Group of Companies ACTIVITY DETAILS OF ORGNEFTEKHIM-HOLDING GROUP OF COMPANIES 2017

Upload: phamkiet

Post on 17-Sep-2018

231 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

ACTIVITY DETAILS OF ORGNEFTEKHIM-HOLDING GROUP OF COMPANIES

2017

Page 2: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

Reconstruction of operating production facility

2

KEY AREAS OF SERVICES PROVIDED BY ORGHNEFTEKHIM-HOLDING GROUP OF COMPANIES

Construction of new production facilities

ONH-Holding group of companies ensures the implementation of package of measures, namely analysis of the existing production facilities and

processing chains, development of design and estimate documentation, approval by the inspecting authorities, equipment supply, construction and installation works, commissioning with obtaining the specific result on the increase in the total profit of the refinery through the use of potential reserves of processing and production

chains.

ONH-Holding group of companies combines highest possible in the industry experience in the

implementation of domestic projects at all stages of the investment cycle, which allows implementation of

Project (number of Projects) based on the principle of necessity and sufficiency of equipment with maximum

use of domestic equipment.This approach makes it possible, when using standard

process, design and managerial decisions job-proved in recent 15 years, to achieve a minimum cost of the

Project within the implementation period, significantly shorter relative to international practice.

Page 3: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

Development

3

ORGHNEFTEKHIM-HOLDING GROUP OF COMPANIES – RUSSIAN ЕРС CONTRACTOR

INKO-TEKConsulting, engineering, R&D, process technology licensing,

commissioning

OrgneftekhimproektDesign institute

NAFTAINZHINIRINGDesign institute

TechnologiyaDesign institute

InsightAPCS and design institute

Kama-AvtomatikaAPCS

Orgneftekhim-EngineeringR&D, process technology

licensing

Innovative Coatings (INPO)

Special protective coatings

Stroy-InvestConstruction and installation

works

КАМАConstruction and installation

works

Extended EPC-structure, reinforced by interaction with the national licensees, and science on the one hand, and service companies on the other.

ONH-SynthesGasProektDesign institute

(synthesis gas, fertilizers)

KMS-TRANSSTROYLogistics services

1000+ People, incl. 500+ Design Engineers, 300+ ConstructorsCan easily be increased several times due to strong management and engineering core

APCS Block

Capital construction

Block

Hydroconversion is a national project

EPC

Project development

and investments justification

Construction organization and control

Technical assistance,

optimization, commissioning

Design Organizations

Block

Exclusive right for alkylation of benzene with ethylene over zeolite catalyst

Alternative method of

isopropylbenzene

production

Page 4: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

LOCATION OF ORGHNEFTEKHIM-HOLDING GROUP OF COMPANIES DIVISIONS

PodolskOOO INPO Chernogolovka:

OOO ONH-Engineering

Nizhny Novgorod:OOO EA InsightOOO Tekhnologiya

Kazan:OOO ONH-HoldingOOO ONH-SGP

Nizhnekamsk:OOO ONH-HoldingOOO INKO-TEKOOO KAMAOOO Kama-Avtomatika

JSC TANECOconstruction site

Sterlitamak:OOO Orgneftekhimproekt

Rostov-on-Don:OOO Tekhnologiya

Krasnodarskiy krai:Afipsky Refineryconstruction site

4

Moscow:OOO ONH-HoldingOOO INKO-TEKOOO KMS-TRANSSTROYOOO NAFTAINZHINIRING

Dzierżyńsk:ООО Tekhnologiya

Volgograd:OOO Stroy-Invest

Page 5: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

TURNKEY PROJECT

Project feasibility study and organization of financing

Basic Engineering,

basis of design

Detailed Engineering

Organization of equipment procurement

Construction works organization and progress

monitoring

Management system organization

Personnel selection and training

Commissioningworks

Technical and economic

optimization

• ООО ONH-Holding• OOO INKO-TEK• ООО Orgneftekhim-Engineering

• ООО ONH-Holding• OOO INKO-TEK• OOO Orgneftekhimproekt• OOO Tekhnologiya• OOO Orgneftekhim-Engineering • OOO Innovative Coatings

• ООО ONH-Holding• OOO Orgneftekhimproekt• OOO Tekhnologiya• OOO INKO-TEK• OOO EA Insight• OOO NAFTAINZHINIRING

• ООО ONH-Holding• OOO INKO-TEK• OOO KMS-TRANSSTROY

• ООО ONH-Holding • OOO Stroy-Invest• OOO INKO-TEK• OOO EA Insight• OOO Kama

• OOO INPOOrganization management systems • OOO ONH-Holding• OOO INKO-TEKAPCS, DCS & ESD• OOO Kama-Avtomatika• OOO EA Insight

• OOO INKO-TEK• OOO EA Insight

• OOO INKO-TEK • OOO Kama-Avtomatika• OOO EA Insight

• OOO ONH-Holding • OOO INKO-TEK

1 2 3

4 5 6

7 98

5

Page 6: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

6

EPC-contract with PJSC TATNEFT n.a. V.D.Shashin for turn-key construction ofHydroconversion Unit together with Off-Site facilities, as well as CDU/VDU-6 atRefinery and Petrochemical Plants Complex in Nizhnekamsk is in progress.

EPC-contract scope:- Design and Detailed Documentation development;- equipment and materials procurement;- follow-up of manufacturing of key equipment purchased by Customer- construction and installation works;- commissioning.

