ELK PETROLEUM LIMITED Suite 4, Level 9 341 George Street Sydney NSW 2000
Tel+61 28256 3262 Email [email protected] Website www.elkpet.com
Elk Petroleum Ltd ABN 38 112 566 499
ASX / Media Release 13 March 2012
Grieve Update by Denbury at the 6th Annual CO2 Conference in Casper, Wyoming, USA
Elk Petroleum Ltd (ASX Code: ELK) wishes to advise that Denbury Resources Inc (Denbury) presented the attached material at the 6th Annual Wyoming CO2 Conference on Thursday 12th March 2012. The presentation provides an update of work carried out at the Grieve field, in which Elk holds a 35% working interest and Denbury holds the remaining interest. As pointed out in the presentation, the Bureau of Land Management (BLM) is expected to conclude the Environmental Assessment (EA) of the project by the end of July. A favourable decision on the EA will allow construction of the CO2 pipeline to commence along with other work at the Grieve field; injection of CO2 is expected to commence later in the year. This EA timing will allow the project to advance in line with the schedule provided in a recent Investor Presentation (ASX release on 24th April 2012). For further information please contact: Elk Petroleum Investor Relations +61 2 8256 3262 or, [email protected]
For
per
sona
l use
onl
y
NYSE: DNR
Grieve Update July 12, 2012
For
per
sona
l use
onl
y
Location of Grieve Field
2
For
per
sona
l use
onl
y
Map of Grieve Field and Development Layout
3
For
per
sona
l use
onl
y
Progress To Date
● 16 Existing Well Workovers completed:
9 CO2 Injection Wells
3 Production Wells
3 Wells P & A’ed
● Further Field Work is awaiting BLM Environmental Assessment
expected by the end of July.
● Further Technical Planning & Design:
Geo
● Static Model
● 3D Seismic
Reservoir
● History Match
● Material Balance
● Reservoir Simulation
4
For
per
sona
l use
onl
y
5
Technical Work In Progress
● Start of simulation study
● Goal is to answer gas recycling requirements
● Grieve has High dip, high perm, but is in a single reservoir
● Additional studies:
PVT, MMP, and swelling experiments
Effects of recycling CO2 with methane
For
per
sona
l use
onl
y
Current Reservoir CO2 Study
● Fine layering with average layer thickness 2 ft.
Preserve reservoir heterogeneity
● New Lab swelling and slim-tube tests will validate
EOS for CO2 flooding predictions.
● Detailed history matching will be conducted to
quantify reservoir parameters (phi, K, aquifer, etc) for
realistic predictions
● Effect of methane contamination in the CO2 recycle
stream will be evaluated
● New SCAL lab work is being planned end of year to
quantify Sorw
6
For
per
sona
l use
onl
y
Static Modeling (Geology)
For
per
sona
l use
onl
y
Depositional Scenario of Valley fill deposits: Example
from Grieve Field
8
For
per
sona
l use
onl
y
Depositional Facies and Facies Groups
Marine
Estuarine
Fluvial
For
per
sona
l use
onl
y
Surfaces Marine Estuarine Fluvial
10
For
per
sona
l use
onl
y
11
Cross Sections and Correlations
A
A`
A A`
Marine Estuarine Fluvial
For
per
sona
l use
onl
y
Facies Histograms
12
For
per
sona
l use
onl
y
Porosity Histograms
Good Quality Sand Facies Moderate Quality Sand Facies
Min 0.10
Max 0.23
Mean 0.16
Min 0.14
