Brechfa Forest ConnectionDevelopment Consent Order Application - Reference EN020016
Guide to the Application
November 2015
Guide to the Application
This document provides a guide to Western Power Distribution’s Brechfa Forest Connection Project
Development Consent Order application. The original application was submitted to the Planning
Inspectorate on 29 May 2015, and accepted for examination by the Examining Authority on 26 June
2015.
Since the submission a number of the original application documents have been revised and new
documents produced. This guide charts the submission of these documents to the Planning
Inspectorate.
The following table identifies the documents we produced during the examination for which we
subsequently provided updates and/or revised documents. The left hand column of this table identifies
the initial submission with the remaining columns indicating when we submitted additional documents to
the Examining Authority.
For ease of navigation these documents are grouped by volumes as follows;
Volume This volume…
1. Application Information provides details of the specific application information required by the Planning Inspectorate
2. Plans, Drawings and Sections contains the plans which show where we propose to undertake the work
3. Draft Development Consent Order outlines the legal powers we are seeking from the Government to build the proposed connection
4. Compulsory Acquisition Information provides evidence of why we may require legal powers
5. Reports and Statements includes the Consultation Report and other reports and statements
6. Environmental Information shows how we assessed the potential impact on the environment
7. Other Media contains the 3D model of the proposed development and associated videos and images
8. Other Documents includes additional documents produced for the application submission
9. Examination Submissions Documents submitted to the Planning Inspectorate as part ofthe Examination
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
APP-001
1.1 Covering Letter including
Schedule of Documents
APP-002
1.2 Application Form
APP-003
1.3 Planning Inspectorate
Electronic Application Index
APP-004
1.4 Newspaper Notices
1.5 Red Line Boundary Shape
Files1
APP-005
1.6 Glossary and
Abbreviations
APP-135
1.7 Guide to the Application
REP-030
1.7A Guide to the Application1.7B Guide to the Application
APP-006
2.1 Works Plans: Overall
Location Plan and Master Key
to Sections Plan
APP-007
2.1 Works Plans: Section A
APP-008
2.1 Works Plans: Section B
APP-009
2.1 Works Plans: Section C
APP-010
2.2 Land Affected and Land
Plans: Section A
APP-136
2.2A Land Affected and Land
Plans: Section A
APP-011
2.2 Land Affected and Land
Plans: Section A
APP-137
2.2A Land Affected and Land
Plans: Section A
APP-012
2.2 Land Affected and Land
Plans: Section B
APP-138
2.2A Land Affected and Land
Plans: Section B
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
Vo
lum
e 2
P
lan
s, D
raw
ing
s a
nd
Se
cti
on
s
1 Submitted electronically only. No PINS reference provided. 1
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
APP-013
2.2 Land Affected and Land
Plans: Overall Location Plan and
