graphene xt speed mp - head.cz · graphene xt speed mp ... head hawk total string length: 12 m /...
TRANSCRIPT
![Page 1: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/1.jpg)
GRAPHENE XT SPEED MP
For optimum performance use: HEAD Hawk
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on. Tie off at holes L6 + R6.
Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L26 + R26 and lace string through hole L25 + R25. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R9 + L9.Please note that grommets L7 + R7, L8 + R8, L24 + R24, L25 + R25 share both main and cross strings.
![Page 2: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/2.jpg)
GRAPHENE XT SPEED S
For optimum performance use: HEAD Lynx
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on. Tie off at holes L6 + R6.
Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L26 + R26 and lace string through hole L25 + R25. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R9 + L9.Please note that grommets L7 + R7, L8 + R8, L24 + R24, L25 + R25 share both main and cross strings.
![Page 3: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/3.jpg)
GRAPHENE XT SPEED PRO
For optimum performance use: HEAD Hawk
Total String Length: 12 m / 39,5 ft
String Pattern: 18 Main (6,5 m / 21,5 ft) 20 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the top with the center holes L34 + R34. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L34 + R34 respectively. Tighten 2 main strings left, two main strings right and so on. Tie off at holes L7 + R7. Cross StringsFor the cross string measure 5,5m (18,0 ft) string. Tie on the cross strings at hole L28 + R28 and lace string through hole L27 + R27. Tighten all 20 cross strings in direction of racquet throat. Tie off at hole L10 + R10.Please note that grommets L8+ R8, L9 + R9, L26 + R26, L27 + R27 share both main and cross strings.
![Page 4: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/4.jpg)
GRAPHENE XT SPEED MP A 16/16
For optimum performance use: HEAD Gravity
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 16 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
NOTE: Use NEON 16/16 ASP insert
Main StringsStart at the top with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8 as well as L25 + R25. Tie off at holes L6 + R6.
Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L28 + R28 and lace string through hole L25 + R25. Tighten all 16 cross strings in direction of racquet throat. Tie off at hole L11 + R11.
![Page 5: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/5.jpg)
GRAPHENE XT SPEED MP A 16/19
For optimum performance use: HEAD Gravity
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
NOTE: Use BLACK 16/19 ASP insert
Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8, as well as L28 + R28. Tie off at holes L6 + R6
Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L31 + R31 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R11 + L11.
![Page 6: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/6.jpg)
GRAPHENE XT SPEED REV PRO 16/16
For optimum performance use: HEAD Gravity
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 16 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
NOTE: Use NEON 16/16 ASP insert
Main StringsStart at the top with the center holes L32 + R32. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L32 + R32 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8, as well as L25 + R25. Tie off at holes L26 + R26.
Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L27 + R27 and lace string through hole L25 + R25. Tighten all 16 cross strings in direction of racquet throat. Tie off at hole R7 + L7.
![Page 7: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/7.jpg)
GRAPHENE XT SPEED REV PRO 16/19
For optimum performance use: HEAD Gravity
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
NOTE: Use BLACK 16/19 ASP insert
Main StringsStart at the top with the center holes L35 + R35. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L35 + R35 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8, as well as L28 + R28. Tie off at holes L29 + R29.
Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L30 + R30 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R7 + L7.
![Page 8: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/8.jpg)
GRAPHENE XT SPEED LITE
For optimum performance use: HEAD Lynx
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the top with the center holes L35 + R35. For the left and the right side of the main strings clamp 3,25 m (10,75 ft) each at hole L35 + R35 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L7 + R7, L9 + R9 as well as L27 + R27, L29 + R29. Tie off at holes L28 + R28.
Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L30/R30 and lace string through hole L29 + R29. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R5 + L5.
![Page 9: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/9.jpg)
YOUTEKTM GRAPHENE PRESTIGE PRO
For optimum performance use: HEAD Hawk
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the top with the center holes L35 + R35. For the left side of the main strings clamp 3 m (10 ft) at hole L35 + R35. Tighten 2 main strings right, two main strings left and so on, skipping holes L8 + R8 and L28 + R28. Tie off at holes L29 + R29.
Cross StringsFor the cross string measure 5 m (16,5 ft) string. Tie on the cross strings at hole L30 and lace string through hole L28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R7.