1EPC-contracts performance

• ООО ONH-Holding• ООО INKO-TEK• ООО Orgneftekhimproekt• ООО Kama• ООО ONH-Engineering

Page 7: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

Pre-project Study - analysis of current situation and conceptual selection of preliminary development options

Feasibility Study (FS) - modeling of general Project development options based on data provided by technology licensors, - reconciliation of feed and product material balances, - closing energy balances, - preliminary comprehensive identification of emission and effluent sources, - evaluation of the logistics for feedstock supply and sales of products- research of feedstock and product markets, - economic estimates

1Project selection

and organization of financing

• ООО ONH-Holding• OOO INKO-TEK• OOO ONH-Engineering

7

Page 8: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

(cont.) Technical feasibility - meteorological and hydrologic surveys, EIA (environmental

impact assessment), organisation of public hearings

Organization of financing - identification of possible funding sources, - optimization of Project phasing in terms of funding and economic returns of each phase, - financial modeling based on the basic design and feasibility studies- obtaining conclusions / clearance by legal, financial, industrial (technical) and marketing experts,- work with banks and export credit agencies, - preparation and maintenance of credit contracts.

1Project selection

and organization of financing

• ООО ONH-Holding• OOO INKO-TEK• OOO ONH-Engineering

8

Page 9: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

ООО Afipskiy Refinery Pre-project investigation for Off-Site & Utilities Complex

Design basis data collection and processing based on similar existing facilities Kick-Off Meeting to set the Design Basis Approval and Acceptance of the Design Basis Determination of the Off-Sites & Utilities Complex configuration, number of units

and their capacities General material and energy balances Technical and economic estimates of natural gas consumption for process feedstock

and fuel needs (according to the RF Government Resolutions No. 317 dated 17.05.2002 and No. 314 dated 30.12.2013)

1Project selection

and organization of financing

• ООО ONH-Holding• OOO INKO-TEK• OOO ONH-Engineering

REFERENCE LIST

9

Page 10: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

(cont.)

Technical and economic estimates of heat and fuel consumption (according to the RF Government Resolutions No. 317 dated 17.05.2002 and No. 314 dated 30.12.2013)

Development of the principal structural diagrams and requirements to the design basis for the Off-Site & Utilities Complex

Development of schematic electrical single-line diagrams Approval of Schematic diagrams Collection of the design basis data from the developers of Basic Designs Development and approval of technical assignments / technical ITBs for engineering of

the Off-Site Facilities Complex Development of technical assignment for the refinery sanitary-protection zone project Development of technical assignments for integrated engineering surveys.

1Project selection

and organization of financing

• ООО ONH-Holding• OOO INKO-TEK• OOO ONH-Engineering

10

Page 11: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

Development of Technical ITBs Selection of Licensors Drafting licensing and basic engineering agreements, with evaluation of

the need to arrange the FEED stage Contracting, holding kick-off meetings with definition of the design basis Acceptance of Basic Design Engineering Packages

2Basic

Engineering

• ООО ONH-Holding• OOO INKO-TEK• OOO Orgneftekhimproekt• OOO Tekhnologiya• OOO ONH-Engineering• OOO Innovative Coatings

11

Page 12: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

REFERENCE LIST

KEY CUSTOMERS AND TYPES OF WORKS:

ООО Afipskiy Refinery Estimates of process variables, calculation and selection of major process equipment,

engineering surveying Design Documentation (aka “Stadia Proect” or “RFEED”) Authority Engineering, State expertise approvals (FAU Gravgosexpertiza) Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking

Unit with Off-Sites and Utilitties Design documentation for the Off-Sites & Utilities

OJSC TANECO Basic Design audit, several projects for the Light Naphtha Isomerization Unit

2Basic

Engineering

• ООО ONH-Holding• OOO INKO-TEK• OOO Orgneftekhimproekt• OOO Tekhnologiya• OOO ONH-Engineering• OOOO Innovative Coatings

12

Page 13: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

Obtaining construction permits - design documentation (aka “Stadia Proect” or “RFEED”), - the obligatory technical specifications for connections, - power, gas and water supply schematic diagrams,- transportation / delivery solutions, - authority engineering: the state expert examination, the industrial

safety expert review, - communication with state agencies to issue permits for preparation for

construction and for construction proper. Detailed Engineering

- Technical Assignments (technical ITBs);- Contract drafts; - selection of design institutes;- work distribution and coordination of activities; - identification of project staging;- review and acceptance of design documentation

3Detailed

Engineering

• ООО ONH-Holding• OOO Orgneftekhimproekt• OOO INKO-TEK• OOO Tekhnologiya• OOO EA Insight

13

Page 14: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

REFERENCE LIST

KEY CUSTOMERS AND TYPES OF WORKS:

ООО Afipskiy Refinery Detailed engineering for the Combined Vacuum Distillation and VR Visbreaking Unit with Off-Site & Utilities

OJSC TANECOParts of detailed engineering, Light Naphtha Isomerization UnitDesign documentation and detailed design of CDU/VDU-6

3Detailed

Engineering

• ООО ONH-Holding• OOO Orgneftekhimproekt• OOO INKO-TEK• OOO Tekhnologiya• OOO EA Insight

14

Page 15: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

Equipment procurement arrangement- market research, - drafting ITBs and holding procurement tenders;- review and analysis of technical documentation for equipment

fabrication;- organisation of procurement processes;

• Arrangement of equipment manufacturing supervision

• Arrangement of equipment delivery / logistics

• Arrangement of equipment incoming acceptance

• Arrangement of equipment completing and release

4 Organization of equipment procurement

• ООО ONH-Holding• OOO INKO-TEK

15

Page 16: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

REFERENCE LIST

KEY CUSTOMERS AND SITES:

ООО Afipskiy Refinery (Combined Vacuum Distillation and VR Visbreaking Unit) Vacuum column purchaseVacuum column delivery arrangementBid process arrangement and controlAnalysis of tender bids, technical documentation for equipment fabrication for compliance with design documentation and the project requirements Technical expert examination of signed contracts for delivery and fabrication of long-lead equipment itemsEquipment fabrication inspection

4 Organization of equipment procurement

• ООО ONH-Holding• OOO INKO-TEK

16

Page 17: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

Selection, work distribution and coordination of construction and installation contractors