Master Key to Sections Plan
APP-139
2.2A Land Affected and Land
Plans: Overall Location Plan
and Master Key to Sections
Plan
APP014
2.3 Access and Public Rights
of Way Plans: Overall Location
Plan and Master Key to
Sections Plan
APP015
2.3 Access and Public Rights
of Way Plans: Section A
APP016
2.3 Access and Public Rights
of Way Plans: Section B
APP017
2.3 Access and Public Rights
of Way Plans: Section C
APP018
2.4 Environmental Features
Plans: Overall Location Plan
and Master Key to Sections
Plan
APP019
2.4 Environmental Features
Plans: Section A
APP020
2.4 Environmental Features
Plans: Section B
APP021
2.4 Environmental Features
Plans: Section C
APP022
2.5 Heritage Designations
Plans: Overall Location Plan
and Master Key to Sections
Plan
APP023
2.5 Heritage Designations
Plans: Section A
Vo
lum
e 2
P
lan
s, D
raw
ing
s a
nd
Se
cti
on
s
2
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
APP024
2.5 Heritage Designations
Plans: Section B
APP-025
2.5 Heritage Designations
Plans: Section C
APP-026
2.6 Special Category Land
Plans and Crown Land Plans:
Overall Location Plan and
Master Key to Sections Plan
APP-027
2.6 Special Category Land
Plans and Crown Land Plans:
Section B
APP-028
2.6 Special Category Land
Plans and Crown Land Plans:
Section C
APP-029
2.7 132kV Overhead Line
Wood Pole Outline
APP-030
2.7 132kV Overhead Line Work
no.1 Profiles
APP-031
2.7 132kV Overhead Line Work
no.3 Profiles
APP-032
2.7 132kV Underground Cable
Work no.2 Design Drawings
APP-033
2.7 Design Drawings Brechfa
Forest Satellite Construction
Compound
APP034
2.7 Key Plan for Detailed
Design Drawings
Vo
lum
e 2
P
lan
s, D
raw
ing
s a
nd
Se
cti
on
s
3
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
APP035
2.8 Trees and Hedges with the
Potential to be Affected Plans:
Overall Location Plan and
Master Key to Sections Plan
APP036
2.8 Trees and Hedges with the
Potential to be Affected Plans:
Section A
APP-037
2.8 Trees and Hedges with the
Potential to be Affected Plans:
Section B
APP-038
2.8 Trees and Hedges with the
Potential to be Affected Plans:
Section C
APP-039
3.1 Draft Development Consent
Order
3.1A Draft Development
Consent Order
3.1.1 Draft Development
Consent Order (Tracked
Change)
APP-040
3.2 Draft Explanatory
Memorandum
APP-041
4.1 Statement of Reasons
APP-139
4.1A Statement of Reasons
APP-140
4.1A Statement of Reasons
(Tracked Change)
APP-042
4.2 Funding Statement
APP-043
4.3 Book of Reference
APP-141
4.3A Book of Reference
4.3B Book of Reference
Part 1
APP-142
4.3A Book of Reference
(Tracked Change)
4.3B Book of Reference
(Tracked Change) Part 1
Vo
lum
e 2
P
lan
s, D
raw
ing
s a
nd
Se
cti
on
s
Vo
lum
e 3
D
raft
Develo
pm
en
t
Co
nsen
t O
rder
Vo
lum
e 4
Co
mp
uls
ory
Ac
qu
isit
ion
Info
rma
tio
n
4
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
APP-044
5.1 Consultation Report
APP-045
5.1 Consultation Report
Appendix 3.1 to 4.3
APP-046
5.1 Consultation Report
Appendix 5.1 to 6.2
APP-047
5.1 Consultation Report
Appendix 6.3 to 8.24
APP-048
5.1 Consultation Report
Appendix 9.1 to 14.7
APP-049
5.1.1 Consultation Report
Summary (Welsh)
APP-050
5.1.1 Consultation Report
Summary
APP-051
5.1 Consultation Report
Addendum
APP-052
5.2 Flood Consequence
