 16/34
027 145,000 Update Airport Master Plan Study
Marana Regional
Nogales International
R
GA
014
013
5,007,921
1,502,500
Construct Taxiway [E, Apron & Access Road, Phase II], Rehabilitate Runway [and 12/30] - 03/21, Rehabilitate Taxiway [A] Install Taxiway Lighting [Signs and Generator], Widen Taxiway [Phase II]
Page Municipal P 019 2,626,132 Acquire Safety Equipment, Construct Heliport/Helipad, Construct Service Road, Construct Taxiway, Improve Airport Drainage
Payson GA 014 30,000 Construct Apron [Design]
Phoenix Deer Valley R 021 3,000,000 Acquire Land for Development [(Reimbursement) for a portion of 80 acres acquired
Phoenix Sky Harbor International P 062 6,884,262in 1999] Rehabilitate Taxiway [Phase IV]
Safford Regional GA 015 125,000 Conduct Miscellaneous Study
San Carlos Apache GA 014 217,248 Construct Taxiway, Install Weather Reporting Equipment
Scottsdale R 022 394,250 Construct Taxiway, Construct Taxiway, Install Airfield Guidance Signs, Rehabilitate Access Road, Rehabilitate Taxiway [Greenway Connectors]
Sedona GA 016 1,150,000 Rehabilitate Taxiway
Show Low Regional CS 015 374,063 Conduct Environmental Study
Sierra Vista Municipal-Libby AAF GA 019 393,917 Rehabilitate Apron
Selection Criteria Year: 2006
Page 84 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
WP LAX AZ Taylor GA 014 333,502 Construct Taxiway [Design and Construct, Phase I.]
Town of Springerville Municipal GA 015 2,410,981 Construct Apron, Install Weather Reporting Equipment
Tucson International P 050 7,656,394 Construct Taxiway [Phase I], Rehabilitate Runway [Phase II] - 11L/29R
051 1,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
Whiteriver GA 009 342,722 Construct Snow Removal Equipment Building
Wickenburg Municipal GA 016 1,200,000 Extend Runway [Phase II] - 05/23, Extend Taxiway [Phase II]
Williams Gateway R 016 2,276,417 Rehabilitate Parking Lot [Sossaman Road Parking Lots-MAP]
017 515,000 Update Airport Master Plan Study
018 2,400,000 Construct Taxiway [Parallel Taxiway B]
Winslow-Lindbergh Regional GA 014 150,000 Conduct Environmental Study [Land Acquisition 21 acres]
Yuma MCAS/Yuma International P 026 1,998,785 Construct Apron [40th Street Cargo Apron]
027 249,374 Conduct Environmental Study
State Total: 45 Grants 70,411,337
WP LAX CA Apple Valley GA 007 439,285 Expand Apron
Big Bear City GA 014 2,302,703 Improve Runway Safety Area [Storm Drainage] - 08/26, Rehabilitate Taxiway
Bob Hope P 041 12,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL, Noise Mitigation Measures for Residences within 65 - 69 DNL
042 1,333,937 Acquire Aircraft Rescue & Fire Fighting Vehicle, Noise Mitigation Measures for Residences within 65 - 69 DNL
Borrego Valley GA 012 581,952 Expand Apron [Phase I]
013 150,000 Conduct Environmental Study
Brackett Field R 010 536,394 Rehabilitate Apron
Brawley Municipal GA 011 1,568,746 Rehabilitate Apron [Phase III]
Brown Field Municipal R 011 1,282,500 Install Perimeter Fencing, Rehabilitate Runway Lighting - 08L/26R
Cable R 010 286,000 Rehabilitate Runway - 06/24, Rehabilitate Taxiway
California City Municipal GA 009 325,322 Widen Runway - 06/24
Camarillo R 023 180,000 Update Airport Master Plan Study
024 1,700,974 Expand Apron [Expand apron along Taxiway A, Phase 1 - design], Rehabilitate Apron [West Apron], Rehabilitate Taxiway [Including apron area], Rehabilitate Taxiway Lighting
Selection Criteria Year: 2006
Page 85 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
WP LAX CA Chino
Delano Municipal
Eastern Sierra Regional
Fallbrook Community Airpark
French Valley