Creating the system of interconnected control over construction and assembly

Acceptance of completed work and required as-built documentation Development of passports, individual testing

5

Construction works management and control

• ООО ONH-Holding• OOO INKO-TEK• ООО ServisTelekom• OOO EA Insight • OOO Kama

17

Page 18: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

REFERENCE LIST

KEY CUSTOMERS AND SITES:

ООО Afipskiy RefineryConstruction and assembly, the Combined Vacuum Distillation and VR Visbreaking UnitExternal power supply facilities of the Main 110/6kW stepdown substationConstruction inspection / supervision, the Combined Vacuum Distillation and VR Visbreaking Unit Field supervisionConstruction and installation, the Central Control Room

5

Construction works management and control

• ООО ONH-Holding• OOO INKO-TEK• OOO EA Insight • OOO Kama

18

Page 19: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

Building the facility management system – development of operation manuals, emergency response plans,

instructions, rules and other local documents, – development of job descriptions,– development of quality management system, – development of safety management system

6

Management system organization

• ООО ONH-Holding

19

Page 20: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

REFERENCE LIST

KEY CUSTOMERS AND SITES:

ООО Afipskiy RefineryImplementation of integrated system for control, management and making reasonable management decisions, ensuring business security, documentation management, data transfer, archiving when organizing construction projects

Development of conceptual technical solutions and the action plan for information-management system integration with the existing systems

6

Management system organization

• ООО ONH-Holding

20

Page 21: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

Technical and economical optimization of the existing facility in integration with other refinery facilities to improve energy efficiency, enhance production flexibility and maximize profits of the entire company

9Technical and economic

optimization

• ООО ONH-Holding• ООО INKO-TEK

21

Page 22: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LIST - ONH-HOLDING GROUP OF COMPANIES 2014 – 2015

REFERENCE LIST

KEY CUSTOMERS AND SITES:

OJSC GazpromNeftekhimSalavat Refinery Technical and economical survey of Refinery to improve profits and operating efficiency

9Technical and economic

optimization

• ООО ONH-Holding• ООО INKO-TEK

22

Page 23: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

Pre-project investigation - analysis of current situation and conceptual selection ofpreliminary development options

Development of a feasibility study (FS)modeling of general Project development options based on data provided by technologylicensors; reconciliation of feed and product material balances; closing energy balances;preliminary comprehensive identification of emission and effluent sources; estimation ofthe logistics for feedstock supply and sales of products; research of feedstock and productmarkets; economic estimates

Determination of feasibilitymeteorological and hydrologic surveys; EIA (environmental impact assessment);organisation of public hearings

Organization of financing structureidentification of possible funding sources; optimization of Project phasing in terms offunding and economic returns of each phase; financial modeling based on the basic designand feasibility studies; obtaining conclusions of legal, financial, industrial (technical) andmarketing experts; work with banks and export credit agencies; preparation andmaintenance of credit contracts

1Project selection

and organizationof financing

• ООО ONH-Holding• ООО INKO-TEK

23

Page 24: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

REFERENCE LIST

KEY CUSTOMERS AND SITES:

ОАО Nizhnekamsk Refinerydevelopment of a feasibility study for:CDU/VDU-7VisbreakerPre-project investigation– analysis of current situation and conceptual selection of preliminary development options Hydrogen Generation Unit Diesel and Kerosene Hydrotreaters (Middle Distillates Hydrotreaters)Sulphur Recovery UnitUnoxidized Road Bitumen UnitJet fuels compounding, storage and shipment farm Low-viscosity marine fuel storage and shipment farm

OOO Tomskneftepererabotka Refinery development Master Plan

1Project selection

and organizationof financing

• ООО ONH-Holding• ООО INKO-TEK

24

Page 25: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

TAIF-NK PSCPre-project investigation, development of a feasibility study:Vacuum Gas Oil Block (in the FCC complex)Gas Condensate Treatment/Processing UnitsLPG Merox (in the FCC complex)High-octane blending stock units (MTBE, TAME) (in the high-octane gasoline components production complex)

OJSC TANECOPre-project investigation, preparation of the plant development scheme:•Combined Hydrocracking Unit•Combined Sulphur Recovery Unit•Heavy Coker Gasoil Hydrotreater

ОАО Gazprom neftekhim SalavatPre-project investigation:CDU/VDU-6FCC

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

1Project selection

and organizationof financing

• ООО ONH-Holding• ООО INKO-TEK

25

Page 26: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

Development of Technical Assignments Licensor selection Drafting of licensing and basic engineering agreements, with determining

the need to allocate the FEED stage Contractual work, holding kick-off meetings with definition of the Design

Basis Acceptance of Basic Engineering Design Packages in stages

2Basic

Engineering

• ООО ONH-Holding• OOO INKO-TEK • ООО Orgneftekhimproekt• OOO Tekhnologiya

26

Page 27: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

KEY CUSTOMERS AND REFERENCES :

ООО Afipskiy Refinery Basic engineeringBasic design documentation for the Combined Vacuum Distillation

and Visbreaker Unit

TAIF-NK PSCBasic engineering: FCCGas Condensate Processing UnitMTBE, TAME Units (high-octane gasoline blending stock production) Complex for production of motor fuels to international standardsLoading and unloading railway rackResidual Fuel oil storage and shipment park

2Basic

Engineering

• ООО ONH-Holding• OOO INKO-TEK • ООО Orgneftekhimproekt• OOO Tekhnologiya

REFERENCE LIST

27

Page 28: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

OJSC TANECODevelopment of Technical Assignments (technical parts of ITBs): Heavy Residue Hydroconversion Commercial Demo Unit Heavy Coker Gasoil Hydrotreater Combined Hydrocracking Unit

ОАО Nizhnekamskneftekhim Fractionator at Divinyl & Hydrocarbon Feed Plant Simple polyesters plant architectural and construction solutions: Ethylene oxide plant

