Guidelines for implementation of Capacity Building Scheme and
utilization of DIT Grant-in-aid
THIS SUBSUMES ALL THE RELEVANT POINTS OF THE
GUIDELINES FOR CAPACITY BUILDING AND INSTITUTIONAL FRAMEWORK FOR E- GOVERNANCE UNDER
DIGITAL INDIA
MARCH 2016
Guidelines for implementation of Capacity Building Scheme II 2
Guidelines for implementation of Capacity Building Scheme Phase-II
Under Digital India
Purpose of the Guidelines
To provide State/UT Governments and Central Line Ministries information / guidelines
about Capacity building Scheme Phase-II under Digital India.
Content of the Guidelines
The guideline entails the objective and scope of the scheme, the institutional framework,
implementation mechanism and fund disbursement and utilization mechanism of
different components of the scheme.
Intended users of the Guidelines
State/UT Governments, Central Line Ministries and National e-Governance Division
How to use the Guidelines
The guidelines aim to provide readers with background of CB Scheme Phase-II, its vision,
objectives and implementation mechanism. Chapter 1 of the document covers the
background of NeGP and Digital India and need for Capacity Building Scheme. Chapter 2
contains the scope of CB Scheme Phase II and its components such as extending the
scope to Central Line Ministries, collaboration with State Administrative Training
Institutes, about e-Governance Competency Framework, Leaning Management System,
Knowledge Management System and virtual cadre. Chapter 3 details the National level
institutional framework for the implementation of the Scheme and role of various
stakeholders. This section also includes guidelines for States to adopt a roadmap for
program level implementation of project and establishment of State Apex Committee and
the envisioned role of State e-Mission Teams. Chapter 4 details the approved components
of the CB Scheme and financial allocation and the 5th Chapter provides guidance on the
fund inclusions and exclusions of the scheme.
Guidelines for implementation of Capacity Building Scheme II 3
Table of Content
1. BACKGROUND OF CAPCITY BUILDING SCHEME PHASE-II 4
2. SCOPE OF CAPACITY BUILDING SCHEME PHASE II 7
3. INSTITUTIONAL FRAMEWORK FOR IMPLEMENTATION OF CB SCHEME PHASE II 11
4. FUND ALLOCATIONS UNDER CB PHASE II SCHEME 19
5. FUNDS UTILIZATION GUIDELINE 21
Guidelines for implementation of Capacity Building Scheme II 4
1. BACKGROUND OF CAPCITY BUILDING SCHEME PHASE-II
Background
1.1 The Government of India approved the National e-Governance Plan (NeGP) in the
year 2006 with a vision to “Make all Government services accessible to the common
man in his locality, through common service delivery outlets and ensure efficiency,
transparency & reliability of such services at affordable costs to realize the basic
needs of the common man”. The vision was to make all government services
accessible to the common man in his locality, through common service delivery
outlets and ensure efficiency, transparency & reliability of such services at
affordable costs to realize the basic needs of the common man.
1.2 NeGP comprised of 44 Mission Mode projects covering a wide range of domains, viz.
Agriculture, Health, Education, Passports, Police, Courts, etc. and 4 infrastructure
components: Common Services Centres, State Data Centres, State Wide Area
Networks and National / State Service Delivery Gateways. Support components of
NeGP include Standards, Technical Assistance, R&D, HRD & Training and
Awareness & Assessment. Currently 27 Mission Mode Projects are operational and
providing a wide range of services with an average of over 270 million (27 crore)
transactions per month.
1.3 With the learning's from the experience of implementation of National e-Governance
Plan (NeGP), it was felt that despite the successful implementation of several e-
Governance projects across the country, the desired transformation in delivering
the public services is yet to be achieved. Hence, a need was felt to enhance the
scope and quality of e-Governance in the country through a more comprehensive
planning and implementation of ICT infrastructure, bringing in transformational
government process reengineering, focusing on integrated services, interoperable
systems and making best use of emerging technologies, to establish a more
connected government.
1.4 In order to transform the entire ecosystem of public services, Govt. of India has
approved the ‘Digital India’ programme with the vision to transform India into a
digitally empowered society and knowledge economy. The vision of ‘Digital India’ is
centered on three key areas, namely, Digital Infrastructure as a Utility to Every
Citizen, Governance & Services on Demand and Digital Empowerment of Citizens.
1.5 Digital India programme is envisaged as a transformational campaign changing the
manner in which governance and public services are provided to citizens. Digital
India also aims to transform India into a knowledge based economy and aims to
deliver good governance to citizens by synchronized and co-ordinated engagement
with both Central government & State government.
1.6 Digital India Programme represents a paradigm shift and the key to implementing it
right is ensuring that the right skills are made available in the various
implementation teams across the nine pillars of Digital India, namely:
1. Broadband Highways
2. Universal Access to Mobile Connectivity
3. Public Internet Access Programme
4. E-Governance – Reforming government through
Technology
5. e-Kranti – Electronic delivery of services
6. Information for All Electronics Manufacturing
7. Electronics Manufacturing – Target NET ZERO Imports
8. IT for Jobs
9. Early Harvest Programmes
About Capacity Building Scheme
1.1. The capacity building scheme, (CB Scheme Phase I) was approved by the
Government in 2008 for taking National e-Governance Plan (NeGP) forward
across the country in all the States and Union Territories. The scheme
addressed the critical ‘Human Resource Development’ and ‘Training’
components of NeGP to provide technical & professional support to State level
policy & decision-making bodies and to develop specialized skills for e-
Governance initiatives.
1.2. The Scheme envisioned the following:
(i) Establishment of an institutional framework for State Level Strategic
decision- making including setting-up of State e-Governance Mission
Team (SeMT) having relevant expertise and experience to provide
technical & professional support.