![Page 10: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/10.jpg)
YOUTEKTM GRAPHENE PRESTIGE REV PRO
For optimum performance use: HEAD Hawk
Total String Length: 11 m / 36,5 ft
String Pattern: 16 Main (6 m / 20 ft) 19 Cross (5 m / 16,5 ft)
Rec. String Tension: 24-28 kg / 52-62 lbs
Main StringsStart at the top with the center holes L35 + R35. For the left side of the main strings clamp 3 m (10 ft) at hole L35 + R35. Tighten 2 main strings right, two main strings left and so on, skipping holes L8 + R8 and L28 + R28. Tie off at holes L29 + R29.
Cross StringsFor the cross string measure 5 m (16,5 ft) string. Tie on the cross strings at hole L30 and lace string through hole L28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R7.
![Page 11: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/11.jpg)
YOUTEKTM GRAPHENE PRESTIGE MP
For optimum performance use: HEAD Hawk
Total String Length: 11 m / 36,5 ft
String Pattern: 18 Main (6 m / 20 ft) 20 Cross (5 m / 16,5 ft)
Rec. String Tension: 24-28 kg / 52-62 lbs
Main StringsStart at the top with the center holes L38 + R38. For the left side of the main strings clamp 3m (10ft) at hole L38 + R38. Tighten 2 main strings right, two main strings left and so on, skipping holes L31 + R31, L29 + R29 as well as L9 + R9. Tie off at holes L7 + R7.
Cross StringsFor the cross string measure 5 m (16,5 ft) string. Tie on the cross strings at hole R 33 and lace string through hole R31. Tighten all 20 cross strings in direction of racquet throat. Tie off at hole R12.
![Page 12: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/12.jpg)
YOUTEKTM GRAPHENE PRESTIGE S
For optimum performance use: HEAD Sonic Pro
Total String Length: 11 m / 36,5 ft
String Pattern: 16 Main (6 m / 20 ft) 19 Cross (5 m / 16,5 ft)
Rec. String Tension: 24-28 kg / 52-62 lbs
Main StringsStart at the top with the center holes L35 + R35. For the left side of the main strings clamp 3 m (10 ft) at hole L35 + R35. Tighten 2 main strings right, two main strings left and so on, skipping holes L8 + R8 and L28 + R28. Tie off at holes L29 + R29.
Cross StringsFor the cross string measure 5 m (16,5 ft) string. Tie on the cross strings at hole L30 and lace string through hole L28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R7.
![Page 13: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/13.jpg)
YOUTEKTM GRAPHENE PRESTIGE PWR
For optimum performance use: HEAD PWR Fusion
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 24-28 kg / 52-62 lbs
Main StringsStart at the bottom with the centre holes L1 + R1. For the left and the right side of the main strings clamp 3,25 m (10,75 ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L7 + R7 and L9 + R9. Tie off at holes L6 + R6.
Cross StringsFor the cross string measure 5,5 m (18 ft) string. Tie on the cross strings at hole R28 + L28 and lace string through hole L26 + R26. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole L4 + R4. Please note that grommets L10 + R10, L25 + R25, L26 + R26 share both main and cross strings.
![Page 14: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/14.jpg)
YOUTEKTM GRAPHENE RADICAL PRO
For optimum performance use: HEAD Hawk
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the top with the center holes L35 + R35. For the left and the right side of the main strings clamp 3,25 m (10,75 ft) at hole L35 and R35 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8 and L28 + R28. Tie off at holes L29 + R29.
Cross StringsFor the cross string measure 5,5 m (168 ft) string. Tie on the cross strings at hole L30 and lace string through hole L28 + R28. Tighten all 19 cross strings in direc-tion of racquet throat. Tie off at hole R7.
![Page 15: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/15.jpg)
YOUTEKTM GRAPHENE RADICAL MP
For optimum performance use: HEAD Hawk
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the top with the center holes L35 + R35. For the left and the right side of the main strings clamp 3,25 m (10,75 ft) at hole L35 and R35 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8 and L28 + R28. Tie off at holes L29 + R29.
Cross StringsFor the cross string measure 5,5 m (168 ft) string. Tie on the cross strings at hole L30 and lace string through hole L28 + R28. Tighten all 19 cross strings in direc-tion of racquet throat. Tie off at hole R7.
![Page 16: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/16.jpg)
YOUTEKTM GRAPHENE RADICAL S
For optimum performance use: HEAD Sonic Pro
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the top with the center holes L35 + R35. For the left and the right side of the main strings clamp 3,25 m (10,75 ft) at hole L35 and R35 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8 and L28 + R28. Tie off at holes L29 + R29.
Cross StringsFor the cross string measure 5,5 m (168 ft) string. Tie on the cross strings at hole L30 and lace string through hole L28 + R28. Tighten all 19 cross strings in direc-tion of racquet throat. Tie off at hole R7.