Fullerton Municipal
General Wm J Fox Airfield
Gillespie Field
Imperial County
Independence
Inyokern
Jack Northrop Field/Hawthorne Municipal
Jacqueline Cochran Regional
John Wayne Airport-Orange County
Lone Pine
Long Beach /Daugherty Field/
Los Angeles International
McClellan-Palomar
Report Date 03/13/2007
FY 2006
Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
027R 1,889,715 Construct Apron, Rehabilitate Access Road [Phase II]
009GA 208,755 Install Perimeter Fencing
011GA 450,000 Improve Access Road [Phase II]
003GA 522,500 Construct Apron [West transient apron (Design)], Construct Terminal Building, Rehabilitate Apron [Phase II]
022GA 250,000 Update Airport Master Plan Study
017R 150,000 Acquire Easement For Approaches, Install Runway Distance-To-Go Signs - 06/24, Install Weather Reporting Equipment
011GA 975,000 Rehabilitate Runway - 06/24, Rehabilitate Taxiway
013R 1,500,000 Construct Apron, Rehabilitate Runway - 17/35, Rehabilitate Taxiway
014 150,000 Conduct Environmental Study
020CS 500,000 Improve Runway Safety Area - 14/32
002GA 136,981 Rehabilitate Apron [Phase 1, design]
021P 1,000,000 Install Weather Reporting Equipment, Rehabilitate Apron, Rehabilitate Runway 15/33, Rehabilitate Taxiway
010R 300,000 Install Airfield Guidance Signs [Including Markings]
014GA 1,882,007 Install Runway Vertical/Visual Guidance System [PAPI] - 12/30, Rehabilitate Runway [Rehabilitate Runway Lighting 12/30], Rehabilitate Taxiway
036P 7,651,107 Construct Apron [Phase III], Construct Taxiway
006GA 150,000 Rehabilitate Runway - 16/34
027P 14,850,466 Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire Rapid Intervention Vehicle], Improve Runway Safety Area [Acquire Land for RSA] - 07L/25R, Rehabilitate Taxiway [Rehabilitate Taxiway L, Phase II]
028 491,464 Conduct Airport Master Plan Study [Update ALP]
036P 29,539,720 Construct Runway [Relocate Runway] - 07R/25L
037 10,950,000 Noise Mitigation Measures for Residences within 65 - 69 DNL [Inglewood]
038 10,000,000 Acquire Land for Noise Compatibility within 65 - 69 DNL [Inglewood]
039 5,000,000 Noise Mitigation Measures for Residences within 70 - 74 DNL [LA County]
040 2,000,000 Noise Mitigation Measures for Residences within 70 - 74 DNL [El Segundo]
041 3,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL [El Segundo]
022P 500,000 Acquire Land for Development [Phase III], Improve Runway Safety Area [Phase III] 06/24
Selection Criteria Year: 2006
Page 86 of 93
FAA - Office Of Airports
Region ADO State Worksite
WP LAX CA
Meadows Field
Mojave
Montgomery Field
Needles
Ontario International
Oxnard
Palm Springs International
Ramona
Riverside Municipal
San Bernardino International
San Diego International
Santa Barbara Municipal
Santa Maria Public/Capt G Allan Hancock Field
Santa Ynez
Southern California Logistics
Twentynine Palms
Whiteman
State Total:
ADO Total:
WP SFO CA Arcata
Grants Awarded by FY
FY 2006
Service Grant Seq AIP Federal Level Number Funds
023 500,000
P 028 2,787,678
GA 018 2,654,892
R 010 427,500
GA 006 3,028,989
P 026 7,000,000
027 14,850,000
P 025 866,372
P 040 6,854,772
R 011 172,500
R 022 4,110,538
023 350,000
R 020 4,305,000
P 045 12,749,346
046 240,000
047 1,096,000
P 034 8,529,791
P 027 1,150,000
GA 010 648,035
P 013 3,687,029
GA 004 1,655,570
R 009 508,250
60 Grants 194,907,790
105 Grants 265,319,127
P 030 5,140,398
Report Date 03/13/2007
Brief Description Of Work
Conduct Miscellaneous Study
Construct Terminal Building, Improve Terminal Building
Extend Runway - 12/30, Extend Taxiway
Improve Runway Safety Area - 10R/28L
