grop · 2011-11-19 · grop d180l roadway roadway block walls o/all plant 1-7-09 1450 3000 600 600...
TRANSCRIPT
GROUP
D180L
ROADWAY
ROADWAY
BLOCK WALLS
O/ALL PLANT 1-7-09
1450
3000
600
600
19200
FLO
W
CV1-T3CV1-T2CV1-T1
DATUMRL:10000
TOC. RL:8137TOC. RL:8071TOC. RL:8059
RL:8059
RL:8000
STOCK PILE1200t
1200t
TOCRL:7700
.
.
250
250600
1750
1750
--
ITEM QTY DESCRIPTION
SADA SERVICES PTY LIMITEDMANUFACTURED WITHOUT THE WRITTEN APPROVAL OF
AND MUST NOT BE COPIED, REPRODUCED OR
THIS IS A CAD DRAWING AND AS SUCHSHOULD NOT BE REVISED MANUALLY
THIS DRAWING AND DESIGN THEREON ARE COPYRIGHT
K
J
No.
1REVISION
2
H
G
F
E
D
C
B
A
1 2
REFERENCE DRAWINGSDWG No.
BY DATE3 4 5
CAD FILE NAME:
CUSTOMER REFERENCE:
6
3 4 5 6
SIZE
DRAWING TITLE
CLIENT
7 8SCALE:
APPROVAL:
CHECKED:
DRAWN BY:Telephone +61 (02) 4654 9442
9 10
THIRD ANGLE
7 8 9 10
DWG No.
11 12
K
J
H
G
F
E
D
C
B
A
11 12
Fax +61 (02) 4654 9425
SADA SERVICES PTY LIMITEDP.O. BOX 52
NARELLAN N.S.W. 2567
0 ISSUED FOR CONSTRUCTION SAS 13/07/09
12 BLOCKS
EXISTING GROUND LINE
EXISTING WASHERY FLOOR
BALLAST FOR DRAINAGE
SAND & CEMENT BASE
BACKFILL WITH ASH12 BLOCKS
FULL BLOCK TURN90 DEGREES
73 FULL BLOCKS REQUIRED
3 HALF BLOCKS REQUIRED
2675
13 BLOCKS
13 BLOCKS
17 BLOCKS6 BLOCKSTOTAL
WP3
WP3
FEED
FRO
M D
RED
GE
FEED
FRO
M D
RED
GE
SADA SERVICES PTY LIMITED
WOLLONDILLY COAL REWASH PLANTS O A PCONVEYORSCONVEYOR IDENTIFICATION PLAN
WRP-S-0??? 0
SAS 13/11/08
1:100WRP-S-0??
--
A1REV.
SITE PLAN - CONVEYOR IDENTIFICATION
PLANT NORTH
CV6 FINE PRODUCT STACK OUT CONVEYOR
CV7 COARSE PRODUCT CONVEYOR
CV4 SAND CONVEYOR
CV2 REJECT CONVEYOR
CV1 PLANT FEED CONVEYOR
CV5 FINE PRODUCT CONVEYOR
CV3 COARSE REJECT CONVEYOR
DREDGE FEED PIPE
DREDGE RETURN WATER PIPE
D180L
ROADWAY
ROADWAY
BLOCK WALLS
O/ALL PLANT 1-7-09
1450
3000
600
600
19200
FLO
W
CV1-T3CV1-T2CV1-T1
DATUMRL:10000
TOC. RL:8137TOC. RL:8071TOC. RL:8059
RL:8059
RL:8000
STOCK PILE1200t
1200t
TOCRL:7700
.
.
250
250600
1750
1750
--
ITEM QTY DESCRIPTION
SADA SERVICES PTY LIMITEDMANUFACTURED WITHOUT THE WRITTEN APPROVAL OF
AND MUST NOT BE COPIED, REPRODUCED OR
THIS IS A CAD DRAWING AND AS SUCHSHOULD NOT BE REVISED MANUALLY
THIS DRAWING AND DESIGN THEREON ARE COPYRIGHT
K
J
No.
1REVISION
2
H
G
F
E
D
C
B
A
1 2
REFERENCE DRAWINGSDWG No.
BY DATE3 4 5
CAD FILE NAME:
CUSTOMER REFERENCE:
6
3 4 5 6
SIZE
DRAWING TITLE
CLIENT
7 8SCALE:
APPROVAL:
CHECKED:
DRAWN BY:Telephone +61 (02) 4654 9442
9 10
THIRD ANGLE
7 8 9 10
DWG No.
11 12
K
J
H
G
F
E
D
C
B
A
11 12
Fax +61 (02) 4654 9425
SADA SERVICES PTY LIMITEDP.O. BOX 52
NARELLAN N.S.W. 2567
0 ISSUED FOR CONSTRUCTION SAS 13/07/09
12 BLOCKS
EXISTING GROUND LINE
EXISTING WASHERY FLOOR
BALLAST FOR DRAINAGE
SAND & CEMENT BASE
BACKFILL WITH ASH12 BLOCKS
FULL BLOCK TURN90 DEGREES
73 FULL BLOCKS REQUIRED
3 HALF BLOCKS REQUIRED
2675
13 BLOCKS
13 BLOCKS
17 BLOCKS6 BLOCKSTOTAL
WP3
WP3
FEED
FRO
M D
RED
GE
FEED
FRO
M D
RED
GE
SADA SERVICES PTY LIMITED
WOLLONDILLY COAL REWASH PLANTS O A PCONVEYORSCONVEYOR IDENTIFICATION PLAN
WRP-S-0??? 0
SAS 13/11/08
1:100WRP-S-0??