![Page 17: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/17.jpg)
YOUTEKTM GRAPHENE RADICAL REV
For optimum performance use: HEAD Sonic Pro
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the top with the center holes L35 + R35. For the left and the right side of the main strings clamp 3,25 m (10,75 ft) at hole L35 and R35 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8 and L28 + R28. Tie off at holes L29 + R29.
Cross StringsFor the cross string measure 5,5 m (168 ft) string. Tie on the cross strings at hole L30 and lace string through hole L28 + R28. Tighten all 19 cross strings in direc-tion of racquet throat. Tie off at hole R7.
![Page 18: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/18.jpg)
GRAPHENE XT INSTINCT MP
For optimum performance use: HEAD Hawk
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on. Tie off at holes L6 + R6.
Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L27 + R27 and lace string through hole L25 + R25. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R9 + L9.Please note that grommets L7 + R7, L8 + R8, L24 + R24, L25 + R25 share both main and cross strings.
![Page 19: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/19.jpg)
GRAPHENE XT INSTINCT S
For optimum performance use: HEAD Lynx
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on. Tie off at holes L6 + R6.
Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L27 + R27 and lace string through hole L25 + R25. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R9 + L9.Please note that grommets L7 + R7, L8 + R8, L24 + R24, L25 + R25 share both main and cross strings.
![Page 20: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/20.jpg)
GRAPHENE XT INSTINCT REV PRO 16/16
For optimum performance use: HEAD Gravity
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 16 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
NOTE: Use WHITE16/16 ASP Insert
Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8, as well as L25 + R25. Tie off at holes L6 + R6.
Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L28 + R28 and lace string through hole L25 + R25. Tighten all 16 cross strings in direction of racquet throat. Tie off at hole L11 + R11.
![Page 21: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/21.jpg)
GRAPHENE XT INSTINCT REV PRO 16/19
For optimum performance use: HEAD Gravity
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
NOTE: Use BLUE 16/19 ASP Insert
Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8, as well as L28 + R28. Tie off at holes L6+R6.
Cross Strings For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L31 + R31 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R11 + L11.
![Page 22: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/22.jpg)
GRAPHENE XT INSTINCT LITE
For optimum performance use: HEAD PWR Lynx
Total String Length: 12 m / 39,5 ft
Besaitungsbild: 16 Main (6,5 m/21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2 main strings left, two main strings right and so on, skipping holes L8 + R8 as well as L28 + R28. Tie off at holes L6 + R6.
Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L29 + R29 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole L11 + R11.
![Page 23: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/23.jpg)
YOUTEKTM GRAPHENE EXTREME PRO
For optimum performance use: HEAD Hawk
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75 ft) each at hole L1 + R1 respectively. Tighten one main string left followed by one main strings right and so on, skipping holes L 8 + R8 as well as L28 + R28. Tie off at holes L6 + R6.
Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L29 + R29 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole L11 + R11.
![Page 24: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/24.jpg)
YOUTEKTM GRAPHENE EXTREME MP
For optimum performance use: HEAD Hawk
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75 ft) each at hole L1 + R1 respectively. Tighten one main string left followed by one main strings right and so on, skipping holes L 8 + R8 as well as L28 + R28. Tie off at holes L6 + R6.
Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L29 + R29 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole L11 + R11.
![Page 25: GRAPHENE XT SPEED MP - HEAD.CZ · GRAPHENE XT SPEED MP ... HEAD Hawk Total String Length: 12 m / 39,5 ft String Pattern: 16 Main ... main strings left, two main strings right and](https://reader031.vdocuments.net/reader031/viewer/2022022008/5ae386787f8b9ae74a8dce9d/html5/thumbnails/25.jpg)
YOUTEKTM GRAPHENE EXTREME LITE
For optimum performance use: HEAD Hydrosorb Pro
Total String Length: 12 m / 39,5 ft
String Pattern: 16 Main (6,5 m / 21,5 ft) 19 Cross (5,5 m / 18,0 ft)
Rec. String Tension: 22-26 kg / 48-57 lbs
Main StringsStart at the bottom with the center holes L1 + R1. For the left and the right side of the main strings clamp 3,25m (10,75 ft) each at hole L1 + R1 respectively. Tighten one main string left followed by one main strings right and so on, skipping holes L 8 + R8 as well as L28 + R28. Tie off at holes L6 + R6.
Cross StringsFor the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at hole L29 + R29 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole L11 + R11.