Assessment
APP-053
5.3 Statement of Statutory
Nuisance
APP-054
5.4 Habitat Regulations
Assessment - No Significant
Effects Report
APP-054
6.1 Environmental Statement
Non Technical Summary
(Welsh)
APP-055
6.1 Environmental Statement
Non Technical Summary
Vo
lum
e 5
R
ep
ort
s a
nd
Sta
tem
en
ts
Vo
lum
e 6
E
nv
iro
nm
en
tal
Info
rma
tio
n
5
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
APP-056
6.2 Environmental Statement
Chapter 1 - Introduction
APP-057
6.2 Environmental Statement
Chapter 2 - Project Description
APP-058
6.2 Environmental Statement
Chapter 3 - Project
Alternatives
APP-059
6.2 Environmental Statement
Chapter 4 - Consultation
APP-060
6.2 Environmental Statement
Chapter 5 - Environmental
Setting
APP-061
6.2 Environmental Statement
Chapter 6 - EIA Process
APP-062
6.2 Environmental Statement
Chapter 6 - EIA Process
APP-063
6.2 Environmental Statement
Chapter 8 - Land Use,
Agriculture and Forestry
APP-064
6.2 Environmental Statement
Chapter 9 - Landscape and
Visual Assessment
APP-065
6.2 Environmental Statement
Chapter 10 - Ecology
APP-066
6.2 Environmental Statement
Chapter 11 - Historic
Environment
Vo
lum
e 6
E
nv
iro
nm
en
tal In
form
ati
on
6
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
APP-067
6.2 Environmental Statement
Chapter 12 - Geology,
Hydrogeology and Ground
Conditions
APP-068
6.2 Environmental Statement
Chapter 13 - Hydrology,
Drainage and Flood Risk
APP-069
6.2 Environmental Statement
Chapter 14 - Noise and
Vibration
APP-070
6.2 Environmental Statement
Chapter 15 - Air Quality
APP-071
6.2 Envirnmental Statement
Chapter 16 - Traffic and
Transport
APP-072
6.2 Environmental Statement
Chapter 17 - Socio-economics,
Recreation and Tourism
APP-073
6.2 Environmental Statement
Chapter 18 - Electric and
Magnetic Fields
APP-074
6.2 Environmental Statement
Chapter 19 - Cumulative
Effects and Inter-relationships
APP-075
6.2 Environmental Statement
Chapter 20 - Environmental
Management
APP-076
6.3 Environmental Statement
Figures 1.1 to 9.4
Vo
lum
e 6
E
nv
iro
nm
en
tal In
form
ati
on
7
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
APP-077
6.3 Environmental Statement
Figure 9.5
APP-078
6.3 Environmental Statement
Figures 9.6 to 11.5
APP-079
6.3 Environmental Statement
Figures 12.1 to 17.1
APP-080
6.3 Environmental Statement
Figures 19.1 to 19.3
APP-081
6.3 Environmental Statement
Appendix 3.1 - WPD Schedule
9 Statement
APP-082
6.4 Environmental Statement
Appendix 3.2 - Change
Request Log
APP-083
6.4 Environmental Statement
Appendix 7.1 - Summary of
LDP Policies
APP-084
6.4 Environmental Statement
Appendix 7.2 - Compliance
with NPS EN1 and NPS EN5
APP-085
6.4 Environmental Statement
Appendix 7.3 - Climate Change
Resilience Report
APP-086
6.4 Environmental Statement
Appendix 9.1 - Effects on
Landscape Elements
Part 1 of 2
Vo
lum
e 6
E
nv
iro
nm
en
tal In
form
ati
on
8
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
APP-087
6.4 Environmental Statement
Appendix 9.1 - Effects on
Landscape Elements
Part 2 of 2
APP-088
6.4 Environmental Statement
Appendix 9.2 - Effects on
Landscape Character
APP-089
6.4 Environmental Statement
Appendix 9.3 - Effects on
Landscape Designations
APP-090