ОАО Gazprom neftekhim SalavatRevision of Basic design documentation: FCC

ООО Freudenberg Politex

Engineering of nonwoven fabric plant

2Basic

Engineering

• ООО ONH-Holding• OOO INKO-TEK • ООО Orgneftekhimproekt• OOO Tekhnologiya

28

Page 29: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

Development of Technical Assignment (technical ITB), basic and detailed engineering documentation for inter-level integration and bumpless switching:Project: ”Reconstruction of plant supervisory control system, OOO Gazprom Transgaz Ukhta”

Development of design documentation for main gas pipeline Automatic Process Control Systems (APCS):the main pipeline section controlled by ООО Gazprom transgas Stavropol (for the corporate system of gas flow metering)the main pipeline section controlled by ООО Gazprom transgas Ekaterinburg» (for the 1-sttrain)

Detailed engineering: APCS Integration of a compressor station with its Dispatching Center of the Line Production Department of the Main Pipeline. Sindor Compressor Station of the SRTO (= North Tyumen Area) – Torzhok pipeline, Sindor LPU MG (Line Production Department of the Main Gas Pipeline)

2Basic

Engineering

• ООО ONH-Holding• OOO INKO-TEK • ООО Orgneftekhimproekt• OOO Tekhnologiya

29

Page 30: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

APCS Pilot project development for linear (pipeline) production departments and field control centers of regional gas companies

Detailed design for turnaround of the Siemens-based APCS, incl. the ESD system, for the gasoline unit at Sosnogorsk Gas Processing Plant, OOO GaspromPererabotka

Detailed engineering documentation sections for the Operational dispatch management system (ODMS):

o Backup control center:- Amur LPU MG (Pipeline Production Department of Main Gas Line), - Khabarovsk LPU MG ,- Primorsk LPU MG for LPU MG Bases, emergency repair train of Amursk Compressor Station (CS) 4, base stations of Line Operations Groups (LOG) of De-Kastri CS 2

and Dalnerechenskaya CS 9 The above are parts of the Gas Pipeline Sakhalin-Khabarovsk-Vladivostok

Investment Project

2Basic

Engineering

• ООО ONH-Holding• OOO INKO-TEK • ООО Orgneftekhimproekt• OOO Tekhnologiya

30

Page 31: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

Obtaining permits for construction– design documentation stage development, – obtaining the necessary technical specifications for connection, – development of power, gas and water supply systems,– transportation / delivery solutions, – state expertise, industrial safety expertise, – industrial safety expert review, – work with state bodies to issue permits for

• preparatory pre-construction activities and • Construction

Detailed Engineering– Technical Assignments preparation, – contracts development, – selection of design institutes, – distribution of jobs, coordination of teams,– defining the project phasing / staging, – review and acceptance of design documentation

Detailed Engineering

3Detailed

Engineering

• ООО ONH-Holding• OOO Orgneftekhimproekt• OOO INKO-TEK• OOO Tekhnologiya• OOO EA Insight• OOO NAFTAINZHINIRING

31

Page 32: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

KEY CUSTOMERS AND REFERENCES:

ООО Afipskiy Refinery Organization of detailed engineering Combined Vacuum Distillation And Visbreaker Unit

ОАО Nizhnekamsk Refinery Organization of detailed engineering Unoxidized Road Bitumen Unit

TAIF-NK PSCOrganization of detailed engineeringEuro-4 Fuel Production Complex

OJSC TANECODetailed Engineering Heavy Coker Gasoil HydrotreaterHeavy Residue Hydroconversion Unit

ООО Tobolsk PolymerDesign documentation and budget estimate for the communication and alarm system for Off-Sites & Utilities

Detailed Engineering

3Detailed

Engineering

• ООО ONH-Holding• OOO Orgneftekhimproekt• OOO INKO-TEK• OOO Tekhnologiya• OOO EA Insight• OOO NAFTAINZHINIRING

REFERENCE LIST

32

Page 33: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

ОАО Gazprom neftekhim SalavatDetailed Engineering:CDU/VDU-6Diesel HydrotreaterSulphide-Caustic Wastes Treatment Unit of the “Monomer” (Steam Cracker) and Refinery sites, FCC Complex Off-Sites & UtilitiesAcrylic Acid Unit

OAO Gazpromdevelopment, preparation and execution of projects Automated Gas Commercial Metering System (AGCMS): Major repair of line telemechanics system for gas distribution pipelines and gas distribution stations, maintenance of back-up supply system, ООО Gazprom transgaz Nizhny NovgorodPower supply of APCS of main gas lines, ООО Gazprom transgaz TomskMajor overhaul of buildings and structures, Emergency Response and Restoration Operations Base (UAVR) and Pereslavl LPU (Gas Pipeline Production Department), ООО Gazprom transgaz Ukhta

Engineering design for overhaul and turnarounds:OOO Gazprom transgaz Uhta facilities.