(ii) Imparting of specialized training, Orientation program for decision
makers (state legislature and senior bureaucrats) and SeMTs, knowledge
sharing and bringing in international best practices.
(iii) Strengthening of Government Training Institutions in States.
(iv) Setting up of an Empowered Committee (EC) under the chairmanship of
Secretary, Department of Information Technology including members
from Planning Commission, Department of Expenditure and
representatives from State governments.
(v) Setting up of a Capacity Building Management Cell (CBMC) at e-
Governance Programme Management Unit (e-GPMU) for coordination and
implementation.
1.3. The scheme was initially approved for a period of three years. The Empowered
Committee considering the various implementation issues, had recommended
the extension of the project for a period of 2 years in 2011, and further
recommended extension till 9th January, 2014. While approving the
extension of the CB Scheme till the 9th January, 2014, the Empowered
Committee had recommended the development of a roadmap for the
continuation of the existing Scheme into the next phase.
Guidelines for implementation of Capacity Building Scheme II 6
1.4. A working Group was constituted to review the CB Scheme and identify gaps,
if any, in the existing scheme with respect to fulfilling requirements of e-
Governance, both for the implementation and maintenance phase and
developing the Road Map for continuation of the Scheme to the next phase.
1.5. The Working Group made an assessment of the Capacity Building Scheme
and the benefits that have accrued to the States/UTs and based on its
assessment recommended the continuation of the scheme for a further period
of 5 years beyond January, 2015, to be called CB Phase II Scheme. (The report
is available at www.negp.gov, may refer the link below
https://negp.gov.in/pdfs/Report_of_working_group_on_CB_roadmap_21%200
3%2013_F.pdf)
1.6. The Empowered Committee accepted the report of the Working Group and
recommended that a Detailed Project Report for Capacity Building Scheme
Phase – II be prepared and also approved the extension of the Phase I scheme
till 9th January, 2015. On the basis of the Detailed Project Report, the
proposal for the Capacity Building Scheme Phase II was considered by the
Expenditure Finance Committee in a meeting held on 27th October, 2014
under the chairmanship of Secretary, Department of Electronics &
Information Technology.
1.7. It was felt that the continuation of the scheme is required for supporting the
implementation of vision of Digital India. For e-Governance initiatives to
succeed across the country there has been a realisation that capabilities must
be built at all levels starting from the top leadership to the user of e-
Governance services. The scheme seeks to address the following specific
capacity gaps:
• Lack of personnel with appropriate qualifications, skill sets and expertise
in managing large IT/e-Governance projects
• Lack of appropriate institutional framework to handle the programme
• Lack of readiness for Digital India and e-Kranti Implementation
Subsequently, the Capacity Building Phase - II was approved under Digital
India up to 31 March 2017
Guidelines for implementation of Capacity Building Scheme II 7
2. SCOPE OF CAPACITY BUILDING SCHEME PHASE II
About Capacity Building Scheme Phase-I
2.1 The various components of the scheme includes formulation of the
implementation guidelines, setting up of the Capacity Building Management Cell,
temporary hiring through a wet leasing arrangement and appointment of
National Institute for Smart Government (NISG) as the execution agency and
development of training modules. The process of hiring of resources through an
agreement with NISG began by June 2010 and the first set of personnel joined
the State e-Mission teams (SeMTs) in December 2010. Initiatially, the content for
Leadership and orientation trainings was developed and training programme
were rolled out. Further, the Specialized Training programmes (STeP) were rolled
out towards the end of 2010.
2.2 Considerable progress was made in the implementation of the scheme by the end
of Phase – I in January 2015. SeMTs were placed in all the States/UTs with
the task of assisting them in undertaking the groundwork for providing for an
overall direction, standardisation and consistency through program management
of the e-Governance initiatives in the State. A number of training initiatives were
undertaken viz. Apex/Policy level sensitization training, specialized e-
Governance trainings, Chief Information Officers (CIO) Training Programs,
Orientation Training for SeMTs and Thematic workshops, which were
successfully delivered across the country. More than 11000 approx officers and
practitioners were trained across the country.
Capacity Building Scheme Phase II
2.3 Capacity Building Scheme Phase II has been approved for a period upto 31st
March 2017 with an outlay of Rs. 423.87 cr. vide. Administrative Approval (AA)
3(10)/2014/EG-II dated 04.03.2015 of Department of Electronics & IT (DeitY).
The key components are; Training & Knowledge sharing initiatives, Deployment
of SeMTs, Its Operational expenses and Contingency. As per the Administrative
Approval the State level trainings are to be implemented by the state
governments and the rest of the scheme is to be implemented by National e-
Governance Division (NeGD). The scope has been extended to cover Central
Line Ministries, which was not part of various training and knowledge sharing
initiatives under CB Scheme Phase-I. The objective of the Capacity Building
Scheme Phase II is to provide professional resources to States and provide
training to political and policy level decision makers for all States/UTs and
Central Line Ministries to build the in-house capacity for implementation of
various e-Governance initiatives. The major components are :
a. Continued deployment and HR management of up to 340 specialized
resources in the SeMTs in all States and UTs to support Digital India
Programme.
b. Training and Knowledge Sharing initiatives, including:
Guidelines for implementation of Capacity Building Scheme II 8
c. Development of training guidelines, content, case studies etc for
different groups of stakeholders
d. Develop a pool of certified trainers
e. Develop Online and Web Based Training and Learning Management
System
f. Certification programmes for specialized/key roles
g. Knowledge management and sharing through workshops, development
of case studies, sharing best practices and creation of repositories etc.