Max 0.29
Mean 0.21
SIMPLE_EXTEND/POR_PHI
Copy_of_indicators Min Max Mean Std Min Max Mean Std Min Max Mean Std Min Max Mean Std Min Max Mean Std
Upper_GQ 0.1 0.3 0.19 0.03 0.1 0.31 0.19 0.04 0.1 0.3 0.19 0.04 0.1 0.3 0.19 0.04 0.1 0.3 0.19 0.04Upper_MQ 0.1 0.31 0.2 0.04 0.1 0.26 0.19 0.03 0.1 0.3 0.19 0.04 0.1 0.29 0.19 0.04 0.1 0.3 0.19 0.04
Lower_GQ 0.1 0.32 0.21 0.03 0.1 0.33 0.21 0.03 0.1 0.31 0.2 0.03 0.1 0.29 0.2 0.03 0.1 0.31 0.2 0.03Lower_MQ 0.1 0.33 0.21 0.04 0.1 0.27 0.2 0.04 0.1 0.28 0.2 0.03 0.11 0.29 0.2 0.03 0.1 0.31 0.21 0.03
ZoneRealization 1 Realization 2 Realization 3 Realization 4 Realization 5
Upper
Lower
* Upper Zone = Marine + Estuarine, Lower Zone= Fluvial
GQ= Good Quality Facies, MQ= Moderate Quality Facies
13
For
per
sona
l use
onl
y
Permeability Histograms
Min 0.1
Max 203.8
Mean 40.0
Min 0.1
Max 1389
Mean 298
* Upper Zone = Marine + Estuarine, Lower Zone= Fluvial
GQ= Good Quality Facies, MQ= Moderate Quality Facies
SIMPLE_EXTEND/PERM
Copy_of_indicators Min Max Mean Std Min Max Mean Std Min Max Mean Std Min Max Mean Std Min Max Mean Std
Upper_GQ 0.1 1389 295.3 164.5 0.1 1389 293.67 162.73 0.1 1389 298.45 186.2 0.1 1390 302.78 191.67 0.1 1390 303.3 191.8
Upper_MQ 0.1 203.8 35 38.12 0.1 204 34.39 37.74 0.1 194 26.64 16.61 0.1 199 26.98 17.05 0.1 196 27.46 17.88
Lower_GQ 0.1 784.9 303.7 151 0.1 785 308.77 155.03 0.1 785 307.09 153.6 0.1 785 304.02 154.45 0.1 785 303.9 150.5Lower_MQ 0.1 187.5 50.23 36.76 0.1 187 52.07 38.13 0.1 581 66.81 85.04 0.1 354 55.95 52.2 0.1 580 74.64 94.51
Realization 5
Upper
Lower
ZoneRealization 1 Realization 2 Realization 3 Realization 4
Good Quality Sand Facies Moderate Quality Sand Facies
14
For
per
sona
l use
onl
y
POR-Kh All Sand Facies
15
For
per
sona
l use
onl
y
POR-Kh Good Quality Sand Facies
Es
tua
rin
e
Flu
via
l M
ari
ne
GU#14
8A Morton
GU#12
16
For
per
sona
l use
onl
y
GU#30 GU#1
6
8A Morton
GU#41 GU#9
Es
tua
rin
e
Flu
via
l M
ari
ne
POR-Kh Moderate Quality Sand
Facies
17
For
per
sona
l use
onl
y
Dynamic Modeling
For
per
sona
l use
onl
y
Gravity Segregation
19
For
per
sona
l use
onl
y
Gas Breakthrough Time (box model)
20
For
per
sona
l use
onl
y
EOS calculated Swelling Psat & 1 D Slim-Tube Simulation
Results—not Validated by Lab yet
2500
3000
3500
4000
4500
0.00 0.20 0.40 0.60 0.80 1.00
Satu
rati
on
Pre
ssu
re (p
sia
)
Composition (mol fraction)
Swelling Calc.
•A validated EOS will help design field
development plans
Needs to be validated
with lab swelling test
Need to be validated with
lab slim-tube test
21
For
per
sona
l use
onl
y
Plans Moving Forward
● 2012
Grieve plant site to be cleared and prepared.
CO2 injection manifold installed.
Installation of CO2 supply (3 mile) pipeline to Grieve from
Anadarko’s CO2 pipeline.
Tie-in to Anadarko’s pipeline.
Installation of field CO2 distribution system and flowlines and the
produced fluid gathering system and flowlines.
Drill and complete 2 Madison water source wells.
Installation of power supply (substation & transmission lines)
Commencement of CO2 injection in November.
● 2013
5 Recompletions.
Continue CO2 injection
Installation of Grieve processing and compression plant.
First oil estimated for Mid Year 2014.