Detailed Engineering

3Detailed

Engineering

• ООО ONH-Holding• OOO Orgneftekhimproekt• OOO INKO-TEK• OOO Tekhnologiya• OOO EA Insight• OOO NAFTAINZHINIRING

33

Page 34: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

ОАО Gazprom – MNPZ (Moscow Refinery)Development of design and detailed engineering documentation:Construction of bitumen modification unit as a new block of bitumen production unit;detailed engineering documentation: FCC naphtha hydrotreater

ОАО OrgkhimArchitectural solutionsExtracts normalization plant

ОАО Slavneft-YANOS (Yaroslavl Refinery) Development of design and detailed engineering documentation: MTBE unit Sulfuric acid alkylation unit Isomerization unit technical works support in the design and procurement of equipment for CDU/VDU -4 CDU/VDU-4 commissioning works Naphtha hydrotreater Diesel hydrotreater

OOO NZMP (Novokuibyshevsk Lubes & Additives Plant)Electric power supply section of documentation:Isodewaxing (IDW) unit

3Detailed

Engineering

• ООО ONH-Holding• OOO NAFTAINZHINIRING • OOO Orgneftekhimproekt• OOO INKO-TEK• OOO Tekhnologiya• OOO EA Insight

34

Page 35: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

ООО Lukoil-NizhegorodnefteorgsintezBasic design and detailed engineering documentation: VGO hydrotreater FCC

TNK BP, ОАО Saratov Refinery Basic design and detailed engineering documentation: Pentane-hexane isomerization unitDiesel Hydrotreater revamp

ОАО Metafraks (Methanol Plant)Development of sections “Design & Construction”; “Electric power”; “Heating, Ventilation & Air Conditioning” (HVAC): Railway rolling stocks repair Unit

ОAО SayanskkhimplastArchitectural design: Direct Ethylene Chlorination and Recycled Dichloroethane Chlorination Unit

3Detailed

Engineering

• ООО ONH-Holding• OOO Orgneftekhimproekt• OOO INKO-TEK• OOO Tekhnologiya• OOO EA Insight• OOO NAFTAINZHINIRING

35

Page 36: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

ООО Lukoil-Nizhegorodnefteorgsintez Development of design specifications sections Electric power; Electric illumination; Power facilities; Process Controls & InstrumentsEquipment replacement: Water supply, drainage, sewage, and waste water treatment units

3Detailed

Engineering

• ООО ONH-Holding• OOO Orgneftekhimproekt• OOO INKO-TEK• OOO Tekhnologiya• OOO EA Insight• OOO NAFTAINZHINIRING

36

Page 37: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

Equipment procurement – Drafting tender documents Conducting of procurement tenders Organisation and management of procurement

Equipment Manufacture Inspection; Equipment Delivery / Logistics organization; Equipment Incoming Control; Organization Equipment Packaging and Issue

4Delivery

of equipment

• ООО ONH-Holding• OOO INKO-TEK• OOO KMS-TRANSSTROY

37

Page 38: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

REFERENCE LIST

KEY CUSTOMERS AND SITES:

ОАО Nizhnekamsk Refinery CDU/VDU-7VisbreakerKerosene HydrotreaterMiddle distillates HydrotreaterUnoxidized Road Bitumen Unit

TAIF-NK PSCCDU/VDU-7FCCGas Condensate Processing UnitMTBE, TAME UnitKerosene Hydrotreater VisbreakerMiddle Distillates Hydrotreater Unoxidized Road Bitumen Unit

4Delivery

of equipment

• ООО ONH-Holding• OOO INKO-TEK• OOO KMS-TRANSSTROY

38

Page 39: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

Selection, distribution / allocation of jobs and coordination of commissioning contractors

Building the interconnected system of construction control Acceptance of completed work and mandatory as-built documentation Development of passports Individual tests

5Construction

management and control

• ООО ONH-Holding• OOO INKO-TEK • ООО EA Insight• ООО Kama• OOO INPO

39

Page 40: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

REFERENCE LIST

KEY CUSTOMERS AND SITES:

ОАО Nizhnekamsk RefineryConstruction and commissioning: Unoxidized Road Bitumen Unit Oxidized Road Bitumen Unit Kerosene Hydrotreater Gas Oil Hydrotreater (Diesel Hydrotreater) Sulphur Plant Hydrogen Generation Unit High-Sulphur Crude Visbreaker

5Construction

management and control

• ООО ONH-Holding• OOO INKO-TEK • ООО EA Insight• ООО Kama• OOO INPO

40

Page 41: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

TAIF-NK PSCConstruction: FCC Gas Condensate Processing Unit MTBE, TAME unitRevamp: FCC Vacuum section of CDU/VDU-7 Middle Distillates Hydrotreatment ComplexRevamp to produce Euro-4 diesel (in cooperation with Shell) : High-Sulphur Feedstock Hydrotreatment UnitInstallation of Instruments and controls, electrical installation FCC Complex

OJSC TANECOField construction supervision: Heavy Coker Gasoil Hydrotreater

5Construction

management and control

• ООО ONH-Holding• OOO INKO-TEK • ООО EA Insight• ООО Kama• OOO INPO

41

Page 42: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

ОАО NTEKConstruction and assembly

ООО Penzaregiongas Construction and assembly

ООО KomiregiongasConstruction and assembly

ООО MariyskregiongasConstruction and assembly

ООО UdmurtregiongasConstruction and assembly

ООО OmskregiongasConstruction and assembly

5Construction

management and control

• ООО ONH-Holding• OOO INKO-TEK • ООО EA Insight• ООО Kama• OOO INPO

42

Page 43: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

Building the facility management system – development of regulations, emergency response plans, instructions, rules

and other local documents, – development of job descriptions, – development of quality management system, – development of safety management system

6Management

system organization

• OOO INKO-TEK • ООО Kama-Avtomatika• ООО EA Insight

43

Page 44: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

REFERENCE LIST

KEY CUSTOMERS AND SITES:

TAIF-NK PSCBuilding the facility management system: CDU/VDU-7 FCC Gas Condensate Processing Unit MTBE/TAME Unit Euro-4 fuels production complex Kerosene Hydrotreater Visbreaker Middle Distillates Hydrotreatment Complex Unoxidized Road Bitumen Units Gas oil Hydrotreatment UnitDevelopment of design and estimate documentation for ACS: Loading and unloading railway rack Residual Fuel-oil storage and shipment park

6Management

system organization

• OOO INKO-TEK • ООО Kama-Avtomatika• ООО EA Insight

44

Page 45: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

(cont.)