2.4 Recommendation of the Working Group suggested that the coverage of
training needs has to be scaled up considerably across the spectrum. More
Training Institutions and trainers need to be aligned. Greater sensitization of
the State Governments is also required for making training efforts more
systematic and outcome oriented. Based on the recommendations, various
types of training programmes to be taken up and the approved component of
the scheme are as given below:
2.4.1 To be Centrally Implemented by NeGD
Deployment of State e Governance Missions Teams to support implementation of Digital India
Operational support and expenditure for SeMT
SeMT/PeMT Orientation Training for State/UT
CIO Programmes for State/UT & Central line ministries
Content Development & Management
Strengthening Pool of Trainers for e-Governance
Knowledge Management Framework for e-Governance
Online Trainings for e-Governance / Certification programmes
Learning Management System
Specialized training programmes for Central Line Ministries 2.4.2. To be Implemented by State
Specialized training programmes for States officials/PeMTs/SeMTs
Apex / Policy Level Sensitization and awareness Workshops
1.1.3. NeGD & State both
Localization & Customization of trainings
Technical training and Thematic workshops
Guidelines for implementation of Capacity Building Scheme II 9
2.5 Extension of training support to Central Line Ministries: Since the
Central line Ministries are implementing the central MMPs and they are also
involved in coordinating the State MMPs, bringing them on to the same
platform was felt necessary. Hence, trainings such as specialized training
programmes, CIO training programmes and thematic programmes etc. under
CB Scheme-II are extended to Central Line Ministries.
2.6 Collaboration with Apex and Administrative Training Institutions at
Central and State levels: For building capacities of National and State level
training institutions and to sustain the capacity building efforts, it is
envisaged to strengthen training Institutions at Apex and State levels. This
will help in enhancement of trainer’s pool and sharing of standardized
content. The Apex Training institutes and Administrative State Training
Institutes would be preferred partners for delivery of end to end training for
different programmes.
2.7 e-Governance Competency Framework (e-GCF): An e-Governance
Competency Framework (e-GCF) has been developed with an objective to
strengthen capacity building for e-Governance/ Digital India by defining role
and competencies to refer for resource selection, deployment and
trainings. The implementation of CB Scheme Phase II would take reference of
this framework for developing training curriculum. The objective of moving
towards a competency-based system is to ensure that each e-Governance job
role is performed by a person who has the required competencies for that job
role. The framework has the following key components:
i. It defines 19 e-Governance job roles covering all aspects of e-Governance project lifecycle
ii. Identifies and defines a comprehensive set of competencies critical to implementation of e-Governance under Digital India/NeGP 2.0
iii. Helps in the principle of ‘Deploy right – Develop right’ talent for implementing Digital India/NeGP 2.0
2.8 Learning Management System (LMS): NeGD has taken up the task of setting
up of a Learning Management System (LMS) and Knowledge Management
System (KMS) for e-Governance. The LMS would enable continuous learning,
driven by role-based knowledge and skills as envisaged in the e-Governance
Competency Framework. A competency-based training approach will also help
e-Governance practitioners to understand the skills and knowledge required
for their job and decide their training track. The LMS would also usher in
efficient administration of training by bringing together learners and content
in an environment which allows flexible learning, regular content updating at
a lesser cost. In a nutshell it is expected that an LMS would also help to
consolidate all training information into one system, such as:
i. Administration of training related data for all institutes conducting CB activities
ii. Online Certification of participants
iii. Course content for all courses under CB at one place
Guidelines for implementation of Capacity Building Scheme II 10
iv. Participant learning information available
v. Refer Competency Framework to help in choosing the right training
vi. Skill gap analysis of the participants to take the appropriate training programme
vii. Learning roadmap for each role/position
2.9 Knowledge Management System: A Knowledge Management System is
proposed for creation of common platform for integration of all e-Governance
related knowledge and artefacts that transcends the scope of CB Scheme. The
KMS is expected to do the following:
i. Centralized system to support the projects/departments under e-Kranti 2.0 & Digital India
ii. Knowledge sharing & collaboration both within the Ministry/MMP/Department in e-Governance and in the extended ministries – including citizens, partners and vendors/suppliers
iii. Formation of communities of practice by experts in each of the critical areas to get the benefit of the collective knowledge and skills
iv. Sharing of best-practices, case-studies, lessons-learned etc. from all sources
v. Establish well-defined processes for knowledge-sharing (contribution) and knowledge-reuse (implementation)
vi. Converting individual/governance knowledge into re-usable organizational knowledge, and making this knowledge available where and when required by the organizations/Govts.
2.10 Setting up of a Virtual Cadre for e-Governance: Another key focus of the
Capacity building is the implementation of the recommendations of the
Expert Committee on the HR Policy for e-Governance constituted in
pursuance of the decision of the meeting of the PM’s Committee on National
e-Governance Plan (NeGP). The recommendation for ‘Setting up of a virtual
cadre for e-Governance by States’ was communicated through DO No.
3(34)/2014-EG-II dated 03rd September, 2014 from Secretary, Department
of Electronics & Information Technology (DeitY).
The States should take up necessary action at the earliest to set up a virtual
IT e-Governance cadre. While a suggested scheme for constituting a virtual
cadre models was circulated along with the letter from the Secretary, based
on scheme notified by the Government of Maharashtra and Government of
Madhya Pradesh, whereas some states like Kerala, Tamil Nadu, Gujarat and
Haryana have also taken a step forward in this direction by setting up a
separate IT cadre in the State.
The e-Governance competency framework would help in identifying the roles,
assessing the skill gaps and training needs for the virtual cadre. The training
for virtual cadre could be organized from the funds available under the CB
Scheme.