Rehabilitate Runway - 02/20, Rehabilitate Taxiway
Acquire Land for Noise Compatibility within 70 - 74 DNL, Acquire Land for Noise Compatibility within 70 - 74 DNL Rehabilitate Runway - 08L/26R, Widen Runway [shoulders] - 08L/26R, Widen Taxiway, Widen Taxiway Improve Runway Safety Area [Relocate service road outside RSA] - 07/25, Rehabilitate Apron Improve Runway Safety Area [Move holdlines and signs to meet standards] 13L/31R, Rehabilitate Taxiway Construct Heliport/Helipad
Rehabilitate Runway - 09/27, Rehabilitate Taxiway [Phase I]
Update Airport Master Plan Study
Construct Fuel Farm [MAP]
Noise Mitigation Measures for Residences within 65 - 69 DNL
Conduct Noise Compatibility Plan Study [Part 150]
Update Miscellaneous Study
Construct Runway Safety Area - 07/25, Construct Taxiway
Conduct Environmental Study [EA for Runway 12/30 runway extension], Expand Terminal Building [Terminal expansion, Phase 2] Construct Taxiway [Taxilanes], Install Perimeter Fencing
Construct Fuel Farm [MAP] [Phase III]
Rehabilitate Apron, Rehabilitate Taxiway
Rehabilitate Runway - 12/30, Rehabilitate Taxiway
Expand Terminal Building [Expand Terminal Building - Phase I Construction], Expand Terminal Building [Expand Terminal Building - Phase II Construction]
Selection Criteria Year: 2006
Page 87 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
WP SFO CA Auburn Municipal GA 009 300,000 Construct Access Road [Phase II], Construct Taxiway [Phase II]
Buchanan Field R 016 1,157,500 Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire 1,500 gallon ARFF vehicle
Byron R 011 150,000and equipment], Install Taxiway Lighting [Install Taxiway Echo Lighting (MITL)] Improve Airport Drainage
Castle GA 007 300,000 Conduct Airport Master Plan Study
008 135,450 Install Perimeter Fencing, Rehabilitate Taxiway [(Phase I)], Rehabilitate Taxiway
Cedarville GA 004 75,000Lighting [MITL (Phase I)] Update Airport Master Plan Study [Update ALP and Exhibit "A" Property Map]
005 55,000 Construct Taxiway [T-hangar taxilanes - Design], Improve Airport Drainage [(Design); erosion control messures], Install Perimeter Fencing [(approximatley 14,000 linear feet) - Design], Rehabilitate Service Road [(approximately 30 feet by
Charles M. Schulz - Sonoma County GA 029 300,000250 feet) - Design] Conduct Environmental Study
030 550,000 Acquire Equipment [(electrical vault improvements)], Rehabilitate Apron [(Overlay) Design Only], Rehabilitate Runway - 14/32, Rehabilitate Runway Lighting - 01/19
Chico Municipal P 025 1,400,000 Expand Aircraft Rescue & Fire Fighting Building [Expand ARFF Building]
026 360,000 Rehabilitate Apron
Cloverdale Municipal GA 003 255,000 Rehabilitate Access Road
Colusa County GA 009 407,761 Install Perimeter Fencing [Design], Rehabilitate Apron, Rehabilitate Runway - 13/31,
Dinsmore GA 005 42,750Rehabilitate Taxiway Rehabilitate Apron [Design], Rehabilitate Runway [Design] - 09/27
Dunsmuir Municipal-Mott GA 008 386,500 Conduct Environmental Study, Install Perimeter Fencing, Rehabilitate Runway 14/32
Ells Field-Willits Municipal GA 003 300,000 Rehabilitate Apron [Phase II]
Fall River Mills GA 007 2,800,000 Construct Apron [Expand exsiting aircracft parking apron (approximately 10,000 SF)], Extend Runway [Extend Runway 2 (approximately 1,413' by 75') and parallel taxiway (approximately 1,650' by 35') including runway lighting and marking Phase 2 Construction] - 02/20, Install Miscellaneous NAVAIDS [Install wind sock and segmented circle], Rehabilitate Runway Lighting [Include power vault and primary electrical service.]