Distributed Process Control Systems: Unoxidized Road Bitumen Unit Visbreaker FCC CDU/VDU-7 Off-Site & Utilities Jet fuel tank farm Middle Distillates Hydrotreatment Complex Sulphur Recovery and Granulation Unit

OAO Gazprompredesign inspection and development of detailed engineering documentation: Phase 1: telemetric system of gas metering stations, the automated commercial gas metering

system, OOO Gazprom Mezhregiongaz Vologdadevelopment of design and budget documentation: Phase 2: telemetric system of gas metering stations, supply of equipment, installation and

construction, OOO Gazprom Mezhregiongaz Vologda

6Management

system organization

• OOO INKO-TEK • ООО Kama-Avtomatika• ООО EA Insight

45

Page 46: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

OAO Gazprom (cont.)separate sections of detailed engineering design specifications:power supply systems Heating, ventilation and air conditioning on facilities (HVAC) for process instruments and controls systems, main gas pipelines controlled by Gazprom Transgaz Ekaterinburg and OOO Gazprom Transgaz Yugorskdevelopment of basic design / project documentation:Regional data transmission network Revamp, OOO Gazprom Transgaz Moskva, OOO Gazprom Transgaz Nizhny Novgorod

Development of Technical Assignment (technical ITB), basic and detailed engineering documentation for inter-level integration and bumpless switching / unaccented transition :Revamp of dispatching management systems, OOO Gazprom Transgaz Ukhta

Main Gas Pipeline Automatic Process Control System, project documentation:the main pipeline section controlled by ООО Gazprom transgas Stavropol (for the corporate system of gas flow metering);the main pipeline section controlled by ООО Gazprom transgas Ekaterinburg (Phase 1)

6Management

system organization

• OOO INKO-TEK • ООО Kama-Avtomatika• ООО EA Insight

46

Page 47: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

Detailed engineering: APCS Integration of a compressor station with its Dispatching Center of the Line Production

Department of the Main Pipeline. Sindor Compressor Station of the SRTO (= North Tyumen Area) – Torzhok pipeline, Sindor LPU MG (Line Productin Department of the Main Gas Pipeline). Sindorskaya Compressor Station.

Pilot project of Automated Control Systems for Pipeline Production Departments (LPU), Central Dispatching Centers (TsDP) for regional gas companies

Detailed Engineering for Capital Repair of Siemens-based Automated Process Control System (incl. emergency shutdown system): Naphtha Unit, Sosnogorsky Gas Processing Plant (SGPZ), OOO Gazprom Pererabotka

Sections of detailed engineering (“working documentation”), Supervisory Control System (Rus. “SODU”): Backup control center:

- Amur LPU MG (Pipeline Production Department of Main Gas Line), - Khabarovsk LPU MG , - Primorsk LPU MG for LPU MG Bases, emergency repair train of Amursk Compressor Station (CS) 4, base stations of Line Operations Groups (LOG) of De-Kastri CS 2 and DalnerechenskayaCS 9 (parts of the investment project: Gas-main Pipeline Sakhalin-Khabarovsk-Vladivostok)

6Management

system organization

• OOO INKO-TEK • ООО Kama-Avtomatika• ООО EA Insight

47

Page 48: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

OJSC TANECOControl systems: CDU/VDU-7 Naphta stabilization block Visbreaker Hydrogen Generation Unit Amine Regeneration Unit Combined Hydrocracking Unit Combined Sulphur Recovery UnitAPCS Commissioning: Air Separation Unit Flare system Naphta stabilization block CDU/VDU -7

OAO ZarubezhneftBuilding of the corporate management system for the Downstream Business Unit (including the Refinery, the gas station chain and the wholesale trader of refined petroleum products);

6Management

system organization

• OOO INKO-TEK • ООО Kama-Avtomatika• ООО EA Insight

48

Page 49: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

OJSC GazpromDevelopment of customized and application software for multilevel integrated APCSRevamp of Process IPCS and replacement of control system VS350 with Repas SCADA system RESY-PMC Revamp of supervisory control systemsDevelopment and commercialisation of software environment for integration of control systems based on the OPS standard, ООО Gazprom transgas UkhtaIntroduction of Moscad controller-based telemetry systems for Regional Gas Companies (RGC), the Automated Gas Fiscal Metering program by ООО Mezhregiongaz (in 16 regions)Development of facilities for data transmission to the level of the CDCP (Central Dispatcher Control Panel) of ОАО GazpromPI Platform-based control center, ООО Gazprom mezhregiongaz KirovDevelopment of software for transmission on natural gas consumption data from the SCADA system to the APCS of natural gas consumers

ООО Gazprom Transgaz UkhtaDevelopment of system software download optimization modules set for SCADA Process IPCS

6Management

system organization

• OOO INKO-TEK • ООО Kama-Avtomatika• ООО EA Insight

49

Page 50: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

ООО SevergazpromCommissioning, testing and start-up of Process IPCS: Compressor shop Compressor station Central control room

ОАО NizhnekamskneftekhimParticipation in APCS Commissioning: Oligomers Plant Divinyl & Hydrocarbon Feed Plant Styrene & Polyether Resin Plant Synthetic Rubber Plant Butyl Rubber Plant Organization of material flows metering systems: Machinery and Repair Plant (RMZ)

ОАО KazanorgsintezProcess Distributed Control Systems: HDPE Production and Processing Plant Bisphenol-A Plant Polycarbonate Plant

6Management

system organization

• OOO INKO-TEK • ООО Kama-Avtomatika• ООО EA Insight

50

Page 51: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

ООО LUKOIL –UkhtaneftepererabotkaProcess Distributed Control Systems: Hydrodewaxing Unit (HDW) Compressor Unit Sulphur Recovery Unit Catalytic Reformer L-35-11/300-95 railway loading / unloading rack for oil & dark refined products Visbreaker Isomerization Unit Units 35-11/300-95 and fully enclosed grounded flare