6.4 Environmental Statement
Appendix 9.4 - Effects on
Representative Viewpoints
APP-091
6.4 Environmental Statement
Appendix 9.5 - Visual Effects
upon Residents
APP-092
6.4 Environmental Statement
Appendix 9.6 - Visual Effects
upon Footpath Users
APP-093
6.4 Environmental Statement
Appendix 9.7 - Visual Effects
upon Road Users
APP-094
6.4 Environmental Statement
Appendix 9.8 - Visual Effects
upon other Recreational and
Tourist Locations
APP-095
6.4 Environmental Statement
Appendix 10.1 - Bat Technical
Report
Vo
lum
e 6
E
nv
iro
nm
en
tal In
form
ati
on
9
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
APP-096
6.4 Environmental Statement
Appendix 10.2 - Botany
Technical Report
APP-097
6.4 Environmental Statement
Appendix 10.3 - Bird Technical
Report
APP-098
6.4 Environmental Statement
Appendix 10.4 - Dormouse
Technical Report
APP-099
6.4 Environmental Statement
Appendix 10.5 - Marsh
Fritillary Technical Report
APP-100
6.4 Environmental Statement
Appendix 10.6 - Otter and
Water Vole Technical Report
APP-101
6.4 Environmental Statement
Appendix 11.1 - Historic
Environment Technical Report
APP-102
6.4 Environmental Statement
Appendix 11.2 - Historic
Environment Planning
Compliance
APP-103
6.4 Environmental Statement
Appendix 12.1 - Geo-
Environmental Information
Part 1 of 6
APP-104
6.4 Environmental Statement
Appendix 12.1 - Geo-
Environmental Information
Part 2 of 6
Vo
lum
e 6
E
nv
iro
nm
en
tal In
form
ati
on
10
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
APP-105
6.4 Environmental Statement
Appendix 12.1 - Geo-
Environmental Information
Part 3 of 6
APP-106
6.4 Environmental Statement
Appendix 12.1 - Geo-
Environmental Information
Part 4 of 6
APP-107
6.4 Environmental Statement
Appendix 12.1 - Geo-
Environmental Information
Part 5 of 6
APP-108
6.4 Environmental Statement
Appendix 12.1 - Geo-
Environmental Information
Part 6 of 6
APP-109
6.4 Environmental Statement
Appendix 13.1 - Hydrology,
Flood Risk and Drainage Data
Table
APP-110
6.4 Environmental Statement
Appendix 14.1 - Noise
Supporting Information
APP-111
6.4 Environmental Statement
Appendix 15.1 - Air Quality
Assessment
APP-112
6.4 Environmental Statement
Appendix 16.1 - Clarification of
Traffic and Transport Scope
Vo
lum
e 6
E
nv
iro
nm
en
tal In
form
ati
on
11
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
APP-113
6.4 Environmental Statement
Appendix 16.2 - Brechfa Forest
Construction Programme
APP-144
6.4 Environmental Statement
Appendix 17.1 - Review of
Socio-economic, Recreation
and Tourism Assessments
APP-114
6.4 Environmental Statement
Appendix 18.1 - EMF
Calculations
APP-115
6.5 Environmental Statement
Scoping Report
APP-116
6.6 Environmental Statement
Scoping Opinion
APP-117
6.7 Environmental Statement
Publicity Requirements
Vo
lum
e 7
O
the
r M
ed
ia
APP-118
7.1 3D Model Visualisation
Document
APP-119
8.1 Planning Statement
APP-145
8.1 Planning Statement
Appendix 1 - Details of Other
Consents and Licenses
APP-120
8.1 Summary Planning
Statement
APP-121
8.1 Summary Planning
Statement (Welsh)
Vo
lum
e 6
E
nv
iro
nm
en
tal In
form
ati
on
Vo
lum
e 8
O
the
r D
oc
um
en
ts
12
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
APP-122
