Green Office Retrofit: The London OfficeInsulating with Natural Eco-friendly Materials
Heating with Biomass
EcoConsulting (UK) Ltd28 Marshalsea Road London, SE1 1HF, UK
l t I +44 (0) 207 939 0989 l f I +44 (0) 207 939 0981 l e l [email protected]
Providing ECOlogical & ECOnomical Solutions to Business-as-Usual Challenges
EcoConsulting (Lebanon)Nahas Building, 4th floor
Georges Haddad AvenuePostal Code: 2028 5806 SAIFI
Beirut, Lebanon l t I +961 (1) 971 266
Introduction
• EcoConsulting is an environmental consultancy specialized in eco-building
• Our dedicated team works with clients, architects, and developers to improve the sustainability of their construction projects
• EcoConsulting is unique in its specialisation, expertise, and experience; we offer a complete range of customised eco-building, energy-efficiency, and renewable energy advice
Our Accreditations• Leadership in Energy and Environmental
Design (LEED) Accredited Professionals• BRE Associates• BRE Licensed Assessors:
– BREEAM Bespoke– BREEAM Industrial– BREEAM International– BREEAM Offices– BREEAM Retail– BREEAM Schools– EcoHomes– Code for Sustainable Homes
• Certified TAS Thermal Modelling Assessors by EDSL
• Certified SAP Assessors under NHER’s“Competent Person” scheme
• Members of the Carbon Trust Register of Approved Consultants
• Members of CIBSE’s Low Carbon Energy Assessors
• Members of CIBSE’s Low Carbon Consultants Register
LEED® Accredited Professionals
Building Regulations Energy Compliance
Eco-Building Consulting
EcoHomes
Code for Sustainable Homes
LEED
BREEAM Retail
BREEAM Education
BREEAM Offices
BREEAM Industrial
BREEAM Bespoke
BREEAM International
Certifications & Consulting
SAP / NHER
EPCs for New-build Domestic
TAS/SBEM
EPCs for Existing Non-Domestic
EPCs for New-build Non-Domestic
Summer –Overheating
ASHRAE
Eco-building Consulting
“Green” Product Specification
Renewable Energy Feasibility Study
Pre-Planning Sustainability
3-D Daylighting Simulations
Dynamic Thermal Modelling
Our 3 Pillars of Services
Planning Sustainability
Report
Renewable Energy Report
LEED &BREEAM
International Consulting & Assessment
Dynamic Energy
Simulation
CHP Sizing
Load Profiling
ASHRAE
Summer Overheating Calculations
3-D Daylighting Simulations
Building User
Guide
International Services
The Renovation of the
London officePart 1: Insulation (Summer 2008)
A story of mud, sweat and sears
The office building
Existing Exterior Walls:400mm Brickwork
U-value of 1.4
Wood fiberboard Insulation with Clay plastering
Wood fiberboard Insulation is:
> Made of waste wood> Renewable Resource> Bio-degradable> Good conductivity & insulation> Adds some thermal mass> Breathable
Clay plastering:> Made of earth / clay> Natural & Renewable Resource> Bio-degradable> Low embodied energy> Breathable> Doesn’t trap moisture> Eliminates the need for paint
reduces time & cost & toxicity
Insulation Effect:
400mm Brickwork (existing)100mm Wood fiberboard7 mm Clay Plaster; 2 layers
U-value drops from 1.4 to 0.325
The old insulation was removed
The radiators were cut and drained
The walls were completely bare
1 ton of insulation boards arrived
…and 1 and ½ tons of clay
They were brought in…
…and packed the whole room
The boards were cut to size…
…with a jigsaw blade
The 100mm boards were drilled in…
…with a 200mm long drill bit
The boards were nailed to the wall…
…with plastic plugs…
…in the corners and the centre
The walls were less bare
The clay was placed in the buckets
…water was poured…
…to mix the clay plaster
The wet lining began…
…to cover the entire room
Mesh was cut to size…
…to hold the clay plaster…
…and was covered with white plaster
The heating & electrics were reconnected
The window sills were put back
The office was ready!
and now occupied.
The Renovation of the
London officePart 2: Biomass Stove (Nov 2010)
The thermal store arrived…
…was craned into position…
…and lowered into the basement
…and installed into its final position
The flue was installed…
…from the basement to the roof.
The stove arrived…
…was craned into position…
…and installed in its final location.
The existing beam was 60 years old & could not handle 1 ton of pellets
So it was removed…
…and replaced with a new one.
1 ton of pellets arrives every month in winter for 6 months
The pallet is lifted from the pavement…
…to the basement.
The final result!
Energy Performance Certificate (EPC): Before the Insulation
Energy Performance Certificate (EPC): After Insulating
Energy Performance Certificate (EPC): Post Biomass
QUESTIONS?
Contact Us
Our Contact Details:
LondonEcoConsulting (UK) Ltd. 28 Marshalsea Road, London, SE1 1HF
l t I +44 (0) 207 939 0989 l f I +44 (0) 207 939 0981 l e l [email protected]
BeirutEcoConsulting (Lebanon)Nahas Building, 4th floor Georges Haddad AvenuePostal Code: 2028 5806 SAIFIBeirut, Lebanon
l t I +961 (1) 971 266l e l [email protected]