ООО LUKOIL— Volgogradneftepererabotka, VolgogradProcess Distributed Control Systems: Compressor Unit Water Treatment Plant Flare Unit

RPK LUKOIL-2, VysotskProcess Distributed Control Systems: Crude and residual fuel oil loading / unloading control Tank Farm

6Management

system organization

• OOO INKO-TEK • ООО Kama-Avtomatika• ООО EA Insight

51

Page 52: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

ООО ElastokamProcess Distributed Control Systems: Tank Farm Combined Control Rooms Equipment life accounting system Material flows metering systems

ZAO PolymatizDevelopment of technical documentation for APCS, maintenance service: Nonwoven fabric production plant based on equipment for extruded polypropylene

processing

Refinery, the Republic of Mariy-ElAPCS Commissioning: Allen Bradley process automatic control systems for crude distillation process

ОАО Tatnefteotdacha, Almetyevsk APCS Commissioning: Crude fiscal metering unit Metering and recording systems based on TREI systems

Mamagementsystem organization

6Management

system organization

• OOO INKO-TEK • ООО Kama-Avtomatika• ООО EA Insight

52

Page 53: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

ZAO Sever-TEK, Haryaga Process Distributed Control System: Haryaga Terminal Crude fiscal metering unit Alderley metering and recording systems

ООО Tatneft-NKNH-Oil, NizhnekamskDelta-V Process Distributed Control System : Synthetic lubes plant Oligomerization unit Hydrogenation unit Compounding unit

ОАО Permnefteorgsintez, PermProcess Distributed Control Systems: Hydrocracking and Hydrodearomatization Units Sulphur Recovery Unit

ООО Orenburggasprom, OrenburgProcess Distributed Control Systems: Condensate and crude booster pump station

6Management

system organization

• OOO INKO-TEK • ООО Kama-Avtomatika• ООО EA Insight

53

Page 54: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

Electrical installation and commissioning: the AUTOMATED SYSTEM OF FISCAL GAS METERING:

Gas metering unit of ОАО Zavolzhsk Engine plant Gas metering unit of ОАО Vyksa Metal Works Gas metering unit of ОАО Dzierżyńskoye Orgsteklo Gas metering unit of ОАО Teploobmennik, Nizhny Novgorod Gas metering unit of ОАО Sibur-Neftechim Gas metering unit of ОАО Dzierżyńskchimmash Gas metering unit of ОАО Setka, Dzierżyńsk Gas metering unit of ООО Pochinsk Construction Materials Production Company Gas metering unit of Nizhny Novgorod Power Plant (GRES) Gas metering unit of ОАО Bogorodsk Machinery Plant Gas metering unit of ОАО Nizhny Novgorod Oil and Fat Plant, Nizhny Novgorod Gas metering unit of ОАО Nizhny Novgorod Aircraft Plant Sokol Gas metering unit of ОАО Gorky Machinery Plant Gas metering unit of FSUE Scientific Industrial Enterprise Polyet, Nizhny Novgorod Gas metering unit of ОАО International Airport Nizhny Novgorod Gas metering unit of Arzamas Instrument Plant JSC, ArzamasGas metering unit of ООО Coca-Cola HBC Eurasia, Nizhniy NovgorodGas metering unit of ОАО Nizhegorodskiy Vodokanal (autocenter), Nizhniy Novgorod

6Management

system organization

• OOO INKO-TEK • ООО Kama-Avtomatika• ООО EA Insight

54

Page 55: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

Gas metering unit of OAO Sintez (1-st site), DzierżyńskJSC Bor Glass Factory, BorFSUE Ya.M.Sverdlov Plant, DzierżyńskОАО Arzamas Machine-building Plant, Arzamas ОАО Lukoil-Nizhegorodnefteorgsintez (Refinery), KstovoОАО Drobmash, Vyksa 1ООО Knauf-Gips Dzierżyńsk, DzierżyńskОАО Pavlovskiy Avtobus, PavlovoОАО DPO Plastik (steam boiler station), DzierżyńskОАО Zavod Nizhegorodskiy teplokhod, BorОАО Nitel, Nizhniy NovgorodОАО AVIABOR, DzierżyńskBrewing Company VolgaFSUE RFYaTs-VNIIEF, SarovОАО Zavod Polyet, Chkalovsk ООО Avtozavodsk Central Heating and Power PlantОАО Popov GZAS (Gorky Communication Equipment Factory), Nizhniy NovgorodОАО ZSA, Nizhniy NovgorodDzierżyńsk Central Heating and Power Plant, ОАО TGK-6Sormovo Central Heating and Power Plant, ОАО TGK-6Igumnovo Central Heating and Power Plant, ОАО TGK-6

6Management

system organization

• OOO INKO-TEK • ООО Kama-Avtomatika• ООО EA Insight

55

Page 56: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

Building the system for personnel selection and training

7

Personnel selection and training

• ООО INKO-TEK

• ООО EA Insight

56

Page 57: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

REFERENCE LIST

KEY CUSTOMERS AND REFERENCES:

TAIF-NK PSCBuilding the system of personnel selection and training: CDU/VDU-7 FCC Unit Gas Condensate Processing Unit MTBE / TAME unit Euro-4 fuels production complex Kerosene Hydrotreater Visbreaker Middle Distillates Hydrotreatment Complex Unoxidized Road Bitumen Unit Gas oil Hydrotreatment Unit

7

Personnel selection and training

• ООО INKO-TEK

• ООО EA Insight

57

Page 58: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

OJSC TANECOBuilding the system of personnel selection and training: CDU/VDU-7 Naphta Stabilizer Visbreaker Hydrogen Generation Unit Amine Regeneration Unit Hydrocracking Complex Combined Sulphur Recovery Unit

OJSC GazpromSoftware development for training working places, Gazprom transgas Ukhta