Guidelines for implementation of Capacity Building Scheme II 11
3. INSTITUTIONAL FRAMEWORK FOR IMPLEMENTATION OF CB SCHEME
PHASE II
3.1. Department of Electronics & Information Technology (DeitY) is the
administrative Department responsible for the implementation of the National e-
Governance Plan 2.0 (NeGP 2.0) & Digital India. The overall Capacity Building
Scheme in Phase II will be administered by DeitY . It will provide policy
guidelines, monitor the implementation of the scheme and provide financial
support for the scheme. Funding for the CB Scheme Phase-II has been done
through Budgetary Allocation by DeitY.
3.2. National e-Governance Division (NeGD) is an autonomous business division
within Media Lab Asia, under the Ministry of Communications and Information
Technology, Government of India, is entrusted for providing programme level and
technical support to DeitY for implementation and monitoring of NeGP. NeGD is
also responsible for the implementation of the Capacity Building Scheme and it
will continue to be the central agency for implementation of CB scheme Phase-II.
3.3. As per the Administrative Approval the State level trainings are to be
implemented by the state governments and the rest of the scheme is to be
implemented by National e-Governance Division (NeGD). An Empowered
Committee will provide the policy, vision and direction for overall CB scheme
implementation. The composition of the Empowered Committee is as under:
1. Secretary, DeitY : Chairperson
2. Additional Secretary (eGov), DeitY : Vice-Chairperson
3. Joint Secretary (eGov), DeitY - Member
4. Joint Secretary & Financial Adviser, DeitY: Member
5. Joint Secretary(Trg.), DoPT : Member
6. Nominated Representative NITI Aayog: Member
7. Nominated Representative Department of Expenditure: Member
8. President & CEO, NeGD Member
9. CEO, NISG: Member
10. Domain Expert(s): Member
11. Representatives from State : Member
12. Director (Capacity Building), EG Group, DeitYMember Convener
3.4. Mandate of the Committee: The Empowered Committee for Capacity Building
will provide the policy, vision and direction for overall CB scheme
implementation. It will review CB policies and recommend corrective actions, if
required, including fund re-allocation and the re-appropriation of funds within
the major components and allocation within the overall approved budget. The
committee is expected to meet once in a period of four months. The broad scope
of the committee will be as follows:
Guidelines for implementation of Capacity Building Scheme II 12
(i) Provide guidance and direction for effective execution of Capacity
Building scheme.
(ii) Overall guidance to the CB Management Cell.
(iii) Designate central agency/society for supporting infusion & retention of
SeMTs and training initiatives.
(iv) Training Guidelines related to CB Scheme.
(v) HR Guidelines for SeMT/PeMT personnel.
(vi) Recommending fund release for States & UTs.
(vii) Monitoring of Fund utilization and funding requirements.
(viii) Accord approval, if any new initiatives is required to be taken up under
the scheme
(ix) Reallocation and Re-appropriation of funds, if necessary, within the
total budget outlay.
(x) Categorizations of the States & UTs in relation to the CB scheme.
Thus, the Empowered Committee can modify and approve the allocation and fund
utilization guidelines, categorization of States/UTs, SeMT strength and fund re-
allocation/re-appropriation within the overall outlay of the Scheme
3.5. Central Line Ministries: The training component of the Capacity Building
Scheme will be extended to the Central Line Ministries in Phase II of the Scheme.
The Central Line Ministries would participate with the CBMC in the assessment of
the training needs of its officials for e-Governance and would be partnering in
designing the curriculum and course content. CBMC in collaboration with the
Line Ministries will draw up the profile of officials for different programmes and
would seek the support of the Central Line Ministries for nomination of officials for
the training programmes.
3.6. Capacity Building Management Cell (CBMC): For coordination implementing
Capacity Building Scheme, a Capacity Building Management Cell (CBMC) has
already been set-up under National e-Governance Division. The CBMC is the
primary execution body with a team of professionals responsible for the Capacity
Building management & implementation under the guidance of Empowered
Committee.
The CBMC manages the Capacity Building initiative in terms of facilitating,
monitoring, feedback, mentoring and suggesting corrective actions. It is expected
that the States/UTs and Central Line Ministries will keep close interaction with
the CBMC at NeGD, DeitY, GoI for greater synergy in implementation of the CB
Scheme Phase-II
3.7. Activities to be undertaken by the CB Management Cell/HR:
3.7.1. Management of Human Resources
a. In order to support the infusion & retention of significant number of
professionals in SeMTs across the nation, there is an immense need for
Guidelines for implementation of Capacity Building Scheme II 13
providing a suitable organizational setup and HR (Human Resource) policies.
It is important to have uniformity in the CB implementation in order to have a
nation-wide synergy. The CBMC/HR at NeGD is to ensure uniformity in the
quality of personnel recruited, pay structure, as well as their management
through design and adoption of appropriate HR policies for these personnel.
b. CBMC will continue to facilitate the support SeMTs by enabling a mechanism
for providing suitable manpower for e-Governance teams in States & UTs,
which may be extended to other ministries and States for setting up their
Project e-Mission Teams (PeMTs) respectively.
c. NeGD has also come out with a Policy on ‘Empanelment of expert
professionals and individual consultants (short term)’ under which many
eligible experts are being empanelled. NeGD will share the list of such experts
with State/UTs, which can be hired directly and payment can be made from
operational expenses.
3.7.2. Facilitating Interaction with States/UTs and Central Line Ministries
To ensure successful implementation of the CB Scheme, the CB Management Cell
will maintain close interaction with the States/ UTs and Central Line Ministries
on a continuous basis. The interaction includes resolving administrative and
technical queries & issues, reviewing status of implementation of State MMPs &
other e-Governance initiatives.