--
A1REV.
SITE PLAN - CONVEYOR IDENTIFICATION
PLANT NORTH
CV6 FINE PRODUCT STACK OUT CONVEYOR
CV7 COARSE PRODUCT CONVEYOR
CV4 SAND CONVEYOR
CV2 REJECT CONVEYOR
CV1 PLANT FEED CONVEYOR
CV5 FINE PRODUCT CONVEYOR
CV3 COARSE REJECT CONVEYOR
DREDGE FEED PIPE
DREDGE RETURN WATER PIPE
Design, Installation and Contract Operation of Coal Processing Plants
•Fullin-houseCADanddraftingfacilities
•Equipmentprocurement,costingandsupplierassessment
•Projectmanagementfromconceptiontooperation
•Detailedcommissioningandperformancemonitoring
•Prepplanttechnicalaudits,includingthereviewofexistingoperationalplantsthathaveexperiencedchangestocharacteristics
•Upgradesandcircuitdesignincorporatingthereview,designandimplementationofupgradestoexistingplants
•Preventativemaintenance
•Environmentalauditsandremediationplanning
Modular Coal Preparation PlantsDedicatedaswearetosuperiorservice,innovationandexcellence,SADAGrouphasdevelopedhighlyefficientmodularcoalpreparationplantsthatcanbeadaptedtosuitanyspecificoperation.
Thebenefitsofourmodularcoalpreparationplantsare:
• Theyprovideacosteffectivealternative,withfasteronsiteconstructiontime
•Areexpandableandallowtheeasyadditionoffurthermodules
• Thehighlymobileportablemodulescanbereadilyrelocatedtonewareasasrequired
•Compactdesign
•Aminimalfootprintisrequiredforoperation
SADA Group Contract Operation SADA’sexperienceandexpertiseasalong-termcontractwasheryoperatorhasledtooursuccessfullydesigningand/orcontractoperatingseveralcoalpreparationplantsformajorAustraliancoalcompanies.
Offeringawealthofexperiencebothinmineoperationandinservicingthemanyneedsofminingcompanies,SADApridesitselfonbeingproactiveinresponsetoclientrequirements,withaquickdecisionmakingprocessbornfromyearsinthebusiness.
Weunderstandprojectsfromourclients’perspectiveanddrawonourownknowledgeandexperiencetothinkbeyondtheimmediatetodelivertrouble-free,seamless,integratedsolutionsoneveryprojectweundertake.
Design, Installation and Contract Operation of Coal Processing PlantsSADAGrouphasaprovenhistoryofbringingoutstandingtechnicalexpertisetobearindesigning,installingandcontractoperatingcoalprocessingplantsforourmanyclients.
EnlistingSADAonyourprojectsisguaranteedtoresultinefficientandcost-effectivesolutions,deliveredwithoutstandingdedicationtocustomerservice.
Design and Installation of Coal Preparation PlantsSADAGroup’sdesignandinstallationcapabilitiesencompassthefullspectrumofcoalpreparationservices,offeringanexceptional`one-stop’solutionforourclients.
Theservicesofferedbyourhighlyskilledteaminclude:
•Conceptplanningandfeasibilitystudies,includingassessmentofin-seamcoalqualitycharacteristics
•Engineeringanddesignwhichcantailortheprocessanddesigntosuitspecificprojects
• In-housedesignandprocessengineering
ASADA-drivencontractoperationoffersmanybenefitstoourclients.
SADA’sextensivecoalpreparationcapabilitiescoverallaspectsofcoalprocessingincludingscreening,crushing,dryandwetprocessing,densemediaprocessinganddewatering.
Weprovidealowercostpertonnealternativewhichimprovesyieldandlowersoperatingcosts,withourexperiencedmanagementteamdeliveringacontractoperationwhichfocusesonmaximisingrecoverableyieldandTPHthroughputwithminimaldowntime.
ASADAcontractoperationalsoensuresadherencetothehighestsafetystandards.BecausetheoperationandmanagementofasafeworkplaceisparamounttoSADAGroup,weimplementacarefullytailoredsafetymanagementsystemtosuiteachindividualoperation.
Tailings ReprocessingSADAGrouphasvastexperienceinthereprocessingoftailingsdamstoachievebothastrongeconomicreturnoninvestmentandanenvironmentaloutcomefordisusedtailingsdamsandchitter/rejectemplacement.
Postal PO Box 52, Narellan NSW 2567Phone 02 4654 9400Fax 02 4654 9425Email [email protected] www.sadacoal.com
GROUP