Firebaugh GA 003 500,000 Rehabilitate Runway - 12/30, Rehabilitate Taxiway
Fresno Chandler Executive R 011 165,000 Install Weather Reporting Equipment, Rehabilitate Taxiway [design]
012 250,000 Conduct Environmental Study
Fresno Yosemite International P 049 1,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
Selection Criteria Year: 2006
Page 88 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
WP SFO CA 050 3,626,180 Modify Terminal Building, Rehabilitate Service Road, Security Enhancements
Gansner Field GA 007 75,000 Update Airport Master Plan Study [Update the Airport Layout Plan and Property
Garberville GA 004 25,000Map] Install Perimeter Fencing [Design]
Georgetown GA 007 297,000 Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate Taxiway
Gustine GA 006 245,100 Remove Obstructions
Half Moon Bay R 011 1,598,500 Construct Access Road [south access road, Phase II], Construct Apron [Phase II], Improve Airport Drainage [Phase II], Install Perimeter Fencing [Phase II], Rehabilitate
Hanford Municipal GA 015 600,000Taxiway [Phase II] Install Taxiway Lighting, Remove Obstructions [Phase 1 design only]
Happy Camp GA 003 80,000 Rehabilitate Runway [Phase 2] - 04/22
Hayfork GA 005 228,800 Rehabilitate Apron, Rehabilitate Runway - 07/25, Rehabilitate Taxiway
Jack McNamara Field P 015 525,000 Conduct Environmental Study
016 1,650,000 Construct Aircraft Rescue & Fire Fighting Building [Phase II], Improve Runway Safety Area [Study-runways 11/29 and 17/35] - 11/29, Install Perimeter Fencing [Phase II], Rehabilitate Runway [Design-runways 11/29 and 17/35] - 11/29, Remove Obstructions [Phase II]
Kneeland GA 005 237,500 Conduct Environmental Study
Lake Tahoe GA 025 150,000 Install Noise Monitoring System
Lee Vining GA 003 150,000 Rehabilitate Access Road [Phase II]
Lincoln Regional/Karl Harder Field R 013 315,790 Install Miscellaneous NAVAIDS, Install Perimeter Fencing, Install Taxiway Lighting,
Little River GA 003 240,000Rehabilitate Taxiway Install Perimeter Fencing, Install Weather Reporting Equipment
Lonnie Pool Field/Weaverville GA 006 100,000 Install Perimeter Fencing
Madera Municipal GA 015 503,750 Install Perimeter Fencing
Mefford Field GA 007 190,000 Construct Apron [Phase 1, design], Improve Airport Miscellaneous Improvements [Phase 1 design]
Merced Municipal/MacReady Field CS 013 416,800 Improve Airport Drainage [(Installing PVC pipeline to replace existing open ditch)]
Metropolitan Oakland International P 040 14,221,668 Rehabilitate Apron [East Apron, South Field, Phase III], Rehabilitate Apron [East
Modesto City County-Harry Sham Field P 030 285,000Apron, South Field, Phase IV] Conduct Noise Compatibility Plan Study
031 550,000 Install Guidance Signs, Rehabilitate Taxiway
Monterey Peninsula P 042 2,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
Selection Criteria Year: 2006
Page 89 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
WP SFO CA 043 300,000 Conduct Noise Compatibility Plan Study
044 123,800 Improve Runway Safety Area - 10L/28R, Improve Runway Safety Area - 10R/28L
Napa County R 021 376,950 Improve Airport Drainage, Rehabilitate Runway [Design (Phase I)] - 18R/36L
022 144,400 Conduct Environmental Study
023 3,600,000 Rehabilitate Runway [Phase II] - 18R/36L
Nervino GA 005 75,000 Update Airport Master Plan Study [Update ALP]
Nevada County Air Park GA 009 635,000 Rehabilitate Apron [Ramp 5]
010 47,500 Conduct Miscellaneous Study [conduct preliminary design and environmental
Norman Y. Mineta San Jose International P 063 6,000,000baseline study] Noise Mitigation Measures for Residences within 65 - 69 DNL