3.7.3. Development of HR Guidelines
The CB Management Cell/HR has develop Human Resource Guidelines for
holistic and smooth functioning of the SeMTs across the States/UTs with
suitable institutional structures. This would address the various HR and
personnel related issues and policies such as: experience, qualifications,
competencies, recruitment, selection, terms of appointment, compensation,
composition of teams, suitable institutional structures, career progression etc..
3.7.4. Development of Training and Knowledge Sharing Roadmap
Training has been envisaged for all stakeholders ranging from policy decision
makers to Panchayat levels. CBMC would develop a training and knowledge
sharing roadmap which would include strategy for Curriculum Development and
Content, identifying partner institutes, defining roles of different stakeholders,
develop and monitor Key performance Indicators for all components of the scheme
and impact assessment etc. The roadmap will broadly contain the following:
Recommending extent and depth of training for each category of target
audience
Planning and identifying partner agencies
Institutional mechanism for imparting training on a regular basis and
training delivery mechanism
State/Centre responsibility and role in CB training delivery and
Collaboration with State and National training institutes
Guidelines for implementation of Capacity Building Scheme II 14
Development and monitoring of Key performance Indicators (KPIs)
Setting up Learning Management System (LMS)
Setting up Knowledge Management System (KMS)
Conducting impact assessment
3.7.5. Organizing specialized forums, lectures and workshops
The CB Management Cell will organize lectures, conferences and workshops for
the States/UTs and other key officials at the State, UT and Central Line Ministries
to bring all on a common platform for knowledge sharing and interaction.
3.7.6. Technical support to the Empowered Committee
The CB Management Cell will be responsible to provide technical and secretarial
support to the Empowered Committee. The CBMC will report the status of
implementation of the CB Scheme to the Empowered Committee on a regular
basis, receive administrative and technical approvals and take its assistance in
resolving any issues in implementing the CB Scheme.
3.8. Role of State/ UT
The State/UT Govt will continue to have a pivotal role for the implementation of
the initiatives under CB Phase II as they would be direct beneficiaries of the
scheme and are responsible for the implementation of State/UT component under
‘Training and Knowledge sharing initiatives. The responsibilities of the States are
as under:
i. Leveraging SeMTs and their day to day management in close
coordination with NeGD.
ii. Identifying the training needs for the State with the support of the
Capacity Building Management Cell (CBMC) of NeGD
iii. Developing a Training Calendar based on the training needs of its
officials.
iv. Spreading awareness of the training programmes amongst the line
departments and obtaining nomination of officers.
v. Conducting training programmes with the help of agencies identified/
empanelled by NeGD or through its own selected agencies.
vi. Building its own infrastructure for training either through
strengthening of ATIs and other State institutions.
vii. Participating in the development of the trainers’ pool through the
Training of Trainers programme to be organized by the NeGD.
viii. Participating in the National Knowledge Management project for e-
Governance through contributing to the system.
Gradually, State/UTs shall takeover of the scheme for State/UT level
initiatives as well as work to take-up new capacity building initiative.
Guidelines for implementation of Capacity Building Scheme II 15
3.9. State Level Institutional Framework For Capacity Building
Since the State NeGP 2.0 and Digital India initiatives would be cutting across
departments, it is expected that the State Government at the highest levels
would be providing leadership, direction and vision for the program, which would
result in broad roadmap and prioritization of the projects.
3.9.1.A State e-Gov Council should be set up ideally under the Chairmanship of
State Chief Minister to provide overall vision, broad policy direction and guidance
to the State level initiatives under NeGP 2.0 and Digital India.
3.9.2.A professional team with appropriate skill-sets and aptitude is required to
facilitate the State administration and to carry out the groundwork for State
MMPs and other e-Governance initiatives including preparing project proposals,
implementing the projects and overseeing O&M & support. The team needs to be
in place at two levels identified:
i. Program level (i.e. at State Level)
ii. Project level (i.e. at Department Level)
This Scheme is for Programme level and it is envisaged that project level team
would be funded from respective project fund.
3.9.3. Programme Level
State Level – State Apex Committee
To achieve the policy goals and objectives as determined by the State e-Gov
Council, a high level committee at the State Level – State Apex Committee is
expected to be set up to provide strategy direction and oversee the e-
Governance program & ensure inter-departmental coordination (The National
Apex Committee for Digital India constituted under Cabinet Secretary at the
Centre, refer to website http://www.deity.gov.in,). A suggested composition of
same is as follows:
1. Chief Secretary – Chairman
2. Secretary to the Chief Minister
3. Secretary (IT) / Secretary (e-Governance) or any other Secretary
designated by State Government - Member Convener
4. Secretary (Finance) – Member
5. Secretary (Planning) - Member
6. Secretary (Administrative Reforms) - Member
7. Secretary (Personnel) – Member
8. SIO (NIC, State unit) - Member
9. Representatives of departments taking up e-Governance projects
10. Domain /Technical experts - Members/special Invitees
Guidelines for implementation of Capacity Building Scheme II 16
It is expected that the Apex committee shall at least meet once in a
quarter
Nodal Agency
a. The State Government should designate a State Nodal Agency, which would
be responsible for initiating and implementing capacity building including
services like selections, contracting of external agencies/persons/services
and administrative support to SeMT. The State Government has the option
of either continuing with the existing agency or setting up a new agency as a
State Nodal Agency. If the State decides to form a new agency for the
purpose the same needs to be registered either as a company or as a
society. If the State decides to designate an existing agency as a State Nodal
Agency, the following issues should be kept in view:
i. It should be a State Government owned/controlled agency working
in the area of Information Technology and registered as a
company/society
ii. The company/society should be a going concern in a healthy
financial condition and the networth of the company/society should
be positive
iii. e-Governance and the capacity building activity should find
necessary prominence within the organization and is not relegated
to insignificance structure and by other activities
iv. The agency should have its own infrastructure and logistics support
b. In CB-II the same structure as above shall be followed, however the
performance of SeMTs shall also be monitored by NeGD.
