guidelines on the implementation of the school readiness year-end assessment (sreya) for...

23

Upload: salanapmaricon48357

Post on 31-Oct-2015

2.637 views

Category:

Documents


0 download

TRANSCRIPT

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 1/23

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 2/23

A. INTRODUCTION

Pursuant to R.A. 10157known as the Kindergarten

Education Act, KindergartenEducation as the first stage of compulsory and mandatory

formal education is vital for the holistic development of the Filipino child.

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 3/23

 

Kindergarten education is herebyinstitutionalized as part of basic

education effective SY 2011-2012,

following the Standards and

Comprehensives for Five-Year Old

Filipino Children.

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 4/23

Along with the implementation of 

this curriculum, an assessmenttool is deemed necessary thus,

the School Readiness Year-End

 Assessment (SReYA) wasrestructured and contextualized

into 12 dominant languages

(mother tongue) 

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 5/23

 

SReYA is a toll to determine the

achievement level of Kindergarten

pupils across different development

domains. Test items were developed

based on the Standards and

Competencies for Five-Year Old

Filipino Children which are alignedwith National Early Learning

Framework.

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 6/23

B. SIGNIFICANCE OF THE SReYA

RESULT 

Result of the assessment will be

beneficial to Grade I teachers because

they will be provided with children’sreadiness profile which is crucial in

addressing their specific learning

needs. Kindergarten teachers on theother hand, will have basis for 

instructional improvement.

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 7/23

 

SReYA result could serve asguide for school principals/schoolheads in strengthening

instructional support,mentoring/staff development,budget allocation and networking

for the effective management of kindergarten education program. 

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 8/23

 

Kindergarten coordinators can be utilize in

giving technical assistance and instructionalsupport to school heads and kindergarten

teachers.

The data obtained from the SReYA resultcould serve as basis for assessment and

improvement of the Kindergarten Curriculum.

Parents can make proper follow-up home

intervention.

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 9/23

C. DESCRIPTION OF THE

SReYA 

The School Readiness Year-End Assessment cuts across the differentdevelopment domains which is

composed of performance andverbal/non-verbal test given individuallyand by groups. Ten (10) test items aregiven in groups while twenty (20) test

items are given individually . Thedifferent developmental domains are asfollow:

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 10/23

 

Physical Health and Well-being

Motor DevelopmentMathematics

Language and Literacy

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 11/23

Sensory Perceptual

Physical and SocialEnvironment

Character and ValuesDevelopment

Socio-emotional Development

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 12/23

D. GENERAL GUIDELINES 

This tool is NOT intended toassess teacher’s performance but as

basis for providing appropriateinstruction, assistance andinterventions to Grade I Entrants.Hence, teachers are advised not tocoach the children during the conductof SReYA.

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 13/23

Important things to remember in the test

administration are the following:

1. SReYA shall be administered using the

mother tongue.

2. It shall be administered at the end of 

each school year in addition to the EarlyChildhood Care Development (ECCD)

checklist which is given three times a

year.

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 14/23

3.  Assessment shall be administered in

every school by the District SReYA Assessment Teams organized and

headed by the Division Kindergarten

Supervisor/Coordinator.

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 15/23

 

4. Each District Testing (DTT) is composed of 

Chief Examiner (PSDS/District Principal In-Charge/Cluster Coordinator), RoomSupervisor (School Head) and RoomExaminer ( Teacher). The Team will also be

responsible in safeguarding the materials aswell as the validity and reliability of theassessment results.

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 16/23

 

5.The test shall be administered in one (1)

day, with a maximum of fifteen (15)

kindergarten pupils per testing room.

Room examiner with the help of the

proctor shall prepare the materials for group test and answer sheets in advance.

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 17/23

Group test will be administered first

followed by the individual test. The

proctor shall record the responses of the children in the tally sheet

provided.

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 18/23

 6.Follow strictly the flowchart for submission

of assessment result/preparation of report

a month after the administration using the

forms provided

( See flow chart attached.)

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 19/23

SReYA Testing & Reporting Flow Chart

RE RE RE RE RE RE RE RE RE

CDD-BEE

Overall

Chairman

(RKC)

Chairman

( DKS/C)

DTTDTT DTT

Chief 

Examnier 

(PSDS)

Chief 

Examnier 

(PSDS)

Chief 

Examnier 

(PSDS)

Room

Supervisor 

S. Heads

Room

Supervisor 

S. Heads

Room

Supervisor 

S. Heads

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 20/23

 

Legend:

CDD-BEE- Curriculum Development Division,Bureau of Elementary Education

RKS- Regional Kindergarten Coordinator 

DKS/C- Division KindergartenSupervisor/Coordinator 

DTT- District Testing Team

PSDS- Public School District Supervisor 

SH- School Heads

RE- Room Examiner 

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 21/23

To the Examiners:

 A. Before the Test

Prepare all the necessary materials before the Assessment:

SReYA Tool

Form 1- Pupil Scoring Sheet

Test Materials (refer to the SReYA tool)

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 22/23

B. During the Test

Be child-friendly

Give instructions clear enough to beunderstood by the child indicated in the

manual.

 Allow some time for the child to respond.However, proceed to the next item if the

child is unable to answer or perform as

required within 5 seconds.

 Administer all the items.

7/16/2019 Guidelines on the Implementation of the School Readiness Year-End Assessment (Sreya) for Kindergarten

http://slidepdf.com/reader/full/guidelines-on-the-implementation-of-the-school-readiness-year-end-assessment 23/23

 

C. After the TestScoring and Reporting of results.The

examiner shall record result on the Pupil

Scoring Sheet ( Form 1): one (1) for every

skill exhibited/ correct answer given, zero

(0) for skills unperformed/incorrect

answer.