064 1,000,000 Acquire Aircraft Rescue & Fire Fighting Vehicle
065 2,520,191 Extend Runway [(LOI - Reimbursement)] - 12L/30R
Nut Tree GA 011 3,000,000 Improve Access Road [pavement reconstruction (approximately 30' X 1300')], Improve Airport Drainage [construct pollution abatement facility], Install Perimeter Fencing [(approximately 5,000LF) including access gates], Light Obstructions [rehabilitate obstruction lighting], Rehabilitate Apron [aircraft parking apron (approximately 450,000 SF)], Rehabilitate Taxiway [hangar area taxilanes
Oakdale GA 009 450,000(approximately 4,700' X 25')] Rehabilitate Runway [phase II] - 10/28
Oroville Municipal GA 011 70,000 Conduct Miscellaneous Study
012 75,000 Update Airport Master Plan Study [- Update Airport Layout Plan]
Paso Robles Municipal GA 018 50,000 Conduct Environmental Study [Environmental Baseline Study]
Petaluma Municipal R 016 150,000 Construct Building [Hangar Development]
Placerville GA 010 236,900 Rehabilitate Runway - 05/23, Rehabilitate Runway Lighting - 05/23
Redding Municipal P 030 1,382,751 Construct Aircraft Rescue & Fire Fighting Building [Phase IV]
Reid-Hillview of Santa Clara County R 011 1,200,000 Install Noise Monitoring System
Rogers Field GA 011 175,000 Acquire Easement For Approaches [Runway 16], Install Weather Reporting
Round Valley GA 002 1,250,000Equipment [AWOS] Construct Access Road, Construct Apron, Construct Heliport/Helipad, Construct
Sacramento International P 038 6,500,000Taxiway Acquire Friction Measuring Equipment, Rehabilitate Runway [Phase II] - 16R/34L
Sacramento Mather R 014 380,000 Improve Building [Improve Hangar Building 4260 [MAP] - Phase III]
Selection Criteria Year: 2006
Page 90 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
WP SFO CA San Francisco International
San Luis County Regional
Siskiyou County
Stockton Metropolitan
Susanville Municipal
Sutter County
Tracy Municipal
Trinity Center
Truckee-Tahoe
Tulelake Municipal
Turlock Municipal
Ukiah Municipal
Watsonville Municipal
Weed
State Total:
WP SFO NV Austin
FY 2006
Service Level
Grant Seq Number
P 034
035
036
037
P
GA
GA
GA
GA
032
006
022
023
008
004
GA
GA
GA
011
005
017
GA
GA
GA
004
007
009
GA 010
GA
89 Grants
006
007
GA 010
AIP Federal Funds
869,600
300,000
22,180,046
1,425,000
15,002,156
150,000
950,000
500,000
600,000
40,000
150,000
195,000
555,000
100,000
45,000
179,550
300,000
100,000
150,000
117,875,291
83,700
Report Date 03/13/2007
Brief Description Of Work
Install Noise Monitoring System
Conduct Noise Compatibility Plan Study [Including Land Use Compatibility Study]
Acquire Aircraft Rescue & Fire Fighting Vehicle, Conduct Miscellaneous Study,Improve Airport Drainage [North and West Field Drainage, phase II], ImproveRunway Safety Area [Southfield RSA improvements, Phase B] - 01L/19R,Rehabilitate Apron [Reconstruct Apron (Boarding Area A)], Rehabilitate Runway[Localized runway pavement replacement, multiple runways] - 01R/19L,Rehabilitate Taxiway [Rehabilitate Taxiways H and M, Phase II]Rehabilitate Runway [Phase I design] - 10R/28L, Rehabilitate Runway Lighting 01L/19RAcquire Aircraft Rescue & Fire Fighting Vehicle, Extend Runway - 11/29
Install Perimeter Fencing, Rehabilitate Runway [Phase 2] - 17/35
Acquire Aircraft Rescue & Fire Fighting Vehicle, Modify Terminal Building
Update Airport Master Plan Study
Construct Taxiway [Taxiway E], Improve Access Road
Install Apron Lighting [Design], Install Perimeter Fencing [including automated andpedestrian gates - Design]Improve Runway Safety Area [phase II] - 12/30