State e-Governance Mission Team (SeMT)
a. The State e-Governance Mission Teams (SeMT) are continued in CB Phase-II
to support the State decision-making bodies and respective Apex Committee.
Since the SeMTs are part of NeGD and utilised by State IT Departments/
Secretaries at the State level, both DeITY / NeGD and State IT Departments
will collaboratively provide SeMTs with policy direction, as we leverage the
talents and expertise of the SeMTs for Central and State Govt e-Gov
activities.
b. Based on the discussions with the IT Secretaries and SeMTs in the meeting
of October, 2014 for review of SeMT performance by Secretary, DeitY it was
concluded that:
i. Work assigned to SeMTs needs to be as per functional job description
ii. SeMT should be responsible for undertaking the groundwork for
providing an overall direction, standardization and consistency
through program management across e-Governance/Digital India
initiatives in the State. Their work allocation can be in the following
key domains:
Guidelines for implementation of Capacity Building Scheme II 17
Undertake strategic planning
Provide project consultancy
Provide project implementation & post implementation support
Change management and Capacity Building
Facilitate setting up of Project e-Governance Mission Teams
(PeMTs)
Perform core SeMT activities
Day to day SeMT operations
iii. It is expected that the SeMT team would liaison between Central
Government and State, especially where MMPs are involved and be
necessarily involved in MMPs. Capacity Building at State Level
(SeMT) typically under the Secretary (IT) or any other secretary
nominated by the State government would inter alia support the
Apex Committee.
c. The SeMTs shall comprise of 340 professionals (13 added to the current
approved strength of 327 to cater to the new State of Telangana) drawn from
the open market and from the Government on deputation with experience
and expertise in Technology, Project Management and other specialized areas
required for e-Governance. The Empowered Committee approved the
categorization of States/UTs for CB Phase 1 and same is being retained for
Phase II. However, the Empowered Committee may review and make
amendments in State categorization if required. The recommended
categorization of States is placed at Annexure I. As recommended by the
Working Group, the State e-Governance Mission Teams are proposed to be
retained at the existing levels as under:
Level Group A States
Group B States
Group C States/ UTs
Principal Consultant 1 1 1
Sr. Consultant 4 2 2
Consultant 8 4 2
Total 13 7 5
These levels are indicative and level restructuring may be carried out as
necessary within the overall numbers and financial outlays.
d. The recruitment for SeMT resources will be managed by the NeGD through
CBMC/HR Cell of NeGD through a Selection committee in which the
States/UTs for which the resources are being recruited would be associated.
Representatives of DeitY, External Experts and any other Expert as required
will also be included in the committee. The arrangement would ensure that
no permanent liabilities are created and States are benefitted by ensuring
uniformity in the quality of personnel and avoiding competition among States
for the same set of resources.
Guidelines for implementation of Capacity Building Scheme II 18
e. Operational support: Necessary Provision of funds for expenses for day-to-
day operations of the SeMTs are made under the following components:.
i. IT Infrastructure
ii. Operational expenses
iii. Office maintenance
iv. Outsourcing
v. Nodal agency charges for fund management
vi. Contingency
3.9.4. Project Level:
Project e-Governance Mission Team
a. At the Project level, the State Departments shall set up Project e-
Governance Mission Teams (PeMT) to support the conceptualization,
development, implementation and O&M for the State MMPs and other
e-Governance initiatives. This team shall oversee project execution,
manage implementation and deal with technology, process & change
management related issues.
b. It is expected that the PeMT would have a well balanced mix of domain
expertise (serving/retired officials of the department having detailed
knowledge about the department and its processes and functions) and
technical expertise (i.e. technology, process re-engineering, change
management, project management).
c. The following provides a diagrammatic representation of the Capacity
Building and Institutional framework at the State Government level:
Guidelines for implementation of Capacity Building Scheme II 19
4. FUND ALLOCATIONS UNDER CB PHASE II SCHEME
4.1. The funding for the Capacity Building Scheme Phase II will be done through one
source, Grant in Aid (GIA)- GIA for administrative convenience. Funding is
provided for the following heads:
SN Fund allocation Component Agency
1
Training &
Knowledge
sharing Initiatives
A Specialized training programmes for Central
Line Ministries NeGD
B Technical training and Thematic workshops NeGD & States/UTs
C SeMT/PeMT Orientation Training for States NeGD
D CIO Programmes for States & Central line
ministries NeGD
E Content Development & Management NeGD
F Strengthening Pool of Trainers for e-Gov; that
includes Empanelment of agencies, Training of
Trainers, Certification and Trainer Development
NeGD
G Knowledge Management Framework for e-Governance
NeGD
H Online Trainings for e-Governance / Certification programmes
NeGD
I Learning Management System NeGD
J Apex / Policy Level Sensitization and awareness
Workshops (State) States/UTs
K Specialized training programmes for States
officials/PeMTs/SeMTs (State) States/UTs
L Localization & Customization of trainings NeGD &
States/UTs
2
Deployment of
SeMTs
M SeMT Manpower
NeGD
N Centralized SeMT Recruitment NeGD
O CBM Cell at NeGD
NeGD
3 Operational
Expenses
p IT Infrastructure for SeMT
NeGD to
States/UTs
Q Office Maintenance @5% of salary cost
R Outsourcing
S Operational cost @12% of salary cost (including
travel expenses of SeMT members).
