gte learning tracker - siemens ltd
TRANSCRIPT
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 1
GTE LEARNING TRACKER
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 2
Employee Introduction
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 3
Overview
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 4
GTE Induction Program1st August to 15th September 2013
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 5
Control and Instrumentation Training16th September to 10th October 2013
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 6
Projects Undertaken
Duration: 15th October,2012 to Present.
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 7
Projects Undertaken - Work Done
Time
Technical Learning
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 8
Description of Work Done
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 9
HMI of BOP Area
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 10
Logics Made
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 11
Factory Acceptance Test
•Number of Cabinets: 20•Number of IOs: 8000 approx
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 12
Site Visit
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 13
Technical Learning Incurred
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 14
Technical Learning Incurred
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 15
Non Technical Learning Incurred
Energy Sector • Fossil Power Generation • Instrumentation, Controls & ElectricalGTE Learning Tracker
Innovations
SIEWIRETOOL TO CREATE WIRING DIAGRAMS(Under development)
Page 8
15 minutes per diagramUsed in CLP Paguthan
10 minutes per diagramUsed in TATA Trombay Stage 1
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 17
Features of Siewire
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 18
Key Milestones
Code for Wiring
Diagrams without FIM
Derive on a
Method to Develop
Finalization of
Templates
Prepare the
User Interface
Search Similar tools,
Study
Survey Preparation
& Analysis
Jot down
Requirements
Status Review
Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestoe 5
Tool Implemented in TATA Trombay
Stage 2
Cost Analysis and
Tool Statistics
Code for Wiring
Diagrams with FIM
Status Review Status Review
Data Checks and
Error Handling
Code to Other
Hardware Engineering
Documents
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 19
Implementation in TATA Trombay Stage 2 - STATISTICS
Number of I/Os in the project: 8000.
Hour
s
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 20
Why use Siewire?
Energy Sector • Fossil Power Generation • Instrumentation, Controls & Electrical •COC1-BOP
GTE Learning TrackerPage 21
Future Plan