7

Personnel selection and training

• ООО INKO-TEK

• ООО EA Insight

58

Page 59: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

Identification of start-up and commissioning stages Selection, work distribution and coordination of commissioning

contractors Organization of complex testing Optimization of process parameters Personnel on-site training

8Commissioning

works

• OOO INKO-TEK• ООО Kama-Avtomatika• ООО EA Insight

59

Page 60: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

REFERENCE LISTKEY CUSTOMERS AND SITES:

ОАО Nizhnekamsk RefineryPreparation for start-up and Commissioning:Vacuum section of CDU/VDU-7VR Visbreaking Unit Hydrogen Generation UnitDiesel and Kerosene HydrotreatersSulphur Recovery UnitUnoxidized Road Bitumen Unit

TAIF-NK PSCPreparation for start-up and Commissioning:Catalytic Cracking UnitGas Condensate Processing UnitLPG Merox desulphurization block in FCC UnitMTBE, TAME units

OJSC TANECOparticipation in Commissioning:Hydrocracking ComplexVisbreakerCombined Sulphur Recovery Unit

8Commissioning

works

• OOO INKO-TEK• ООО Kama-Avtomatika• ООО EA Insight

60

Page 61: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

ОАО Gazprom neftekhim SalavatCoordination and participation in Commissioning:CDU/VDU -6

ОАО NTEKStart-up and Commissioning

ООО PenzaregiongasStart-up and Commissioning

OOO KomiregiongasStart-up and Commissioning

ООО MariyskregiongasStart-up and Commissioning

ООО UdmurtregiongasStart-up and Commissioning

ООО OmskregiongasStart-up and Commissioning

8Commissioning

works

• OOO INKO-TEK• ООО Kama-Avtomatika• ООО EA Insight

61

Page 62: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

Technical and economic optimization of operating units in integration with other refinery facilities to improve energy efficiency, production flexibility and maximize profitability of the entire company

9 Technical and economic

optimization

• OOO INKO-TEK

62

Page 63: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

KEY CUSTOMERS AND SITES:

ОАО Nizhnekamsk Refinerytechnical and economic optimization: Unoxidized Road Bitumen UnitJet fuel compounding, storage and loading farmBunker fuel storage and shipment farm

TAIF-NK PSCtechnical and economic optimization: FCCGas Condensate Processing PlantMTBE / TAME unitsEuro-4 fuel production unit (FCC)Vacuum Section of CDU/VDU-7Kerosene HydrotreaterGas Oil Hydrotreater High-Sulphur Petroleum Streams Hydrotreatment Unit – in cooperation with Shell to produce Euro-4 diesel

9 Technical and economic

optimization

• OOO INKO-TEK

REFERENCE LIST

63

Page 64: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

OJSC TANECOTechnical and economic optimization:Heavy Coker Gasoil HydrotreaterVisbreakerCDU/VDU -7

ОАО Gazprom neftekhim Salavattechnical and economic optimization:CDU/VDU-6

OOO Tomskneftepererabotkatechnical and economic optimization: CDU-1CDU -2

ОАО Novokuybyshevsk Refinery list of actions and technical solutions to improve the operation efficiency:Atmospheric Vacuum Distillation Unit, Parex, Delayed CockerBenzene-rich cut recovery from stabilized reformateMEA gas treatment unitsCaustic treatment unit

9 Technical and economic

optimization

• OOO INKO-TEK

64

Page 65: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

REFERENCE LISTS OF TEAMS AND EXPERTS OF THE ONH-HOLDING GROUP

OAO Zarubezhnefttechnical and economic optimization CDU/VDU-3 Naphtha Hydrotreatment and Fractionation Unit Kerosene Hydrotreatment Unit Diesel Hydrotreatment Unit Bitumen Unit Fuel Gas Treatment Unit LPG Treatment Unit Reformer Benzene Recovery Unit Suphur Recovery Unit Hydrogen Production Unit Hydrocracker

9 Technical and economic

optimization

• OOO INKO-TEK

65

Page 66: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

66

ORGNEFTEKHIM-HOLDING TOP MANAGEMENT

Alexander A.BABYNIN

General Director

Honored Chemist of the Republic of Tatarstan

Laureate of Russian Federation and Tatarstan Republic State Prizes in Science and Engineering

Leonid V.MIKHAILOV

Deputy General Director for Corporate Ownership and Investments

Vladislav I.EMEKEEV

Deputy General Directorfor Construction Organization and Control

Honored Chemist of the Republic of Tatarstan

Dr. Mikhail I.TYUNIN

Deputy General Director Chief Engineer

Honored Chemist of the Republic of Tatarstan

Dr. Valery B.KOUZNETSOV

Deputy General Director for Strategic Development

Page 67: Group of Companies - onh-holding.ruОНХ-Холдинг) общая 09... · Design documentation for the Combined Vacuum Distillation Unit and VR Visbreaking ... Vacuum column purchase

Group of Companies

Moscow Project Office

Off. 328, Business center Chayka Plaza-2

bld. 28, Sredniy Tishinskiy pereulok,

Moscow, Russian Federation

Tel:+ 7(495) 374-62-48

Moscow Main Office

Flor. 8, Block A, BC Magistral Plaza,

1-st Magistralny tupik 5a,

Moscow, Russian FederationTel: +7(499) 372-52-30

Kazan Office

Office 210 a, Sechenovа str. 19 Kazan

Tatarstan Republic, Russian FederationTel: +7(843) 212-41-97

Legal address: office 35,

Magistralny 1-st tupik 5a, 123290, Moscow

Postal address: BC Magistral Plaza, block A, Magistralny 1-st tupik 5a, 123290, Moscow

e-mail: [email protected]

e-mail: [email protected]

Website: www.onh-holding.ru

67

Nizhnekamsk Office

Bld. 9a, Khimikov str., Nizhnekamsk,Tatarstan Republic, Russian Federation

e-mail: [email protected]