T Nodal Agency Charges @ 5% of total Operational Expenses
U Mid-term appraisal of the scheme and impact
assessment NeGD
Guidelines for implementation of Capacity Building Scheme II 20
4
Contingency
@5% of total
project cost
V
To provide for variations of cost of Training
components, Personnel salaries etc. and any new initiatives to be taken up during the
implementation of the scheme
NeGD
4.2. Disbursement of funds under the CB Phase II Scheme
The funds are available under two categories and disbursement is made through
two sources; one is through NeGD for the Operation Expenses for SeMTs and
other is for the training and knowledge sharing initiatives through DeitY under
the National e-Governance Action Plan (NeGAP) .
4.2.1.Funds under the NeGAP to State/UTs by DeitY: The capacity building
funds allocated under the NeGAP to be utilized by the State/UTs will be
exclusively for the training and knowledge sharing initiatives in e-Governance.
The NeGAP scheme would be optional for the State and funding shall be on
sharing basis between the State and Central (Annexure I & II). The funding
pattern of this scheme for State/UTs is as below:
(i) Union Territories – 100% funded by Central Government
(ii) State Government – 50:50 (between Central and State Govt.)
(iii) North Eastern & 3 Himalayan States - 80:20 (between Central &
State Govt.)
Refer to the letter no. 4(5)/2014-EG-II dated no. 20.11.2015 from Director
e- Gov, DeitY to Chief Secretary State/UTs.
4.2.2.Funds under Operational Expenses (OE) for SeMTs by NeGD: The
disbursement of the operational expense is to be made by NeGD to the States
through the state designated e-Governance nodal agencies.
Guidelines for implementation of Capacity Building Scheme II 21
5. FUNDS UTILIZATION GUIDELINE
5.1. As per the fund allocation and bifurcation by DeitY, the State/UT level trainings
are to be implemented by the respective State/UT governments and the rest of
the heads and component of the scheme is to be implemented by National e-
Governance Division (NeGD). At the Policy level NeGD would be guided by DeitY
and the Empowered Committee under the chairmanship of Secretary (DeitY),
who will mentor and monitor the initiative.
5.2. Components under DeitY funds to NeGD
I. SeMT Manpower
The fund shall provide for the following expenses incurred by NeGD on SeMTs:
a. Payment of compensation and other benefits to the SeMTs post
appointment through direct recruitment from the market and
deputation from the Central/State Government/ PSUs.
b. Salary of office assistant for the purpose of assisting SeMTs in their
day to day working.
c. Miscellaneous expenses incurred in the process of appointing SeMTs
such as expenses on recruitment / advertisement etc.
II. SeMT/PeMT Training
Orientation programme for SeMTs will be organized centrally by NeGD, after
their appointment to which the SeMTs will be invited as per pre-defined
schedule. The objective of the programme would be to build awareness in areas
like e-Governance project life cycle and ecosystem in the country, Monitoring &
Evaluation (M&E) Framework, Programme Management, Government Process
Reengineering (GPR), Change Management, Technology, Funding and other
policies related areas etc. The programme shall cover case studies and best
practices for better understanding of e- Governance.
Orientation programme for PeMTs is envisaged to be similar to the orientation
programme for SeMTs in terms of content and delivery. Therefore, States may
also nominate their PeMTs along with SeMTs for the centrally organized
orientation programme by DeitY, GoI.
The fund shall provide for the operational expenses of SeMTs/PeMTs incurred
during the course of training including travel, boarding, lodging of participants
and other miscellaneous expenses.
Exclusions:
The fund shall not provide for the following:
Salary expenses for office support staff viz. receptionists, peons,
cleaners, security etc. [excluding Office Assistant 5.2 I (b)]
Any kind of operational/ general level trainings like MS Office, Auto
CAD and MS Excel etc.
Guidelines for implementation of Capacity Building Scheme II 22
Capital expenditure like building of new training facilities and
renovation of existing training facilities.
Training Content development and delivery for Orientation
programmes.
Operational expenses on training through other mechanism.
Operational expenses of non- SeMT staff.
Salary expenses for PeMTs and other non- SeMT staff. PeMT
expenses should be met from the project expenses only.
III. Operational Expenses
a. IT Infrastructure
The fund under IT Infrastructure is allocated for expenses incurred in setting
up of IT related systems to facilitate the working of SeMTs on the
confirmation of their appointment.
The fund shall provide for procurement and maintenance of IT hardware and
other computer peripherals, software applications etc. required for SeMTs.
The fund can also be utilized for furnishing such as computer tables, chairs
etc. to set up of IT hardware.
Exclusions:
The fund shall not provide for the following:
Procurement of consumables.
Procurement and maintenance of hardware and computer
peripherals for non-SeMT purposes.
Purchase of office infrastructure such as cooling/heating systems,
decorative items, soft furnishings, upholstery etc for SeMT.
b. Outsourcing
The fund under ‘Outsourcing’ is allocated for bearing expenses incurred by
SeMTs in seeking consultation from external agencies for project related
activities such as preparation of e Gov projects DPRs, RFPs, framework,
guidelines and other emerging technology specific study etc.
Exclusions:
The fund shall not provide for:
Preparation of Capacity Building Roadmap and DPR
Training services from external agencies.
Substituting expenditure on any other similar activities already
funded by some other source
Guidelines for implementation of Capacity Building Scheme II 23
c. Operational Cost
The fund shall provide for expenses incurred on travel (both local and
domestic), boarding, lodging and other incidental expenses of SeMTs. This
will also provide towards expenditure on mobile and internet uses of SeMT.