8.2 Strategic Optioneering
Report
APP-123
8.3 Draft Section 106
Agreement
APP-124
8.4 Lifetime Costs Report
APP-125
8.5 Construction Management
Strategy Part 1 of 2
APP-126
8.5 Construction Management
Strategy Part 2 of 2
APP-127
8.6 Construction
Environmental Management
Plan
APP-128
8.7 Construction Traffic
Management Plan
APP-129
8.7 Construction Traffic
Management Plan Figures 1.1
to 4.2
APP-130
8.7 Construction Traffic
Management Plan Appendix 1
PRoW Management Strategy
APP-131
8.7 Construction Traffic
Management Plan Appendix 2
Access Pro Formas
APP-132
8.8 Transport Assessment
Vo
lum
e 8
O
the
r D
oc
um
en
ts
13
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
APP-133
8.9 Outline Archaeological
Written Scheme of
Investigation
APP-134
8.9 Outline Archaeological
Written Scheme of
Investigation Figure 1.1
APP-135
8.10 DCO Documents Errata
APP-147
8.10 Volume 6.4 - Appendix
14.1 Noise Supporting
Information Errata
APP-148
8.11 Sections 56 and 59 and
Regulation 13 Compliance
Certificates and Notice of
Recipients Not Included in the
Revised Book of Reference
APP-149
8.12 Response to ExA
Procedural Decision dated 6
July 2015 and Planning
Inspectorate Section 55
Application Checklist
REP1-029
9.1 Response to the Examining
Authority's First Written
Questions
REP1-031
9.2.1 CA01 Appendix 1 Change
Requests
REP1-058
9.2.2 CA12 Appendix 1
Justification for Land
REP1-070
9.2.3 CA13 Appendix 1
Organogram
Vo
lum
e 8
O
the
r D
oc
um
en
ts
Vo
lum
e 9
E
xa
min
ati
on
Su
bm
iss
ion
s
14
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
REP1-071
9.2.4 CA14 Appendix 1 Annual
Report and Financial Statement
REP1-072
9.2.5 CA18 Appendix 1 Land
Owner Engagements
REP1-073
9.2.6.1 DLV02 Appendix 1 Figure
1 Appendix 9.5 Residential
Receptors
REP1-074
9.2.6.2 DLV02 Appendix 2 Figure
1 Appendix 9.6 Footpaths
REP1-075
9.2.6.3 DLV02 Appendix 3 Figure
1 Appendix 9.7 Classified Roads
REP1-076
9.2.6.4 DLV02 Appendix 4 Figure
1 Appendix 9.8 Other Receptors
REP1-077
9.2.7 DLV03 Appendix 1
Viewpoints
REP1-078
9.2.8.1 DLV06 Appendix 1 Phillip
Black - CV
REP1-079
9.2.8.2 DLV06 Appendix 2 Ellie
Davies - CV
REP1-080
9.2.8.3 DLV06 Appendix 3 John
Meehan - CV
REP1-081
9.2.9 DLV13 Appendix 1
Modified Table 9.1
REP1-032
9.2.10 DLV15 Appendix 1 Table
of Receptors
Vo
lum
e 9
E
xa
min
ati
on
Su
bm
iss
ion
s
15
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
REP1-033
9.2.11 DLV19 Appendix 1
Options Comparison
REP1-033
9.2.12 DLV20 Appendix 1 Report
into Underground Cables
REP1-035
9.2.13.1 DLV22 Appendix 1
Route Alignment Selection
Report
REP1-036
9.2.13.2 DLV22 Appendix 2
Route Alignment Selection
Report Figures
REP1-037
9.2.13.3 DLV22 Appendix 3
Route Alignment Selection
Report Appendix 1.1
REP1-038
9.2.13.4.1 DLV22 Appendix 4
Route Alignment Selection
Report Appendix 1.2 Part 1
REP1-039
9.2.13.4.2 DLV22 Appendix 4
Route Alignment Selection
Report Appendix 1.2 Part 2
REP1-046
9.2.13.4.3 DLV22 Appendix 4
Route Alignment Selection
Report Appendix 1.2 Part 3
REP1-047
9.2.13.4.4 DLV22 Appendix 4
Route Alignment Selection
Report Appendix 1.2 Part 4
REP1-040
9.2.13.5 DLV22 Appendix 5
Route Alignment Selection
Report Appendix 2.1
Vo
lum
e 9
E
xa
min
ati
on
Su
bm
iss
