gsa pbs recovery
DESCRIPTION
1st presentation from Sustainability CouncilTRANSCRIPT
![Page 1: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/1.jpg)
“We can help get people back to work.” ~Tony Costa, Acting Commissioner
Building the RecoveryAugust 2009
U. S. G E N E R A L S E R V I C E S A D M I N I S T R A T I O N
![Page 2: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/2.jpg)
US General Services Administration
• An Overview
• Today’s Panel
Public Buildings Service (PBS)• Kendra Turner, Director of Industry Relations• Janise Nichols, Industry Relations Manager for Design
and Construction• Raheem Cash, Director, Environment Division
Federal Acquisition Service (FAS)• Stephanie L. Price, National Account Manager
![Page 3: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/3.jpg)
G S A ’ S P U B L I C B U I L D I N G S S E R V I C E (P B S)
Landlord for civilian Federal government
• Portfolio of 354 million square feet of space
• House over 1,000,000 tenants from 400 federal agencies, bureaus and commissions
• 8,603 owned and leased assets (480 historic properties)
• 30 LEED certified properties
• FY ’08 revenue—$8.23 B
• $881.2 M in project starts in FY ‘08
![Page 4: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/4.jpg)
THE AMERICAN RECOVERY & REINVESTMENT ACT OF 2009 (ARRA)
Creating and saving jobs
Reviving the renewable energy industry and increasing domestic renewable energy capacity
Investing in infrastructure with long-term economic benefits
Stabilizing state and local government budgets
Assisting those most impacted by the recession
Providing unprecedented levels of transparency, oversight and accountability
![Page 5: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/5.jpg)
GSA’s Role in the Recovery
Federal Acquisition Service:
• $300 million for fuel efficient vehicles
Public Buildings Service:
• $5.55 billion for building projects
![Page 6: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/6.jpg)
PBS’ $5.5 BILLION RECOVERY ACT SPEND PLAN
![Page 7: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/7.jpg)
Other Provisions of the Act
• $5 billion shall be obligated by September 30, 2010.
• Give preference to activities that can be started and completed expeditiously. (Goal of 50% of funds obligated within 120 days)
• Provide the maximum number of practicable opportunities for small businesses.
“…because everybody has to be possessed with a sense of urgency about putting people back to work.” ~President Barack Obama
![Page 8: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/8.jpg)
Project Selection Criteria
Two Overarching Criteria
Ability of the project to put people Transforming Federal buildingsback to work quickly into high-performance green buildings.
Security of the People, 1942 Construction, 1938Seymour Fogel Chaim Gross
![Page 9: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/9.jpg)
GSA’s Project Plan (released March 27, 2009)
Hundreds of projects funded in four categories:
New Construction (Federal Buildings, Courthouses and Land Ports of Entry)
High Performance Green Buildings
Full and partial building modernizations
Limited scope projects
Small projects
![Page 10: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/10.jpg)
Janise NicholsIndustry Relations Manager for Design and Construction
![Page 11: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/11.jpg)
New Construction of Federal Buildings, Courthouses, and Land Port of Entry’s (LPOEs)
• Six courthouses
• Seven border stations
• One office building
• DHS consolidation (site, infrastructure, and development of St. Elizabeth’s campus)
![Page 12: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/12.jpg)
High Performance Green Buildings
Expenditures That Meet the HPGB Requirement
• Reduces energy, water, and material resource use
• Improves indoor environmental quality
• Reduces negative impacts on the environment throughout the life- cycle of the building
• Increases the use of environmentally preferable products
• Increases reuse and recycling opportunities
• Integrates systems in the building
• Reduces the environmental/energy impacts of transportation
• Considers indoor and outdoor effects of the building on human health and the environment
![Page 13: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/13.jpg)
High Performance Green Buildings (HPGB)
![Page 14: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/14.jpg)
HPGB Full and Partial Building Modernizations
Full Modernization
Involves the replacement of multiple building systems (e.g. HVAC, electrical, plumbing, elevators, roof, windows), and often requires demolition down to the building shell and relocation of tenants.
Partial Modernization
Involves the replacement of a one or more major systems, but the building remains mostly intact, and may or may not require the relocation of tenants.
![Page 15: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/15.jpg)
New Construction and Modernization Projects
Projects Already Underway Construction Phase
Project is already awarded
Design Phase
Design is already awarded
Depending on project delivery method, construction may already be awarded (e.g. design/build)
New Projects
Full and Open Competition
GSA will determine delivery method. Most likely methods are:
Design/Build
Construction Manager as Constructor (CMc)
![Page 16: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/16.jpg)
Limited-Scope, HPGB Projects
Scope Examples
• Re-commissioning
• Replacing flat roofs with integrated photo-voltaic panels bonded to the membrane or planted “green” roofs.
• Installing intelligent lighting systems that provide daylight and provide controls for occupants to adjust for ambient light versus task light.
• Installing more efficient motors to reduce energy and extend the life of the mechanical equipment;
• Converting parking structure lighting to LED (light-emitting diode)
• Retrofitting or replacing less efficient windows
Almost 200 HPGB limited-scope projects are on the list
![Page 17: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/17.jpg)
Limited-Scope, HPGB Projects
Potential Procurement Methods Procurement methodology determined by scope of individual project
1. Full and Open Competition
• New or existing Indefinite Delivery, Indefinite Quantity (IDIQ) contracts
• Multiple Award Schedules
• New or existing Blanket Purchase Agreements (BPAs)
• New single award
2. Full and open competition after exclusion of sources
• Small business set asides
![Page 18: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/18.jpg)
How Suppliers Can Get Involved
Understand How and What Agencies Buy
• Each Government agency has a unique mission, and acquires goods and services in a way that fits their requirements (ie: GSA’s P-100)
• Follow the money - use available (free) government websites to understand agency buying habits and to find current or interested service providers (FPDS.gov, FedBizOpps.gov)
• Utilize Industry/Vendor Outreach Divisions and agency websites
• Each agency has an Office of Small Business Utilization that helps both small and large businesses
GSA Schedules
• Schedule 56 - Buildings and Building Materials/ Industrial Services and Supplies
• Other Schedules – www.gsaelibrary.gsa.gov
• Federal Acquisition Regulation (FAR) 51
![Page 19: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/19.jpg)
Recovery Update (as of August 6, 2009)
GSA has obligated $1,127,042,517 of Recovery Funds, exceeding our August 1st commitment of $1 billion in Recovery Act obligations.
Less than ten weeks after submitting our spending plan to Congress, we awarded over 120 projects in all 11 regions with work underway in 42 states, the District of Columbia, and Puerto Rico.
![Page 20: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/20.jpg)
Where To Go For More Information
www.gsa.gov
www.gsa.gov/recovery
1-866-PBSVEND (coming soon)
![Page 21: GSA Pbs Recovery](https://reader033.vdocuments.net/reader033/viewer/2022051110/54c204524a7959a87b8b4569/html5/thumbnails/21.jpg)
Raheem CashDirector, PBS Environment Division