A detailed set of HR policy covering travel, mobile and internet entitlements
for SeMTs are already issued by NeGD.
Exclusions:
Funds shall not provide for the following:
Remuneration and operational expenses (travel, lodging etc) of
external resources / visiting faculties for training
International travel of SeMTs – any such requirement shall be
approved by Empowered Committee.
Operational expenses of non-SeMT employees.
d. Office maintenance
The fund shall cover consumables (both IT and other office consumables),
procurement of telephone equipment and installation, communication
expenses, network bandwidth expenses and other office maintenance related
expenses.
Exclusions:
The fund shall not be utilized for the following purposes:
Payment of utility bills such as electricity, gas and water.
Rental payment of the office premises for SeMT.
Payment of lease for office equipment such as cooling / heating
systems, furniture, computer and other hardware, generators etc
Salary for office support staff including peons, cleaners, security
etc.
Note - Nodal Agencies are entitled for up to 5% of the Total Operational Expenses
as overhead / processing charges towards fund handling.
5.3 Components under DeitY (NeGAP) Funds to State
I. Apex / Policy Level Sensitization and awareness Workshops
The funds to be utilized for conducting Sensitization and awareness
Workshops/ exposure visits for political executives and policy level officials
in order to pave way and accelerate the implementation of Digital India.
Exclusions
ICT/ Computer training not to be covered
Operational level officials not to be considered
Guidelines for implementation of Capacity Building Scheme II 24
II. Technical Training and Thematic Workshops
Funds to shall be utilized for conducting specialized programmes on specific
themes, programmes on special themes such as use of Open source
technology and standards, Big date analytics, Cyber Security, Use of GIS,
SMAC trends in technology etc.
Exclusions
Regular e-Governance module not to be covered in thematic
Trainings
Exposure trips to best practices not to be covered
Core IT/ Computer training not to be covered
III. Specialized Training Programmes for State Officials/ SeMT/PeMT
The fund shall be utilized for training officials of State departments/
SeMT/PeMT on areas such as e-Governance framework, exposure to best
practices, PPP, Change Management, DPR, RFP, Project Management, new e-
Governance courses, refreshers, learning areas in the emerging technology and
technology management etc. and Trainings for officers identified under
Virtual cadre for e-Governance shall be given preference under this
component.
The fund shall provide for the costs incurred on the delivery of training
programmes stated above as well as the operational costs (lodging & boarding of
State Officials) incurred in the process of delivery of such programmes. This will
also include inviting external resources/ visiting faculty for these trainings.
Exclusions:
The fund shall not provide for the following:
Training Content development.
Any kind of operational/ general level trainings like MS Office, Auto CAD,
and MS Excel.
Expenses incurred for activities other than training programmes for State
officials.
Capital expenditure like building of new training facilities and renovation
of existing training facilities is not covered.
Any other non-training related expenses.
Software/application related training not covered
IV. Localization & Customization of Trainings
The fund shall cover costs incurred on localization and customization of
trainings. The focus should be to equip State and National Level Training
Guidelines for implementation of Capacity Building Scheme II 25
Institution to support delivery of e-Governance training programme by
specifically providing for Training of Trainers, bringing in External faculty,
content customization and local language conversion.
Exclusions:
The fund shall not be used for
Setting of new training facilities/ building renovation
Buying computers, setting up computer labs
Payment of operational expenses such as utilities, salaries of
facility maintenance staff, travel etc.
Up-gradation of non e-Governance related training curriculum/
facilities
-------- End of Document ------
Guidelines for implementation of Capacity Building Scheme II 26
Annexure I
Categorization of States/ UTs
SN States/UTs Category
1 Andhra Pradesh* A
2 Bihar A
3 Chhattisgarh A
4 Goa B
5 Gujarat A
6 Haryana A
7 Jharkhand A
8 Karnataka A
9 Kerala A
10 Madhya Pradesh A
11 Maharashtra A
12 Odisha A
13 Punjab A
14 Rajasthan A
15 Tamil Nadu A
16 Telangana* A
17 Uttar Pradesh A
18 West Bengal A
1 Arunachal Pradesh C
2 Assam A
3 Himachal Pradesh B
4 Jammu & Kashmir B
5 Manipur B
6 Meghalaya B
7 Mizoram C
8 Nagaland C
9 Sikkim C
10 Tripura B
11 Uttarakhand B
1 Andaman & Nicobar C
2 Chandigarh C
3 Dadra Nagar Haveli C
4 Daman & Diu C
5 Delhi B
6 Lakshadweep C
7 Puducherry C
(50:50)
(80:20)
(100:0)
Guidelines for implementation of Capacity Building Scheme II 27
Annexure II
I. Component wise breakup of the fund allocation through DeitY to State/UTs
(Under NeGAP)
S No. Component/ Programme
Categories Programme Cost
Capping Allocation Percentage
1 Technical training and Thematic workshops
Max @ Rs.12.50 lacs per workshop
3%
2 Apex / Policy Level Sensitization and awareness Workshops
Max @ Rs.20 lacs per workshop
17%
3 Specialized training programmes/ Courses for States officials/PeMTs/SeMTs
Max @ Rs. 7 lacs per programme
60%
4 Localization & Customization of trainings
Localization and customization of Trainings as per State requirements @20% of total training funds including Apex level and Specialized Trainings
20%
II. Component wise breakup of the fund allocation through NeGD to State/UTs
i) IT infrastructure for SeMTs
ii) Office maintenance @5% of salary cost
iii) Outsourcing expenses
iv) Operational expenses @12% of salary cost
v) Nodal Agency Charges - upto 5% of the Total Operational Expenses.