ion
s
16
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
REP1-041
9.2.14.1 DLV24 Appendix 1
National Grid - Our Approach to
Design and Routeing 2012
REP1-042
9.2.14.2 DLV24 Appendix 2
National Grid - Approach to
Options Appraisal 2012
REP1-043
9.2.14.3 DLV24 Appendix 3 NG
UG Policy New Connections
REP1-044
9.2.14.4.1 DLV24 Appendix 4
CIGRE Guidelines Part 1
REP1-045
9.2.14.4.2 DLV24 Appendix 4
CIGRE Guidelines Part 2
REP1-048
9.2.15 DCO03 Appendix 1
Mitigation Table
REP1-049
9.2.16 DCO24 Appendix 1
Brechfa Forest West Wind Farm
Approved layout
REP1-050
9.2.17 DCO33 Appendix 1 Email
from Openreach
REP1-051
9.2.18.1 DCO34 Appendix 1 S37
Consent Burry Port
REP1-052
9.2.18.2 DCO34 Appendix 2
Existing Assets Table
REP1-053
9.2.18.3 DCO34 Appendix 3
Proposed Works to Existing
Assets Plans
Vo
lum
e 9
E
xa
min
ati
on
Su
bm
iss
ion
s
17
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
REP1-054
9.2.19.1 EIA09 Appendix 1 Notes
of NRW ecology meetings
REP1-055
9.2.19.2 EIA09 Appendix 2
Follow up Email with NRW
REP1-056
9.2.19.3 EIA09 Appendix 3 CCC
Scoping Opinion to PINS
REP1-057
9.2.19.4 EIA09 Appendix 4 CCC
Response on Draft ES
REP1-059
9.2.20.1 EIA13 Appendix 1
BFWWF Habitat Management
Plan
REP1-060
9.2.20.2 EIA13 Appendix 2
BFWWF Completed Unilateral
Undertaking
REP1-061
9.2.21 EIA17 Appendix 1 Stage 3
Consultation - NRW
REP1-062
9.2.22 EIA20 Appendix 1
Conceptual Site Model
REP1-063
9.2.23.1 EIA22 Appendix 1
Relevant Watercourses
Part 1
REP1-064
9.2.23.2 EIA22 Appendix 2
Relevant Watercourses
Part 2
REP1-065
9.2.24 EIA26 Appendix 1 Outline
Frac-out Contingency Plan
Vo
lum
e 9
E
xa
min
ati
on
Su
bm
iss
ion
s
18
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
REP1-066
9.2.25 EIA29 Appendix 1 SIA
Guidelines
REP1-067
9.2.26 EIA30 App1 Tables 20.1 &
20.2
REP1-068
9.2.27 HA11 Appendix 1 HRA
Figure 2 Otter Figures
REP1-069
9.2.28 OM02 Appendix 1 Guide
to the Application
REP1-083
9.3.1 Statements of Common
Ground - Carmarthenshire
County Council
REP1-084
9.3.2 Statements of Common
Ground - Historic Environment -
Dyfed Archaeological Trust and
Cadw
9.3.3 Statements of Common
Ground - Natural Resources
Wales
9.3.4 Statements of Common
Ground - Landscape and Visual -
Carmarthenshire County
Council
REP1-085
9.4 Applicant’s Responses to
Relevant Representations
REP1-086
9.5 Position with regard to
Statements of Common Ground
9.6.1 Applicant’s Comments on
Written Representations from
Carmarthenshire County
Council
Vo
lum
e 9
E
xa
min
ati
on
Su
bm
iss
ion
s
19
Guide to the Application
Volume Main Submission
29 May 2015
Documents Submitted
21 August 2015
Documents Submitted
25 September 2015
Documents Submitted
for Deadline 1
9 November 2015
Documents Submitted
for Deadline 2
24 November 2015
Documents Submitted
for Deadline 3
17 December 2015
Vo
lum
e 1
Ap
plic
ati
on
In
form
ati
on
9.6.2 Applicant’s Comments on
Written Representations from
Other Parties
9.7 Applicant’s Comments on
Carmarthenshire County
Council's Local Impact Report
9.8 Applicant’s Comments on
Responses to Examining
Authority’s First Written
Questions
9.9 Commentary of Changes to
Draft Development Consent
Order 3.1
Vo
lum
e 9
E
xa
min
ati
on
Su
bm
iss
ion
s
20