Rehabilitate Runway - 14/32, Rehabilitate Taxiway
Rehabilitate Runway [(approximately 100 feet by 7,000 feet)] - 10/28, RehabilitateRunway [(approximately 75 feet by 4,650 feet)] - 01/19, Rehabilitate Taxiway[(approximately 90,000 square feet)]Rehabilitate Apron [Design], Rehabilitate Service Road [Design]
Rehabilitate Taxiway [crack seal and slurry seal]
Construct Service Road [Phase II], Install Perimeter Fencing [Phase II], RehabilitateApron [Phase II]Improve Airport Drainage [(Drainage Study and Utility Plan], Rehabilitate Runway[and Taxiways(crack seal and remarking)] - 08/26, Rehabilitate TaxiwayInstall Taxiway Lighting [Phase I, design]
Conduct Airport Master Plan Study
Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Runway - 18/36,
Selection Criteria Year: 2006
Page 91 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
WP SFO NV 010 Rehabilitate Taxiway
Battle Mountain GA 016 961,400 Construct Taxiway, Rehabilitate Runway - 03/21
Beatty GA 007 57,000 Update Airport Master Plan Study
Boulder City Municipal GA 010 308,829 Expand Apron [Phase I], Install Weather Reporting Equipment [Phase II]
Carson R 013 5,000,000 Acquire Land For Approaches
Derby Field GA 009 46,766 Construct Fuel Farm, Rehabilitate Runway - 01/19
Elko Regional P 030 1,235,000 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Aircraft Rescue & Fire Fighting Building
031 3,724,706 Construct Taxiway [Relocate Parallel Taxiway A, Phase III]
Gabbs GA 005 189,489 Install Miscellaneous NAVAIDS, Remove Obstructions
Lincoln County GA 005 161,500 Construct Access Road [Phase I], Construct Taxiway [Phase I], Rehabilitate Apron [phase I], Rehabilitate Runway [Phase I] - 17/35
McCarran International P 060 10,743,257 Construct Apron [NW Concourse D, including taxiway]
061 1,077,286 Acquire Aircraft Rescue & Fire Fighting Vehicle [two ARFF vehicles]
Minden-Tahoe GA 016 200,000 Remove Obstructions [Rwy 12/30 - phase II]
017 328,000 Conduct Airport Master Plan Study
North Las Vegas P 024 156,747 Acquire Aircraft Rescue & Fire Fighting Vehicle
Perkins Field GA 005 150,000 Improve Access Road
Reno/Stead R 023
024
2,049,375
300,000
Rehabilitate Runway Lighting - 08/26, Rehabilitate Service Road [Phase 2], Rehabilitate Taxiway Update Airport Master Plan Study
Reno/Tahoe International P 068 5,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
069 2,000,000 Acquire Land for Noise Compatibility within 65 - 69 DNL
070 3,750,000 Construct Aircraft Rescue & Fire Fighting Building
071 111,625 Conduct Miscellaneous Study
072 468,622 Rehabilitate Taxiway [Phase I]
073 1,200,000 Security Enhancements
Silver Springs GA 008 874,000 Construct Apron [T-hangar apron], Improve Access Road, Install Weather Reporting Equipment [Phase 2]
009 28,500 Update Airport Master Plan Study
State of Nevada 005 250,000 Conduct State System Plan Study
Selection Criteria Year: 2006
Page 92 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
WP SFO NV Tonopah
Wells Municipal/Harriet Field
Winnemucca Municipal
008
007
011
GA
GA
GA
418,000
2,081,297
1,015,992
Install Perimeter Fencing
Rehabilitate Runway - 08/26, Rehabilitate Runway Lighting - 08/26
Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System [REILs and PAPIs] - 02/20, Install Runway Vertical/Visual Guidance System [REILs and PAPIs] - 14/32, Install Taxiway Lighting
State Total: 30 Grants 43,971,091
ADO Total: 119 Grants 161,846,382
Region Total: 2059 Grants 503,799,536
Report Total: 2059 Grants 3,539,103,886
Selection Criteria Year: 2006